This document contains details for a federal construction contract opportunity and related solicitation to construct an Army Lodge facility in Baumholder, Germany. The U.S. Army Corps of Engineers (USACE) Europe District will solicit and award a firm-fixed-price design-bid-build construction contract with an estimated value between $40-70 million. The scope of work includes constructing a 78-unit Army Lodge with family suites, offices, amenities, and associated site and utility infrastructure. Supporting facilities include utilities, site work, and information systems. The projected construction period is 1100 calendar days. The solicitation is anticipated for release on or about February 27, 2023, and will be available for download on SAM.gov. The selection method will be a best value tradeoff and the deadline for questions will be in the solicitation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
FY21 PN94238 Construct Army Lodging Facility
Smith Barracks, USAG Rheinland Pfalz, Baumholder, Germany
PRICE SCHEDULE – Page 1
Offerors shall provide pricing for all base and option items.
The following items include providing all labor, materials, equipment, and services necessary to complete the construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Request for Proposal and Base Contract. It also includes preparation of all documents, submittals, and schedules;
inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.
Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Request for Proposal for the period of performance for all base and option items.
Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Request for Proposal for the liquidated damages for all base and option items.
Option Items: The Government reserves the right to award the options up to 90 calendar days from contact award. See Section 01 22 00 for additional information regarding the award of options.
Item No. Title Quantity Unit Unit Price Amount
BASE ITEMS
0001 Primary Facilities 1 Job € €
0002 Supporting Facilities
0002AA Supporting Facilities – NAF 1 Job € €
0002AB Supporting Facilities – DPW 1 Job € €
0003 Site Grading and Site Preparation
0003AA
Site Grading and Site Preparation inside the 5-foot line – NAF
1 Job € €
0003AB
Site Grading and Site Preparation outside the 5-foot line -- DPW
1 Job € €
0004 German Government Charge
0004AA German Government Charge -- NAF 1 Job DO NOT PRICE
0004AB German Government Charge – DPW 1 Job DO NOT PRICE
Total of Base Items 0001 thru 0004 €
OPTION ITEMS
0005 Option 1: Playground Surfacing 1 Job € €
0006 Option 2: Commercial Laundry Equipment 1 Job € €
PRICE SCHEDULE
FY21 PN94238 Construct Army Lodging Facility
Smith Barracks, USAG Rheinland Pfalz, Baumholder, Germany
PRICE SCHEDULE – Page 2
Item No. Title Quantity Unit Unit Price Amount 0007 Option 3: Prep
Kitchen/Dining Equipment 1 Job € €
0008 Option 4: Kitchenettes 1 Job € €
0009 Option 5: Parking PV Carport 1 Job € €
Total of Option Items 0005 thru 0009 €
Total of all Base and Option Items €
EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
-- END OF PROPOSAL SCHEDULE --
| BH Lodge_SpecsCOVER |
| 00 74 01 |
| 00 74 02 |
| 00 74 05 |
| 00 74 10 |
| 00 74 70 |
| 01 11 00 |
| 01 22 00 |
| 01 22 00_Att1_ Price Schedule |
| 01 22 00_Att2_Period of Performance Clause |
| 01 30 01 |
| 01 32 01 |
| 01 33 00 |
| 01 33 29 |
| 01 35 26 |
| 01 42 00 |
| 01 45 00 |
| 01 45 01 |
| 01 45 05 |
| 01 45 35 |
| 01 60 00 |
| 01 78 00 |
| 01 78 23 |
| 01 91 00.15 10 |
| 01 91 00.15 10_100PCTCF |
| Baumholder_Lodge_Cx Plan Construction Phase 100PctCorrectedFinal |
| Contents |
| Revision History |
| Definition of Document Terms |
