amd 0007 conform _2_.pdf
PDF 576 KB Posted
- Solicitation number
- W912HN-08-B-0021
About this file
Revised Front-End (Amendment No.0007)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amd 0010.pdf | ||
| amd 0010 conform.pdf | ||
| amd 0009.pdf | ||
| amd 0009 conform.pdf | ||
| W912HN-08-B-0021 Amendment 0008.pdf | ||
| amd 0007 _2_.pdf | ||
| amd 0006 _2_.pdf | ||
| amd 0006 conformed.pdf | ||
| amd 0005.pdf | ||
| amd 0005 conform.pdf | ||
| amd 0004 conform.pdf | ||
| amd 0004.pdf | ||
| W912HN-08-B-0021 Conformed thru Amendment 0003.pdf | ||
| Amendment 0003.pdf | ||
| W912HN-09-B-0021-0001.pdf | ||
| W912HN-09-B-0021 Conformed Copy.pdf | ||
| W912HN-09-B-0021-0002.pdf | ||
| SPECIFICATIONS.pdf | ||
| W912HN-08-B-0021_Plans.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912HN-08-B-0021-0007
Contract Specialist: Sandy Meyers (912) 652-5324 E-Mail sandra.b.meyers@usace.army.mil
Indefinite Delivery Indefinite Quantity Contract for Maintenance of Dredged Material Containment Areas for Savannah and Brusw ick Harbor, Georgia
HUBZONE SET-ASIDE: Competition w ill be 100% Set-Aside for Historically Underutilized Businesses (HUBZone) Certif ied Construction Firms.
Bids from other than HUBZone Small Business Concerns w ill not be considered. Bidders must be eligible as determined by the Small Business Administration and appear on the List of Qualif ied HUBZone Small Business concerns located at SBA's w ebsite http:w w w .sba.gov/hubzone
X
SANDRA B MEYERS 912/652-5324
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
07-Jan-2009
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________Section 00800
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________24 Feb 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY ENGINEER DISTRICT SAVANNAH
100 W OGLETHORPE AVENUE
SAVANNAH GA 31401-3640
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912HN-08-B-0021
Section 00010 - Solicitation Contract Form
NOTICE TO OFFERORS
HAND-CARRIED OR MAILED BIDS:
All bids must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the Invitation for Bids (IFB) No., Bid Opening Date and Time, and Title of Project.
The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf as indicated below.
Bids delivered by commercial carrier and those sent by U.S. Mail, including U.S. Express Mail, must be addressed as indicated below. Bids shall not be addressed to any specific person.
U.S. Army Engineer District, Savannah
ATTN: CECT-SAS-CT-PS
100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
Mailroom personnel on the first floor of 100 West Oglethorpe Avenue must receive bids sent by U.S. Mail or delivered by commercial carrier by the time specified in Block 13 of the SF1442 for receipt of bids.
Bidders are cautioned that bids sent via United States Postal Service Express Mail are first delivered to the Savannah District Post Office Box instead of 100 West Oglethorpe Avenue, “the office designated for receipt of bids” therefore, allow sufficient mailing time.
Hand-carried bids also must be delivered to mailroom personnel on the first floor of 100 West Oglethorpe Avenue by the time specified in Block 13 of SF1442 for receipt of bids.
Bidders are cautioned that there is no parking in or around the building, therefore, when hand delivering bids sufficient time should be allowed for transporting of bid packages from your vehicle to mailroom personnel.
TECHNICAL MATTERS: Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet
All questions regarding this Invitation for Bids (IFB) must be submitted in writing via Bidder Inquiry in ProjNet within no less than 10 calendar days prior to the date established in the IFB for bid opening. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to bid opening date.
If a Bidder believes that the requirements in this IFB contain an error, omission, or are otherwise unsound; the Bidder shall immediately notify the Contract Specialist in writing with supporting rationale.
To submit and review bid inquiry items, Bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
W912HN-08-B-0021
Indefinite Delivery Indefinite Quantity Contract, Maintenance of Dredged Material Containment Areas, Savannah Harbor and Brunswick Harbor Bidder Inquiry Key 1UHPXO-XAMT5K
FACSIMILE MODIFICATIONS OF PROPOSALS ARE NOT AUTHORIZED.
NOTE: Issuance of Task Orders. As the requirements of the Corps of Engineers are defined, the Contracting Officer will notify the Contractor of a requirement through the issuance of a Request for Proposal (RFP) Letter.
The RFP Letter will provide the Contractor with a description of the services to be provided for the prospective task order. The Corps of Engineers will then negotiate with the Contractor the proposed effort and the time period for performing the work. The Task Order price will be negotiated utilizing the Contract Rate Schedule in Section 00010.
Work will only be ordered through the issuance of individual task orders. All task orders issued will be for the services specified therein, and will be in accordance with the fixed rates established in Section 00010 of the Schedule.
The Contracting Officer’s Representative does not have authority to modify any provision of this contract. Any request for deviation from the terms of this contract or any task orders issued hereunder must be submitted to the Contracting Officer for contractual action.
A DD Form 1155 will be issued for each task order. Each task order will include:
(1) Date of task order; contract number; task order number; task order price or performance data accounting and appropriation data; and any other pertinent information. Delivery or performance shall be specified in each task order issued hereunder.
(2) The specific Scope of Work related to the work covered by the task order and any other special technical requirements, instructions, or clearances.
