This solicitation is for the construction of a non-standard Battalion Operations Facility at Fort Benning, Georgia. The project involves constructing administrative areas, operations areas including a Sensitive Compartmented Information Facility and Ranger Operations Center, and Company Operations Facilities/Readiness Bays totaling approximately 92,000 square feet. Supporting facilities such as site development, utilities, parking, drainage, landscaping and signage are also required. The period of performance is 740 calendar days. The contract value is estimated to be between $25-100 million and will be awarded using Lowest Price Technically Acceptable evaluation. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Savannah.

View the file

Other files

File Type Posted
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0006 CC.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD6.pdf PDF
W912HN-22-R-3004_SPECS_VOL_2 AMD06.pdf PDF
W912HN-22-R-3004_SPECS_VOL_5 AMD06.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0006.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0005 CC.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD5.pdf PDF
W912HN-22-R-3004_CIDPart-3 AMD0005.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0005.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD0004.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0004 CC.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_2 AMD0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_4 AMD0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_5 AMD0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_1 AMD0004.pdf PDF
W912HN-22-R-3004_SPECS_VOL_3 AMD0004.pdf PDF
W912HN-22-R-3004_CIDPart-2 AMD0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_1 AMD0003.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_2 AMD0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_4 AMD0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_3 AMD0003.pdf PDF
W912HN-22-R-3004_CIDPart-3 AMD0003.pdf PDF
W912HN-22-R-3004_SPECS_VOL_5 AMD0003.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD3.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0003 CC.pdf PDF
W912HN-22-R-3004_CIDPart-1 AMD0003.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0002 CC.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0002.pdf PDF
W912HN-22-R-3004_SPECS_VOL1_AMD2.pdf PDF
W912HN-22-R-3004_DRAWINGS_AMD2.pdf PDF
W912HN-22-R-3004_SPECS_VOL2_AMD2.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation Conformed Solicitation.pdf PDF
B.08 W912HN22R3004 Fort Benning SOF HQ Solicitation AMD 0001.pdf PDF
Site Visit Mintues PN92792 SOF Bn HQs.pdf PDF
W912HN-22-R-3004_CIDPart-2.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_1.pdf PDF
W912HN-22-R-3004_SPECS_VOL_2.pdf PDF
W912HN-22-R-3004_SPECS_VOL_1.pdf PDF
W912HN-22-R-3004_CIDPart-1.pdf PDF
W912HN-22-R-3004_CIDPart-3.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_5.pdf PDF
W912HN-22-R-3004_SPECS_VOL_4.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_2.pdf PDF
Site Visit Linkup Map.pdf PDF
W912HN-22-R-3004_SPECS_VOL_5.pdf PDF
W912HN-22-R-3004_DRAWINGS_PART_3.pdf PDF
W912HN-22-R-3004_SPECS_VOL_3.pdf PDF
Attachment 1 - PIEE - Solicitation - Module.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M H

T

W

M H

A

M H

COMM

COMM

COMM

COMM

COMM

C O

M M

C O

M M

X

X

M H

B

B U

I L D

I N

G

COMM

C

O

M

M

C

O

M

M

COMM

COMM

COMM

COMM

B L D

BLD# 2825

C

O

M

M

C

O

M

M

M H

T

W

M H

M H

SIGHTSEEING RD

W A

Y

A

V E

W A

Y

A

V E

S

T

I N

F A

N T

R Y

B

I G

A D

E

L

O O

P

C O

M M

C O

M M

C O

M M

C O

M M

COMM

COMM

COMM

COMM

SPLICE NEW 200 PR AND 24SM TO

EXISTING VACANT PAIRS/STRANDS

IN MH 284

1EA 144SM

INTO EXISTING

INNERDUCT

1EA 144SM

INTO EXISTING

INNERDUCT

1EA 144SM

INTO EXISTING

INNERDUCT

1EA 144SM

TERMINATE IN NEW 4RU

FDP, LC CONNECTORS, IN

EXISTING FOC RACK - (REMOVE

TOP SHELF, INSTALL NEW FDP)

CA/COUNT TBD

C

C

C

C

C

C

500' CC

M H

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

M H

T

W

M H

M

H T

W

COMM

SIG

HTSEEIN

G R D

SIGHTSEEING RD

E C

K E

L

A

V E

G U

N T

E R

M A

N

S

T

COMM

COMM

COMM

COMM

C

O

M

M

1EA 144SM

INTO EXISTING

INNERDUCT

1EA 144SM

INTO EXISTING

INNERDUCT

1EA 144SM

INTO EXISTING

INNERDUCT

500' CC

260' CC

365' CC

C

A N

S I

D

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

R E

A D

Y

T

O

A

D V

E R

T I S

E

R

T A

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

T

N

O

US Army Corps of Engineers

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

D

E

D E

S C

R I P

T I O

N

B L

A C

K

A

D

V

E A

T C

H

F

E D

E R

A L

W

S

R

E E

T

S

U I T

E

O V

E R

L A

P

A R

K

K

A N

S A

S

F O

N

N I N

G

G

E O

R G

I A

S O

F

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F

A C

I L

I T

Y

F

Y

J A

N U

A R

Y

SHEET ID

U S

A

R M

Y

C

O R

F

E

N G

I N

E E

R S

S A

V A

N N

I S

T R

I C

T

W

E S

T

O

G L

E T

H O

R P

E

A

V E

S A

V A

N N

A H

G

A

60' 120'0

L E

N A

M E

S

B

R O

W N

M

R

E E

V E

S

J

B

E A

V E

R S

M

N

E P

L

L E

C O

M

S

I T

E

L A

Y O

U

A

TS107

MATCHLINE SEE TS106

M A

T C

H L

I N

E

S

L

O W

M A

T C

H L

I N

E

S

O

V E

M A

T C

H L

I N

E

S

D1

TELECOM SITE LAYOUT PLAN - PANEL T5

SCALE: 1"=60'

A1

TELECOM SITE LAYOUT PLAN - PANEL T6

SCALE: 1"=60'

X

X

B

B B

E

326327

GRAVEL PATHWAY

SIGN

POST

WOOD TRAINING

STRUCTURE

WOOD TRAINING

STRUCTURE

ASPHALT

TRANS.

ELEC.

PANEL

CONC.

STRUCTURE

CONC.

STRUCTURE

ROAD

MARKING

SWALE

PROBABLE DRAINAGE

STRUCTURE

W.M.

BL BL

BLBL

ELEC.

PANEL

S

S

S

D

D

E

RANGER

RANGER

D

D

E

294.82

292.46

290.59

289.83

292.99

293.07

290.11

CO

291.36

R-CURVE

STOP

15MP

292.23

C

FH

FH

297.62

D

300.96

S

STOP

307.78 C

S

S

S

FH

FH

S

WLA20

WLA19

WLA21

WLA22

R-0

R-1 L-1

L-2

R-2

R-3

L-3

L-4

R-4WLA34

L-5

R-5

WLA38

WLA39

WLA36

S-1 S-2

WLA40

WLA1

WLA2

WLA3

L-1

L-2-100

WLA4

R-1

R-2

WLA35

WLA34

R-3

L-3

WLA5

WLA6

R-4

R-4

WLA33

R-5

R-6

WLA32

R-6

L-5

WLA7

WLA31

L-1

R-1

R-2

L-2

WLA8

WLA9

WLA10

WEIR

(ASPHALT)

GRAVEL DRIVE

ASPHALT DRIVE

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

36"RCP

36"RCP

15"RCP

30"RCP

8" PL

24"RCP

6" PL

24"RCP

6" PL

24"RCP

24"RCP

24"RCP

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

4" PL

15"RCP

8" PL

15"RCP

6" PL

15"RCP

36"RCP

36"RCP

36"RCP

36"RCP

24"RCP

36"RCP

36"RCP

8" PL

48"RCP

INV.=265.25

INV.=260.24

48"RCP

INV.=260.24

48"RCP

15"RCP

INV.=272.62

INV.=270.11

INV.=267.91

8" PL

8" PL

8" PL

8" PL

8" PL

10" PL

10" PL

4"CLAY

18" RCP

36" RCP

36" RCP

INV.=277.29

36" RCP

18" RCP

30" RCP

36"RCP

24"RCP

15"

RCP

42"RCP

15"RCP

15"RCP

18"RCP

42"RCP

INV.=278.69

HEADWALL

HEADWALL

WLA13

WLA12

WLA11

WLA14

WLA15

WLA16

WLA17

WLA18

WLA28

WLA27

WLA26

WLA25

WLA24

WLA23

R-9

S3

L-3

R-8

R-7

R-7 R-8

L-9

L-10

R-10

R-11L-11

WLA29

WLA30

ST-4 R-1

R-2

R-3

R-4

WLB-1

R-5

R-7

WLB-B2

WLB

R-8

R-9

WLB

R-10

WLB

WLB

R-12

WLB

R-13

R-14

WLB

R-15

CREEK

R-11

WL-A

UPL-A

UPL-B

WL-B

WETLAND A2.61 ACRES

WETLAND B0.3 ACRES

STREAM1

STREAM2

STREAM3

STREAM4

25'STREAMBUFFER

25'STREAMBUFFER

25'STREAMBUFFER

25'STREAMBUFFER

C

C

MH 55.4

MH 55.3

MH 55.5

MH 55.6

MH 55.7

DUCT BANK

DUCT BANK

DUCT BANK

DUCT BANK

MH 284

C

50078311.369UUTP

C

50093334.158UUTP

C

C

E

D

AW

SO

N

LO

O

P R

O

AD

TOWER

CONCRETE SIDEWALK

D

AW

SO

N

LO

O

P R

O

AD

" P

VC

" P

VC

36" PVC

" P

VC

" S

TE

EL

" S

TE

EL

24" CLAY

24" CLAY

36" PVC

36" PVC

" P

VC

" P

VC

36" PVC

36" PVC

6' C

HAIN LIN

K FENCE

6'

CH

AI

N

LIN

K

FE

NC

E

8'

CH

AI

N

LIN

K

FE

NC

E

8' CHAIN LINK FENCE

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

RESTRICTED AREA

4'H x 6'W

C

UL

VE

RT

4'H x 6'W

C

UL

VE

RT

4'H x 6'W

C

UL

VE

RT

AS

PH

AL

T D

RI

VE

GRAVEL DRIVE

A

B

A B

A

B A

B

A B

B

A

B

A

B A

24" RCP

24" RC

P

MH-T7A

MH-T9A

D

TOP = 242.55'INV A= 239.25'INV B= 237.95'

D

TOP = 256.94'INV A= 245.74'INV B= 244.74'

SSMH RIM= 274.08'ABANDONDEDINV A= 261.28'

INV B= 261.18'

SSMH RIM= 268.29'INV A= 258.89'INV B= 258.24'

SSMH RIM= 254.45'INV A= 248.95'INV B= 248.85'

SSMH RIM= 269.52'INV A= 260.77'INV B= 260.67'

SSMH RIM= 271.42'INV A= 260.12'INV B= 259.92'

D

TOP = 242.59'UNABLE TO ACCESS

SSMH RIM= 267.01' INV A= 252.71'INV B= 252.71'

SSMH RIM= 270.16'INV A= 249.46'INV B= 249.36'

SSMH RIM= 253.84'INV A= 248.24'INV B=248.24 '

