A.03.09.04 STRUCTURAL_DC-23-0008.pdf

PDF 32 MB Posted

Attached to
Construct Baumholder Army Lodge, United States Army Garrison (USAG) Rheinland-Pfalz, Baumholder Military Community, Germany
Solicitation number
W912GB23R0025
Issued by

About this file

This document provides details on a forthcoming federal contract solicitation for construction services. The U.S. Army Corps of Engineers Europe District will be soliciting proposals for the construction of a new 78-unit Army Lodge facility at the Baumholder Military Community in Germany. The project scope includes construction of lodging, administrative, and support buildings along with associated site work and utilities. The contract type will be firm-fixed-price and the period of performance is estimated at 1100 calendar days from notice to proceed. The estimated value of construction is between $40-70 million. The solicitation is anticipated for release on or around February 27, 2023, with award to follow. Interested contractors must register in SAM.gov to access solicitation documents through that site and monitor for amendments. The primary points of contact are the listed Contract Specialist and Contracting Officer.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL STRUCTURAL NOTES ALLGEMEINE STATIK HINWEISE

DESIGN STANDARDS BEMESSUNGSGRUNDLAGE

SITE CHARACTERISTICS STANDORTEIGENSCHAFTEN

DESIGN LOADS

STATIKLASTEN

MATERIALS MATERIALEIGENSCHAFTEN

GEOTECHNICAL CHARACTERISTICS GEOTECHNISCHE EIGENSCHAFTEN

REFER TO STRUCTRAL CALCULATIONS.

1. IMPOSED LOADS (BUILDING)

CATEGORY OCCUPANCY Q(kN/m²) Q(kN/m) Q(KN) CODE

A2 RESIDENTIAL (HOTELS AND MULTIFAMILY 2,70 - DIN EN 1991-1-1/NA

DWELINGS) + PARTITON WALLS

H ORDINARY FLAT ROOF - MAINENTRANCE 1,00 1,00 DIN EN 1991-1-1/NA

T2 STAIRS AND EXITS 5,00 2,00 DIN EN 1991-1-1/NA

B2 CORRIDORS SERVING HOTEL AND MULTIFALMILY DWELLING 3,00 3,00 DIN EN 1991-1-1/NA

C3 LOBBIES AND GROUND FLOOR CORRIDORS 5,00 4,00 DIN EN 1991-1-1/NA

HANDRAILS AND GUARDS - 1,0 0,89 DIN EN 1991-1-1/NA

TYPE ELEMENT Q(kN/m²)

ARCHITECTURAL LAYER FLAT ROOF 0,50

TYPICAL FLOOR CORRIDORS 2,00

TYPICAL FLOOR ALL OTHERS 1,50

GROUND FLOOR 1,60

MECHANICAL EQUIPMENT AHU 5,50

TYPE ELEMENT Q(kN/m²)

MECHANICAL EQUIPMENT 10,00

TYPE ELEMENT Q(kN/m²)

ARCHITECTURAL LAYER ROOF 0,60

NACH STATIKANALYSIS.

1. NUTZLASTEN (GEBAEUDE)

KATEGORIE NUTZUNG Q(kN/m²) Q(kN/m) Q(kN) CODE

A2 WOHNGEBAEUDE ( HOTEL UND MEHRFAMILIENHAEUSER)

+ TRENNWAENDE 2,70 - DIN EN 1991-1-1/NA

H NORMALES FLACHDACH - WARTUNG 1,00 1,00 DIN EN 1991-1-1/NA

T2 TREPPEN UND AUSGAENGE 5,00 2,00 DIN EN 1991-1-1/NA

B2 HOTEL FLURE UND MEHRFAMILIENHAUESER 3,00 3,00 DIN EN 1991-1-1/NA

C3 LOBBYS UND ERDGESCHOSS FLURE 5,00 4,00 DIN EN 1991-1-1/NA

GELAENDER UND BRUESTUNGEN - 1,00 0,89 DIN EN 1991-1-1/NA

TYPE ELEMENT Q(kN/m²)

ARCHITEKONISCHE SCHICHT FLACHDACH 0,50

FLUR 2,00

FLUR 1,50

EG 1,60

MECHANISCHE GERAETE AHU 5,50

TYPE ELEMENT Q(kN/m²)

MECHANISCHE GERAETE 10,00

TYPE ELEMENT Q(kN/m²)

ARCHITEKTONISCHE SCHICHT DACH 0,60

2. EIGENLASTEN (GEBAUEDE)

3. EIGENLASTEN (PLATTFORM AUS STAHL)

4. EIGENLASTEN (UEBERDACHUNG)

2. DEAD LOADS (BUILDING))

3. DEAD LOADS (STEELPLATFORM)

4. DEAD LOADS (CANOPY)

PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF

THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)

PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES

PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)

US Army Corps of Engineers

C R O

M W

E L L

SHEET ID

D R

AW

N

B Y

C H

EC

KE

D B

Y

SU

BM

IT

TE

D B

Y

D

ES

IG

N

ED

B

Y

SI

ZE

IS

SU

E D

AT

E

P

LO

TT

ED

/ P

LA

N D

AT

U

M

/ G R

O E

SS

E

/ G

EZ

EI

C

H N

E T:

/ G

EP

R U

E

FT

/ V O

R G

E

LE

G T:

/ G

EN

E H

M

IG

T:

/ BLATT

/ R E

V / D

AT

U

M / B

ES

C

H R

E

IB

U N

G M

AR

K

D

AT

E D

ES

C

R

IP

TI

O

N

SO

LI

C

IT

AT

IO

N N

O

AU

FT

R A

G S

-N R

C O

N

TR

AC

T

N O

/ V

E R

TR

A

G S-

N R

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

EU

R

O

PE

D

IS

TR

IC

T -C

O N

TR

AC

TI

N

G D

IV

IS

IO

N

KO

N

R

AD

A D

EN

AU

ER

R

IN

G

W

IE

SB

A D

EN

G

ER

M

A N

Y

IS

O

A

SEAL

FOR

CONSTRUCTIO

N

SEAL

SM

IT

H B

AR

R

AC

KS

, U

SA

G R

H

EI

N

LA

N D

-P

FA

LZ

, B

AU

M

H O

LD

ER

, G

ER

M

AN

Y

FY

P

N

C O

N

ST

R U

C T

AR

M

Y

LO

D G

IN

G

F

AC

IL

IT

Y

C O

R R

EC

TE

D

N O

V

EM

B

ER

W

2G B

F0

W

2G B1

9D

CUI//REL TO DEU

C U

I// R

EL

T

O D

EU

C U

I// R

EL

T

O D

EU

CUI//REL TO DEU

±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN

/1

1/

:3 1:

P

M

ST

R

U C

TU

R

AL

G

E N

ER

AL

N O

TE

S

A

EC

O M

D

ES

IG

N

T

EA

M

M . D

E

IE

R

LE

IN

I.

M

IK

LO

S

I.

M

E N

EN

D

EZ

S-001

S

TA

TI

K

A

LL

G E

M E

IN

H

IN

W

E

IS

E

1 DIMENSIONS SHALL BE VERIFIED IN CONJUNCTION WITH THE EXISTING SITUATION, AND THE DESIGNER SHALL BE NOTIFIED IN CASE OF UNFORESEEN

DISCREPANCIES.

1 DIE ABMESSUNGEN SIND IM ZUSAMMENHANG MIT DER BESTEHENDEN SITUATION ZU UEBERPRUEFEN UND BEI UNVORHERGESEHEN ABWEICHUNGEN DEM DESIGNER

MITZUTEILEN.

2 THIS DRAWING SHALL BE USED FOR CONSTRUCTION ONLY AFTER BEING APPROVED BY AN APPROVAL ENGINEER. THE RESPECTIVE COMPANY IS RESPONSIBLE

FOR EXECUTION ACCORDING TO THE UNCHECKED PLAN.

2 DIESER PLAN GILT ERST NACH DER FREIGABE EINES PRUEFINGENIEURS. FUER AUSFUEHRUNGEN NACH DEM UNGEPRUEFTEN PLAN IST DIE JEWEILIGE FIRMA

VERANTWORTLICH.

3 ON THE ENTIRE EXECUTION PERIOD, ALL PERMANENT AND TEMPORARY WORKS, INCLUDING WORKS INVOLVING EXCAVATIONS AND SOIL SUPPORT, SHALL BE CARRIED OUT ACCORDING TO RELATING HEALTH AND SAFETY AND FIRE PREVENTION LEGISLATIVE NORMS AND REGULATIONS.

3 WAEHREND DER GESAMTEN AUSFUEHRUNGSDAUER DER GEBAEUDE SIND ALLE PERMANENTEN UND TEMPORAEREN ARBEITEN, EINSCHLIESSLICH DER ARBEITEN IM ZUSAMMENHANG MIT AUSGRABUNGEN UND BODENBEFESTIGUNGEN, NACH DEN GESUNDHEIT UND SICHERHEIT SOWIE FUER DEN BRANDSHUTZ NORMEN

DURCHZUFUEHREN.

4 ALL LEGAL REQUIREMENTS AND PROCEDURES REGARDING EXISTING CONSTRUCTIONS PROTECTION IN THE PROXIMITY OF THE SITE SHALL BE RESPECTED. 4 ALLE GESETZLICHEN ANFORDERUNGEN UND VERFAHREN BEZUEGLICH DES BESTEHENDEN BAUTENSCHUTZES IN DER NAEHE DES STANDORTS SIND ZU BEACHTEN.

5 UNLESS NOTED OTHERWISE ALL DIMENSIONS IN PLAN AND CROSS-SECTIONS ARE IN METERS AND CENTIMETERS AND LEVELS IN METERS. DRAWINGS WILL NOT

BE SCALED.

5 SOFERN NICHTS ANDERS ANGEGEBEN, SIND ALLE ABMESSUNGEN IN PLAN UND QUIERSCHINITTEN IN METER UND ZENTIMETER UND EBENEN IN METER. ZEICHNUNGEN

WERDEN NICHT SKALIERT.

6 THE FOLLOWING OPENINGS ARE RELEVANT TO THE STRUCTURAL SYSTEM AND HAVE TO BE PRESENTED COMPREHENSIVELY BY THE END OF THE DESIGN

PLANNING PROCESS.

• OPENINGS WITH AN EDGE OF 40 CM OR LARGER.

• ALL SLAB OPENING CLOSE TO COLUMNS, WALL ENDS AND WALL CORNERS, WITH A DISTANCE SMALLER THAN 6X SLAB THICKNESS.

• OPENINGS IN BEAMS WITH A DIAMETER BIGGER THAN THE 1/4 OF THE HEIGHT OF THE WEB.

6 FOLGENDE DURCHBRUECHE SIND STATISCH RELEVANT UND VOLLSTAENDIG ZUM ABSCHLUSS DER ENTWURFSPLANUNG ANZUGEBEN.

• DURCHBRUECHE MIT EINER KANTENLAENGE VON 40 CM UND GROESSER.

• ALLE DECKENDURCHBRUECHE AN STUETZEN,WANDENDEN UND WANDECKEN IM ABSTAND KLEINER 6X DECKENDICKE.

• DURCHBRUECHE IN UNTER-UND UEBERZUENGEN MIT DURCHMESSER GROESSER ALS 1/4 DER STEGHOEHE.