| Commissioning Overview |
| Commissioning Process |
| Commissioning Plan |
| Design Phase Commissioning |
| Owner’s Project Requirements |
| Commissioning Team |
| Cx Team Meetings |
| Cx Schedule |
| Issues Log |
| Commissioned Systems |
| Systems Manual |
| Progress Reports |
| Basis of Design |
| Commissioning Specifications |
| Design Review |
| Host Nation Testing and Regulations |
| Prefunctional Checklists |
| Functional Performance Testing |
| End of Phase Report and Acceptance |
| Construction Phase Commissioning |
| Commissioning Team Update |
| Commissioning Kickoff Meeting |
| Submittal Review |
| Tests and Inspections |
| Prefunctional Checklists |
| Test and Balance Verification |
| Functional Performance Testing |
| Site Visits |
| Training |
| End of Phase Report and Acceptance |
| Occupancy and Operations Phase Commissioning |
| Training |
| Systems Manual |
| Warranty Review |
| Final Report and Acceptance |
| Appendices |
| Appendix A Owners Project Requirements |
| Appendix B Construction Cx Team |
| Appendix C Communication Protocol |
| Appendix D Roles and Responsibilities |
| Appendix E Meetings |
| Appendix F Cx Schedule-Construction |
| Appendix G Sample Issues Log |
| Appendix H Commissioned Systems |
| Appendix I Systems Manual Outline |
| Appendix J Cx Progress Reports |
| Appendix K Basis of Design |
| Appendix L Cx Specifications |
| Appendix M Design Reviews |
| Appendix N Prefunctional Checklists |
| Air Handling Unit (EW, HWC) PFC EU |
| Air-Cooled Chiller PFC EU |
| Building Automation System PFC EU |
| Building Envelope PFC EU |
| Cathodic Protection PFC EU |
| Chilled Water System Piping PFC EU |
| Domestic Water Piping PFC EU |
| Ductless Split System Air Conditioner PFC EU |
| Electric Instantaneous Water Heater PFC EU |
| Electric Meter PFC EU |
| Electrical Panel PFC EU |
| Emergency Lighting PFC EU |
| Emergency Shower and Eyewash PFC EU |
| Exhaust Fan PFC EU |
| Expansion Vessel PFC EU |
| Exterior Lighting PFC EU |
| Fan Coil Unit PFC EU |
| Grounding And Bonding PFC EU |
| Heat Exchanger PFC EU |
| Heat Trace PFC EU |
| Heating Water System Piping PFC EU |
| Interior Lighting PFC EU |
| Pump PFC EU |
| Radiator PFC EU |
| RPZ PFC EU |
| Sanitary Sewer And Vent Piping PFC EU |
| Solar PV System PFC EU |
| Thermostatic Mixing Valve PFC EU |
| Washing Machine PFC EU |
| Water Fountain PFC EU |
| Water Meter PFC EU |
| Appendix O Functional Performance Tests |
| Air Handling Unit (EW, HC) FPT EU |
| Chilled Water Pumps FPT EU |
| Chilled Water System FPT EU |
| Domestic Hot Water FPT EU |
| Ductless Split System Cool FPT EU |
| Electric Instantaneous Water Heater FPT EU |
| Electric Unit Heater FPT EU |
| Emergency Shower & Eye Wash FPT |
| Exhaust Fan FPT EU |
| Fan Coil Unit (Cool Only) FPT EU |
| Fan Coil Unit (Heat/Cool) FPT EU |
| Generator and Emergency Power FPT EU |
| Guest Room FPT EU |
| Heating Water Pumps FPT EU |
| Heating Water System FPT EU |
| Lighting Control FPT EU |
| Power Receptacle FPT EU |
| Radiator FPT EU |
| Radiator-Heating/Cooling (Fan) FPT EU |
| Appendix P Submittal Review |
| Appendix Q Site Visits |
| Appendix R Training |
| 02084 DEMOLITION AND DISMANTLING WORK / ABBRUCH- UND RÜCKBAUARBEITEN |
| 03013A CONCRETE WORK STRUCTURES / BETONARBEITEN |
| 03013B CONCRETE WORK CIVILWORKS/ BETONARBEITEN |
| 04012 MASONRY WORK / MAUERARBEITEN |
| 05017 STEEL CONSTRUCTION WORK / STAHLBAUARBEITEN |
| 05031 METAL WORK / METALLBAUARBEITEN |
| 06027A CARPENTRY WORK / TISCHLERARBEITEN |
| 06027B SOLID SURFACING FABRICATIONS |
| 07020 ROOFING WORK / DACHDECKUNGSARBEITEN |
| 07021 ROOF WATERPROOFING WORK / DACHABDICHTUNGSSARBEITEN |