MH-T13A

MH-T10A

MH-T11A

MH-T12A

MH-281

MH-TW33

MH-282A

MH-283

MH-TW25D

MH-TW25C

MH-TW25B

MH-282B

MH-TW31

MH-279 / MH-TW25

MH-TW25A

MH-TW30

MH-T8ADID NOTFIND

D

ID

N

O

T

F

IN

D

C

O

N

N

E

C

T

IN

G

S

T

R

U

C

T

U

R

E

WATER COMMING IN

FROM THIS DIRECTION

NO PIPE VISIBLE

BUILDING8861

MH-TW24 / MH-278

BUILDINGADN 8856

BLD # 2931

BLD# 2933

BLD# 2825

BLD# 2580

BLD# 2295

MH-TW34

MH-284

MH-55.7

MH-55.6

MH-55.5

MH-55.4

JECELIN ST

JECELIN ST

JECELIN ST

INDIANHEAD RD

1ST INFANTRY BRIGADE LOOP

SIGHTSEEING RD

SIGHTSEEING RD

SIGHTSEEING RD

SIGHT

SEEIN

G RD

ECKEL AVE

GUNTERMAN ST

WAY AVE

WAY AVE

1ST INFANTRY BRIGADE LOOP

BLD# 2486

MH 55.6

243243

242 243

240240

238239

241241

241 242

240240

238 239

241242

240 241

236237

241241

240240

270271

254 253

252 254

260 261

270 271

T2

T3

GENERAL NOTES:

SHEET NOTES:

KEY PLAN

A1

B2

B1

T5

T6

T7

T8

T9

T4

T1

F

1. CABLE PLACEMENT, SPLICING, TERMINATION AND

TESTING TO BE IN ACCORDANCE WITH THE UNITED

STATES ARMY INFORMATION SYSTEMS

ENGINEERING COMMAND (USAISEC) OUTSIDE

PLANT DESIGN AND PERFORMANCE

REQUIREMENTS (OSPDPR) AND IN COLLABORATION

WITH AND ACCEPTANCE BY THE FT BENNING

NETWORK ENTERPRISE CENTER (NEC).

2. EXISTING VACANT DUCTS THAT ARE TO BE USED

FOR NEW CABLES SHALL BE CLEANED AND TESTED

WITH A TEST MANDREL TO DETECT ANY

OBSTRUCTIONS, COLLAPSED DUCTS, OR DUCT

INCONSISTENCIES.

3. COPPER AND FIBER OPTIC CABLE (FOC) SPLICING

SHALL BE PERFORMED IAW RUS BULLETIN

1753F-401, STANDARDS FOR SPLICING COPPER

AND FIBER OPTIC CABLE, FEBRUARY 1995.

4. ALL COPPER SPLICES SHALL BE MULTI-PAIR, FOLD

BACK TYPE. FIBER OPTIC SPLICE SHALL BE FUSION

TYPE.

5. CONFIRM CABLE IDENTIFICATION AND

PAIR/STRAND COUNTS WITH THE NEC.

6. CABLE ID/TAGS SHALL BE INSTALLED AT ALL

TERMINATION POINTS AND SPLICES. IN

MAINTENANCE HOLES, ALL NEW AND EXISTING

CABLES THAT ARE PART OF THE PROJECT SHALL

BE TAGGED/RETAGGED BETWEEN THE SPLICE AND

THE WALL AND ON BOTH SIDES OF A SPLICE LOOP

OR MAINTENANCE LOOP.

Brian McKenzie Snapshot

T

W A

COMM

COMM

COMM

COMM

COMM

COMM

COMM

C

O

M

M

M H

T

W

M

H

SIG

HTSEEIN

G R D

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

1EA 144SM

EXISTING

INNERDUCT

1EA 144SM

EXISTING

INNERDUCT

M

H

T

W

B

C

O

M

M

M

H

T

W

M

H

T

W

A

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

COMM COMM COMM COMM COMM

1EA 144SM

EXISTING

INNERDUCT

1EA 144SM

EXISTING

INNERDUCT

1EA 144SM

EXISTING

INNERDUCT

C

C

530' CC

A N

S I

D

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

R E

A D

Y

T

O

A

D V

E R

T I S

E

R

T A

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

US Army Corps of Engineers

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

D

E

D E

S C

R I P

T I O

N

B L

A C

K

A

A

T C

H

F

E D

E R

A L

R

E E

T

S

U I T

E

O V

E R

L A

R

K

K

A N

S A

S

F O

N

N I N

G

G

E O

R G

I A

S O

F

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F

A C

I L

I T

Y

F

Y

J A

N U

A R

Y

SHEET ID

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S A

V A

N N

S

T R

I C

T

W

E S

T

O

G L

E T

H O

R P

E

A

V E

S A

V A

N N

A H

G

A

L E

N A

M E

S

B

R O

W N

M

R

E E

V E

S

J

B

E A

V E

R S

M

N

E P

L E

C O

M

S

I T

E

L A

Y O

A

TS108

A

T C

H L

I N

E

S

MATCHLINE SEE BELOW

M A

T C

H L

I N

E

S

O

V E

MATCHLINE SEE TS109

A1

TELECOM SITE LAYOUT PLAN - PANEL T8

SCALE: 1"=60'

E1

TELECOM SITE LAYOUT PLAN - PANEL T7

SCALE: 1"=60'

X

X

B

B B

E

326327

GRAVEL PATHWAY

SIGN

POST

WOOD TRAINING

STRUCTURE

WOOD TRAINING

STRUCTURE

ASPHALT

TRANS.

ELEC.

PANEL

CONC.

STRUCTURE

CONC.

STRUCTURE

ROAD

MARKING

SWALE

PROBABLE DRAINAGE

STRUCTURE

W.M.

BL BL

BLBL

ELEC.

PANEL

S

S

S

D

D

E

RANGER

RANGER

D

D

E

294.82

292.46

290.59

289.83

292.99

293.07

290.11

CO

291.36

R-CURVE

STOP

15MP

292.23

C

FH

FH

297.62

D

300.96

S

STOP

307.78 C

S

S

S

FH

FH

S

WLA20

WLA19

WLA21

WLA22

R-0

R-1 L-1

L-2

R-2

R-3

L-3

L-4

R-4WLA34

L-5

R-5

WLA38

WLA39

WLA36

S-1 S-2

WLA40

WLA1

WLA2

WLA3

L-1

L-2-100

WLA4

R-1

R-2

WLA35

WLA34

R-3

L-3

WLA5

WLA6

R-4

R-4

WLA33

R-5

R-6

WLA32

R-6

L-5

WLA7

WLA31

L-1

R-1

R-2

L-2

WLA8

WLA9

WLA10

WEIR

(ASPHALT)

GRAVEL DRIVE

ASPHALT DRIVE

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

36"RCP

36"RCP

15"RCP

30"RCP

8" PL

24"RCP

6" PL

24"RCP

6" PL

24"RCP

24"RCP

24"RCP

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

4" PL

15"RCP

8" PL

15"RCP

6" PL

15"RCP

36"RCP

36"RCP

36"RCP

36"RCP

24"RCP

36"RCP

36"RCP

8" PL

48"RCP

INV.=265.25

INV.=260.24

48"RCP

INV.=260.24

48"RCP

15"RCP

INV.=272.62

INV.=270.11

INV.=267.91

8" PL

8" PL

8" PL

8" PL

8" PL

10" PL

10" PL

4"CLAY

18" RCP

36" RCP

36" RCP

INV.=277.29

36" RCP

18" RCP

30" RCP

36"RCP

24"RCP

15"

RCP

42"RCP

15"RCP

15"RCP

18"RCP

42"RCP

INV.=278.69

HEADWALL

HEADWALL

WLA13

WLA12

WLA11

WLA14

WLA15

WLA16

WLA17

WLA18

WLA28

WLA27

WLA26

WLA25

WLA24

WLA23

R-9

S3

L-3

R-8

R-7

R-7 R-8

L-9

L-10

R-10

R-11L-11

WLA29

WLA30

ST-4 R-1

R-2

R-3

R-4

WLB-1

R-5

R-7

WLB-B2

WLB

R-8

R-9

WLB

R-10

WLB

WLB

R-12

WLB

R-13

R-14

WLB

R-15

CREEK

R-11

WL-A

UPL-A

UPL-B

WL-B

WETLAND A2.61 ACRES

WETLAND B0.3 ACRES

STREAM1

STREAM2

STREAM3

STREAM4

25'STREAMBUFFER

25'STREAMBUFFER

25'STREAMBUFFER

25'STREAMBUFFER

C

C

MH 55.4

MH 55.3

MH 55.5

MH 55.6

MH 55.7

DUCT BANK

DUCT BANK

DUCT BANK

DUCT BANK

MH 284

C

50078311.369UUTP

C

50093334.158UUTP

C

C

E

D

AW

SO

N

LO

O

P R

O

AD

TOWER

CONCRETE SIDEWALK

D

AW

SO

N

LO

O

P R

O

AD

" P

VC

" P

VC

36" PVC

" P

VC

" S

TE

EL

" S

TE

EL

24" CLAY

24" CLAY

36" PVC

36" PVC

" P

VC

" P

VC

36" PVC

36" PVC

6' C

HAIN LIN

K FENCE

6'

CH

AI

N

LIN

K

FE

NC

E

8'

CH

AI

N

LIN

K

FE

NC

E

8' CHAIN LINK FENCE

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

RESTRICTED AREA

4'H x 6'W

C

UL

VE

RT

4'H x 6'W

C

UL

VE

RT

4'H x 6'W

C

UL

VE

RT

AS

PH

AL

T D

RI

VE

GRAVEL DRIVE

A

B

A B

A

B A

B

A B

B

A

B

A

B A

24" RCP

24" RC

P

MH-T7A

MH-T9A

D

TOP = 242.55'INV A= 239.25'INV B= 237.95'

D

TOP = 256.94'INV A= 245.74'INV B= 244.74'

SSMH RIM= 274.08'ABANDONDEDINV A= 261.28'

INV B= 261.18'

SSMH RIM= 268.29'INV A= 258.89'INV B= 258.24'

SSMH RIM= 254.45'INV A= 248.95'INV B= 248.85'

SSMH RIM= 269.52'INV A= 260.77'INV B= 260.67'

SSMH RIM= 271.42'INV A= 260.12'INV B= 259.92'

D

TOP = 242.59'UNABLE TO ACCESS

SSMH RIM= 267.01' INV A= 252.71'INV B= 252.71'

SSMH RIM= 270.16'INV A= 249.46'INV B= 249.36'

SSMH RIM= 253.84'INV A= 248.24'INV B=248.24 '

MH-T13A

MH-T10A

MH-T11A

MH-T12A

MH-281

MH-TW33

MH-282A

MH-283

MH-TW25D

MH-TW25C

MH-TW25B

MH-282B

MH-TW31

MH-279 / MH-TW25

MH-TW25A

MH-TW30

MH-T8ADID NOTFIND

D

ID

N

O

T

F

IN

D

C

O

N

N

E

C

T

IN

G

S

T

R

U

C

T

U

R

E

WATER COMMING IN

FROM THIS DIRECTION

NO PIPE VISIBLE

BUILDING8861

MH-TW24 / MH-278

BUILDINGADN 8856

BLD # 2931

BLD# 2933

BLD# 2825

BLD# 2580

BLD# 2295

MH-TW34

MH-284

MH-55.7

MH-55.6

MH-55.5

MH-55.4

JECELIN ST

JECELIN ST

JECELIN ST

INDIANHEAD RD

1ST INFANTRY BRIGADE LOOP

SIGHTSEEING RD

SIGHTSEEING RD

SIGHTSEEING RD

SIGHT

SEEIN

G RD

ECKEL AVE

GUNTERMAN ST

WAY AVE

WAY AVE

1ST INFANTRY BRIGADE LOOP

BLD# 2486

MH 55.6

243243

242 243

240240

238239

241241

241 242

240240

238 239

241242

240 241

236237

241241

240240

270271

254 253

252 254

260 261

270 271

T2

T3

GENERAL NOTES:

SHEET NOTES:

KEY PLAN

A1

B2

B1

T5

T6

T7

T8

T9

T4

T1

F

1. CABLE PLACEMENT, SPLICING, TERMINATION AND

TESTING TO BE IN ACCORDANCE WITH THE UNITED

STATES ARMY INFORMATION SYSTEMS

ENGINEERING COMMAND (USAISEC) OUTSIDE

PLANT DESIGN AND PERFORMANCE

REQUIREMENTS (OSPDPR) AND IN COLLABORATION

WITH AND ACCEPTANCE BY THE FT BENNING

NETWORK ENTERPRISE CENTER (NEC).

