B.08 RFP_Att 14 Existing Conditions Drawings AMD1.pdf
PDF 1 MB Posted
- Attached to
- Animal Health Science Reference Lab
- Solicitation number
- W912GB25R0027
- Issued by
-
Department of the Army European Command
About this file
This document is a preliminary architectural design set for a laboratory building project for the IIAM (Instituto de Investigação Agrária de Moçambique) located in Mozambique. The architectural drawings include floor plans for three levels (ground floor, first floor, and second floor), multiple elevation views, cross-sections, and 3D renderings of the proposed laboratory facility.
The proposed building is a three-story rectangular structure with a white and gray exterior, featuring multiple windows and concrete sun-shading elements. The design includes specialized laboratory spaces on each floor, such as chemistry labs, diagnostic rooms, technical offices, storage areas, restrooms, and circulation zones. The roof is a combination of concrete slab and Lusalite roofing supported by wooden trusses. The architectural plans are detailed with precise measurements, room designations, and structural annotations, indicating this is an early-stage design proposal for a scientific research facility.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
Projectista: Dono do projecto:
REPÚBLICA DE
Projectista: Dono do projecto:
MOÇAMBIQUE
Nome do projecto:
Título:
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOCAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
PROJECTO DE LEVANTAMENTO
DE UM EDIFÍCIO DE
LABORATÓRIO DO IIAM
PROJECTO DE LEVANTAMENTO
DE UM EDIFÍCIO DE
LABORATÓRIO DO IIAM
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.011:100
16,246 m
22,500 m
22,500 m
9,043 m
8,869 m
31,196 m
38,238 m
49,697 m
72,285 m
59,625 m
28,875 m
18,149 m
9,883 m
10,750 m
10,750 m
22,500 m
23,460 m
46,500 m
66,440 m
4,100 m
12,044 m
DOWNUP
20R x 0,15
19G x 0,32
DOWN
UP
20R x 0,15
19G x 0,35
0,20 7,20
0,20 5,40
0,20
13,20
0,20 2,70 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20
47,75
0,20 5,00
0,20 2,00
0,20 5,40
0,20
13,20
0,20 3,90 0,20 4,10 0,20
5,40 0,20
3,45 0,20
9,45
0,20 4,50 0,20 6,25 0,20
0,20 2,70 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15
51,85
Laboratório de Q uim ica
Laboratório LC V
Arm azém preparaótrio
Arm azém
R ecepção
W c-F
W c-M
Frigorífico
G abinete Técnico
Laboratorio de Q uim ica
Laboratorio de Q uim ica
H all
Laboratório de Q uim ica
Acesso Posterior G abinete Técnico
G abinete Técnico
Zona de Arm azenam ento de Botijas de G ás
G abinete Técnico
G abinete Técnico
Sala de Água D estilada
Sala de Lavagem
Zona de Esterilização Zona de M áquinas
Acesso Pricim pal
Zona de C irculação
Vestiário
Vestiário
Laboratório LC V
Zona de C irculação
Elevador
11,614 m
6,095 m
6,079 m
4,500 m
Planta de Piso de R/c
PLANTA DE PISO DO R/C
e7ecedmr Cloud+ e7ecedmr Cloud+ AMD#1: Replace flooring in "Armazem Preparatorio" Room.
e7ecedmr Cloud+ e7ecedmr Cloud+ AMD#1: Replace Exterior Door.
e7ecedmr Cloud+ e7ecedmr Cloud+ AMD#1: Replace Exterior Door.
e7ecedmr Cloud+ e7ecedmr Cloud+ AMD#1: Replace Exterior Door.
e7ecedmr Cloud+ e7ecedmr Cloud+ AMD#1: Replace Exterior Door.
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.021:100
19,440 m
5,698 m
8,014 m 2 24,682 m
33,954 m
41,900 m
5,238 m
27,116 m
20,585 m
5,932 m
12,322 m
5,970 m
12,369 m
12,369 m
49,697 m
10,750 m
11,250 m
11,025 m
18,874 m
24,988 m
9,220 m
22,500 m
2,524 m
4,865 m 25,560 m
66,499 m
DOWNUP
19R x 0,16
18G x 0,32
DOWN
UP
19R x 0,15
18G x 0,35
DOWNUP
19R x 0,16
18G x 0,32
DOWN
UP
19R x 0,15
18G x 0,35
0,20 5,00
0,20 2,00
0,20
0,20 2,70 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 0,15 5,00
0,20 2,00
0,20 5,40
0,20
0,20 2,35 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20 2,15 0,20
13,20
44,85
47,75
13,15
3,65
11,35
9,45
4,10
59,008 m
Sala de Produção de Vacina Sintom ática
Sala de Tubercolina
Frigorífico
G abinete Técnico
Sala de Tuberculose
H all
Sala de Infrascam ento
G abinete Técnico
Zona de Arm azenam ento de Botijas de G ás
G abinete Técnico
Sala de Anatom ia e
Panteologia
Zona de C irculação
R epartição de
Parasitologia
Zona de C irculação
G abinete Técnico
Sala de D iagnóstico de
Bateriologia
Elevador
G abinete Técnico
G abinete Técnico
Sala de D iagnóstico de Bateriologia
G abinete Técnico
G abinete Técnico
Estufa
Sala de Produção de Vacina asintom ática
Área Técnica W c-M
W c-F R epartição de Parasitologia
Sala de H erm intologia
Saida de Emergência
H all
B
9,510 m
22,500 m
Planta de Piso do 1ºAndar
PLANTA DE PISO DO
10ANDAR
e7ecedmr Cloud+ e7ecedmr Cloud+ AMD#1: Replace flooring in "Sala de Anatomia and Panteologia" Room.