7 IN CASES OF CONFLICT BETWEEN STRUCTURAL DRAWINGS AND OTHER DISCIPLINES, CONTRACTOR SHALL NOTIFY THE DESIGN PROFESSIONALS AND OBTAIN

CLARIFICATION BEFORE PROCEEDING WITH WORK.

7 BEI KONFLIKTEN ZWISCHEN DEN STATISCHEN ZEICHNUNGEN UND ANDEREN DISZIPLINEN MUSS DER BAUUNTERNEHMER DIE PLANUNGSFACHLEUTE BENACHRICHTIGEN UND EINE KLAERUNG HERBEIFUEHREN, BEVOR ER MIT DEN ARBEITEN FORTFAEHRT.

8 OPENINGS SHOWN IDENTIFY THE VOIDS IN THE STRUCTURAL ELEMENTS. RECONCILE THEIR EXACT SIZE AND LOCATION WITH ARCHITECTURAL BEFORE

PROCEEDING WITH WORK.

8 DIE DARGESTELLTEN OEFFNUNGEN KENNTEICHNEN DI HOLRAEUME IN DEN STRUKTURELEMENTEN. STIMMEN SIE IHRE GENAUE GROESSE UND LAGE MIT DEN

ARCHITEKTONISCHEN BEVOR SIE MIT DEN ARBEITEN FORTFAHREN.

9 THE CENTRE LINES OF THE STRUCTURAL ELEMENTS COINCIDE WITH THE INTERSECTIONS OF THE GRID LINES, UNLESS OTHERWISE SPECIFIED. 9 DIE MITTELLINIEN DER STRUKTURELEMENTE MIT DEN SCHNITTPUNKTEN DER GITTERLINIEN UEBEREINSTIMMEN, SOFERN NICHTS ANDERES ANGEGEBEN IST.

10 THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE STRUCTURAL SUPPORT OF CONSTRUCTION LOADS (SHORING) DURING ALL PHASES OF

CONSTRUCTION.

10 DER AUFTRAGNEHMER IST DAFUER VERANTWORTLICH, WAEHREND ALLER BAUPHASEN FUER EINE ANGEMESSENE STATISCHE UNTERSTUETZUNG DER BAULASTEN

(ABSTUETZUNG) ZU SORGEN.

11 THE CONTRACTOR IS SOLELY RESPONSIBLE TO MEASURE AND QUANTIFY ALL PROJECT REQUIREMENTS. 11 DER AUFTRAGNEHMER IST ALLEIN FUER DIE MESSUNG UND QUANTIFIZIERUNG ALLER PROJEKTANFORDERUNGEN VERANTWORTLICH.

1 DESIGN IS BASED ON THE LASTEST EDITION OF THE FOLLOWING EUROPEAN CODES, TOGETHER WITH THEIR CORRESPONDING NATIONAL ANNEX:

• DIN EN 1990 & NA: BASIS OF STRUCTURAL DESIGN;

• DIN EN 1991 & NA: ACTIONS ON STRUCTURES;

• DIN EN 1992 & NA: DESIGN OF CONCRETE STRUCTURES;

• DIN EN 1993 & NA: DESIGN OF STEEL STRUCTURES;

• DIN EN 1997 & NA: GEOTECHNICAL DESIGN;

1 BEI DEM STATIK DESIGN SIND ALLE GUELTIGEN UND NEUESTEN AUSGABEN DER EUROCODE EINZUHALTEN; ZUSAMMEN MIT DEM ENTSPRECHENDEN NATIONALEN

ANHANG:

• DIN EN 1990 & NA: GRUNDLAGEN DER TRAGWERKSPLANUNG;

• DIN EN 1991 & NA: EINWIRKUNGEN AUF TRAGWERKE;

• DIN EN 1992 & NA: BEMESSUNG UND KONSTRUKTION VON STAHLBETON-UND SPANNBETONTRAGWERKEN;

• DIN EN 1993 & NA: BEMESSUNG UND KONSTRUKTION VON STAHLBAUTEN;

• DIN EN 1997 & NA ENTWURF, BERECHNUNG UND BEMESSUNG IN DER GEOTECHNIK;

2 UFC 3-301-01 STRUCTURAL ENGINEERING 2 UFC 3-301-01 STRUCTURAL ENGINEERING

3 ANTITERRORISM DESIGN:

• UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS (AUGUST 2020)

• HQ USEUCOM AT OPORD 20-12

3 ANTITERRORISM DESIGN:

• UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS (AUGUST 2020)

• HQ USEUCOM AT OPORD 20-12

4 THIS PROJECT WAS DETERMINED TO TRIGGER ANTITERRORISM/ FORCE PROECTION (ATFP) REQUIREMENTS. ALL ATFP, INCLUDING PROGRESSIVE COLLAPSE

RESISTENCE MEASURES HAVE BEEN INCORPORATED INTO THE DESIGN.

4 BEI DIESEM PROJEKT WURDE FESTGESTELLT, DASS ES ANFORDERUNGEN ZUR ANTITERRORISM/ FORCE PROECTION (ATFP) ERFUELLT. ALLE ATFP-ANFORDERUNGEN, EINSCHLIESSLICH DER MASSNAHMEN ZUM PROGRESSIVE COLLAPSE RESISTENCE, WURDEN IN DEN ENTWURF AUFGENOMMEN.

1 THE BUILDING IS LOCATED IN BAUMHOLDER, GERMANY.

• SNOW (ACCORDING TO DIN EN 1991-1-3) sk = 1.65 kN/m²,

• WIND (ACCORDING TO DIN EN 1991-1-4) qb = 0.32 kN/m²,

• SEISMIC (ACORDING TO DIN EN 1998-1) agR = 0,164m/s² SEISMIC HAZARD NOT APPLICABLE WHEN THE PEAK GROUND ACCELERATION IS SMALLER THAN 0,40m/s²

• FIRE RESISTANCE CLASS 4.