2. EXISTING VACANT DUCTS THAT ARE TO BE USED

FOR NEW CABLES SHALL BE CLEANED AND TESTED

WITH A TEST MANDREL TO DETECT ANY

OBSTRUCTIONS, COLLAPSED DUCTS, OR DUCT

INCONSISTENCIES.

3. COPPER AND FIBER OPTIC CABLE (FOC) SPLICING

SHALL BE PERFORMED IAW RUS BULLETIN

1753F-401, STANDARDS FOR SPLICING COPPER

AND FIBER OPTIC CABLE, FEBRUARY 1995.

4. ALL COPPER SPLICES SHALL BE MULTI-PAIR, FOLD

BACK TYPE. FIBER OPTIC SPLICE SHALL BE FUSION

TYPE.

5. CONFIRM CABLE IDENTIFICATION AND

PAIR/STRAND COUNTS WITH THE NEC.

6. CABLE ID/TAGS SHALL BE INSTALLED AT ALL

TERMINATION POINTS AND SPLICES. IN

MAINTENANCE HOLES, ALL NEW AND EXISTING

CABLES THAT ARE PART OF THE PROJECT SHALL

BE TAGGED/RETAGGED BETWEEN THE SPLICE AND

THE WALL AND ON BOTH SIDES OF A SPLICE LOOP

OR MAINTENANCE LOOP.

T

W

D

M

H

T

W

C

M

H

T

W

B

X

X

X

X

COMM COMM COMM COMM

M

H

T

W

C

O

M

M

C

O

M

M

B

U

I

L

D

I

N

G

A

D

N

X

X

X

X

X

X

X

B

L

B

L

COMM

COMM

COMM

COMM

COMM

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

T

1EA 144SM

EXISTING

INNERDUCT

1EA 144SM

TERMINATE IN NEW 4RU

FDP, LC CONNECTORS, IN

EXISTING FOC RACK - RR#4

(BELOW EXISTING FDP)

CA/COUNT TBD

420' CC

515' CC

C

C

A N

S I

D

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

R E

A D

Y

T

O

A

D V

E R

T I S

E

R

T A

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

US Army Corps of Engineers

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

D

E

D E

S C

R I P

T I O

N

B L

A C

K

A

A

T C

H

F

E D

E R

A L

R

E E

T

S

U I T

E

O V

E R

L A

R

K

K

A N

S A

S

F O

N

N I N

G

G

E O

R G

I A

S O

F

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F

A C

I L

I T

Y

F

Y

J A

N U

A R

Y

SHEET ID

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S A

V A

N N

S

T R

I C

T

W

E S

T

O

G L

E T

H O

R P

E

A

V E

S A

V A

N N

A H

G

A

L E

N A

M E

S

B

R O

W N

M

R

E E

V E

S

J

B

E A

V E

R S

M

N

E P

L E

C O

M

S

I T

E

L A

Y O

A

TS109

A

T C

H L

I N

E

S

E1

TELECOM SITE LAYOUT PLAN - PANEL T9

SCALE: 1"=60'

X

X

B

B B

E

326327

GRAVEL PATHWAY

SIGN

POST

WOOD TRAINING

STRUCTURE

WOOD TRAINING

STRUCTURE

ASPHALT

TRANS.

ELEC.

PANEL

CONC.

STRUCTURE

CONC.

STRUCTURE

ROAD

MARKING

SWALE

PROBABLE DRAINAGE

STRUCTURE

W.M.

BL BL

BLBL

ELEC.

PANEL

S

S

S

D

D

E

RANGER

RANGER

D

D

E

294.82

292.46

290.59

289.83

292.99

293.07

290.11

CO

291.36

R-CURVE

STOP

15MP

292.23

C

FH

FH

297.62

D

300.96

S

STOP

307.78 C

S

S

S

FH

FH

S

WLA20

WLA19

WLA21

WLA22

R-0

R-1 L-1

L-2

R-2

R-3

L-3

L-4

R-4WLA34

L-5

R-5

WLA38

WLA39

WLA36

S-1 S-2

WLA40

WLA1

WLA2

WLA3

L-1

L-2-100

WLA4

R-1

R-2

WLA35

WLA34

R-3

L-3

WLA5

WLA6

R-4

R-4

WLA33

R-5

R-6

WLA32

R-6

L-5

WLA7

WLA31

L-1

R-1

R-2

L-2

WLA8

WLA9

WLA10

WEIR

(ASPHALT)

GRAVEL DRIVE

ASPHALT DRIVE

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

36"RCP

36"RCP

15"RCP

30"RCP

8" PL

24"RCP

6" PL

24"RCP

6" PL

24"RCP

24"RCP

24"RCP

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

6" PL

4" PL

15"RCP

8" PL

15"RCP

6" PL

15"RCP

36"RCP

36"RCP

36"RCP

36"RCP

24"RCP

36"RCP

36"RCP

8" PL

48"RCP

INV.=265.25

INV.=260.24

48"RCP

INV.=260.24

48"RCP

15"RCP

INV.=272.62

INV.=270.11

INV.=267.91

8" PL

8" PL

8" PL

8" PL

8" PL

10" PL

10" PL

4"CLAY

18" RCP

36" RCP

36" RCP

INV.=277.29

36" RCP

18" RCP

30" RCP

36"RCP

24"RCP

15"

RCP

42"RCP

15"RCP

15"RCP

18"RCP

42"RCP

INV.=278.69

HEADWALL

HEADWALL

WLA13

WLA12

WLA11

WLA14

WLA15

WLA16

WLA17

WLA18

WLA28

WLA27

WLA26

WLA25

WLA24

WLA23

R-9

S3

L-3

R-8

R-7

R-7 R-8

L-9

L-10

R-10

R-11L-11

WLA29

WLA30

ST-4 R-1

R-2

R-3

R-4

WLB-1

R-5

R-7

WLB-B2

WLB

R-8

R-9

WLB

R-10

WLB

WLB

R-12

WLB

R-13

R-14

WLB

R-15

CREEK

R-11

WL-A

UPL-A

UPL-B

WL-B

WETLAND A2.61 ACRES

WETLAND B0.3 ACRES

STREAM1

STREAM2

STREAM3

STREAM4

25'STREAMBUFFER

25'STREAMBUFFER

25'STREAMBUFFER

25'STREAMBUFFER

C

C

MH 55.4

MH 55.3

MH 55.5

MH 55.6

MH 55.7

DUCT BANK

DUCT BANK

DUCT BANK

DUCT BANK

MH 284

C

50078311.369UUTP

C

50093334.158UUTP

C

C

E

D

AW

SO

N

LO

O

P R

O

AD

TOWER

CONCRETE SIDEWALK

D

AW

SO

N

LO

O

P R

O

AD

" P

VC

" P

VC

36" PVC

" P

VC

" S

TE

EL

" S

TE

EL

24" CLAY

24" CLAY

36" PVC

36" PVC

" P

VC

" P

VC

36" PVC

36" PVC

6' C

HAIN LIN

K FENCE

6'

CH

AI

N

LIN

K

FE

NC

E

8'

CH

AI

N

LIN

K

FE

NC

E

8' CHAIN LINK FENCE

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

RESTRICTED AREA

4'H x 6'W

C

UL

VE

RT

4'H x 6'W

C

UL

VE

RT

4'H x 6'W

C

UL

VE

RT

AS

PH

AL

T D

RI

VE

GRAVEL DRIVE

A

B

A B

A

B A

B

A B

B

A

B

A

B A

24" RCP

24" RC

P

MH-T7A

MH-T9A

D

TOP = 242.55'INV A= 239.25'INV B= 237.95'

D

TOP = 256.94'INV A= 245.74'INV B= 244.74'

SSMH RIM= 274.08'ABANDONDEDINV A= 261.28'

INV B= 261.18'

SSMH RIM= 268.29'INV A= 258.89'INV B= 258.24'

SSMH RIM= 254.45'INV A= 248.95'INV B= 248.85'

SSMH RIM= 269.52'INV A= 260.77'INV B= 260.67'

SSMH RIM= 271.42'INV A= 260.12'INV B= 259.92'

D

TOP = 242.59'UNABLE TO ACCESS

SSMH RIM= 267.01' INV A= 252.71'INV B= 252.71'

SSMH RIM= 270.16'INV A= 249.46'INV B= 249.36'

SSMH RIM= 253.84'INV A= 248.24'INV B=248.24 '

MH-T13A

MH-T10A

MH-T11A

MH-T12A

MH-281

MH-TW33

MH-282A

MH-283

MH-TW25D

MH-TW25C

MH-TW25B

MH-282B

MH-TW31

MH-279 / MH-TW25

MH-TW25A

MH-TW30

MH-T8ADID NOTFIND

D

ID

N

O

T

F

IN

D

C

O

N

N

E

C

T

IN

G

S

T

R

U

C

T

U

R

E

WATER COMMING IN

FROM THIS DIRECTION

NO PIPE VISIBLE

BUILDING8861

MH-TW24 / MH-278

BUILDINGADN 8856

BLD # 2931

BLD# 2933

BLD# 2825

BLD# 2580

BLD# 2295

MH-TW34

MH-284

MH-55.7

MH-55.6

MH-55.5

MH-55.4

JECELIN ST

JECELIN ST

JECELIN ST

INDIANHEAD RD

1ST INFANTRY BRIGADE LOOP

SIGHTSEEING RD

SIGHTSEEING RD

SIGHTSEEING RD

SIGHT

SEEIN

G RD

ECKEL AVE

GUNTERMAN ST

WAY AVE

WAY AVE

1ST INFANTRY BRIGADE LOOP

BLD# 2486

MH 55.6

243243

242 243

240240

238239

241241

241 242

240240

238 239

241242

240 241

236237

241241

240240

270271

254 253

252 254

260 261

270 271

T2

T3

GENERAL NOTES:

SHEET NOTES:

KEY PLAN

A1

B2

B1

T5

T6

T7

T8

T9

T4

T1

F

1. CABLE PLACEMENT, SPLICING, TERMINATION AND

TESTING TO BE IN ACCORDANCE WITH THE UNITED

STATES ARMY INFORMATION SYSTEMS

ENGINEERING COMMAND (USAISEC) OUTSIDE

PLANT DESIGN AND PERFORMANCE

REQUIREMENTS (OSPDPR) AND IN COLLABORATION

WITH AND ACCEPTANCE BY THE FT BENNING

NETWORK ENTERPRISE CENTER (NEC).

2. EXISTING VACANT DUCTS THAT ARE TO BE USED

FOR NEW CABLES SHALL BE CLEANED AND TESTED

WITH A TEST MANDREL TO DETECT ANY

OBSTRUCTIONS, COLLAPSED DUCTS, OR DUCT

INCONSISTENCIES.

