B.08 RFP_Att 11 Past Performance Information Sheet_Rev 13 Feb 2023.docx

DOCX document 42 KB Posted

Attached to
Animal Health Science Reference Lab Federal contract opportunity
Solicitation number
W912GB25R0027
Issued by
Department of the Army European Command

About this file

The document is a Past Performance Information Sheet for a medical storage facility project in Chad, associated with Solicitation Number W912GB25R0036 and IAF-25-0029. The form is designed to capture detailed contractor past performance information, requiring offerors to provide comprehensive project details including project completion date, final cost, project type (design-build or design-bid-build), scope, facility purpose, construction size, work percentage self-performed, and whether the project was for the US Department of Defense. The form distinguishes between different contractor roles such as Prime Contractor, Subcontractor, Joint Venture, and Key Subcontractor, with specific instructions for documenting each type of project involvement and requiring additional explanatory information for non-prime contractor roles.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 12 (amended 13 FEB2023) W912GB25R0036; IAF-25-0029 Medical Storage Facility, Chad

CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. W912GB25R0036; IAF-25-0029 Medical Storage Facility, Chad, Page 1

Project Name, Contract number, and Location:

Past Performance:

1. The day, month, and year work was completed: _______________

2. Is this project more than 75% complete? ____ Yes ____ No If “No” explain current percentage of completion, if yes and between 75-99% complete please explain how the percentage was calculated and what work remains.

3. The final cost of this project €_________________________

4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for this project:

o Design- Build or Design-Bid-Build o Scope of the project, to include purpose/use of facility.

o Size of the project, differentiate square footage of new construction versus renovation if project includes both.

o Type and percentage of work that was self-performed.

o Whether the project involved new construction, renovation, or both. Clearly delineate square meters for construction and renovation.

o Whether the project was completed for the United States DoD.

(Continue typing if required to provide more information)

ATTACHMENT 2 – CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. W912GB25R0036; IAF-25-0029 Medical Storage Facility, Chad Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 15% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror may take credit for the Key Subcontractor’s past performance if it was meaningful to this procurement. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.

5. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

File details come from the government source that posted it. Updated .