1 DAS GEBAEUDE BEFINDET SICH IN BAUMHOLDER, DEUTSCHLAND.

• SCHNEE (NACH DIN EN 1991-1-3) sk = 1.65 kN/m²,

• WIND (NACH DIN EN 1991-1-4) qb = 0.32 kN/m²,

• ERDBEBEN (NACH DIN EN 1998-1) agR = 0,164m/s² ERDBENEN NACHWEIS NICHT ERFORDERLICH WENN DIE REFERENZSPITZENWERTE DER BODENBESCHLEUNIGUNG KLEINER ALS 0,40m/s² SIND.

• FEUERWIDERSTANDSKLASSE 4.

1 BLINDING CONCRETE C16/20 1 ESTRICHBETON C16/20

2 STRUCTURAL CONCRETE

• STRIP FOUNDATIONS, FOUNDATION SLABS C30/37

• SUPERSTRUCTURES ELEMENTS C30/37

2 BETON

• STREIFENFUNDAMENT, BODENPLATTE C30/37

• OBERBAUELEMENTE C30/37

3 REINFORCEMENT B500 (A,B) 3 BEWEHRUNGSTAHL B500 (A,B)

4 STRUCTURAL STEEL S235; S355 4 TRAGWERK STAHL S235; S355

5 ALL CONCRETE CONSTRUCTION JOINTS WILL BE PROPERLY PREPARED BEFORE CONCRETE POURING; 5 ALLE BETONARBEITSFUGEN WERDEN VOR DEM BETONIEREN ORDNUNGSGEMAESS VORBEREITET;

6 DEVIATIONS FROM MATERIAL TYPE OR QUALITY CLASS ARE NOT PERMITTED WITHOUT DESIGNER WRITTEN APPROVAL; 6 ABWEICHUNGEN VON DER MATERIALART ODER QUALITAETSKLASSE SIND OHNE SCHRIFTLICHE GENEHMIGUNG DES PRUEFINGENIEUR NICHT ZULAESSIG 7 ALL WELDS WILL BE FACTORY EXECUTED, IN CONTROLLED ENVIRONMENT, USING AN APPROVED TECHNOLOGY; 7 ALLE SCHWEISSNAEHTE WERDEN WERKSEITIG AUSGEFUEHRT, IN KONTROLLIERTER UMGEBUNG, UNTER VERWENDUNG EINER ZUGELASSENEN TECHNOLOGIE;

8 WELDING ON SITE IS NOT PERMITTED WITHOUT THE WRITTEN APPROVAL OF THE DESIGNER. 8 SCHWEISSEN VOR ORT IST OHNE DIE SCHRIFTLICHE ZUSTIMMUNG DES PRUEFINGENIEURS SIND NICHT ZULAESSIG.

1 IF, DURING THE EXECUTION OF THE INFRASTRUCTURE WORKS, THE GEOTECHNICAL CONDITIONS FOUND ON SITE WILL BE DIFFERENT FROM THE ONES CONSIDERED THROUGHOUT THE PROJECT, EXECUTION WILL STOP AND THE GEOTECHNICAL ENGINEER AND THE DESIGNER WILL BE CONTACTED TO ANALYZE

AND FIND A SOLUTION ADJUSTED TO THE REAL CONDITIONS.

1 WENN DIE VOR ORT FESTGESTELLTEN GEOTECHNISCHEN BEDINGUNGEN VON DENEN DES GESAMTEN PROJEKTS UNTERSCHIEDEN WIRD, WIRD DIE ARBEIT UNTERBROCHEN UND DER GEOTECHNIKER UND DER PRUEFINGENIEUR WERDEN KONTAKTIERT,UM EINE ANGEPASSTE LOESUNG AN DIE REALEN BEDINGUNGEN ZU

ANALYSIEREN UND ZU FINDEN.

2 THE FREEZING DEPTH CONSIDERED IS 80 cm. 2 DIE BETRACHTETE GEFRIERTIEFE BETRAEGT 80 cm.

3 SOIL PARAMETERS:

- MOIST UNIT WEIGHT γk=19-21 kN/m³

- SATURATED UNIT WEIGHT γk=21-23 kN/m³

3 BODENKENNWERTE:

- ERDFEUCHTE WICHTE γk=19-21 kN/m³

- WASSERGESAETTIGTE WICHTE γk=21-23 kN/m³

4 •ACCORDING TO THE GEOTECHNICAL REPORT FROM OCTOBER 18, 2021 DEVELOPED BY AECOM, IN ORDER TO KEEP SEDIMENTS AND SEDIMENTATION DIFFERENCES WITHIN A TOLERABLE RANGE, A SOIL EXCHANGE PAD UNDER FOUNDATION SYSTEM OF AT LEAST 2.5m IS RECOMMENDED (ELEVATION DEPTH -3.67m).

A MIXED-GRAIN, STANDARDIZED, FROST-PROOF MATERIAL (E.G. FROST PROTECTION MATERIAL 0/45 MM) SHOULD BE SELECTED AS THE SOIL REPLACEMENT

CUSHION.

•THE SOIL HORIZON BELOW THE BALLAST PAD SHOULD HAVE, AT A MINIMUM, A STIFF CONSISTENCY OR MEDIUM-DENSITY BEDDING. IF DURING CONSTRUCTION, THE SOIL HORIZON IS FOUND TO HAVE A SOFT CONSISTENCY, THE BALLAST CUSHION SHOULD BE BROUGHT DOWN TO DEPTHS WHERE AT LEAST A STIFF CONSISTENCY

IS ACHIEVED.