3. COPPER AND FIBER OPTIC CABLE (FOC) SPLICING

SHALL BE PERFORMED IAW RUS BULLETIN

1753F-401, STANDARDS FOR SPLICING COPPER

AND FIBER OPTIC CABLE, FEBRUARY 1995.

4. ALL COPPER SPLICES SHALL BE MULTI-PAIR, FOLD

BACK TYPE. FIBER OPTIC SPLICE SHALL BE FUSION

TYPE.

5. CONFIRM CABLE IDENTIFICATION AND

PAIR/STRAND COUNTS WITH THE NEC.

6. CABLE ID/TAGS SHALL BE INSTALLED AT ALL

TERMINATION POINTS AND SPLICES. IN

MAINTENANCE HOLES, ALL NEW AND EXISTING

CABLES THAT ARE PART OF THE PROJECT SHALL

BE TAGGED/RETAGGED BETWEEN THE SPLICE AND

THE WALL AND ON BOTH SIDES OF A SPLICE LOOP

OR MAINTENANCE LOOP.

10+00

11+00

12+00

13+00

14+00

14+60

C

D

B

G

R

A

CDB

GRADE = 0.34%

C O

S T

A

R I M

I N

V

E

I N

V

S

W

FINISHED GRADE

EXISTING GRADE

F O

R

C

O N

T I N

U A

T I O

N

S

O

F I

L O

W

C

D

BG

R

A

CONNECT TO EXISTING MH 55.3

14+40

15+00 15+75

EXISTING GRADE

FINISHED GRADE

CDB

GRADE = 0.34%

F O

R

C

O N

T I N

U A

T I O

N

S

O

F I

O

V E

BUILDING

CONNECTION

END STA. 15+22.84

IE 270.86

A N

S I

D

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

R E

A D

Y

T

O

A

D V

E R

T I S

E

R

T A

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

US Army Corps of Engineers

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

D

E

D E

S C

R I P

T I O

N

B L

A C

K

A

A

T C

H

F

E D

E R

A L

R

E E

T

S

U I T

E

O V

E R

L A

R

K

K

A N

S A

S

F O

N

N I N

G

G

E O

R G

I A

S O

F

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F

A C

I L

I T

Y

F

Y

J A

N U

A R

Y

SHEET ID

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S A

V A

N N

S

T R

I C

T

W

E S

T

O

G L

E T

H O

R P

E

A

V E

S A

V A

N N

A H

G

A

L E

N A

M E

M

N

E P

P L

M

R

E E

V E

S

E

R

I G

B Y

M

N

E P

L E

C O

M

D

U C

T B

A N

K

P

R O

F I L

TS200

5' 10'030' 60'0

1. SEE SHEET C-001 FOR GENERAL NOTES AND

ABBREVIATIONS.

2. SEE SHEET C-002 FOR CIVIL LEGEND AND

SYMBOLS.

3. SEE SHEET GC101 FOR PROJECT LOCATION AND

VICINITY MAP.

4. SEE SHEET TS100 TO TS109 FOR TELECOM SITE

LAYOUT PLANS.

GENERAL NOTES:

SHEET NOTES:

D1

TELECOM DUCTBANK PROFILES - COMM A

HORIZONTAL SCALE: 1"=30' VERTICAL SCALE: 1"=5'

A1

TELECOM DUCTBANK PROFILES CONT- COMM A

HORIZONTAL SCALE: 1"=30' VERTICAL SCALE: 1"=5' 5' 10'030' 60'0

10+00

11+00

12+00

13+00

14+00

15+00

16+00

17+00

17+15

EXISTING GRADE

C O

S T

A

R I M

I N

V

S

W

I N

V

N

CDB

GRADE = 0.82%

C D

B

G R

A D

E

.7

F O

R

C

O N

T I N

U A

T I O

N

S

O

F I

L O

W

16+85

17+00

18+00

19+00

20+00

21+00

22+00

22+15

EXISTING GRADE

C D

B

G R

A D

E

.7

C D

B

G R

A D

E

.7

F O

R

C

O N

T I N

U A

T I O

N

S

O

F I

O

V E

F O

R

C

O N

T I N

U A

T I O

N

S

E

A N

S I

D

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

R E

A D

Y

T

O

A

D V

E R

T I S

E

R

T A

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

US Army Corps of Engineers

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

D

E

D E

S C

R I P

T I O

N

B L

A C

K

A

A

T C

H

F

E D

E R

A L

R

E E

T

S

U I T

E

O V

E R

L A

R

K

K

A N

S A

S

F O

N

N I N

G

G

E O

R G

I A

S O

F

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F

A C

I L

I T

Y

F

Y

J A

N U

A R

Y

SHEET ID

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S A

V A

N N

S

T R

I C

T

W

E S

T

O

G L

E T

H O

R P

E

A

V E

S A

V A

N N

A H

G

A

L E

N A

M E

M

N

E P

P L

M

R

E E

V E

S

E

R

I G

B Y

M

N

E P

L E

C O

M

D

U C

T B

A N

K

P

R O

F I L

TS201

5' 10'030' 60'0

1. SEE SHEET C-001 FOR GENERAL NOTES AND

ABBREVIATIONS.

2. SEE SHEET C-002 FOR CIVIL LEGEND AND

SYMBOLS.

3. SEE SHEET GC101 FOR PROJECT LOCATION AND

VICINITY MAP.

4. SEE SHEET TS100 TO TS109 FOR TELECOM SITE

LAYOUT PLANS.

GENERAL NOTES:

SHEET NOTES:

D1

TELECOM DUCTBANK PROFILES - COMM B

HORIZONTAL SCALE: 1"=30' VERTICAL SCALE: 1"=5'

A1

TELECOM DUCTBANK PROFILES CONT- COMM B

HORIZONTAL SCALE: 1"=30' VERTICAL SCALE: 1"=5' 5' 10'030' 60'0

21+80

22+00

23+00

24+00

25+00

25+15

EXISTING GRADE

RETAINING WALL

C D

B

G R

A D

E

.7

COMM HH 03

STA: 23+54.07

RIM: 268.21

INV. SW: 257.13

INV. SE: 257.25

C

D

B

G

R

A

F O

R

C

O N

T I N

U A

T I O

N

S

E

F O

R

C

O N

T I N

U A

T I O

N

S

L O

W

FINISHED GRADE

24+80

25+00 26+00

EXISTING GRADE

FINISHED GRADE

CDB

GRADE = 7.05%

F O

R

C

O N

T I N

U A

T I O

N

S

O

F I

O

V E

BUILDING

CONNECTION

A N

S I

D

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

R E

A D

Y

T

O

A

D V

E R

T I S

E

R

T A

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

US Army Corps of Engineers

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

D

E

D E

S C

R I P

T I O

N

B L

A C

K

A

A

T C

H

F

E D

E R

A L

R

E E

T

S

U I T

E

O V

E R

L A

R

K

K

A N

S A

S

F O

N

N I N

G

G

E O

R G

I A

S O

F

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F

A C

I L

I T

Y

F

Y

J A

N U

A R

Y

SHEET ID

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S A

V A

N N

S

T R

I C

T

W

E S

T

O

G L

E T

H O

R P

E

A

V E

S A

V A

N N

A H

G

A

5' 10'030' 60'0

1. SEE SHEET C-001 FOR GENERAL NOTES AND

ABBREVIATIONS.

2. SEE SHEET C-002 FOR CIVIL LEGEND AND

SYMBOLS.

3. SEE SHEET GC101 FOR PROJECT LOCATION AND

VICINITY MAP.

4. SEE SHEET TS100 TO TS109 FOR TELECOM SITE

LAYOUT PLANS.

GENERAL NOTES:

SHEET NOTES:

D1

TELECOM DUCTBANK PROFILES - COMM B

HORIZONTAL SCALE: 1"=30' VERTICAL SCALE: 1"=5'

5'030' 60'0

A1

TELECOM DUCTBANK PROFILES CONT- COMM B

HORIZONTAL SCALE: 1"=30' VERTICAL SCALE: 1"=5'

L E

N A

M E

M

N

E P

P L

J

B

E L L

E

R

I G

B Y

M

N

E P

L E

C O

M

D

U C

T B

A N

K

P

R O

F I L

TS202

S I

D

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

R E

A D

Y

T

O

A

D V

E R

T I S

E

R

T A

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

US Army Corps of Engineers

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

D

E

D E

S C

R I P

T I O

N

B L

A C

K

A

A

T C

H

F

E D

E R

A L

R

E E

T

S

U I T

E

O V

E R

L A

R

K

K

A N

S A

S

F O

N

N I N

G

G

E O

R G

I A

S O

F

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F

A C

I L

I T

Y

F

Y

J A

N U

A R

Y

SHEET ID

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S A

V A

N N

S

T R

I C

T

W

E S

T

O

G L

E T

H O

R P

E

A

V E

S A

V A

N N

A H

G

A

E

S d w g

W

H

O W

E N

E

L A

R E

S

N

W

H E

A T

L E

Y

N

D

A V

N D

H O

T

A I L

TS501

C1

COMMUNICATION VAULT DETAIL

SCALE: NTS

TELECOM

D5

STABILOC ASSEMBLY DETAIL

SCALE: NTS

A4

RUBBER SEALANT SPECIFICATIONS

SCALE: NTS

1. CABLE PLACEMENT, SPLICING, TERMINATION AND

TESTING TO BE IN ACCORDANCE WITH THE UNITED

STATES ARMY INFORMATION SYSTEMS

ENGINEERING COMMAND (USAISEC) OUTSIDE

PLANT DESIGN AND PERFORMANCE

REQUIREMENTS (OSPDPR) AND IN COLLABORATION

WITH AND ACCEPTANCE BY THE FT BENNING

NETWORK ENTERPRISE CENTER (NEC).

2. EXISTING VACANT DUCTS THAT ARE TO BE USED

FOR NEW CABLES SHALL BE CLEANED AND TESTED

WITH A TEST MANDREL TO DETECT ANY

OBSTRUCTIONS, COLLAPSED DUCTS, OR DUCT

INCONSISTENCIES.

3. COPPER AND FIBER OPTIC CABLE (FOC) SPLICING

SHALL BE PERFORMED IAW RUS BULLETIN

1753F-401, STANDARDS FOR SPLICING COPPER

AND FIBER OPTIC CABLE, FEBRUARY 1995.

4. ALL COPPER SPLICES SHALL BE MULTI-PAIR, FOLD

BACK TYPE. FIBER OPTIC SPLICE SHALL BE FUSION

TYPE.

5. CONFIRM CABLE IDENTIFICATION AND

PAIR/STRAND COUNTS WITH THE NEC.

6. CABLE ID/TAGS SHALL BE INSTALLED AT ALL

TERMINATION POINTS AND SPLICES. IN

MAINTENANCE HOLES, ALL NEW AND EXISTING

CABLES THAT ARE PART OF THE PROJECT SHALL

BE TAGGED/RETAGGED BETWEEN THE SPLICE AND

THE WALL AND ON BOTH SIDES OF A SPLICE LOOP

OR MAINTENANCE LOOP.

GENERAL NOTES:

SHEET NOTES:

KEY PLAN

NOTE: LOCKING COVER

SHOWN FOR ILLUSTRATION.

NEW HANDHOLES TO HAVE

NON-LOCKING COVERS.