NOTES:
a. Quantities are estimated and are to be used for evaluation purposes only.
b. The contract will be a firm fixed price Indefinite Delivery Indefinite Quantity type contract consisting of a base year period and two one-year option periods. The contract maximum amount per year is $2,000,000.00 for the base year period and a maximum of $2,000,000.00 for each two one-year option periods.
c. The contract minimum guaranteed amount is $5,000.00 for the base year period.
d. All prices listed herein are to include all materials and labor required to provide a complete furnished product.
e. Sizes listed for equipment are the minimum acceptable sizes to be used in performing the work for this contract.
The Government does not guarantee that the sizes listed will be most efficient to complete the required work or that the sizes listed will be large enough to perform required work in task orders.
f. An hour defined as an hour of satisfactory performance of work meeting specified requirements as specified requirements as determined by the Contracting Officer.
g. NOTE: Section 700 - Contract Clauses includes 52.228-13 “ALTERNATIVE PAYMENT PROTECTIONS (Jul 2000)”, and 52.228-15 “PERFORMANCE & PAYMENT BONDS – CONSTRUCTION (Jul 2000)”. Bonding requirements shall be applied at the individual task order level. For task orders between $25,000 and $100,000, FAR Clause 52.228-13 shall apply. For task orders exceeding $100,000, FAR 52.228-15 shall apply.
h. All prices listed herein are to include all materials and labor required to provide a complete furnished product
i. Sizes listed for equipment are the minimum acceptable sizes to be used in performing the work for this contract.
The Government does not guarantee that the sizes listed will be most efficient to complete the required work or that the sizes listed will be large enough to perform required work in task orders.
TOTAL BASE PERIOD – CLINS 0001 THROUGH 0101----------------------------$________________
TOTAL OPTION PERIOD 1 – CLINS 0102 THROUGH 0202---------------------------$________________
TOTAL OPTION PERIOD 2 – CLINS 0203 THROUGH 0303---------------------------$________________
TOTAL – CLINS 0001 THROUGH 0303 $________________
BASE PERIOD:
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE EST AMOUNT
0001 20 Trips $_________ $____________ Mobilization/Demobilization to Savannah Harbor
(Base Period)
UNIT UNIT PRICE EST AMOUNT
0002 5 Trips $__________ $____________ Mobilization/Demobilization to Jones/Oysterbed Island to Include Interior Bird
Islands on Jones/Oyserbed Island (Base Period)
UNIT UNIT PRICE EST AMOUNT
0003 5 Trips $__________ $____________ Mobilization/Demobilization to Disposal 2A
UNIT UNIT PRICE EST AMOUNT
0004 3 Trips $__________ $____________ Mobilization/Demobilization to Andrews
Island - Brunswick Harbor (Base Period)
ITEM NO SUPPLIES/SERVICES MAX
UNIT UNIT PRICE MAX AMOUNT
0005 3 Trips $__________ $_____________ Mobilization/Demobilization from
Savannah Harbor to Interior Bird Islands in Disposal Areas 12A, 12B, 13A, 13B, 14A, and 14B (Base Period)
UNIT UNIT PRICE EST AMOUNT
0006 3 Trips $__________ $____________ Mobilization/Demobilization from Savannah Harbor to Offshore Bird Island
(Tomkins Island) (Base Period)
UNIT UNIT PRICE EST AMOUNT
0007 3 Trips $__________ $____________ Mobilization/Demobilization from Brunswick Harbor to Offshore Bird Island
UNIT UNIT PRICE EST AMOUNT
0008 500 Hours $__________ $____________ Pontoon Rotary Ditcher With Winch Truck - Furnish all Labor, Materials, and
Equipment to Operate Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0009 745 Acre $__________ $____________ Mowing- During Mowing Season (16 Jul-31 - 31 Mar) Furnish all Labor, Materials, and Equipment to Perform Mowing (Base Period)
UNIT UNIT PRICE EST AMOUNT
0010 265 Acre $__________ $____________ Mowing- During Non-Mowing Season ( 1 Apr- 15 Jul) Furnish all Labor, Materials, and Equipment to Perform Mowing (Base Period)
UNIT UNIT PRICE EST AMOUNT
DELETED
UNIT UNIT PRICE EST AMOUNT
0012 100 Hours $__________ $___________ Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 80
HP) Furnish all Labor, Materials and Equipment to Perform Tree Cutting
UNIT UNIT PRICE EST AMOUNT
0013 600 Hours $__________ $____________ Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to
Operate Dozer (Base Period)
UNIT UNIT PRICE EST AMOUNT
0014 200 Hours $__________ $___________ Front-End Loader (Minimum 2 Cubic Yards) Furnish all Labor, Materials and
Equipment to Operate Loader (Base Period)
UNIT UNIT PRICE EST AMOUNT
0015 200 Hours $__________ $____________ Highway Dump Truck (Minimum 12 CubicYards) - Furnish all Labor, Materials and Equipment to Operate Truck (Base Period)
UNIT UNIT PRICE EST AMOUNT
0016 200 Hours $__________ $____________ Off Road Dump Truck (minimum 25-ton) - Furnish all Labor, Materials and
Equipment to Operate Truck (Base Period)
UNIT UNIT PRICE EST AMOUNT
0017 600 Hours $__________ $____________ Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with
Heavy Duty Tree Cutter, etc.) (Minimum 175 HP) Furnish all Labor, Materials and Equipment to Operate Excavator (Base Period)
UNIT UNIT PRICE EST AMOUNT
0018 300 Hours $__________ $____________ Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and
Minimum 0.5 Cubic Yard Ditching Bucket - Furnish all Labor, Materials and Equipment to Operate Excavator (Base Period)
UNIT UNIT PRICE EST AMOUNT
0019 100 Hours $__________ $____________ Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to
Operate Motor Grader (Base Period)
UNIT UNIT PRICE EST AMOUNT
