FY22 PN 92792 SOF Battalion Headquarters Fort Benning, GA
Solicitation number
W912HN22R3004
Issued by

About this file

This solicitation is for the construction of a non-standard Battalion Operations Facility at Fort Benning, Georgia. The facility will be approximately 92,000 square feet and include administrative areas, an operations area with a Sensitive Compartmented Information Facility, a Ranger Operations Center, and Company Operations Facilities/Readiness Bays. Supporting facilities will also be constructed including site development, utilities, parking, drainage, landscaping and signage. The period of performance is 740 calendar days. The contract will be awarded using Lowest Price Technically Acceptable source selection procedures to the responsive, responsible offeror with the lowest evaluated price. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Savannah.

View the file

Other files

File Type Posted
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0006 CC.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD6.pdf PDF
W912HN-22-R-3004_SPECS_VOL_2 AMD06.pdf PDF
W912HN-22-R-3004_SPECS_VOL_5 AMD06.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0006.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0005 CC.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD5.pdf PDF
W912HN-22-R-3004_CIDPart-3 AMD0005.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0005.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD0004.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0004 CC.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_2 AMD0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_4 AMD0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_5 AMD0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_1 AMD0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_3 AMD0004.pdf PDF
W912HN-22-R-3004_CIDPart-2 AMD0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_1 AMD0003.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_2 AMD0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_4 AMD0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_3 AMD0003.pdf PDF
W912HN-22-R-3004_CIDPart-3 AMD0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_5 AMD0003.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD3.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0003 CC.pdf PDF
W912HN-22-R-3004_CIDPart-1 AMD0003.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0002 CC.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0002.pdf PDF
W912HN-22-R-3004_SPECS_VOL1_AMD2.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD2.pdf PDF
W912HN-22-R-3004_SPECS_VOL2_AMD2.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation Conformed Solicitation.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0001.pdf PDF
Site Visit Mintues PN92792 SOF Bn HQs.pdf PDF
W912HN-22-R-3004_CIDPart-2.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_1.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_6.pdf PDF
W912HN-22-R-3004_SPECS_VOL_1.pdf PDF
W912HN-22-R-3004_CIDPart-1.pdf PDF
W912HN-22-R-3004_CIDPart-3.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_5.pdf PDF
W912HN-22-R-3004_SPECS_VOL_4.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_2.pdf PDF
Site Visit Linkup Map.pdf PDF
W912HN-22-R-3004_SPECS_VOL_5.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_3.pdf PDF
W912HN-22-R-3004_SPECS_VOL_3.pdf PDF
Attachment 1 - PIEE - Solicitation - Module.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTA SUBMITTAL

SPECIFICATIONS – Vol 2 of 5

SOF BATTALION HEADQUARTERS FACILITY

Fort Benning, Georgia

CONTRACT SOLICITATION NO. W912HN22R3004

B&V PROJECT NO. 043146

B&V FILE NO. 50.1000

PREPARED FOR

U.S. Army Corps of Engineers, Savannah District

21 JANUARY 2022

PREPARED BY:

BLACK & VEATCH SPECIAL PROJECTS

6800 WEST 115TH STREET

OVERLAND PARK, KANSAS 66211

B la c k

V e a tc h H o ld in g

C o m p a n y

A ll r ig h ts r e se rv e d

Ft. Benning SOF BN HQ Facility 43146

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION and DECONSTRUCTION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

05 72 00 DECORATIVE METAL SPECIALTIES

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD INSULATION

07 21 13.01 SPRAY FOAM INSULATION

07 21 16 BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 13 METAL WALL PANELS

07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 33 23 OVERHEAD COILING DOORS

08 34 59 VAULT DOORS AND DAY GATES

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, PORCELAIN AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 66 23 RESINOUS MATRIX TERRAZZO FLOORING AND TERRAZZO TILE

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 72 00 WALLCOVERINGS

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHER CABINETS

10 51 13 METAL LOCKERS

10 51 20 PHENOLIC LOCKERS

10 56 13 STEEL SHELVING

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 11 - EQUI PMENT

11 11 37 ELECTRIC VEHICLE SUPPLY EQUIPMENT

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 WINDOW BLINDS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION

12 59 00 SYSTEMS FURNITURE

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 73 SEISMIC/ATFP CONTROL FOR MISCELLANEOUS EQUIPMENT/COMPONENTS

13 49 20.00 10 RF SHIELDING

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 24 13 HYDRAULIC FREIGHT ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