•A PRESSURE SPREAD ANGLE OF 45° MUST BE CONSIDERED WHEN INSTALLING THE SOIL REPLACEMENT MATERIAL UNDER THE FOUNDATION SYSTEM. THE LOAD-BEARING CAPACITY AND COMPACTION MUST BE VERIFIED BY MEANS OF STATIC PLATE PRESSURE TESTS. THE SOIL REPLACEMENT MUST BE INSTALLED AND

COMPACTED IN LAYERS.

•WHEN PERFORMING STATIC LOAD PLATE TESTS, THE FOLLOWING LOAD-BEARING CAPACITY AND COMPACTION REQUIREMENTS MUST BE ACHIEVED ON THE

SURFACE OF THE SOIL REPLACEMENT:

DEFORMATION MODUL Ev2 ≥ 100 MN/m², Ev2/Ev1 < 2,3 WHEN PERFORMING DYNAMIC LOAD PLATE TESTS, THE FOLLOWING LOAD-BEARING CAPACITY AND COMPACTION REQUIREMENTS MUST BE ACHIEVED:

DEFORMATION MODUL Evd ≥ 50 MN/m² •AECOM RECOMMENDS CARRYING OUT AT LEAST ONE STATIC TEST AS A REFERNCE FOR ANY FURTHER DYNAMIC TESTS, AS EXPERIENCE HAS SHOWN THAT

DYNAMIC TESTS HAVE ONLY LIMITED INFORMATIVE VALUE ABOUT THE COMPACTION SUCCESS.

4 •GEMAESS DEM VON AECOM ERSTELLTEN GEOTECHNISCHEN REPORT VOM 18. OKTOBER 2021 WIRD EIN BODENAUSTAUSCHPOLSTER VON MINDESTENS 2,5m EMPFOHLEN, UM SETZUNGEN UND SETZUNGSUNTERSCHIEDE IN EINER VERTRAEGLICHEN GROESSENORDNUNG ZU HALTEN (HOEHE TIEFE -3.67m). ALS BODENAUSTAUSCHPOLSTER SOLLTE EIN GEMISCHTKOERNIGES, GENORMTES, FROSTSICHEREN MATERIAL (Z.B. FROSTSCHUTZMATERIAL 0/45 MM) GEWAEHLT WERDEN.

•DER BODENHORIZONTSOLLTE UNTERHALB DES SCHOTTERPOLSTERS EINE MINDESTENS STEIFE KONSISTENZ BZW. MITTELDICHTE LAGERUNG AUFWEISEN. WERDEN WAEHREND DER BAUAUSFUEHRUNG BEREICHE UNTERHALB DES SCHOTTERPOLSTERS GEFUNDEN, DIE EINE WEICHPLASTISCHE KONSISTENZ BZW. LOCKERE LAGERUNG AUFWEISEN, IST DAS SCHOTTERPOLSTER BIS IN TIEFEN ZU FUEHREN IN DEM MINDESTENS EINE STEIFE KONSISTENZ BZW. MITTELDICHTE LAGERUNG

VORHERRSCHT.

•ES IST EIN DRUCKAUSBREITUNGSWINKEL VON 45° BEIM EINBAU DES BODENAUSTAUSCHMATERIALS ZU BERUECKSICHTIGEN. DIE TRAGFAEHIGKEIT UND VERDICHTUNG IST MITTELS STATISCHEN PLATTENDRUCKVERSUCHE NACHZUWEISEN. DIE BODENAUSTAUSCHSCHICHT IST JEWEILS LAGENWEISE EINZUBAUEN UND ZU VERDICHTEN.

•AUF DER OBERFLAECHE DES BODENAUSTAUSCHES SIND BEI AUSFUEHRUNG STATISCHER LASTPLATTENVERSUCHE DIE FOLGENDEN TRAGFAEHIGKEITS- UND

VERDICHTUNGSANFORDERUNGEN EINZUHALTEN:

VERFORMUNGSMODUL VON Ev2 ≥ 100 MN/m², Ev2/Ev1<2,3 •BEI DER AUSFUEHRUNG DYNAMISCHER LASTPLATTENVERSUCHE SIND DIE FOLGENDEN TRAGFAEHIGKEITS- UND VERDICHTUNGSANFORDERUNGEN EINZUHALTEN:

VERFORMUNGSMODUL VON Evd ≥ 50 MN/m² •AECOM EMPFIEHLT MINDESTENS EINEN STATISCHEN VERSUCH ALS REFERENZ FUER EVENTUELL WEITERE DYNAMISCHE VERSUCHE DURCHZUFUEHREN, DA DYNAMISCHE VERSUCHE ERFAHRUNGSGEMAESS NUR BEGRENZTE AUSSAGEKRAFT UEBER DEN VERDICHTUNGSERFOLG HABEN.

5 FOR CONSTRUCTION OF EXCAVATION PITS, A SLOPE ANGLE OF MAXIMUM 45° IS TO BE MAINTAINED. 5 BEI DER ERRICHTUNG VON BAUGRUBEN, IST EIN BOESCHUNGSWINKEL VON MAXIMAL 45° EINZUHALTEN.