0020 1,200 Hours $__________ $____________ Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all
Labor, Materials and Equipment to Operate Tractor w/Pan (Base Period)
UNIT UNIT PRICE EST AMOUNT
0021 100 Hours $__________ $____________ Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe
Bucket and 2 Cubic Yard Loader Bucket) - Furnish all Labor, Materials and Equipment to Operate Tractor w/Backhoe/Loader (Base Period)
UNIT UNIT PRICE EST AMOUNT
0022 100 Hours $__________ $____________ Tractor (minimum 115 HP)with Disc Harrows (minimum 16” cutting width)-
Furnish all Labor, Materials and Equipment to Operate Tractor w/disc harrows
UNIT UNIT PRICE EST AMOUNT
0023 500 Acre $__________ $____________ Stripping - Furnish all Labor, Materials, and Equipment to perform Stripping
Operations (Base Period)
UNIT UNIT PRICE EST AMOUNT
0024 500 Acre $__________ $____________ Clearing Interior of Disposal Areas-- Complete (Base Period)
UNIT UNIT PRICE EST AMOUNT
0025 500 Acre $__________ $____________ Clearing, Grubbing and Burning of Interior of Disposal Areas- Complete
UNIT UNIT PRICE EST AMOUNT
0026 20 Acre $__________ $____________ Furnish all Labor, Materials and Equipment for Permanent Grassing
UNIT UNIT PRICE EST AMOUNT
0027 20 Acre $_________ $___________ Furnish all Labor, Materials and Equipment for Temporary Grassing
UNIT UNIT PRICE EST AMOUNT
0028 20 Acre $__________ $____________ Furnish all Labor, Materials and Equipment for Marsh Grass Planting
UNIT UNIT PRICE EST AMOUNT
0029 250 Linear Foot
Furnish all Labor, Materials Equipment to Install Silt Fence (GA DOT Type A)
UNIT UNIT PRICE EST AMOUNT
0030 250 Linear Foot
Furnish all Labor, Materials and Equipment to Install Silt Fence (GA DOT Type C) (Base Period)
UNIT UNIT PRICE EST AMOUNT
0031 50 Ton $__________ $____________ Furnish all Labor, Materials and Equipment for Armor Stone (Base Period)
UNIT UNIT PRICE EST AMOUNT
0032 50 Ton $__________ $____________ Furnish all Labor, Materials and Equipment for GA DOT Type #1 Rip Rap
UNIT UNIT PRICE EST AMOUNT
0033 50 Ton $__________ $____________ Furnish all Labor, Materials and Equipment for GA DOT Type #3 Rip Rap
UNIT UNIT PRICE EST AMOUNT
0034 50 Ton $__________ $____________ Furnish all Labor, Materials and Equipment for GA DOT Size #4 Coarse
Aggregate (Base Period)
UNIT UNIT PRICE EST AMOUNT
0035 10 Cubic Yard
Furnish all Labor, Materials and Equipment for Concrete Grout (Base Period)
UNIT UNIT PRICE EST AMOUNT
0036 50 Ton $__________ $____________ Armor Stone, Materials Only (Base Period)
UNIT UNIT PRICE EST AMOUNT
0037 50 Ton $__________ $___________ GA DOT Type #1 Rip Rap, Materials Only (Base Period)
UNIT UNIT PRICE EST AMOUNT
0038 50 Ton $________ $____________ GA DOT Type #3 Rip Rap, (Materials Only) (Base Period)
UNIT UNIT PRICE EST AMOUNT
0039 50 Ton $__________ $___________ GA DOT Size #4 Coarse Aggregate, Materials Only (Base Period)
UNIT UNIT PRICE EST AMOUNT
0040 120 Linear Foot
Weir Stoplogs (Base Period)
UNIT UNIT PRICE EST AMOUNT
0041 10 Square Foot
Repair Weir Riser, Complete, Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0042 10 Linear Foot
Metal Catwalk Repair, Complete -Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0043 10 Linear Foot
Metal Catwalk Extensions, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0044 2 Each $__________ $____________ Install New Weir, Complete, Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0045 10 Linear Foot
Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0046 50 Linear Foot
Install New Weir Catwalk, Complete Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0047 50 Square Foot
Install New Vinyl Sheet Piles, Complete Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0048 2 Each $___________ $____________ Install New Safety Climb, Complete, Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0049 2 Each $___________ $____________ Install New Weir Foundation-Concrete Slab with Pilings, Complete, Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0050 2 Each $__________ $____________ Install New Flange and Galvanized Ring, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0051 2 Each $___________ $____________ Install New Elbow with Flanges and Galvanized Rings, Complete, Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0052 400 Linear Foot
Removal and Replacement of 48" HDPE Outfall Pipes, Complete, Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0053 10 Hours $__________ $____________ Tamping (Base Period)
UNIT UNIT PRICE EST AMOUNT
0054 10 Cubic Yard
Removal of Unstable Material and Replacement with Select Granular Material for installation of 48" HDPE Outfall Pipes, Complete, Labor, Materials and
UNIT UNIT PRICE EST AMOUNT
0055 10 Hours $__________ $_____________ 6" Sump Pump (Base Period)
UNIT UNIT PRICE EST AMOUNT
0056 50 Acre $__________ $_____________ Burning (Base Period)
UNIT UNIT PRICE EST AMOUNT
0057 20 Days $__________ $_____________ Forced Air Burner/Air Curtain
UNIT UNIT PRICE EST AMOUNT
0058 100 Linear Foot
48”Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0059 100 Linear Foot
30” Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0060 100 Linear Foot
24” Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0061 100 Linear Foot
18” Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0062 100 Linear Foot
12” Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0063 2 Each $__________ $____________ 48” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to perform Polyethylene Pipe Fusing Operations (per joint) (Base Period)
UNIT UNIT PRICE EST AMOUNT