21 30 00 FIRE PUMPS

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 21 23 HYDRONIC PUMPS

23 30 00 HVAC AIR DISTRIBUTION

23 52 00 HEATING BOILERS

23 64 26 HOT AND CONDENSER WATER PIPING SYSTEMS

23 65 00 COOLING TOWERS

23 81 47 WATER-LOOP HEAT PUMP SYSTEMS

23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.14 24 CYBERSECURITY FOR ELEVATOR CONTROL SYSTEM

25 05 11.21 CYBERSECURITY FOR FIRE AND LIFE SAFETY

25 05 11.21 03 CYBERSECURITY FOR FIRE PUMP CONTROL SYSTEM

25 05 11.23 CYBERSECURITY FOR BUILDING AUTOMATION SYSTEM

PROJECT TABLE OF CONTENTS Page 3

25 05 11.26 32 CYBERSECURITY FOR GENERATOR CONTROL SYSTEM

25 05 11.26 33 CYBERSECURITY FOR UPS CONTROL SYSTEM

25 05 11.26 34 CYBERSECURITY FOR VEHICLE CHARGING SYSTEM

25 05 11.26 36 CYBERSECURITY FOR ATS CONTROL SYSTEM

25 05 11.26 51 CYBERSECURITY FOR BUILDING LIGHTING CONTROL SYSTEM

25 08 10 ENERGY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 ENERGY MONITORING AND CONTROL SYSTEM (EMCS) INTEGRATION

DI VI SI ON 26 - ELECTRI CAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 LOW-VOLTAGE SWITCHGEAR

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS

26 32 15.00 NATURAL GAS ENGINE-GENERATOR SET STATIONARY 1000 KW, WITH

AUXILIARIES

26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)

26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 52 24 AUDIO-VISUAL SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19.13 GEOTEXTILES FOR EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSES

32 11 23.23 BASE COURSE DRAINAGE LAYERS

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 ROAD-MIX ASPHALT PAVING

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 32 23.13 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 35 00 PEDESTRIAN BRIDGE

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

PROJECT TABLE OF CONTENTS Page 4

DI VI SI ON 33 - UTI LI TI ES

33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 11 23 NATURAL GAS PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 47 13.01 BIORETENTION AREAS

33 49 23 UNDERGROUND DETENTION SYSTEM

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT

46 25 14 COALESCING OIL-WATER SEPARATORS

APPENDIX B - CONSTRUCTION SECURITY PLAN

APPENDIX C - GEOTECHNICAL REPORT

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 6

SECTION 02 41 00

DEMOLITION and DECONSTRUCTION

05/ 10, CHG 2: 02/ 19

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP A10.6 (2006) Safety & Health Program Requirements for Demolition Operations - American National Standard for Construction and Demolition Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

1.2 PROJECT DESCRIPTION

This section covers the demolition, deconstruction, relocation and reconstruction of Aircraft Training Aids and Ranger Physical Assessment Test equipment.

1.2.1 Definitions

1.2.1.1 Demolition

Demolition is the process of wrecking or taking out any load-supporting structural member of a facility together with any related handling and disposal operations.

1.2.1.2 Deconstruction

Deconstruction is the process of taking apart a facility with the primary goal of preserving the value of all useful building materials.

1.2.1.3 Demolition Plan

Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.

SECTION 02 41 00 Page 1

1.2.1.4 Deconstruction Plan

Deconstruction Plan is the planned steps and processes for dismantling all or portions of a structure or assembly, to include managing sequencing activities, storage, re-installation activities, salvage and disposal mechanisms.

1.2.2 Demolition/Deconstruction Plan

Prepare a Deconstruction Plan and submit proposed salvage, demolition, deconstruction, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Identify components and materials to be salvaged for reuse or recycling with reference to paragraph Existing Facilities to be Removed. Append tracking forms for all removed materials indicating type, quantities, condition, destination, and end use.

Coordinate with Waste Management Plan in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Provide procedures for safe conduct of the work in accordance with EM 385-1-1 . Plan shall be approved by Professional Engineer prior to work beginning.

1.2.3 General Requirements

Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes the value derived from the salvage and recycling of materials. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1 , Section 23, Demolition, and other applicable Sections.

1.3 ITEMS TO REMAIN IN PLACE

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.

Coordinate the work of this section with all other work indicated.

Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

1.3.1 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and

SECTION 02 41 00 Page 2 migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.

1.3.2 Trees

Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.

1.3.3 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.

1.3.4 Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer.

Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.

1.4 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

When used, the "RO" designation following the "G" identifies that the Resident Office will review the submittal for the Government. When used, the "AE" designation following the "G" identifies that the Architect-Engineer will review the submittal for the Government.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Deconstruction Plan; G

SECTION 02 41 00 Page 3

Existing Conditions

SD-02 Shop Drawings

Foundation Plan; G

SD-05 Design Data

Calculations; G

SD-07 Certificates

Notification; G

1.6 QUALITY ASSURANCE

Submit timely notification of demolition and deconstruction projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61 , Subpart M. Notify the local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61 , Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSP A10.6 . Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.

1.6.1 Dust and Debris Control

Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris.

1.7 PROTECTION

1.7.1 Traffic Control Signs

a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.

1.7.2 Protection of Personnel

Before, during and after the demolition and deconstruction work continuously evaluate the condition of the structure being deconstructed and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, walls, columns, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.8 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to

SECTION 02 41 00 Page 4 be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.

1.8.1 Training Aids

See Attachment A for As-Built drawings for Training Aids. Training Aids will be relocated as indicated on the drawings. See Attachment A for photographs of Training Aids to be relocated.

1.9 EXISTING CONDITIONS

Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.

1.9.1 Ground Penetrating Radar Survey (GPR)

A GPR survey was performed in July 2021 within the limits of the SOF Bn HQ construction footprint. The results of that survey can be found in Attachment B to this specification. The contractor should flag these areas prior to excavation and notify the Contracting Officer of any differing conditions (should they exist).

PART 2 PRODUCTS

2.1 FILL MATERIAL

a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures.

2.2 SUPERSTRUCTURE, FOUNDATION, AND ANCHOR DESIGN

This work element includes engineering services in addition to the construction requirements. Provide engineering services that include design of the new Training Aid foundation plan and including but not limited to design of anchors. Provide shop drawings indicating all features of the complete design.

2.2.1 Design Requirements

Analyze and design all superstructure components under the direction of a professional engineer licensed in the state of Georgia. Design all foundations and anchors under the direction of a professional engineer.

The design engineer must stamp all drawings and calculations.

SECTION 02 41 00 Page 5

2.2.2 Design Parameters

Design footing sizes and reinforcing based on allowable soil bearing capacity of 3000 psf. Submit design calculations, including computer output data, program documentation. Include a clear outline of material properties and assumptions.

Contractor shall adhere to the recommendations stated in the geotechnical report.

2.2.3 Layout

Show on the shop drawings (fabrication and installation drawings) all information needed to fabricate and construct the foundation. The design and layout of the internal reinforcement are subject to the following:

a. Incorporate all features indicated in the contract documents in the final design and construction.

2.3 COMPONENTS

2.3.1 Concrete

Concrete and reinforcing per Section 03 30 00 CAST-IN-PLACE CONCRETE.

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.

Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.

Materials shall be designated for reuse onsite whenever possible.

3.1.1 Structures

a. Remove existing structures indicated to be removed to 4 feet below grade. Remove sidewalks, curbs, gutters and street light bases as indicated.

b. Deconstruct structures in a systematic manner from the top of the structure to the ground. Complete deconstruction work above each tier or floor before the supporting members on the lower level are disturbed. Remove structural framing members and lower to ground by means of derricks, platforms hoists, or other suitable methods as approved by the Contracting Officer.

c. Locate demolition and deconstruction equipment throughout the structure and remove materials so as to not impose excessive loads to floors or framing.

3.1.2 Utilities and Related Equipment

3.1.2.1 General Requirements

Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not

SECTION 02 41 00 Page 6 interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.

Shut off and cap utilities for future use, as indicated.

3.1.2.2 Disconnecting Existing Utilities

Remove existing utilities, as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.

3.1.3 Paving and Slabs

Remove sawcut concrete and asphaltic concrete paving and slabs including aggregate base as indicated to a depth of 8 inches below existing adjacent grade. Provide neat sawcuts at limits of pavement removal as indicated.

Pavement and slabs not to be used in this project shall be removed from the Installation at Contractor's expense.