WOOD

HOLZ

CAST-IN-PLACE REINFORCED CONCRETE

BEWEHRTER ORTBETON

PRECAST CONCRETE

FERTIGBETON

PLAIN CONCRETE

UMBEWERTER ORTBETON

DOUBLE WALL

DOPPELWAND

FILIGREE SLAB

ELEMENTDECKE

EARTH

ERDE

GRAVEL

KIES

MASONRY

MAUERWERK

STEEL

STAHL

SOFT INSULATION

DAEMMSTOFFE

LEGENDS /

LEGENDE

RIGID INSULATION

DICHTSTOFFE

GROUT

MOERTEL

CONSTRUCTION JOINT

ARBEITSFUGE

SPAN OF STRUCTURAL ELEMENTS

SPANNRICHTUNG DER TRAGWERKSELEMENTE

POSITION OF STRUCTURAL ELEMENT

POSITIONS DES TRAGWERKSELEMENTES

N

NORTH ARROW

NORDPFEIL

PLAN SPOT ELEVATION

HOEHENKOTE IM GRUNDRISS

SECTION SPOT ELEVATION

HOEHENKOTE IM SCHNITT

SYMBOLS /

SYMBOLE

BREAK LINE

BRUCHKANTE

X KEY NOTES

HAUPTANMERKUNGEN

XXYY

POSITION NUMBER

POSITIONSNUMMER

POSITION CODE

POSITIONS CODE

MATCH LINE

PLAN SCHNITTLINE

M

AT

C H

L

IN

E

X / X

-X

XX

REFERENCED SHEET

REFERENZBLATT

X

XXX

CALL OUT

DETAILAUSSCHNITT

CONSTRUCTION JOINT

ARBEITSFUGE

PARAPET HEIGHT (FROM TOC)

BRUESSTUNGSHOEHE (AB OKRF)

PH: X,XX m

RADON CERTIFIED VAPOR LAYER

RADON UND DAMPFSPERRE

RECTANGULAR PENETRATION - SECTION

RECHTECKIGE DURCHBRUCH- SCHNITT

PARTIAL RECTANGULAR WALL PENETRATION

RECHTECKIGE TEILWANDAUSSPARUNG

RECTANGULAR PENETRATION - PROJECTION

RECHTECKIGE DURCHBRUCH - PROJEKTION

CIRCULAR PENETRATION

RUNDE DURCHBRUCH

PENETRATION TAG

DURCHBRUCH TAGYY - XXX

FLOOR

STOCK

00 : GROUND FLOOR

EG

01 : 1ST FLOOR

1. OG

02 : 2ND FLOOR

2. OG

03 : 3RD FLOOR

3. OG

04 : ROOF

DACHGESCHOSS

STRUCTURAL OPENING

STRUKTURELLE OEFFNUNG

PERFORATED PIPES FOR RADON

PERFORIERTE ROHRE FUER RADON

REINFORCEMENT STEEL AREA

QUERSCHNITTE VON

FLAECHENBEWEHRUNG

As,xxx top TOP

OBEN

bot BOTTOM

UNTEN

ver VERTICAL

VERTIKALE

hor HORIZONTAL

HORIZONTALE

trans TRANSVERSAL

TRANSVERSALE

XX Ø-- / -- REBAR SHAPE TAG

BIEGEFORMEN TAG

SPACING IN CM

ABSTAND IN CM

BAR DIAMETER IN MM

STABDURCHMESSER IN MM

BAR MARK NUMBER

STABPOSITION NUMMER

EW EXTERIOR WALL

AUSSENWAND

IW INTERIOR WALL

INNENWAND

FN FOUNDATION

FUNDAMENT

SL SLAB

DECKE

CL COLUMN

STUETZE

ST STAIR

TREPPE

BM BEAM

BALKEN

RW RETAINING WALL

STUETZMAUER

RF ROOF

DACH

SC STEEL COLUMN

STAHLSTUETZE

SB STEEL BEAM

STAHLBALKEN

long LONGITUDINAL

LONGITUDINAL

ABBREVIATIONS /

ABKUERZUNGEN

ENGLISH

ENGLISCH

EL ANSICHT

FL FLOOR

GESCHOSS

ELEVATION

RC STAHLBETON

TOC TOP OF THE CONCRETE

OBERKANTE BETON

REINFORCED CONCRETE

GERMAN

DEUTSCH

DG ROOF FLOOR

EG ERDGESCHOSS

GROUND FLOOR

DACHGESCHOSS

OG UPPER FLOOR

OKRF OBERKANTE ROHFUSSBODEN

TOP FACE OF SLAB

OBERGESCHOSS

BOC UNTERKANTE BETON

BOTTOM OF THE CONCRETE

BOF UNTERKANTE FUNDAMENT

BOTTOM OF THE FOUNDATION

TOF TOP OF THE FOUNDATION

OBERKANTE FUNDAMENT

GND ERDBODEN

GROUND

STB STAHLBETON

REINFORCED CONCRETE

PH PARAPET HEIGHT

BRUESSTUNGSHOEHE

ATFP ANTITERRORISMUS UND KRAFTSCHUTZ

ANTITERRORISM AND FORCE PROTECTION

PRC PRECAST

FERTIGTEIL

FT FERTIGTEIL

PRECAST

beff MITWIRKENDE PLATTENBREITE

EFFECTIVE FLANGE WIDTH

PE VAPOR BARRIER (POLYETHYLENE FOIL, 2 LAYERS)