0064 2 Each $__________ $____________ 30” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to
UNIT UNIT PRICE EST AMOUNT
0065 2 Each $__________ $____________ 24” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to
UNIT UNIT PRICE EST AMOUNT
0066 2 Each $__________ $____________ 18” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to
UNIT UNIT PRICE EST AMOUNT
0067 2 Each $__________ $_____________ 12” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to
UNIT UNIT PRICE EST AMOUNT
0068 100 Square Yard
Geotextile Fabric - Furnish all Labor, Materials, and Equipment to Install Geotextile Fabric (Base Period)
UNIT UNIT PRICE EST AMOUNT
0069 50 Ton $__________ $____________ Lime
UNIT UNIT PRICE EST AMOUNT
0070 2 Ton $__________ $____________ Fertilizer
UNIT UNIT PRICE EST AMOUNT
0071 100 Acre $__________ $____________ Herbicide/Rodeo - Ground Application Including Labor, Materials and
UNIT UNIT PRICE EST AMOUNT
0072 30 Acre $__________ $____________ Herbicide/Rodeo - Aerial (Helicopter) Application Including Labor, Materials and Equipment (Base Period)
UNIT UNIT PRICE MAX AMOUNT
0073 55 Acre $___________ $____________ Application of a non-selective pre-emergent approved for aquatic use to include all labor, materials, and equipment (Base Period)
UNIT UNIT PRICE EST AMOUNT
0074 30 Pound $__________ $____________ Amdro
UNIT UNIT PRICE EST AMOUNT
0075 10 Pound $__________ $____________ Orthene
UNIT UNIT PRICE EST AMOUNT
0076 100 Acre $__________ $____________ Herbiciding with Boom Sprayer (Rodeo) - Furnish all Labor, Materials, and
Equipment to Herbicide Disposal Areas including Slopes (Base Period)
UNIT UNIT PRICE EST AMOUNT
0077 100 Hours $__________ $__________ Welding, Burning and Cutting
Furnish all Labor, Equipment and Materials (Base Period)
UNIT UNIT PRICE EST AMOUNT
0078 80 Hours $__________ $____________ Laborer - Chatham and Effingham Counties, Georgia (Base Period)
UNIT UNIT PRICE EST AMOUNT
0079 80 Hours $__________ $____________ Laborer -Glynn County, Georgia
UNIT UNIT PRICE EST AMOUNT
0080 80 Hours $__________ $____________ Laborer -Jasper County, South Carolina
UNIT UNIT PRICE EST AMOUNT
0081 5 Trips $__________ $___________ Transportation of Personnel to Jones/Oysterbed Island (Base Period)
UNIT UNIT PRICE EST AMOUNT
0082 5 Trips $__________ $____________ Transportation of Personnel to Savannah Harbor Offshore Bird Island
UNIT UNIT PRICE EST AMOUNT
0083 5 Trips $__________ $____________ Transportation of Personnel to Brunswick Harbor Offshore Bird Island
UNIT UNIT PRICE EST AMOUNT
0084 25 Days $__________ $____________ Crane Barge, Inland (capable of placing up to 10,000 lb rock 60 feet from barge), including mobilization/demobilization, labor, and attendant plants (tugboat and minimum 30’x120’material barge with spuds) (Base Period)
UNIT UNIT PRICE EST AMOUNT
DELETED
UNIT UNIT PRICE EST AMOUNT
0086 10 Hours $__________ $____________ Electrician, Apprentice- Chatham and Effingham Counties, Georgia
UNIT UNIT PRICE EST AMOUNT
0087 10 Hours $__________ $____________ Electrician, Apprentice- Glynn County, Georgia (Base Period)
UNIT UNIT PRICE EST AMOUNT
0088 10 Hours $__________ $____________ Electrician, Apprentice - Jasper County, South Carolina (Base Period)
UNIT UNIT PRICE EST AMOUNT
0089 10 Hours $__________ $____________ Electrician, Journeyman-Chatham and Effingham Counties, Georgia
UNIT UNIT PRICE EST AMOUNT
0090 10 Hours $__________ $____________ Electrician, Journeyman- Glynn County, Georgia (Base Period)
UNIT UNIT PRICE EST AMOUNT
0091 10 Hours $__________ $____________ Electrician, Journeyman-Jasper County, South Carolina (Base Period)
UNIT UNIT PRICE EST AMOUNT
0092 10 Hours $__________ $____________ Pipefitter, Apprentice- Chatham and Effingham Counties, Georgia (Base Period)
UNIT UNIT PRICE EST AMOUNT
0093 10 Hours $__________ $____________ Pipefitter, Apprentice- Glynn County, Georgia (Base Period)
UNIT UNIT PRICE EST AMOUNT
0094 10 Hours $__________ $____________ Pipefitter, Apprentice- Jasper County, South Carolina
UNIT UNIT PRICE EST AMOUNT
0095 10 Hours $___________ $_____________ Pipefitter, Journeyman- Chatham and Effingham Counties, Georgia (Base Period)
UNIT UNIT PRICE EST AMOUNT
0096 10 Hours $__________ $____________ Pipefitter, Journeyman - Glynn County, Georgia
UNIT UNIT PRICE EST AMOUNT
0097 10 Hours $__________ $____________ Pipefitter, Journeyman- Jasper County, South Carolina
UNIT UNIT PRICE MAX AMOUNT
0098 30 Acre $__________ $_____________ Maintain Interior Bird Islands in
Disposal Areas 12A, 12B, 13A, 13B, 14A and 14B, including all Labor, Materials and Equipment, clearing, and burning (Base Period)
UNIT UNIT PRICE EST AMOUNT
0099 12 Acre $__________ $____________ Maintain Interior Bird Islands in Jones/Oysterbed Island Disposal Area, including all Labor, Materials and Equipment, clearing and burning (Base Period)
UNIT UNIT PRICE EST AMOUNT
0100 4 Acre $__________ $____________ Maintain Tomkins Island Offshore Bird Island (Savannah Harbor) , including all
Labor, Materials and Equipment, clearing and burning (Base Period)
UNIT UNIT PRICE EST AMOUNT
0101 10 Acre $__________ $____________ Maintain Brunswick Harbor Offshore Bird Island including all Labor, Materials, and Equipment, clearing and burning (Base Period)
UNIT UNIT PRICE EST AMOUNT
0102 20 Trips $__________ $____________ OPTION Mobilization/Demobilization to Savannah Harbor
(Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0103 5 Trips $_________ $____________ OPTION Mobilization/Demobilization to Jones/Oysterbed Island to include Interior Bird