3.1.4 Structural Steel

Dismantle structural steel at field connections and in a manner that will prevent bending or damage. Salvage for reuse structural steel, steel joists, girders, angles, plates, columns and shapes. Do not use flame-cutting torches. Transport steel joists and girders as whole units and not dismantled. Transport structural steel shapes to a designated area as directed by the Contracting Officer, stacked according to size, type of member and length, and stored off the ground, protected from the weather.

3.1.5 Miscellaneous Metal

Deconstruct shop-fabricated items including Training Aids as indicated.

The Training Aids shall be deconstructed in such a way to make for easy transport without damaging the Training Aids. Any items damaged during deconstruction shall be replaced by the Contractor at no cost to the Government. Recycle scrap metal as part of demolition and deconstruction operations. Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility, in accordance with the Waste Management Plan.

3.1.6 Electrical Equipment and Fixtures

Salvage motors, motor controllers, and operating and control equipment that are attached to the driven equipment. Salvage wiring systems and components. Box loose items and tag for identification. Disconnect primary, secondary, control, communication, and signal circuits at the point of attachment to their distribution system.

3.1.6.1 Fixtures

Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately. Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts manufactured

SECTION 02 41 00 Page 7 prior to 1978, boxed and tagged for identification, and protected from breakage.

3.1.6.2 Electrical Devices

Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.

3.1.6.3 Wiring Ducts or Troughs

Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths. Remove plug-in or disconnecting devices from the busway and store separately.

3.1.6.4 Conduit and Miscellaneous Items

Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.

3.2 INSTALLATION OF RELOCATED ITEMS

Install deconstructed items in the locations identified on the drawings.

3.2.1 Foundations

See Section 31 00 00 EARTHWORK for preparation of foundation installation.

3.3 CONCURRENT EARTH-MOVING OPERATIONS

Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition or deconstruction work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.

3.4 DISPOSITION OF MATERIAL

3.4.1 Title to Materials

Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

SECTION 02 41 00 Page 8

3.4.2 Reuse of Materials and Equipment

Remove and store materials and equipment listed in the Deconstruction Plan to be reused or relocated to prevent damage, and reinstall as the work progresses. Coordinate the re-use of materials and equipment with the re-use requirements in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Capture re-use of materials in the diversion calculations for the project.

3.5 CLEANUP

Remove debris and rubbish from basement and similar excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

3.6 DISPOSAL OF REMOVED MATERIALS

3.6.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan.

3.6.2 Burning on Government Property

Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.

3.6.3 Removal to Spoil Areas on Government Property

Transport noncombustible materials removed from demolition and deconstruction structures to designated spoil areas on Government property.

3.6.4 Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.

3.7 REUSE OF SALVAGED ITEMS

Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

-- End of Section --

SECTION 02 41 00 Page 9

ATTACHMENT A - TRAINING AIDS TO BE RELOCATED

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C T

N

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P

F

E

N G

I N

E E

R S

A N

S I

D

W H

N D

M A

Y

S A

V A

N N

A H

G

A

W

O

G L E

T H

O R

E

A

V E

S A

V A

N N

H

D

I S

T R

I C

T

S A

N D

Y

S

P R

I N

G S

G

A

H

A M

M O

R I V

E

L O

W

G

I N

E E

R S

L L C

F Y

P

N

S O

F

M

I

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F O

N

N I N

G

G

E O

R G

I A

V-004

G R

P

D

A T

A

S H

E E

T

B C

T W

GPR 10

B5

GPR 6

B1

GPR 11

B8

GPR 4

E5

GPR 1

E1

GPR 5

E8

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

F

E

N G

I N

E E

R S

A N

S I

D

W H

N D

M A

Y

S A

V A

N N

A H

G

A

W

O

G L E

T H

O R

V E

S A

V A

N N

H

I S

T R

I C

T

S A

N D

Y

S

P R

I N

G S

G

A

H

A M

M O

I V

E

L O

W

G

I N

E E

R S

L L C

F Y

P

N

S O

F

M

I

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F O

N

N I N

G

G

E O

R G

I A

V-005

G R

P

D

A T

A

S H

E E

T

B C

T W

GPR 28

B5

GPR 26

B1

GPR 15

E5

GPR 12

E1

GPR 22

E8

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

02/19

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary

ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO

ACI 213R (2014; E2017) Guide for Structural Lightweight-Aggregate Concrete

ACI 214.4R (2010; R 2016) Guide for Obtaining Cores and Interpreting Compressive Strength Results