| 07022 ROOF PLUMBING WORK / DACHKLEMPNERARBEITEN |
| 08026 WINDOWS, EXTERIOR DOORS / FENSTER, AUSSENTÜREN |
| 08029 HARDWARE / BESCHLAGSARBEITEN |
| 09023 PLASTERING and STUCCO WORK, THERMAL INSULATION SYSTEMS / PUTZ- UND STUCKARBEITEN, WÄRMEDÄMMSYSTEME |
| 09024B TILE WORKS |
| 09025 SCREED WORK / ESTRICHARBEITEN |
| 09027 ACOUSTICAL CEILINGS |
| 09034A PAINTING and VARNISHING - COATINGS / MALER- UND LACKIERARBEITEN - BESCHICHTUNGEN |
| 09034B INTERIOR PAINTING AND COATINGS AND HIGH- PERFORMANCE COATINGS |
| 09036A FLOORING WORK / BODENBELAGARBEITEN |
| 09036B RESILIENT FLOORING AND CARPETING |
| 09037 WALL COVERINGS |
| 09039 DRYWALL WORK / TROCKENBAUARBEITEN |
| 10027 VISUAL DISPLAY UNITS |
| 10029A INTERIOR SIGNAGE |
| 10029B EXTERIOR SIGNAGE / BESCHILDERUNG IM AUSSENBEREICH |
| 10031 SHELVING AND UTILITY ACCESSORIES |
| 10037 WALL PROTECTION |
| 10099A SPECIAL BUILT-IN FEATURES / SONDEREINBAUTEN |
| 10099B BID OPTION 005 - PV CARPORT / PV CARPORT |
| 12003A BICYCLE RACKS |
| 12003B SMOKING SHELTER |
| 12036 FLOOR MAT WORKS |
| 14069 ELEVATORS / AUFZÜGE |
| 21049 FIRE EXTINGUISHING SYSTEMS, FIRE EXTINGUISHERS / FEUERLOESCHANLAGEN, FEUERLÖSCHGERAETE |
| 22042 PLUMBING / KLEMPNERARBEITEN |
| 22044 SEWAGE SYSTEMS PIPE FITTINGS |
| 23040 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) |
| 23041 HEAT SUPPLY SYSTEMS - PIPES, FITTINGS, HEATING SURFACES / WÄRMEVERSORGUNGSANLAGEN - LEITUNGEN, ARMATUREN, HEIZFLÄCHEN |
| 23075 AIR CONDITIONING SYSTEMS/RAUMLUFTTECHNISCHE ANLAGEN |
| 23078 REFRIGERATION SYSTEMS FOR AIR CONDITIONING SYSTEMS / KÄLTEANLAGEN FÜR RAUMLUFTTECHNISCHE ANLAGEN |
| 23157 INSTRUMENTATION AND BACNET CONTROL FOR HVAC SYSTEMS |
| 25051A CYBERSECURITY – FIRE ALARM AND MASS NOTIFICATION |
| 25051B CYBERSECURITY – FACILITY-RELATED CONTROL SYSTEMS (UMCS) |
| 25051C CYBERSECURITY – FACILITY-RELATED CONTROL SYSTEMS (BMS and HVAC) |
| 25070 UTILITY MONITORING AND CONTROL SYSTEM – FRONT END INTEGRATION |
| 26053 INTERIOR DISTRIBUTION SYSTEM / VERTEILUNGSSYSTEM |
| 26054 SWITCHBOARD AND SWITCHGEAR |
| 26058 LIGHTING / LEUCHTEN UND LAMPEN |
| 26059 EMERGENCY LIGHTING / SICHERHEITSBELEUCHTUNGSANLAGEN |
| 26310 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV) SYSTEMS / PHOTOVOLTAIKANLAGEN |
| 27060 INTERCOMMUNICATION SYSTEM |
| 27061 TELECOMMUNICATION SYSTEMS |
| 27062 TELEVISION SYSTEM |
| 27063 EMERGENCY CALL |
| 28063 ALARM SYSTEMS / GEFAHRENMELDEANLAGEN |
| 28064 ELECTRONIC SECURITY SYSTEMS |
| 28065 AREA OF REFUGE TWO-WAY EMERGENCY COMMUNICATION SYSTEM |
| 31002 EARTHWORKS CIVIL WORKS/ ERDARBEITEN |
| 32003 LANDSCAPING / LANDSCHAFTSBAUARBEITEN |
| 32004 LANDSCAPING - PLANTS / LANDSCHAFTSBAUARBEITEN - PFLANZEN |
| 32080 STREETS, PATHS, & PLAZAS / STRASSEN, WEGE, PLAETZE |
| 33009 DRAINAGE SEWER WORKS / ENTWÄSSERUNGSKANALARBEITEN |
| 33041 HEAT SUPPLY SYSTEMS - PIPES, FITTINGS, HEATING SURFACES / WAERMEVERSORGUNGSANLAGEN - LEITUNGEN, ARMATUREN, HEIZFLAECHEN |
| 33043 PRESSURE PIPELINES FOR GAS, WATER AND SEWAGE / DRUCKROHRLEITUNGEN FÜR GAS, WASSER UND ABWASSER |
| 33050 LIGHTNING PROTECTION, EARTHING SYSTEM, SURGE PROTECTION / BLITZSCHUTZ – ERDUNGSANLAGEN, ÜBERSPANNUNGSCHUTZ |
| 33051 CABLE LINE UNDERGROUND ENGINEERING / KABELLEITUNGSTIEFBAUARBEITEN |
| 33052 MEDIUM VOLTAGE SYSTEMS |
| 34003A ANTI-TERRORISM FORCE PROTECTION - CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS / FAHRZEUGBARRIEREN UND - STEUERUNGEN |
| 34003B ANTI-TERRORISM FORCE PROTECTION - AUTOMATED BARRIER GATE / ELEKTRISCH ANGETRIEBENES AUTOMATISIERTES SCHRANKENTOR |
| 34003C ANTI-TERRORISM FORCE PROTECTION - BURIED BOULDERS / VERGRABENE FELSBROCKEN |