Islands on Jones/Oysterbed Island (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0104 5 Trips $__________ $____________ OPTION Mobilization/Demobilization to Disposal Area 2A (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0105 3 Trips $__________ $___________ OPTION Mobilization/Demobilization to Andrews Island - Brunswick Harbor
UNIT UNIT PRICE MAX AMOUNT
0106 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from from Savannah Harbor to Interior Bird Islands in Disposal Areas 12A, 12B, 13A, 13B, 14A, and 14B (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0107 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from Savannah Harbor to Offshore Bird Island
(Tomkins Island) (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0108 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from Brunswick Harbor to Offshore Bird Island
UNIT UNIT PRICE EST AMOUNT
0109 500 Hours $__________ $_____________ OPTION Pontoon Rotary Ditcher With Winch Truck-Furnish all Labor, Materials, and
Equipment to Operate Equipment (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0110 745 Acre $__________ $____________ OPTION Mowing- During Mowing Season (16 Jul-31 Mar) Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 1)
UNIT UNIT PRICE ESTAMOUNT
0111 265 Acre $__________ $____________ OPTION Mowing- During Non-Mowing Season (1 Apr- 15 Jul) Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
OPTION DELETED
UNIT UNIT PRICE EST AMOUNT
0113 100 Hours $__________ $____________ OPTION Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 80
UNIT UNIT PRICE EST AMOUNT
0114 600 Hours $__________ $____________ OPTION Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to
Operate Dozer (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0115 200 Hours $__________ $____________ OPTION Front-End Loader (Minimum 2 Cubic Yards) Furnish all Labor, Materials and
Equipment to Operate Loader (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0116 200 Hours $_________ $___________ OPTION Highway Dump Truck(Minimum 12 Cubic Yards) - Furnish all Labor, Materials and Equipment to Operate Truck (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0117 200 Hours $__________ $____________ OPTION Off Road Dump Truck (Minimum 25-ton) - Furnish all Labor, Materials and
Equipment to Operate Truck (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0118 600 Hours $__________ $____________ OPTION Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with and Equipment to Operate Excavator (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0119 300 Hours $__________ $____________ OPTION Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and
Equipment to Operate Excavator (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0120 100 Hours $__________ $____________ OPTION Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to
Operate Motor Grader (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0121 1,200 Hours $__________ $____________ OPTION Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all
Labor, Materials and Equipment to Operate Tractor w/Pan (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0122 100 Hours $___________ $_____________ OPTION Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe
Equipment to Operate Tractor w/Backhoe/Loader (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0123 100 Hours $__________ $____________ OPTION Tractor (minimum 115 HP) with Disc Harrows (Minimum 16’ cutting width)-
Furnish all Labor, Materials and Equipment to Operate Tractor w/Disc Harrows
UNIT UNIT PRICE EST AMOUNT
0124 500 Acre $__________ $____________ OPTION Stripping - Furnish all Labor, Materials, and Equipment to Perform Stripping
Operations (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0125 500 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Clearing Interior of Disposal
Areas- Complete (Option Period 1)
UNIT UNIT PRICE ESTAMOUNT
0126 500 Acre $__________ $____________ OPTION Furnish all Labor, Materials,and Equipment for Clearing, Grubbing and Burning of Interior of Disposal Areas- Complete (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0127 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials and Equipment for Permanent Grassing
UNIT UNIT PRICE EST AMOUNT
0128 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Temporary Grassing
UNIT UNIT PRICE EST AMOUNT
0129 20 Acre $_________ $____________ OPTION Furnish all Labor, Materials and Equipment for Marsh Grass Planting
UNIT UNIT PRICE EST AMOUNT
0130 250 Linear Foot
OPTION Furnish all Labor, Materials, and Equipment to Install Silt Fence (GA DOT Type A) (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0131 250 Linear Foot
OPTION Furnish all Labor, Materials, and Equipment to Install Silt Fence (GA DOT Type C) (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0132 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Armor Stone (Option Period 1
UNIT UNIT PRICE EST AMOUNT
0133 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Type #1 Rip Rap
UNIT UNIT PRICE EST AMOUNT
0134 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Type #3 Rip Rap
UNIT UNIT PRICE EST AMOUNT
0135 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Size #4 Coarse
Aggregate (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0136 10 Cubic Yard
OPTION Furnish all Labor, Materials, and Equipment for Concrete Grout (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0137 50 Ton $__________ $____________ OPTION Armor Stone, Materials Only
UNIT UNIT PRICE EST AMOUNT