ACI 301 (2016) Specifications for Structural Concrete

ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction

ACI 304.2R (2017) Guide to Placing Concrete by Pumping Methods

ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete

ACI 305.1 (2014) Specification for Hot Weather Concreting

ACI 305R (2010) Guide to Hot Weather Concreting

ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting

ACI 306R (2016) Guide to Cold Weather Concreting

ACI 308.1 (2011) Specification for Curing Concrete

ACI CT (2018) ACI Concrete Terminology

ACI MNL-2 (2019; Abstract: 11th Edition) ACI Manual of Concrete Inspection

SECTION 03 30 00 Page 1

ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References

AMERICAN HARDBOARD ASSOCIATION (AHA)

AHA A135.4 (1995; R 2004) Basic Hardboard

AMERICAN WELDING SOCIETY (AWS)

AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel

ASTM INTERNATIONAL (ASTM)

ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A184/A184M (2019) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement

ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM A706/A706M (2016) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement

ASTM A934/A934M (2016) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars

ASTM A996/A996M (2016) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement

ASTM A1044/A1044M (2016a) Standard Specification for Steel Stud Assemblies for Shear Reinforcement of Concrete

ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM C31/C31M (2019a) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates

ASTM C39/C39M (2020) Standard Test Method for

SECTION 03 30 00 Page 2

Compressive Strength of Cylindrical Concrete Specimens

ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

ASTM C78/C78M (2018) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)

ASTM C94/C94M (2020) Standard Specification for Ready-Mixed Concrete

ASTM C143/C143M (2015) Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C150/C150M (2020) Standard Specification for Portland Cement

ASTM C157/C157M (2017) Standard Test Method for Length Change of Hardened Hydraulic-Cement Mortar and Concrete

ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete

ASTM C173/C173M (2016) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method

ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C311/C311M (2018) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete

ASTM C330/C330M (2017a) Standard Specification for Lightweight Aggregates for Structural Concrete

ASTM C494/C494M (2019) Standard Specification for Chemical Admixtures for Concrete

ASTM C552 (2017; E 2018) Standard Specification for Cellular Glass Thermal Insulation

ASTM C578 (2019) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C591 (2019a) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

SECTION 03 30 00 Page 3

ASTM C595/C595M (2020) Standard Specification for Blended Hydraulic Cements

ASTM C618 (2019) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C803/C803M (2018) Standard Test Method for Penetration Resistance of Hardened Concrete

ASTM C845/C845M (2018) Standard Specification for Expansive Hydraulic Cement

ASTM C873/C873M (2015) Standard Test Method for Compressive Strength of Concrete Cylinders Cast in Place in Cylindrical Molds

ASTM C900 (2015) Standard Test Method for Pullout Strength of Hardened Concrete

ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants

ASTM C989/C989M (2018a) Standard Specification for Slag Cement for Use in Concrete and Mortars

ASTM C1012/C1012M (2018b) Standard Test Method for Length Change of Hydraulic-Cement Mortars Exposed to a Sulfate Solution

ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete

ASTM C1074 (2011) Standard Practice for Estimating Concrete Strength by the Maturity Method

ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

ASTM C1107/C1107M (2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)

ASTM C1157/C1157M (2020) Standard Performance Specification for Hydraulic Cement

ASTM C1218/C1218M (2020c) Standard Test Method for Water-Soluble Chloride in Mortar and Concrete

ASTM C1240 (2020) Standard Specification for Silica Fume Used in Cementitious Mixtures

ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)

SECTION 03 30 00 Page 4

ASTM C1293 (2008; R 2015) Standard Test Method for Determination of Length Change of Concrete Due to Alkali-Silica Reaction

ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602/C1602M (2018) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete

ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D1171 (2018) Standard Test Method for Rubber Deterioration - Surface Ozone Cracking Outdoors

ASTM D471 (2016a) Standard Test Method for Rubber Property - Effect of Liquids

ASTM D1752 (2018) Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction

ASTM D2628 (1991; R 2016) Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements

ASTM D2835 (1989; R 2017) Standard Specification for Lubricant for Installation of Preformed Compression Seals in Concrete Pavements

ASTM D5759 (2012) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses

ASTM D6690 (2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements

ASTM D6817/D6817M (2017) Standard Specification for Rigid Cellular Polystyrene Geofoam

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

ASTM E329 (2020) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection

ASTM E1155 (2020) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers

SECTION 03 30 00 Page 5

ASTM E1643 (2018a) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs

ASTM E1745 (2017) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs

CONCRETE REINFORCING STEEL INSTITUTE (CRSI)

CRSI 10MSP (2018) Manual of Standard Practice

CRSI RB4.1 (2016) Supports for Reinforcement Used in Concrete

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Waterstops

COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops

COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)

HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings

1.2 SUSTAINABLE STRATEGIES COMPLIANCE

This project has been designed to be compliant with the High Performance and Sustainable Building or HPSB Guiding Principles . In addition to the sustainable design requirements stated herein, refer to additional requirements found in Secion 01 33 29 SUSTAINABILITY REPORTING.