S I

D

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

R E

A D

Y

T

O

A

D V

E R

T I S

E

R

T A

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

US Army Corps of Engineers

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

D

E

D E

S C

R I P

T I O

N

B L

A C

K

A

A

T C

H

F

E D

E R

A L

R

E E

T

S

U I T

E

O V

E R

L A

R

K

K

A N

S A

S

F O

N

N I N

G

G

E O

R G

I A

S O

F

B

A T

T A

L I O

N

H

E A

D Q

U A

R T

E R

S

F

A C

I L

I T

Y

F

Y

J A

N U

A R

Y

SHEET ID

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S A

V A

N N

S

T R

I C

T

W

E S

T

O

G L

E T

H O

R P

E

A

V E

S A

V A

N N

A H

G

A

E

S d w g

W

H

O W

E N

E

L A

R E

S

N

W

H E

A T

L E

Y

N

D

A V

N D

H O

T

A I L

TS502

TELECOM

D1

CABLE RACK DETAILS

SCALE: NTS

A1

MISCELLANEOUS HANDHOLE DETAILS

SCALE: NTS

1. CABLE PLACEMENT, SPLICING, TERMINATION AND

TESTING TO BE IN ACCORDANCE WITH THE UNITED

STATES ARMY INFORMATION SYSTEMS

ENGINEERING COMMAND (USAISEC) OUTSIDE

PLANT DESIGN AND PERFORMANCE

REQUIREMENTS (OSPDPR) AND IN COLLABORATION

WITH AND ACCEPTANCE BY THE FT BENNING

NETWORK ENTERPRISE CENTER (NEC).

2. EXISTING VACANT DUCTS THAT ARE TO BE USED

FOR NEW CABLES SHALL BE CLEANED AND TESTED

WITH A TEST MANDREL TO DETECT ANY

OBSTRUCTIONS, COLLAPSED DUCTS, OR DUCT

INCONSISTENCIES.

3. COPPER AND FIBER OPTIC CABLE (FOC) SPLICING

SHALL BE PERFORMED IAW RUS BULLETIN

1753F-401, STANDARDS FOR SPLICING COPPER

AND FIBER OPTIC CABLE, FEBRUARY 1995.

4. ALL COPPER SPLICES SHALL BE MULTI-PAIR, FOLD

BACK TYPE. FIBER OPTIC SPLICE SHALL BE FUSION

TYPE.

5. CONFIRM CABLE IDENTIFICATION AND

PAIR/STRAND COUNTS WITH THE NEC.

6. CABLE ID/TAGS SHALL BE INSTALLED AT ALL

TERMINATION POINTS AND SPLICES. IN

MAINTENANCE HOLES, ALL NEW AND EXISTING

CABLES THAT ARE PART OF THE PROJECT SHALL

BE TAGGED/RETAGGED BETWEEN THE SPLICE AND

THE WALL AND ON BOTH SIDES OF A SPLICE LOOP

OR MAINTENANCE LOOP.

GENERAL NOTES:

SHEET NOTES:

KEY PLAN

BATT

BC

BK

BKR

BL

BLDG

BLK

BMS

BMS

BN

BREX

BATTERY

BATTERY CHARGER

BLACK

BREAKER

BLUE

BUILDING

BLACK

BALANCED MAGNETIC SWITCH

BUILDING MANAGEMENT

BROWN

CRASH BAR REQUEST TO EXIT

Y YELLOW

XFMR

XFR

TRANSFORMER

TRANSFER

W W/

WH

WBC

WHD

WP

WS

WW

WHITE, WIRE, WIDTH, WEST

WITH

WATER HEATER

WAVEGUIDE BELOW CUTOFF

WATT HOUR DEMAND

WEATHERPROOF

WORK STATION

WIREWAY

UL

UNO

UP

UPSD

UNDERWRITERS LABORATORIES

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER 208V

PANELBOARD UNINTERRUPTIBLE POWER SUPPLY

V

VAC

VDC

VOIP

VOLTAGE

AC VOLTS

VOLTS DIRECT CURRENT

VOICE OVER INTERNET PROTOCOL

O

OBA

OD

ORANGE

ON BATTERY ALARM

OVERHEAD DOOR

QTY QUANTITY

I&C

ICD

ICS

IDS

IESS

INSTRUMENTATION AND CONTROLS

INTELLIGENCE COMMUNITY DIRECTIVE

INTELLIGENCE COMMUNITY STANDARD

INTRUSION DETECTION SYSTEM

INTEGRATED ELECTRONIC SECURITY SYSTEM

JB JUNCTION BOX

KAIC

KV

KVA

KVAR

KVH

KW

KWH

KILOVOLT-AMPERES INTERRUPTING

CAPACITY KILOVOLTS

KILOVOLT AMPERES

KILOVAR

KILOVARHOUR

KILOWATTS

KILOWATTHOUR

L

LBA

LBS

LAN

LC

LCP

LOCAL

LOW BATTERY ALARM

POUNDS

LOCAL AREA NETWORK

LIGHTING CONTRACTOR

LOCAL CONTROL PANEL

(F)

FCU

FM

FO

FODC

FODP

FORX

FOTX

FOT

FOTM

FUTURE

FAN COIL UNIT

FREQUENCY METER

FIBER OPTIC, FUEL OIL

FIBER OPTIC DUCT CABLE

FIBER OPTIC DISTRIBUTION PANEL

FIBER OPTIC RECEIVER

FIBER OPTIC TRANSMITTER

FIBER OPTIC TRANSCEIVER

FIBER OPTIC TRANSCEIVER/MULTIPLEXER

GALVANIZED

GREEN,GROUND

GROUND BAR

GROUND FAULT CIRCUIT

INTERRUPTER GROUND

H

HZ

HIGH OR HANDHOLE

HERTZ

EF

EB

EHH

EL

ELEC, ELECT

ELEV

EMI

EMT

ENCL

EQ

EQUIP

EST

EAST

ELECTRIFIED BOLT

ELECTRICAL HANDHOLE

ELECTRIC LOCK

ELECTRICAL

ELEVATION

ELECTROMAGNETIC INTERFERENCE

ELECTRICAL METALLIC TUBING

ENCLOSURE

EQUAL

EQUIPMENT

ESTIMATED

N/A

NC

NE

NIC

NO

NSW

NW

NOT APPLICABLE

NORMALLY CLOSED

NORTHEAST

NOT IN CONTRACT

NUMBER, NORMALLY OPEN

NETWORK SWITCH

NORTHWEST

DIGITAL AMMETER

DURESS ALARM SWITCH

DIRECT CURRENT/DC PANEL BOARD

DOOR CONTROL PANEL, DIRECT CURRENT PANELBOARD

DIESEL GENERATOR

DEVICE INTERFACE BOX

DISTANCE

LAN SWITCH

VOLTAGE REGULATOR

C

CAB

CAM

CATV

CB

CC

CCTV

CCVT

CDB

CER

CGB

CJB

CKT

CMH

COMM

CONN

CP

CPB

CPR

CR

CRAC

CRIB

CTL

CU

CLOSE, CONDUIT

CABINET

CAMERA FIXED OR PTZ

CABLE TELEVISION

CIRCUIT BREAKER

COMMUNICATIONS CABINET

CLOSED CIRCUIT TELEVISION

COUPLING CAPACITOR VOLTAGE TRANSFORMER

COMMUNICATIONS DUCT BANK

COMMUNICATIONS EQUIPMENT ROOM

COMMUNICATIONS GROUND BAR

CAMERA JUNCTION BOX

CIRCUIT

COMMUNICATIONS MANHOLE

COMMUNICATION

CONNECTED OR CONNECTION

CONTROL PANEL

COMMUNICATIONS PULLBOX

COMMUNICATIONS PROCESSOR

CARD READER

COMPUTER ROOM AIR CONDITIONER

CARD READER INTERFACE BOARD

CONTROL

COPPER

MCB

MCC

MCS

MDP

MECH

MGB

MN

MS

MSB

MTL

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MAIN CIRCUIT SWITCH

MAIN DISTRIBUTION PANEL

MECHANICAL

MAIN GROUND BAR

MAIN

MOTOR STARTER, MOTION SENSOR

MAIN SWITCHBOARD

METAL

P

PBB

PS

PA

PB

PIMS

POS

PP

PR

PST

PT

PTB

PTZ

PVC

PWR

POLE

TELECOM PRIMARY BUSBAR

POWER SUPPLY

PUBLIC ADDRESS

PULLBOX

PASSIVE INFRARED MOTION SENSOR

POSITION OF SWITCH

POWER PLAN, POWER PANEL (208V)

PAIR/POWER RECEPTACLE (480V)

PHASE SHIFTING TRANSFORMER

POTENTIAL TRANSFORMER

POTENTIAL TEST BLOCK

CAMERA PAN-TILT-ZOOM POLYVINYL

POLYVINYL CHLORIDE CONDUIT

POWER

S

SCC

SE

SEC

SIM

SMF

SO

SOO

SP

SQ

SS

STD

STHWEST

STOR

SUB

SW

SLIP FITTING, SOUTH

SYSTEM CONTROL CABINET

SOUTHEAST

SECONDS

SENSOR INPUT MODULE

SINGLE MODE FIBER

FLEXIBLE POWER CORD

SEQUENCE OF OPERATION

SYSTEM PROCESSOR, SPARE

SQUARE

STAINLESS STEEL OR SYNCHRONIZING SWITCH

STANDARD

SOUTHWEST

STORAGE

SUBSTATION

SWITCH

TA

TAS

TB

TBD

THWN

TOT

TR

TYP

TROUBLE ALARM

TAMPER ALARM SWITCH

TERMINAL BLOCK

TO BE DETERMINED

THERMOPLASTIC HEAT AND WATER RESISTANT NYLON COATED

TOTAL

TRANSFORMER / TELECOMMUNICATION ROOM

TYPICAL

GAL

G,GN

GB

GFCI

GND

R

RF

RL

RM

RMC

REMOTE

RADIO FREQUENCY

REMOTE/LOCAL

ROOM

RIGID METAL CONDUIT

A

AF

AFF

AFG

APPROX

AWG

AUX

AMPERES

AMP FRAME

ABOVE FINISH FLOOR

ABOVE FINISH GRADE

APPROXIMATELY

AMERICAN WIRE GAUGE

AUXILIARY

DA

DAS

DC

DCP

DG

DIB

DIST

DLS

DVR

LPP

LREX

LTS

LV

LOCAL PROCESSOR PANEL

LEVER REQUEST TO EXIT DEVICE

LIGHTS

LOW VOLTAGE (600V OR LESS)

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:48:31 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY001

SE

C

U R

IT

Y

AB

BR

EV

IA

TI

O

N S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

W H

N R

G

E

O

R

G

I

A

P

A

J

AC

K

S

O

N

R

E

G

I S

T E

R

E

D

E

N

G

IN

E

E

R

No. PE046864

PROFESSIONAL

01/21/22

SECURITY

BALANCED MAGNETIC SWITCH

360° DOME PTZ CAMERA AND HOUSING

FIXED CAMERA

GLASS BREAK SENSOR

MOTION SENSOR - PASSIVE INFRARED

MOTION SENSOR - 360 DEG COVERAGE

DEVICE INTERFACE BOX

ELECTRIFIED COMBINATION LOCK (FF-L-2740)

KEYPAD

CARD READER OPTIONS:

• 1-LEVEL 1 CARD READER

• 2-LEVEL 2 CARD READER W/INTEGRAL

KEYPAD OR SEPARATE KEYPAD

• 3-LEVEL 3 CARD READER W/KEYPAD

AND BIOMETRICS

• X- SHALL BE REPLACED BY NUMBERS

LISTED ABOVE AS INDICATED ON PLAN

DRAWING

ROLL-UP DOOR BALANCED MAGNETIC SWITCH

EQUIPMENT ID CODES

ATS AUTOMATIC TRANSFER SWITCH

BATT BATTERY

BD BUS DUCT

BAL BLUE ALERT LIGHT

BMS BALANCED MAGNETIC SWITCH

CAM CAMERA

CJB CAMERA JUNCTION BOX

CR CARD READER / CARD READER WITH KEYPAD

DIB DEVICE INTERFACE BOX

DRI DUEL READER INTERFACE

DS DISCONNECT SWITCH

FOP FIBER OPTIC PATCH PANEL

FOTX FIBER OPTIC TRANSMITTER

GBS GLASS BREAK SENSOR

JB JUNCTION BOX

KP KEYPAD

ICM INPUT CONTROL MODULE

IDRI INTELLIGENT DUEL READER INTERFACE

IS INTEGRATED SWITCHBOARD

ISC INTELLIGENT SYSTEM CONTROLLER

LP LIGHTING PANELBOARD

LREX LEVER REQUEST TO EXIT

MAG ELECTROMAGNETIC LOCK

MCC MOTOR CONTROL CENTER

ML MORTISE LOCK

MS MOTION SENSOR

MTS MANUAL TRANSFER SWITCH

NSW NETWORK SWITCH

PDM POWER DISTRIBUTION MODULE

PDP POWER DISTRIBUTION PANELBOARD

PIR MOTION SENSOR - PASSIVE INFRARED

PP POWER PANELBOARD

PS POWER SUPPLY

PU POWER PANELBOARD UNINTERRUPTIBLE

SU SWITCHBOARD UNINTERRUPTIBLE

SSDA SURGE SUPPERSSION DATA

SSP SURGE SUPPERSSION POWER

SWG SWITCHGEAR

RF RF/EMI FILTER ASSEMBLY

T TRANSFORMER

TAS TAMPER SWITCH

TU TRANSFORMER UNINTERRUPTIBLE

UPS UNINTERRUPTIBLE POWER SUPPLY

360°

BATTERY

FIBER OPTIC PATCH PANEL

FIBER OPTIC TRANSMITTER

POWER DISTRIBUTION MODULE

POWER SUPPLY

NETWORK SWITCH

CRASH BAR REQUEST TO EXIT

X

GENERAL EQUIPMENT IDENTIFICATION

REDUNDANT GROUP OR OTHER ID

3 DIGIT EQUIPMENT NUMBER

3 DIGIT BUILDING ID

NN9 = SITE

NQ9 = BLDG.

EQUIPMENT ID CODE

XXX - XXX XXX X

A = A SIDE

B = B SIDE

H = HOUSE OR NON-PROCESSING POWER

T = TECHNICAL OR PROCESSING POWER

LS = LIFE SAFETY

GENERAL NOTES

1. FOR GENERAL EQUIPMENT IDENTIFICATION, BUILDING ID, AND

EQUIPMENT ID CODES SEE SHEET T-003.

2. REFER TO ARCHITECTURAL FOR WALL TYPES INCLUDING FIREWALLS.

3. RF/EMI PROTECTION SUBSYSTEMS ARE REQUIRED IN A PORTION OF

THE FACILITY. THIS WORK AND ANY WORK THAT MIGHT AFFECT

PERFORMANCE OF THE RF/EMI SHIELD SHALL BE COORDINATED WITH

AN APPROVED SUBSYSTEM SHIELDING SPECIALIST AS REQUIRED BY

THE SPECIFICATIONS. SHIELD PENETRATIONS OTHER THAN THOSE

SHOWN ON THE DRAWINGS MUST BE APPROVED BY THE CONTRACTING

OFFICER.

4. ALL ELECTRICAL DISTRIBUTION EQUIPMENT SHALL HAVE A RMS

SYMMETRICAL SHORT CIRCUIT RATING EQUAL TO OR GREATER THAN

THE RATINGS INDICATED ON THE DRAWINGS. THE MINIMUM RMS

SYMMETRICAL SHORT CIRCUIT RATING SHALL BE 10,000 AMPS FOR

EQUIPMENT WITHOUT SHORT CIRCUIT RATINGS INDICATED ON

DRAWINGS. IN ADDITION, ALL EQUIPMENT SHALL BE RATED GREATER

THAN THE SHORT CIRCUIT STUDY CALCULATED DUTY PROVIDED BY

THE CONTRACTOR IN ACCORDANCE WITH SPECIFICATION SECTION 26

28 01.00 10 COORDINATED POWER SYSTEM PROTECTION STUDY.

5. ALL ELECTRICAL WORK AND MATERIAL IS NEW, AND PROVIDED BY THE

CONTRACTOR UNLESS INDICATED OTHERWISE.

6. ALL NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT, LIGHTING

FIXTURES, ETC., SHALL BE GROUNDED BY MEANS OF GREEN

INSULATED GROUND WIRE IN RACEWAY WITH SUPPLY CONDUIT SHALL

BE ELECTRICALLY CONTINUOUS AND GROUNDED IN ACCORDANCE

WITH THE NATIONAL ELECTRICAL CODE, ARTICLE 250.

7. THE ELECTRICAL INSTALLATION COMPLY WITH ALL THE 2017 NATIONAL

ELECTRICAL CODE AND OTHER GOVERNMENT ORDINANCES.

8. ALL ELECTRICAL EQUIPMENT SHALL BE UL LABELED.

9. COORDINATE ALL TELECOM & SECURITY WORK WITH OTHER TRADES.

MECHANICAL EQUIPMENT TAGS MAY HAVE THE BUILDING NUMBER

TRUNCATED FROM THESE DRAWINGS.

10. ALL ELECTRICAL EQUIPMENT AND RACEWAYS SHALL BE SEISMICALLY

QUALIFIED AND SUPPORTED PER THE SEISMIC REQUIREMENTS IN THE

SPECIFICATIONS.

11. DRIP PANS SHALL BE PROVIDED BELOW ALL PIPING OR DUCTWORK

THAT IS INSTALLED ABOVE ELECTRICAL EQUIPMENT.

12. CONSTRUCTION OF SECURE AREAS, AND SECURE AREA MATERIALS

AND COMPONENTS, SHALL COMPLY WITH UFC 4-010-015 AND IC TECH

SPECS FOR ICD/ICS 705, AND FULLY MEET AND PASS ALL

ACCREDITATION.

13. THIS FACILITY IS A CONTROLLED ACCESS AREA (CAA), NO PROTECTION

DISTRIBUTION SYSTEM (PDS) IS REQUIRED.

14. IN ALL CEILING AREAS OPEN TO STRUCTURE ABOVE, INSTALL ALL

EXPOSED CONDUIT AND RACEWAY IN AN ORGANIZED FASHION AND

PERPENDICULAR AND PARALLEL TO EACH OTHER AND TO THE

BUILDING EXTERIOR WALLS TO THE GREATEST EXTENT POSSIBLE. ALL

EXPOSED ITEMS LOCATED ABOVE THE SUSPENDED LIGHT FIXTURES

AND CEILING CLOUD ELEMENTS SHALL BE PAINTED THE SAME COLOR

AS THE EXPOSED STRUCTURE AS INDICATED NOTED ON DRAWINGS

A-601 AND A-602, FOR INTERIOR STRUCTURE, AND A-605 AND A-606, FOR

EXTERIOR STRUCTURE. DO NOT PAINT SPRINKLER HEADS, FIRE/SMOKE

DETECTORS AND NOTIFICATION DEVICES, OPERABLE VALVES OR ANY

OTHER ITEMS THAT ARE PROHIBITED FROM PAINTING BY THE

MANUFACTURER OR THAT WOULD IMPACT INTENDED USE OR

OPERABILITY.

CAMERA JUNCTION BOXCJB

DIB

ECL

KP

BATT

BREX

FOP

FOTX

NSW

PDM

PS

BATT BATTERY

EL ELECTRIC LOCK

LOCAL PROCESSOR PANELLP

NETWORK VIDEO RECORDERNVR

JUNCTION BOXJB

WS WORKSTATION

DURESS ALARM SWITCH

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:44:44 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY002

SE

C

U R

IT

Y

LE

G

EN

D

N

O

TE

S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

W H

N R

G

E

O

R

G

I

A

P

A

K

S

O

N

R

E

G

I S

T E

R

E

D

E

N

G

IN

E

E

R

No. PE046864

NMLKJHGFEDCBA

8.2

1.3

C.3B.3 L.7D.5

TY111 TY112 TY113

TY116TY115TY114

4.5

D E F

A B C

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN NORTH

KEY PLAN

SCALE: NTS

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:48:40 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY110

SE

C

U R

IT

Y

PL

AN

LE

VE

L

1- O

VE

R

AL

L

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

1/16" = 1'-0"C2 SECURITY PLAN - LEVEL 1 - OVERALL

0 8' 16' 32'

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

W H

N R

G

E

O

R

G

I

A

P

A

K

S

O

N

R

E

G

I S

T E

R

E

D

E

N

G

IN

E

E

R

No. PE046864

JB

JB JB

EL

DIB

DIB

EL

JB

JB

JB

JB

JB

EDCBA

M

AT

C H

LI

N

E S

EE

B

TY

MATCHLINE SEE C2 / TY114

ALOC

122.3

COMM S6

123.1

GUARD DUTY

STATION

VESTIBULE

LOBBY

ALOC

COMM S6

MECHANICAL

ALOC

122.1

ELEC.

ALOC

122.2

HHC CO

125.1

HHC HQ

FIRE PUMP ROOM

STAIR C

SHARED

PLANNING BAY

SOUTH

113B

SHARED

PLANNING BAY

NORTH

113A

ELEV MECH

STORAGE

STORAGE

JAN

HALLWAY

1.3

C.3B.3 D.5

N

VR

4.5

JB-AD1-009

JB-AD1-015A1

TY507

HHC CO

125.2

HHC CO

125.3

JB-AD1-001 JB-AD1-002

DIB-AD1-001

DIB-AD1-002

A1

TY506

A1

TY508

JB-AD1-014

B5

TY510

TYP

B5

TY505

TYP

WS

WS

JB-AD1-018

BREX

BREX

WS-AD1-002

WS-AD1-001

JB-AD1-019

JB-AD1-020

A1

TY505

TYP

JB-AD1-0XX

D E F

A B C

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN NORTH

KEY PLAN

SCALE: NTS

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:46:45 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY111

SE

C

U R

IT

Y

PL

AN

LE

VE

L

-A

R

EA

A

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

1/8" = 1'-0"B1 SECURITY PLAN - LEVEL 1 - AREA A

8'4' 16'0

1. FOR SECURITY GENERAL NOTES, LEGENDS, AND ABBREVIATIONS, SEE

SHEETS TY001 AND TY002.

2. ALL SECURITY DEVICES INCLUDING SYSTEM AND INSTALLATION IS GFGI. ANY

MENTION OF SECURITY HARDWARE IS FOR REFERENCE ONLY TO THE

CONTRACTOR.

3. ALL CONDUITS SHALL BE INSTALLED WITH PULL STRINGS.

4. REFERENCE ELECTRICAL SPECIFICATION FOR INTERIOR CONDUIT, POWER,

CABLE, AND ENCLOSURE REQUIREMENTS.

5. REFERENCE DRAWINGS TY501 THRU TY510 FOR INSTALLATION DETAILS.

6. CONDUITS (GFGI SIGNAL CABLE) SHALL BE ROUTED FROM GFGI SECURITY

DEVICES TO THE NEAREST NIPR TR ROOM.