DAMPFBREMSE (PE-FOLIE; ZWEILAGIG)

mm MILLIMETER

MILLIMETERS

WU WASSERUNDURCHLAESSIGEN

WATERTIGHT CONCRETE

OVERLAP. UEBERGREIFUNGSLAENGE

OVERLAP LENGTH

D TIEFE

DEPTH

H HOEHE

HEIGHT

W WIDTH

BREITE

cm ZENTIMETER

CENTIMETERS

GROUND SLAB FOUNDATION

SLAB ABOVE GROUND FLOOR

SLAB ABOVE 1ST FLOOR

SLAB ABOVE X FLOOR

ROOF FLOOR

BODENPLATTE

DECKE UEBER EG

DECKE UEBER 1.OG

DECKE UEBER X.OG

DG

GROUND FLOOR

EG

1ST FLOOR

1.OG

X FLOOR

X.OG

ROOF FLOOR

DG

STRUCTURAL FLOOR PLAN ORIENTATION /

TRAGWERKSPLAN ORIENTIERUNG

STRIP FOUNDATION

STREIFENFUNDAMENT

PHX FLOOR

X.OG

ROOF FLOOR

DG PH

PARAPET HEIGHT /

BRUESSTUNGSHOEHE

ELEVATION

ANSICHT

SECTION

SCHNITT

TOC

OKRF

TOC

OKRF

TOC

OKRF

TOC

OKRF

ROOF PARAPET

ATTIKA

ROOF PARAPET

ATTIKA

PENETRATIONS IN STRUCTURAL ELEMENTS /

DURCHBRUECHE IN TRAGENDEN ELEMENTEN

RECTANGULAR SLAB PENETRATION

RECTANGULAR WALL PENETRATION

CIRCULAR WALL PENETRATION

RECHTECKIGE WANDDURCHBRUCH

RUNDE WANDDURCHBRUCH

RECHTECKIGE DECKEDURCHBRUCH

EL

EV

AT

IO

N

HO

EH

E

EL

EV

AT

IO

N

HO

EH

E

TOC

OKRF

CIRCULAR SLAB PENETRATION

RUNDE DECKEDURCHBRUCH

W

H

D

H

W

D

PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF

THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)

PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES

PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)

US Army Corps of Engineers

C R O

M W

E L L

SHEET ID

D R

AW

N

B Y

C H

EC

KE

D B

Y

SU

BM

IT

TE

D B

Y

D

ES

IG

N

ED

B

Y

SI

ZE

IS

SU

E D

AT

E

P

LO

TT

ED

/ P

LA

N D

AT

U

M

/ G R

O E

SS

E

/ G

EZ

EI

C

H N

E T:

/ G

EP

R U

E

FT

/ V O

R G

E

LE

G T:

/ G

EN

E H

M

IG

T:

/ BLATT

/ R E

V / D

AT

U

M / B

ES

C

H R

E

IB

U N

G M

AR

K

D

AT

E D

ES

C

R

IP

TI

O

N

SO

LI

C

IT

AT

IO

N N

O

AU

FT

R A

G S

-N R

C O

N

TR

AC

T

N O

/ V

E R

TR

A

G S-

N R

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

EU

R

O

PE

D

IS

TR

IC

T -C

O N

TR

AC

TI

N

G D

IV

IS

IO

N

KO

N

R

AD

A D

EN

AU

ER

R

IN

G

W

IE

SB

A D

EN

G

ER

M

A N

Y

IS

O

A

SEAL

FOR

CONSTRUCTIO

N

SEAL

SM

IT

H B

AR

R

AC

KS

, U

SA

G R

H

EI

N

LA

N D

-P

FA

LZ

, B

AU

M

H O

LD

ER

, G

ER

M

AN

Y

FY

P

N

C O

N

ST

R U

C T

AR

M

Y

LO

D G

IN

G

F

AC

IL

IT

Y

C O

R R

EC

TE

D

N O

V

EM

B

ER

W

2G B

F0

W

2G B1

9D

CUI//REL TO DEU

C U

I// R

EL

T

O D

EU

C U

I// R

EL

T

O D

EU

CUI//REL TO DEU

±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN

/1

1/

:3 1:

P

M

ST

R

U C

TU

R

AL

G

EN

ER

AL

LE

G

EN

D S

AN

D

A

BB

R

EV

IA

TI

O N

S

A

EC

O M

D

ES

IG

N

T

EA

M

M . D

E

IE

R

LE

IN

I.

M

IK

LO

S

I.

M

E N

EN

D

EZ

S-002

S

TA

TI

K

A

LL

G E

M E

IN

LE

G E

N D

E U

N D

A B

K U

E R

ZU

N

G E

N

LAYING DISTANCE FOR LINEAR SUPPORTS: s IS AXIAL DIMENSION LAYING DISTANCE FOR POINT SUPPORTS: s APPLIES TO BOTH DIRECTIONS

VERLEGEABSTAND BEI LINIENFOERMIGEN UNTERSTUETZUNGEN: s IST

ACHSMASS

VERLEGEABSTAND BEI PUNKTFOERMIGEN UNTERSTUETZUNGEN: s GILT

FUER BEIDE RICHTUNGEN

CONCRETE REBAR BENDING

BIEGEN VON BETONSTAEHLEN

WHEN DETERMINING THE BENDING ROLL DIAMETER D, DIN 1045-2 MUST BE OBSERVED AND A DISTINCTION MADE ACCORDING TO THE STRUCTURAL

FUNCTION OF THE BEND.

BEI DER BESTIMMUNG DES BIEGEROLLENDURCHMESSERS D IST DIN 1045-2 ZU BEACHTEN UND NACH DER BAUTECHNISCHEN FUNKTION DER BIEGUNG

ZU UNTERSCHEIDEN.

A) BENDING WITH APPLIED FORCE B) CONSTRUCTIVE BENDING

BIEGUNG ZUR KRAFTUMLEITUNG KONSTRUKTIVE BIEGUNG

THE MINIMUM VALUES OF BENDING ROLL DIAMETERS LISTED UNDER A) AND B)

APPLY ONLY WHEN a ≥ 4Ø (a= DISTANCE OF WELDING FROM THE BEGINNING OF CRUMBLING).

DIE UNTER A) UND B) AUFGEFUEHRTEN MINDESTWERTE DER

BIEGEROLLENDURCHMESSER GELTEN NUR, WENN a ≥ 4Ø (a= ABSTAND DER SCHWEISSUNG VOM KRUEMMUNGSBEGINN).