1.3 DEFINITIONS

Unless otherwise defined herein or in Contract Documents, ACI CT .

a. "Cementitious material" as used herein must include pozzolans and hydraulic cements such as portland cement, pozzolan, fly ash, and slag cement."

b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the structure and surrounding structures such as fences or other buildings. A public location is accessible to persons not responsible for operation or maintenance of the structure.

c. "Chemical admixtures" are liquids, or dispersible powders, used as an ingredient in a cementitious mixture to improve its economy and/or

SECTION 03 30 00 Page 6 properties in the plastic and/or hardened state.

d. "Supplementary cementitious materials" (SCM) are inorganic materials such as coal fly ash, slag cement, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace portland cement and reacts pozzolanically or hydraulically.

e. "Design strength" (fc') is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.

f. "Mass Concrete" (thermally-controlled concrete) is any concrete system that may approach a maximum temperature of 158 degrees F or may approach a maximum temperature difference between any two monitored locations of 36 degrees F without Contracting Officer written approval to exceed. In addition, it includes all concrete elements with a section thickness of greater than 3 feet or more regardless of temperature.

g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the specified strength, service life and constructability requirements of the project using available materials while minimizing the initial and life-cycle cost.

h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic yard) of concrete.

i. "Pozzolan" is a siliceous or silico-aluminous material that will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds having cementitious properties.

j. "Workability" is the ease with which freshly mixed concrete or mortar can be mixed, placed , consolidated, and finished to a homogenous condition. Workability typically depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious materials content and age since batching (level of hydration).

k. "Final Setting" is a degree of stiffening of a cementitious mixture where plasticity is lost sufficiently to resist the penetration of a weighted test device a specific distance; typically using a Vicat Apparatus.

l. "Hard-troweled finish" is a finishing process which produces a hard, dense, and smooth surface by troweling in repeated right angle passes while increasing blade pressure on surface with each pass. Increased pressure is typically obtained by increasing trowel blade angle.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. When used, the "RO" designation following the "G" identifies that the Resident Office will review the submittal for the Government. When used, the "AE" designation following the "G" identifies that the Architect-Engineer will review the submittal for the Government. Submittals with an "S" are for inclusion in

SECTION 03 30 00 Page 7 the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Concrete Curing Plan

Quality Control Plan; G

Quality Control Personnel Certifications; G

Quality Control Organizational Chart

Laboratory Accreditation; G

Cold Weather Plan; G

Hot Weather Plan; G

Maturity Method Data

SD-02 Shop Drawings

Reinforcing Steel; G

Placement Sequence and Jointing Plan; G

SD-03 Product Data/ Sustainable Design Requirements

Joint Sealants

Joint Filler

Formwork Materials

Cementitious Materials

Vapor Retarder

Concrete Curing Materials

Reinforcement

Liquid Chemical Floor Hardeners and Sealers

Admixtures

Mechanical Reinforcing Bar Connectors

Waterstops

Biodegradable Form Release Agent

Pumping Concrete

Finishing Plan

Nonshrink Grout

SECTION 03 30 00 Page 8

Recycled Content; G, S

SD-04 Samples

SD-05 Design Data

Concrete Mixture Proportion; G

SD-06 Test Reports

Concrete Mixture Proportion; G

Fly Ash

Pozzolans Slag Cement

Aggregates

Tolerance Report

Compressive Strength Tests; G

Air Content

Slump Tests

Water

Shrinkage Testing

SD-07 Certificates

Reinforcing Bars

Welder Qualifications

VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers; G, S

Safety Data Sheets

Ready-mixed Concrete Manufacturer (Plant) and Trucks

Field Testing Technician and Testing Agency

SD-08 Manufacturer's Instructions

Liquid Chemical Floor Hardeners and Sealers

Joint Sealants

Curing Compound

1.5 MODIFICATION OF REFERENCES

Accomplish work in accordance with ACI publications except as modified herein. Except for provisions associated with Contractor's means and

SECTION 03 30 00 Page 9 methods or items delegated to the Contractor, such as formwork calculations, consider the non-mandatory, advisory or recommended provisions within ACI publications to be mandatory; where specific conflicts or options exist, request in writing a Contracting Officer determination. Interpret reference to the "Licensed Design Engineer," the "Licensed Design Professional," the "Building Official," the "Structural Engineer," and the "Architect/Engineer," or similar title to mean the Contracting Officer unless multiple roles or personnel are indicated in a specific requirement.