0138 50 Ton $__________ $____________ OPTION GA DOT Type #1 Rip Rap, Materials Only (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0139 50 Ton $__________ $____________ OPTION GA DOT Type #3 Rip Rap, Materials Only (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0140 50 Ton $__________ $____________ OPTION GA DOT Size #4 Coarse Aggregate, Materials Only
UNIT UNIT PRICE EST AMOUNT
0141 120 Linear Foot
OPTION Weir Stoplogs (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0142 10 Square Foot
OPTION Repair Weir Riser, Complete, Labor, Materials and Equipment (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0143 10 Linear Foot
OPTION Metal Catwalk Repair, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0144 10 Linear Foot
OPTION Metal Catwalk Extensions, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0145 2 Each $__________ $____________ OPTION Install New Weir, Complete, Labor, Materials and Equipment (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0146 10 Linear Foot
OPTION Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0147 50 Linear Foot
OPTION Install New Weir Catwalk, Complete, Labor, Materials and Equipment (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0148 50 Square Foot
OPTION Install New Vinyl Sheet Piles, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0149 2 Each $__________ $____________ OPTION Install New Safety Climb, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0150 2 Each $__________ $____________ OPTION Install New Weir Foundation-Concrete Slab with Pilings, Labor, Materials and
UNIT UNIT PRICE EST AMOUNT
0151 2 Each $__________ $____________ OPTION Install New Flange and Galvanized Ring, Complete, Labor, Materials and
UNIT UNIT PRICE EST AMOUNT
0152 2 Each $__________ $____________ OPTION Install New Elbow with Flanges andGalvanized Rings, Complete, Labor, Materials and Equipment (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0153 400 Linear Foot
OPTION Removal and Replacement of 48" HDPE Outfall Pipes, Complete, Labor, Materials and Equipment (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0154 10 Hours $__________ $_____________ OPTION Tamping
(Option PerIod 1)
UNIT UNIT PRICE EST AMOUNT
0155 10 Cubic Yard
OPTION Removal of Unstable Material and Replacement with Select Granular Material for installation of 48" HDPE Outfall Pipes, Complete, Labor, Materials and
UNIT UNIT PRICE EST AMOUNT
0156 10 Hours $_________ $____________ OPTION 6" Sump Pump (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0157 50 Acre $__________ $____________ OPTION Burning
UNIT UNIT PRICE EST AMOUNT
0158 20 Days $__________ $___________ OPTION Forced Air Burner/Air Curtain
UNIT UNIT PRICE EST AMOUNT
0159 100 Linear Foot
OPTION 48” Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0160 100 Linear Foot
OPTION 30” Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0161 100 Linear Foot
OPTION 24” Polyethylene Pipe, Materials Only
ITEM NO SUPPLIES/SERVICES ESTMATED
UNIT UNIT PRICE EST AMOUNT
0162 100 Linear Foot
OPTION 18” Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0163 100 Linear Foot
OPTION 12” Polyethylene Pipe, Materials Only
UNIT UNIT PRICE EST AMOUNT
0164 2 Each $__________ $____________ 48” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to perform Polyethylene Pipe Fusing Operations (per joint) (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0165 2 Each $_________ $____________ OPTION 30”Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to
UNIT UNIT PRICE ESTAMOUNT
0166 2 Each $__________ $____________ OPTION 24” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to
UNIT UNIT PRICE EST AMOUNT
0167 2 Each $__________ $____________ OPTION 18” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to
UNIT UNIT PRICE EST AMOUNT
0168 2 Each $__________ $____________ OPTION 12” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to
UNIT UNIT PRICE EST AMOUNT
0169 100 Square Foot
OPTION Geotextile Fabric - Furnish all Labor, Materials, and Equipment to Install Geotextile Fabric (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0170 50 Ton $__________ $____________ OPTION Lime
UNIT UNIT PRICE EST AMOUNT
0171 2 Ton $__________ $____________ OPTION Fertilizer
UNIT UNIT PRICE EST AMOUNT
0172 100 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Herbicide/Rodeo - Ground
Application (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0173 30 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Herbicide/Rodeo - Aerial
(Helicopter) Application (Option Period 1)
UNIT UNIT PRICE MAX AMOUNT
0174 55 Acre $_________ $_____________ OPTION Application of a non-selective equipment (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0175 30 Pound $__________ $____________ OPTION Amdro
UNIT UNIT PRICE EST AMOUNT
0176 10 Pound $__________ $____________ OPTION Orthene
UNIT UNIT PRICE EST AMOUNT
0177 500 Acre $__________ $____________ OPTION Herbiciding with Boom Sprayer (Rodeo) - Furnish all Labor, Materials, and
Equipment to Herbicide Disposal Areas including Slopes (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0178 80 Hours $__________ $____________ OPTION Welding, Burning and Cutting,- Labor, Equipment, and Materials
UNIT UNIT PRICE EST AMOUNT
0179 80 Hours $__________ $_____________ OPTION Laborer -Chatham and Effingham Counties, Georgia
UNIT UNIT PRICE EST AMOUNT
0180 80 Hours $__________ $__________ OPTION Laborer- Glynn County, Georgia (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0181 80 Hours $___________ $_____________ OPTION Laborer - Jasper County, South Carolina
UNIT UNIT PRICE EST AMOUNT
0182 5 Trips $__________ $____________ OPTION Transportation of Personnel to Jones/Oysterbed Island