7. CONDUITS (CFCI POWER CABLE) SHALL BE ROUTED FROM THE NEAREST

ELECTRICAL ROOM TO A RECEPTACLE IN THE GFGI SECURITY DEVICE

ENCLOSURES OR JUNCTION BOX.

8. CONDUITS SHALL BE ROUTED FROM THE GFGI CAMERAS TO NEAREST NIPR

TR ROOM.

9. SEE RISER DIAGRAMS TY601 THRU TY603.

10. COORDINATE WITH MECHANICAL CONTRACTOR TO ENSURE THAT SECURITY

JUNCTION BOXES OR ENCLOSURES DO NOT BLOCK MAINTENANCE ACCESS

FOR WATER-TO-AIR HEAT PUMPS (WAHP). LOCATION AND MAINTENANCE

CLEARANCE OF WAHPS ARE SHOWN IN MECHANICAL MH SERIES DRAWINGS.

GENERAL NOTES

1. SEE SHEETS A-610 TO A-612 FOR DOOR HARDWARE AND SPEC 08 71 00FOR

EACH OF THESE DOORS. THESE DOORS ARE EQUIPPED WITH A STAND-ALONE

LOCK EQUIPPED WITH PUSHBUTTON KEYPAD AND/OR BADGE READER. THE

READER DOES NOT HAVE ANY CONNECTION TO THE ACCESS CONTROL

SYSTEM AND IS SHOWN ON THE FLOOR PLANS FOR REFERENCE ONLY TO THE

CONTRACTOR.

2. THE NETWORK VIDEO RECORDER AND WALL MOUNTED RACK WILL BE GFGI.

CONTRACTOR TO ROUTE 1" CONDUIT WITH PULLSTRING FROM THE JUNCTION

BOX IN GUARD DUTY STATION TO MAIN NIPR TR 106 JUNCTION BOX FOR THE

GFGI NETWORK SWITCH AND GFGI WALL MOUNTED RACK.

3. CONTRACTOR TO ROUTE TWO 1" CONDUITS WITH PULLSTRING FROM THE

JUNCTION BOX IN MAIN NIPR TR 106 TO GUARD DUTY STATION JUNCTION BOX

FOR BOTH WORKSTATIONS. JUNCTION BOX SHOULD BE FLUSH MOUNTED IN

THE WALL BEHIND THE CONSOLE.

4. CONTRACTOR TO ROUTE 3/4" CONDUIT WITH PULLSTRING FROM GUARD DUTY

STATION CONSOLE TO BOTH DOORS 100A AND 101A FOR THE GFGI DOOR

RELEASE PUSHBUTTION.

SHEET NOTES

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

W H

N R

G

E

O

R

G

I

A

P

A

K

S

O

N

R

E

G

I S

T E

R

E

D

E

N

G

IN

E

E

R

No. PE046864

JB EL

EL

DIB

D

IB

JBJBJB

LP

JB

JHGFE

M

AT

C H

LI

N

E S

EE

B

TY

MATCHLINE SEE C2 / TY115

M

AT

C H

LI

N

E S

EE

B

TY

VESTIBULE

STAIR A

SHOP

CONFERENCE

ROOM 12PN

CONFERENCE

ROOM 12PN

CONFERENCE

ROOM 12PN

SHARED BREAK

RECYCLE

CEMA HQ XO

129.1

CEMA HQ 1ST

SGT

129.2

CEMA HQ

COMMANDER

129.3

CEMA CO HQ

CYBER

VESTIBULE

CYBER

130.1

TSD

131.1

EW

132.1

BREAK

EW

ELEC.

MAIN JIANT TR

MAIN NIPR TR

HALLWAY

HALLWAY

1.3

EW

132.2

4.5

JB-AD1-013

A1

TY506

A1

TY508

JB-AD1-016JB-AD1-004JB-AD1-003

LPP-AD1-001

DIB-AD1-003

DIB-AD1-004

JB-AD1-021

B5

TY505

TYP

D5

TY505

NSW

NSW-AD1-001

B5

TY510

BREX

BR

EX

BREX

D E F

A B C

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN NORTH

KEY PLAN

SCALE: NTS

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:46:52 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY112

SE

C

U R

IT

Y

PL

AN

LE

VE

L

-A

R

EA

B

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

1/8" = 1'-0"B2 SECURITY PLAN - LEVEL 1 - AREA B

8'4' 16'0

1. FOR SECURITY GENERAL NOTES, LEGENDS, AND ABBREVIATIONS, SEE

SHEETS TY001 AND TY002.

2. ALL SECURITY DEVICES INCLUDING SYSTEM AND INSTALLATION IS GFGI. ANY

MENTION OF SECURITY HARDWARE IS FOR REFERENCE ONLY TO THE

CONTRACTOR.

3. ALL CONDUITS SHALL BE INSTALLED WITH PULL STRINGS.

4. REFERENCE ELECTRICAL SPECIFICATION FOR INTERIOR CONDUIT, POWER,

CABLE, AND ENCLOSURE REQUIREMENTS.

5. REFERENCE DRAWINGS TY501 THRU TY510 FOR INSTALLATION DETAILS.

6. CONDUITS (GFGI SIGNAL CABLE) SHALL BE ROUTED FROM GFGI SECURITY

DEVICES TO THE NEAREST NIPR TR ROOM.

7. CONDUITS (CFCI POWER CABLE) SHALL BE ROUTED FROM THE NEAREST

ELECTRICAL ROOM TO A RECEPTACLE IN THE GFGI SECURITY DEVICE

ENCLOSURES OR JUNCTION BOX.

8. CONDUITS SHALL BE ROUTED FROM THE GFGI CAMERAS TO NEAREST NIPR

TR ROOM.

9. SEE RISER DIAGRAMS TY601 THRU TY603.

10. COORDINATE WITH MECHANICAL CONTRACTOR TO ENSURE THAT SECURITY

JUNCTION BOXES OR ENCLOSURES DO NOT BLOCK MAINTENANCE ACCESS

FOR WATER-TO-AIR HEAT PUMPS (WAHP). LOCATION AND MAINTENANCE

CLEARANCE OF WAHPS ARE SHOWN IN MECHANICAL MH SERIES DRAWINGS.

GENERAL NOTES

1. SEE SHEETS A-610 TO A-612 FOR DOOR HARDWARE AND SPEC 08 71 00 FOR

EACH OF THESE DOORS. THESE DOORS ARE EQUIPPED WITH A STAND-ALONE

LOCK EQUIPPED WITH PUSHBUTTON KEYPAD AND/OR BADGE READER. THE

READER DOES NOT HAVE ANY CONNECTION TO THE ACCESS CONTROL

SYSTEM AND IS SHOWN ON THE FLOOR PLANS FOR REFERENCE ONLY TO THE

CONTRACTOR.

SHEET NOTES

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

W H

N R

G

E

O

R

G

I

A

P

A

K

S

O

N

R

E

G

I S

T E

R

E

D

E

N

G

IN

E

E

R

No. PE046864

1 EL

DIB

D

IB

EL

JB

JB JB

JB

JB

JB

JB

360°

NMLKJ

M

AT

C H

LI

N

E S

EE

B

TY

MATCHLINE SEE C2 / TY116

CO COMMANDER

135.1

COMPANY FIRST

SRG 1SG

135.2

CO XO

135.3

HUMINT

135.4

HUMINT

135.5

RMIC HUMINT

136.1

BREAK

RMIC CO HQ

1ST FLOOR JIANT

1ST FLOOR NIPR

HUMINT

ELEC

140 MECHANICAL

STAIR B

CORRIDOR

1.3

L.7

4.5

HUMINT

DIB-AD1-006

A1

TY508

A1

TY506

DIB-AD1-005

JB-AD1-006

JB-AD1-007 JB-AD1-008

JB-AD1-011

JB-AD1-017

A1

TY507

JB-AD1-012

JB-AD1-010

A1

TY507

BREX

BR

EX

B5

TY505

TYP

B5

TY510

TYP

D E F

A B C

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN NORTH

KEY PLAN

SCALE: NTS

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:46:59 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY113

SE

C

U R

IT

Y

PL

AN

LE

VE

L

-A

R

EA

C

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

1/8" = 1'-0"B2 SECURITY - LEVEL 1 - AREA C

8'4' 16'0

1. FOR SECURITY GENERAL NOTES, LEGENDS, AND ABBREVIATIONS, SEE

SHEETS TY001 AND TY002.

2. ALL SECURITY DEVICES INCLUDING SYSTEM AND INSTALLATION IS GFGI. ANY

MENTION OF SECURITY HARDWARE IS FOR REFERENCE ONLY TO THE

CONTRACTOR.

3. ALL CONDUITS SHALL BE INSTALLED WITH PULL STRINGS.

4. REFERENCE ELECTRICAL SPECIFICATION FOR INTERIOR CONDUIT, POWER,

CABLE, AND ENCLOSURE REQUIREMENTS.

5. REFERENCE DRAWINGS TY501 THRU TY510 FOR INSTALLATION DETAILS.

6. CONDUITS (GFGI SIGNAL CABLE) SHALL BE ROUTED FROM GFGI SECURITY

DEVICES TO THE NEAREST NIPR TR ROOM.

7. CONDUITS (CFCI POWER CABLE) SHALL BE ROUTED FROM THE NEAREST

ELECTRICAL ROOM TO A RECEPTACLE IN THE GFGI SECURITY DEVICE

ENCLOSURES OR JUNCTION BOX.

8. CONDUITS SHALL BE ROUTED FROM THE GFGI CAMERAS TO NEAREST NIPR

TR ROOM.

9. SEE RISER DIAGRAMS TY601 THRU TY603.

10. COORDINATE WITH MECHANICAL CONTRACTOR TO ENSURE THAT SECURITY

JUNCTION BOXES OR ENCLOSURES DO NOT BLOCK MAINTENANCE ACCESS

FOR WATER-TO-AIR HEAT PUMPS (WAHP). LOCATION AND MAINTENANCE

CLEARANCE OF WAHPS ARE SHOWN IN MECHANICAL MH SERIES DRAWINGS.

GENERAL NOTES

1. SEE SHEETS A-610 TO A-612 FOR DOOR HARDWARE AND SPEC 08 71 00 FOR

EACH OF THESE DOORS. THESE DOORS ARE EQUIPPED WITH A STAND-ALONE

LOCK EQUIPPED WITH PUSHBUTTON KEYPAD AND/OR BADGE READER. THE

READER DOES NOT HAVE ANY CONNECTION TO THE ACCESS CONTROL

SYSTEM AND IS SHOWN ON THE FLOOR PLANS FOR REFERENCE ONLY TO THE

CONTRACTOR.

2. MECHANICAL AND ELECTRICAL ROOM DOORS ARE KEYED LOCK AND WILL

NOT REQUIRE A BMS SWITCH OR MOTION SENSOR. SEE SHEETS A-610 TO

A-612 FOR DOOR HARDWARE AND SPEC 08 71 00 FOR THESE DOORS. THIS IS

FOR REFERENCE ONLY TO THE CONTRACTOR.

SHEET NOTES

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

W H

N R

G

E

O

R

G

I

A

P

A

K

S

O

N

R

E

G

I S

T E

R

E

D

E

N

G

IN

E

E

R

No. PE046864

EL

DIB

JBEL

DIB

JB JB

JB JB

JB

JB

EDCBA

SECURE

NON-SENS.