1.6 DELIVERY, STORAGE, AND HANDLING

Follow ACI 301 , ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor retarder, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store opened containers ofconcrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions, or in occupied spaces. Protect liquid admixtures and other liquid materials such as curing compounds and sealers from freezing and from temperature changes that would adversely affect their characteristics.

1.6.1 Reinforcement

Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground and out of standing water to avoid excessive rusting. Protect from contaminants such as grease, oil, form release agent, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.

1.7 QUALITY ASSURANCE

1.7.1 Design Data

1.7.1.1 Concrete Mixture Proportion

Unless otherwise approved in writing by Contracting Officer, sixty days minimum prior to concrete placement, submit a mixture proportion for each class of concrete required in paragraph titled CONCRETE MIXTURE PROPORTION in PART 2. It is acceptable to submit a mixture proportion which meets multiple classes of concrete if properly identified. Submit a complete list of materials including type; brand; source and amount of cement, supplementary cementitious materials, , and admixtures; and applicable reference specifications. Submit mill test and all other tests for cement, supplementary cementitious materials, aggregates, and admixtures.

Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieves, and a graph of percentage retained verses sieve size. Provide mixture proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. If source material changes in quality or source, resubmit mixture proportion data using revised source material. Provide only materials that have been proven by trial mixture studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mixture proportion is used when more than one mixture proportion is submitted. For previously approved concrete mixture proportions used within the past twelve months, the previous mixture proportion may be re-submitted without further trial

SECTION 03 30 00 Page 10 batch testing if accompanied by material test data conducted within the last six months. Obtain mixture proportion approval from the Contracting Officer prior to concrete placement.

1.7.2 Shop Drawings

1.7.2.1 Reinforcing Steel

Indicate bending diagrams, assembly diagrams, splicing and laps of bars, shapes, dimensions, and details of bar reinforcing, accessories, and concrete cover. Do not scale dimensions from Contract Drawings to determine lengths of reinforcing bars. Reproductions of Contract Drawings are unacceptable.

1.7.3 Control Submittals

1.7.3.1 Concrete Curing Plan

Submit proposed materials, methods and duration for curing concrete elements in accordance with ACI 308.1 .

1.7.3.2 Pumping Concrete

Submit proposed materials and methods for pumping concrete. Submittal must include mixture proportions, pumping equipment including type of pump and size and material for pipe, and maximum length and height concrete is to be pumped.

1.7.3.3 Finishing Plan

Submit proposed material and procedures to be used in obtaining the finish for the elevated floors and slabs. Include qualification of person to be used for obtaining floor tolerance measurement, description of measuring equipment to be used, and a sketch showing lines and locations the measuring equipment will follow.

1.7.3.4 VOC Content for form release agents, curing compounds, and concrete penetrating sealers

Submit certification for the form release agent, curing compounds, and concrete penetrating sealers that indicate the VOC content of each product.

1.7.3.5 Safety Data Sheets

Submit Safety Data Sheets (SDS) for all materials that are regulated for hazardous health effects. SDS must be readily accessible during each work shift for viewing.

1.7.4 Test Reports

1.7.4.1 Fly Ash and Pozzolans

Submit test results in accordance with ASTM C618 for fly ash and raw or calcined natural pozzolans. Submit test results performed within 6 months of submittal date.

1.7.4.2 Slag Cement

Submit test results in accordance with ASTM C989/C989M for slag cement.

SECTION 03 30 00 Page 11

Submit test results performed within 6 months of submittal date.

1.7.4.3 Aggregates

Submit test results in accordance with ASTM C33/C33M, or ASTM C330/C330M for lightweight aggregate, and ASTM C1293, ASTM C1567, or ASTM C1260 as required in the paragraph titled ALKALI-AGGREGATE REACTION.

This is the start of the file's text. The full file is on GovTribe.