UNIT UNIT PRICE EST AMOUNT
0183 5 Trips $__________ $_____________ OPTION Transportation of Personnel to Savannah Harbor Offshore Bird Island
UNIT UNIT PRICE EST AMOUNT
0184 5 Trips $__________ $____________ OPTION Transportation of Personnel to Brunswick Harbor Offshore Bird Island
UNIT UNIT PRICE EST AMOUNT
0185 25 Days $__________ $____________ OPTION Crane Barge, Inland (capable of placing up to 10,000 lb rock 60 feet from barge), including mobilization/demobilization, labor, and attendant plant (tugboat and minimum 30’x120’ material barge with spuds)
UNIT UNIT PRICE EST AMOUNT
UNIT UNIT PRICE EST AMOUNT
0187 10 Hours $__________ $____________ OPTION Electrician, Apprentice- Chatham and Effingham Counties, Georgia
UNIT UNIT PRICE EST AMOUNT
0188 10 Hours $__________ $____________ OPTION Electrician, Apprentice- Glynn County, Georgia (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0189 10 Hours $__________ $____________ OPTION Electrician, Apprentice-Jasper County, South Carolina
UNIT UNIT PRICE EST AMOUNT
0190 10 Hours $__________ $____________ OPTION Electrician, Journeyman-Chatham and Effingham Counties, Georgia
UNIT UNIT PRICE EST AMOUNT
0191 10 Hours $__________ $____________ OPTION Electrician, Journeyman- Glynn County, Georgia (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0192 10 Hours $__________ $___________ OPTION Electrician, Journeyman -Jasper County, South Carolina (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0193 10 Hours $_________ $____________ OPTION Pipefitter, Apprentice - Chatham and Effingham Counties, Georgia
UNIT UNIT PRICE EST AMOUNT
0194 10 Hours $__________ $____________ OPTION Pipefitter, Apprentice- Glynn County, Georgia (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0195 10 Hours $__________ $____________ OPTION Pipefitter, Apprentice- Jasper County, South Carolina (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0196 10 Hours $__________ $____________ OPTION Pipefitter, Journeyman- Chatham and Effingham Counties, Georgia
UNIT UNIT PRICE EST AMOUNT
0197 10 Hours $__________ $____________ OPTION Pipefitter, Journeyman- Glynn County, Georgia
UNIT UNIT PRICE EST AMOUNT
0198 10 Hours $__________ $____________ OPTION Pipefitter, Journeyman- Jasper County, South Carolina (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0199 30 Acre $_________ $____________ OPTION Maintain Interior Bird Islands in Disposal Areas 12A, 12B, 13B, 14A and 14B, including all Labor, Materials and Equipment, Mobilization/Demobilization., Clearing, Burning, and Herbiciding (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0200 12 Acre $__________ $___________ OPTION Maintain Interior Bird Islands in Jones/Oysterbed Island Disposal Area, including all Labor, Materials and Equipment, clearing and burning (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0201 4 Acre $__________ $____________ OPTION Maintain Tomkins Island Offshore Bird Island (Savannah Harbor) , including all
Labor, Materials and Equipment, clearing and burning (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0202 10 Acre $___________ $___________ OPTION Maintain Brunswick Harbor Offshore Bird Island, including all Labor, Materials, and Equipment, clearing and burning (Option Period 1)
UNIT UNIT PRICE EST AMOUNT
0203 20 Trips $__________ $____________ OPTION Mobilization/Demobilization to Savannah Harbor (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0204 5 Trips $___________ $____________ OPTION Mobilization/Demobilization to Jones /Oysterbed Island to include Interior Bird
Islands on Jones/Oysterbed Island (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0205 5 Trips $__________ $____________ OPTION Mobilization/Demobilization to Disposal Area 2A
(Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0206 3 Trips $__________ $____________ OPTION Mobilization/Demobilization to Andrews Island - Brunswick Harbor
UNIT UNIT PRICE MAX AMOUNT
0207 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from
Savannah Harbor to Interior Bird Islands in Disposal Areas, 12A, 12B, 13A, 13B, 14A, and 14B (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0208 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from Savannah Harbor to Offshore Bird Island
(Tomkins Island) (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0209 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from Brunswick Harbor to Offshore Bird Island
UNIT UNIT PRICE EST AMOUNT
0210 500 Hours $__________ $____________ OPTION Pontoon Rotary Ditcher With Winch Truck - Furnish all Labor, Materials, and
Equipment to Operate Equipment (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0211 745 Acre $__________ $____________ OPTION Mowing- During Mowing Season (16 Jul-31 Mar) Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0212 265 Acre $__________ $____________ OPTION Mowing- During Non-Mowing Season (1 Apr- 15 Jul) - Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
UNIT UNIT PRICE EST AMOUNT
0214 100 Hours $__________ $____________ OPTION Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 80
UNIT UNIT PRICE EST AMOUNT
0215 600 Hours $__________ $____________ OPTION Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to
Operate Dozer (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0216 200 Hours $__________ $____________ OPTION Front-End Loader (Minimum 2 Cubic Yards) Furnish all Labor, Materials and