STORAGE

HHC READINESS

BAY

COMM STORAGE

UNIT STORAGE

UNIT STORAGE

MENS

159 HALLWAY

WOMENS

ARMS VAULT

MATCHLINE SEE B1 / TY111

M

AT

C H

LI

N

E

SE

E C

TY

8.2

C.3B.3 D.5

NBC ROOM

A1

TY506

DIB-RM-001

A1

TY501

JB-RM-001

DIB-RM-002

JB-RM-002A JB-RM-002B JB-RM-004JB-RM-003

JB-RM-005

JB-RM-006

BREX

C1

TY505

A6

TY507

B5

TY505

TYP

BREX

A1

TY509

B5

TY510

D E F

A B C

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN NORTH

KEY PLAN

SCALE: NTS

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:47:05 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY114

SE

C

U R

IT

Y

PL

AN

LE

VE

L

-A

R

EA

D

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

1/8" = 1'-0"C2 SECURITY - LEVEL 1 - AREA D

8'4' 16'0

1. FOR SECURITY GENERAL NOTES, LEGENDS, AND ABBREVIATIONS, SEE

SHEETS TY001 AND TY002.

2. ALL SECURITY DEVICES INCLUDING SYSTEM AND INSTALLATION IS GFGI. ANY

MENTION OF SECURITY HARDWARE IS FOR REFERENCE ONLY TO THE

CONTRACTOR.

3. ALL CONDUITS SHALL BE INSTALLED WITH PULL STRINGS.

4. REFERENCE ELECTRICAL SPECIFICATION FOR INTERIOR CONDUIT, POWER,

CABLE, AND ENCLOSURE REQUIREMENTS.

5. REFERENCE DRAWINGS TY501 THRU TY510 FOR INSTALLATION DETAILS.

6. CONDUITS (GFGI SIGNAL CABLE) SHALL BE ROUTED FROM GFGI SECURITY

DEVICES TO THE NEAREST NIPR TR ROOM.

7. CONDUITS (CFCI POWER CABLE) SHALL BE ROUTED FROM THE NEAREST

ELECTRICAL ROOM TO A RECEPTACLE IN THE GFGI SECURITY DEVICE

ENCLOSURES OR JUNCTION BOX.

8. CONDUITS SHALL BE ROUTED FROM THE GFGI CAMERAS TO NEAREST NIPR

TR ROOM.

9. SEE RISER DIAGRAMS TY601 THRU TY603.

10. COORDINATE WITH MECHANICAL CONTRACTOR TO ENSURE THAT SECURITY

JUNCTION BOXES OR ENCLOSURES DO NOT BLOCK MAINTENANCE ACCESS

FOR WATER-TO-AIR HEAT PUMPS (WAHP). LOCATION AND MAINTENANCE

CLEARANCE OF WAHPS ARE SHOWN IN MECHANICAL MH SERIES DRAWINGS.

GENERAL NOTES

1. SEE SHEETS A-610 TO A-612 FOR DOOR HARDWARE AND SPEC 08 71 00 FOR

EACH OF THESE DOORS. THESE DOORS ARE EQUIPPED WITH A STAND-ALONE

LOCK EQUIPPED WITH PUSHBUTTON KEYPAD AND/OR BADGE READER. THE

READER DOES NOT HAVE ANY CONNECTION TO THE ACCESS CONTROL

SYSTEM AND IS SHOWN ON THE FLOOR PLANS FOR REFERENCE ONLY TO THE

CONTRACTOR.

SHEET NOTES

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

W H

N R

G

E

O

R

G

I

A

P

A

K

S

O

N

R

E

G

I S

T E

R

E

D

E

N

G

IN

E

E

R

No. PE046864

JB JB

JB JB

JB

DIB

EL 1

1EL

DIB

JHGFE

COMM STORAGE

UNIT STORAGE

UNIT STORAGE

ARMS VAULT

WOMENS

HALLWAY

145 MENS

CEMA READINESS

BAY

MATCHLINE SEE B2 / TY112

M

AT

C H

LI

N

E

SE

E C

TY

M

AT

C H

LI

N

E

SE

E C

TY

8.2

NBC ROOM

SECURE

NON-SENS.

STORAGE

JB-RM-009

JB-RM-010

A1

TY501

JB-RM-007

DIB-RM-004

JB-RM-008A JB-RM-008B

JB-RM-011 JB-RM-012

DIB-RM-003

A1

TY506

C1

TY505

A6

TY506

B5

TY510

A1

TY509

BREX

B5

TY505

TYP

BREX

D E F

A B C

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN NORTH

KEY PLAN

SCALE: NTS

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:47:12 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY115

SE

C

U R

IT

Y

PL

AN

LE

VE

L

-A

R

EA

E

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

1/8" = 1'-0"C2 SECURITY PLAN - LEVEL 1 - AREA E

8'4' 16'0

1. FOR SECURITY GENERAL NOTES, LEGENDS, AND ABBREVIATIONS, SEE

SHEETS TY001 AND TY002.

2. ALL SECURITY DEVICES INCLUDING SYSTEM AND INSTALLATION IS GFGI. ANY

MENTION OF SECURITY HARDWARE IS FOR REFERENCE ONLY TO THE

CONTRACTOR.

3. ALL CONDUITS SHALL BE INSTALLED WITH PULL STRINGS.

4. REFERENCE ELECTRICAL SPECIFICATION FOR INTERIOR CONDUIT, POWER,

CABLE, AND ENCLOSURE REQUIREMENTS.

5. REFERENCE DRAWINGS TY501 THRU TY510 FOR INSTALLATION DETAILS.

6. CONDUITS (GFGI SIGNAL CABLE) SHALL BE ROUTED FROM GFGI SECURITY

DEVICES TO THE NEAREST NIPR TR ROOM.

7. CONDUITS (CFCI POWER CABLE) SHALL BE ROUTED FROM THE NEAREST

ELECTRICAL ROOM TO A RECEPTACLE IN THE GFGI SECURITY DEVICE

ENCLOSURES OR JUNCTION BOX.

8. CONDUITS SHALL BE ROUTED FROM THE GFGI CAMERAS TO NEAREST NIPR

TR ROOM.

9. SEE RISER DIAGRAMS TY601 THRU TY603.

10. COORDINATE WITH MECHANICAL CONTRACTOR TO ENSURE THAT SECURITY

JUNCTION BOXES OR ENCLOSURES DO NOT BLOCK MAINTENANCE ACCESS

FOR WATER-TO-AIR HEAT PUMPS (WAHP). LOCATION AND MAINTENANCE

CLEARANCE OF WAHPS ARE SHOWN IN MECHANICAL MH SERIES DRAWINGS.

GENERAL NOTES

1. SEE SHEETS A-610 TO A-612 FOR DOOR HARDWARE AND SPEC 08 71 00 FOR

EACH OF THESE DOORS. THESE DOORS ARE EQUIPPED WITH A STAND-ALONE

LOCK EQUIPPED WITH PUSHBUTTON KEYPAD AND/OR BADGE READER. THE

READER DOES NOT HAVE ANY CONNECTION TO THE ACCESS CONTROL

SYSTEM AND IS SHOWN ON THE FLOOR PLANS FOR REFERENCE ONLY TO THE

CONTRACTOR.

SHEET NOTES

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

W H

N R

G

E

O

R

G

I

A

P

A

K

S

O

N

R

E

G

I S

T E

R

E

D

E

N

G

IN

E

E

R

No. PE046864

DIB

EL 1

JB

JB JB

EL

D

IB

JBJB

NMLKJ

SECURE

NON-SENSITIVE

STORAGE

NBC ROOM

ARMS VAULT

RMIC READINESS

BAY

HALLWAY

146WOMENS

MENS

COMM STORAGE

UNIT STORAGE

UNIT STORAGE

MATCHLINE SEE B2 / TY113

M

AT

C H

LI

N

E

SE

E C

TY

8.2

L.7

JB-RM-018

JB-RM-017

A1

TY506

A1

TY501

DIB-RM-005

JB-RM-013

JB-RM-014A JB-RM-014B

DIB-RM-006

JB-RM-015 JB-RM-016

B5

TY510

BREX

A1

TY509

B5

TY505

TYP

BREX C1

TY505

A6

TY507

D E F

A B C

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

A

TE

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R P

S O

F

EN

G

IN

EE

R

S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

PLAN NORTH

KEY PLAN

SCALE: NTS

FB-75RBHQ-TY_detached.rvt

1/19/2022 11:47:17 PM

JA

N

U

AR

Y

N

. W H

EA

TL

EY

J.

W

IT

H

R O

W

N . D

AV

IS

1-

-0

TY116

SE

C

U R

IT

Y

PL

AN

LE

VE

L

-A

R

EA

F

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

BL

AC

K

VE

AT

C H

S P

EC

IA

L

PR

O

JE

C

TS

C O

R P.

W

TH

S

TR

EE

T

SU

IT

E

O

VE

R

LA

N

D P

AR

K, K S

-2

FO

R

T

BE

N N

IN

G

, G

EO

R G

IA

SO

F

BA

TT

AL

IO

N

H

EA

D Q

U

AR

TE

R

S

FA

C

IL

IT

Y

FY

PN

W . H

O W

EN

R

EA

D Y

TO

A

D

VE

R

TI

SE

(R

TA

SHEET ID

1/8" = 1'-0"C2 SECURITY PLAN - LEVEL 1 - AREA F

8'4' 16'0

1. FOR SECURITY GENERAL NOTES, LEGENDS, AND ABBREVIATIONS, SEE

SHEETS TY001 AND TY002.

2. ALL SECURITY DEVICES INCLUDING SYSTEM AND INSTALLATION IS GFGI. ANY

MENTION OF SECURITY HARDWARE IS FOR REFERENCE ONLY TO THE

CONTRACTOR.

3. ALL CONDUITS SHALL BE INSTALLED WITH PULL STRINGS.

4. REFERENCE ELECTRICAL SPECIFICATION FOR INTERIOR CONDUIT, POWER,

CABLE, AND ENCLOSURE REQUIREMENTS.

5. REFERENCE DRAWINGS TY501 THRU TY510 FOR INSTALLATION DETAILS.

6. CONDUITS (GFGI SIGNAL CABLE) SHALL BE ROUTED FROM GFGI SECURITY

DEVICES TO THE NEAREST NIPR TR ROOM.

7. CONDUITS (CFCI POWER CABLE) SHALL BE ROUTED FROM THE NEAREST

ELECTRICAL ROOM TO A RECEPTACLE IN THE GFGI SECURITY DEVICE

ENCLOSURES OR JUNCTION BOX.

8. CONDUITS SHALL BE ROUTED FROM THE GFGI CAMERAS TO NEAREST NIPR

TR ROOM.

9. SEE RISER DIAGRAMS TY601 THRU TY603.

10. COORDINATE WITH MECHANICAL CONTRACTOR TO ENSURE THAT SECURITY

JUNCTION BOXES OR ENCLOSURES DO NOT BLOCK MAINTENANCE ACCESS

FOR WATER-TO-AIR HEAT PUMPS (WAHP). LOCATION AND MAINTENANCE

CLEARANCE OF WAHPS ARE SHOWN IN MECHANICAL MH SERIES DRAWINGS.

GENERAL NOTES

1. SEE SHEETS A-610 TO A-612 FOR DOOR HARDWARE AND SPEC 08 71 00 FOR

EACH OF THESE DOORS. THESE DOORS ARE EQUIPPED WITH A STAND-ALONE

LOCK EQUIPPED WITH PUSHBUTTON KEYPAD AND/OR BADGE READER. THE

READER DOES NOT HAVE ANY CONNECTION…