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.031:100
DOWNUP
19R x 0,155
18G x 0,315
DOWN
UP
19R x 0,150
18G x 0,350
Sala de Eletrofence
Sala de M aster M ix e M áquinas de PC R Frigorífico
G abinete Técnico
Sala de Lavagem
Sala de C ontrolo de
Q ualidade
Sala de Analise de M edicam entos
Zona de C irculação
Sala de Q uím ica
Zona de C irculação
Sala de R aiva
Elevador
Sala de R epartição de Virologia G abinete Técnico
Estufa
Serologia de D oenças viais
Área Técnica W c-M
W c-F
Saida de Emergência
Sala de Q uím ica
Sala de Q uím ica
Sala de Q uím ica
G abinete Técnico
Sala de Lavagem
Sala de Q uím ica B B
A A
PLANTA DE PISO DO
20ANDAR
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.031:100
2,15 2,40 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35
44,85
2,90
2,15 2,40 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,21
44,85
2,90
7,60
0,59 1,55
1,50 1,50
1,50 1.50
1,50 1,50
1,50 1,50
1,50 0,58
16,21
B B
A A
PLANTA DE ESTRUTURA
DE COBERTURA
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.041:100
2,15 2,40 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35
44,85
2,90
2,15 2,40 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,35 2,21
44,85
2,90
7,60
0,59 1,55
1,50 1,50
1,50 1.50
1,50 1,50
1,50 1,50
1,50 0,58
16,21
B B
A A
PLANTA DE COBERTURA
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.051:100
±0,00 +0,45
+3,25
+6,20
+8,95 +9,30
+12,23+12,23
+8,95
+6,20
+3,25+3,30
±0,00 +0,15 +0,15 +0,45
+0,15
+3,30
+6,40
+3,25
+8,95
+12,23+12,23
+8,95
+6,25
+3,25
+0,45 ±0,00+0,15±0,00
+9,30
01 ALÇADO FRONTAL 1:100
02 ALÇADO POSTERIOR 1:100
ALÇADO FRONTAL E POSTERIOR
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.061:100
±0,00 +0,10 +0,45
+0,15 ±0,00
+3,30+3,25
+3,88
+6,35
+3,40
+6,20
+12,23
+9,15 +9,15
+0,45
+3,25
±0,00 +0,15
+3,30
+0,45 ±0,00
+6,20
+9,15+9,15
+6,20
+3,25
+0,15
+12,23
03 ALÇADO LATERAL DIREITO 1:10004 ALÇADO LATERAL ESQUERDO 1:100
ALÇADO LATERAL DIREITO E
ESQUERDO
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.071:50
Cobertura em Lusalite assente sobre estrutura de Madeira(Asna , Madtres) e seus suportes
Cobertura Feita em Laje de Betao Armado
Quebrassois Horizontais feitos rm Betao Armado
Quebrassois feitos rm Betao Armado
Quebrassois feitos rm Betao Armado
Quebrassois Verticais feitos rm Betao Armado
A CORTE-AA´ 1:50
CORTE-AA´ E BB´
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.081:100
+6,20
+3,25
+0,45
+9,30
+11,65 +11,65
+0,45 ±0,00±0,00
2, 2, 2, 2, 2, 2, B CorteBB´ 1:100
CORTE-AA´ E BB´
GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100GSPublisherVersion 0.0.100.100
REPÚBLICA DE
Folha número:
Escala:
Verificado:
Modificado:
D at a:
A br il.
/2
5Obra:
Fase:
Rev. Alter. Change Name
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária
2 . Todas as medidas a serem confirmadas na obra
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Projectista: Dono do projecto:
MOÇAMBIQUE
Folha número:
Escala:
Verificado:
Modificado:
Nome do projecto:
Título:
Obra:
Fase:
Estudo Preliminar
Rev. Alter. Change Name Data
OBSERVAÇÃO :
1. Todas as medidas estão em metros , excepto indicação contrária .
2 . Todas as medidas a serem confirmadas na obra .
3 . Na falta de dimensões escritas consultar ao projectista ou a fiscalização . Não usar escala ou fita métrica
4 . Todas as medidas estão a tosco .
5 . Reservam - se os direitos de autor sobre todas as informações inseridas nesta folha (desenho ) , não podendo ser reproduzidos no seu todo ou em parte , sem prévio consentimento por escrito.
Revisão Levantou.
Desenhou.
Verificou.
Estruturas Arquitectura
Hidráulica
Eurico/Celso
Eurico Monjane
Eurico Monjane Souto/Langa
/Langa
Souto/Langa
IIAM-INSTITUTO DE
INVESTIGAÇÃO AGRÁRIA DE
MOÇAMBIQUE
Projecto de Levantamento de Infraestruturas do IIAM (DCA)
EDIFÍCIO DE LABORATÓRIO
INSTITUTO NACIONAL DE IRRIGAÇÃO, INSTITUTO PÚBLICO
Layout ID
A.09
IMAGENS-3D
File details come from the government source that posted it. Updated .