Equipment to Operate Loader (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0217 200 Hours $__________ $____________ OPTION Highway Dump Truck (Minimum 12 Cubic Yards) - Furnish all Labor, Materials and Equipment to Operate Truck (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0218 200 Hours $__________ $____________ OPTION Off Road Dump Truck (minimum 25-ton) - Furnish all Labor, Materials and
Equipment to Operate Truck (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0219 600 Hours $__________ $____________ OPTION Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with and Equipment to Operate Excavator (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0220 300 Hours $__________ $____________ OPTION Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and
Equipment to Operate Excavator (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0221 100 Hours $__________ $____________ OPTION Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to
Operate Motor Grader (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0222 1,200 Hours $__________ $____________ OPTION Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all
Labor, Materials and Equipment to Operate Tractor w/Pan (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0223 100 Hours $__________ $____________ OPTION Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe
Equipment to Operate Tractor w/Backhoe/Loader (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0224 100 Hours $__________ $____________ OPTION Tractor (minimum 115 HP) with disc harrows (minimum 16”cutting width)-
Furnish all Labor, Materials and Equipment to Operate Tractor w/disc harrows
UNIT UNIT PRICE EST AMOUNT
0225 500 Acre $__________ $__________ OPTION Stripping - Furnish all Labor, Materials, and Equipment to perform Stripping
Operations (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0226 500 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Clearing Interior of Disposal
Areas- Complete (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0227 500 Acre $___________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Clearing, Grubbing and Burning of Interior of Disposal Areas- Complete (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0228 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Permanent Grassing
UNIT UNIT PRICE EST AMOUNT
0229 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Temporary Grassing
UNIT UNIT PRICE EST AMOUNT
0230 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Marsh Grass Planting
UNIT UNIT PRICE EST AMOUNT
0231 250 Linear Foot
Type A) (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0232 250 Linear Foot
Type C) (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0233 50 Ton $__________ $___________ OPTION Furnish all Labor, Materials, and Equipment for Armor Stone (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0234 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials and Equipment for GA DOT Type #1 Rip Rap
UNIT UNIT PRICE EST AMOUNT
0235 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Type #3 Rip Rap
UNIT UNIT PRICE EST AMOUNT
0236 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Size #4 Coarse
Aggregate (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0237 10 Cubic Yard
OPTION Furnish all Labor, Materials, and Equipment for Concrete Grout
UNIT UNIT PRICE EST AMOUNT
0238 50 Ton $__________ $_____________ OPTION Armor Stone, Materials Only
UNIT UNIT PRICE EST AMOUNT
0239 50 Ton Miles
OPTION GA DOT Type #1 Rip Rap, Materials Only (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0240 50 Ton $__________ $____________ OPTION GA DOT Type #3 Rip Rap, Materials Only (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0241 50 Ton $__________ $____________ OPTION GA DOT Size #4 Coarse Aggregate, Materials Only (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0242 120 Linear Foot
OPTION Weir Stoplogs (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0243 10 Square Foot
OPTION Repair Weir Riser, Complete, Labor, Materials and Equipment (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0244 10 Linear Foot
OPTION Metal Catwalk Repair, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0245 10 Linear Foot
OPTION Metal Catwalk Extensions, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0246 2 Each $__________ $____________ OPTION Install New Weir, Complete, Labor, Materials and Equipment (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0247 10 Linear Foot
OPTION Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0248 50 Linear Foot
OPTION Install New Weir Catwalk, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0249 50 Square Foot
OPTION Install New Vinyl Sheet Piles, Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0250 2 Each $__________ $____________ OPTION Install New Safety Climb,Complete, Labor, Materials and Equipment
UNIT UNIT PRICE EST AMOUNT
0251 2 Each $__________ $____________ OPTION Install New Weir Foundation-Concrete Slab with Pilings, Complete, Labor, Materials and Equipment (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0252 2 Each $__________ $____________ OPTION Install New Flange and Galvanized Ring, Complete, Labor, Materials and
UNIT UNIT PRICE EST AMOUNT
0253 2 Each $__________ $____________ OPTION Install New Elbow with Flanges and Galvanized Rings, Complete, Labor, Materials and Equipment (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0254 400 Linear Foot
OPTION Removal and Replacement of 48" HDPE Outfall Pipes, Complete, Labor, Materials and Equipment (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0255 10 Hours $__________ $____________ OPTION Tamping (Option Period 2)
UNIT UNIT PRICE EST AMOUNT
0256 10…