SUPPORTS

UNTERSTUETZUNGEN

SPACERS AND SUPPORTS MUST LIE ON TOP OF EACH OTHER.

ABSTANDHALTER UND UNTERSTUETZUNGEN MUESSEN UEBEREINANDER LIEGEN.

SECURING THE POSITION OF THE UPPER REINFORCEMENT ACCORDING TO THE DBV-DATA SHEET "UNTERSTUETZUNGEN"

BIEGUNG NACH A) BIEGUNG NACH B)

FOR PRODUCTION AND INSPECTION, THE REQUIRED BENDING ROLL DIAMETER

MUST ALWAYS BE INDICATED ON THE BENDING FORM IN THE REINFORCEMENT

PLAN AND ON THE BAR LIST

IF A BENDING ROLL DIAMETER IS NOT SPECIFIED FOR THE BENDING FORM EITHER

IN THE REINFORCEMENT PLAN OR ON THE BAR LIST, THE ERF. D IS TO BE TAKEN

FROM THE ABOVE TABLE.

ZUR HERSTELLUNG UND UEBERPRUEFUNG IST DER ERFORDERLICHE

BIEGEROLLENDURCHMESSER IMMER ANZUGEBEN UND ZWAR AN DER

BIEGEFORM IM BEWEHRUNGSPLAN UND AUF DER STABLISTE

WIRD AN DER BIEGEFORM WEDER IM BEWEHRUNGSPLAN NOCH AUF DER

STABLISTE EIN BIEGEROLLENDURCHMESSER ANGEGEBEN, SO IST DER ERF. D

IN ABHAENGIGKEIT VON DER OBIGEN TABELLE ZU ENTNEHMEN.

FOR REINFORCING STEEL MESH AND WELDED REINFORCEMENT BENT AFTER

WELDING, DIN EN 1992-1-1 MUST ALSO BE OBSERVED. EXECUTION OF LOCKS

ON SUPPORTS:BEI BETONSTAHLMATTEN UND GESCHWEISSTER BEWEHRUNG, DIE NACH DEM

SCHWESSEN GEBOGEN WERDEN, IST ZUSAETZLICH DIN EN 1992-1-1 ZU

BEACHTEN.

AUSFUEHRUNG VON

BUEGELSCHLOESSER

N BEI STUETZEN:

MINIMUM VALUES OF THE CONCRETE

COVER PERPENDICULAR TO THE

CURVATURE PLANE

BENDING ROLL DIAMETER D

IN MM BAR DIAMETER Ø IN MM

BENDING ROLL DIAMETER D

IN MM

MINDESTWERTE DER BETONDECKUNG

RECHTWINKLING ZUR RUEMMUNGSEBENE

BIEGEROLLENDURCHMESSER D

IN MM

STABDURCHMESSER Ø IN MM BIEGEROLLENDURCHMESSER D

IN MM

> 100 MM AND/UND > 7 ØS MIN D = 10 ØS

6, 8, 10, 12 4 ØS MIN D = 40 MM

> 50 MM AND/UND > 3ØS MIN D = 15 ØS

14, 16 4 ØS MIN D = 64 MM

≤ 50 MM AND/UND < 3ØS MIN D = 20 ØS

20, 25, 28 7 ØS MIN D = 175 MM

BENDING AFTER A) BENDING AFTER B)

LAGESICHERUNG DER OBEREN BEWEHRUNG NACH DEM DBV-MERKBLATT "UNTERSTUETZUNGEN"

FOR COMPONENT THICKNESSES UP TO APPROX. 50 CM, THE DBV-DATA SHEET SPECIFIES THE REQUIREMENTS FOR THE SUPPORTS AND REGULATES THEIR

APPLICATION.

BEI BAUTEILDICKEN BIS CA. 50 CM LEGT DAS DBV-MERKBLATT DIE ANFORDERUNGEN AN DIE UNTERSTUETZUNGEN FEST UND REGELT DEREN ANWENDUNG.

FOR SUPPORTS, CERTIFIED ACCORDING TO DBV-DATA SHEET, THE FOLLOWING LOADS FRD ARE PERMISSIBLE:

FUER UNTERSTUETZUNGEN, ZERTIFIZIERT GEMAESS DBV-MERKBLATT, SIND FOLGENDE LASTEN FRD ZULAESSIG:

LINEAR SUPPORTS (SUPPORT BASKETS, - SNAKES) POINT SUPPORTS (SUPPORT BLOCKS)

LINIENFOERMIGE UNTERSTUETZUNGEN (UNTERSTUETZUNGSKOERBE, -

SCHLANGEN) PUNKTFOERMIGE UNTERSTUETZUNGEN (UNTERSTUETZUNGSBOECKE)

Pzul = 0,67 kN/m

MAXIMUM LAYING DISTANCE s FOR SUPPORTS MAXIMUM LAYING DISTANCE s FOR SUPPORTS MAXIMALER VERLEGEABSTAND s FUER UNTERSTUETZUNGEN MAXIMALER VERLEGEABSTAND s FUER UNTERSTUETZUNGEN BAR DIAMETER Øs OF TOP

REINFORCEMENT LINEAR SUPPORT

BAR DIAMETER Øs OF TOP

REINFORCEMENT POINT SUPPORT

STABDURCHMESSER Øs DER

OBEREN BEWEHRUNG

LINIENFOERMIGE

UNTERSTUETZUNG

STABDURCHMESSER Øs DER

OBEREN BEWEHRUNG

PUNKTFOERMIGE

UNTERSTUETZUNG

≤ 6,5 MM s = 50 CM ≤ 6,5 MM s = 50 CM 6,5 MM < ds ≤ 12 MM s = 70 CM 6,5 MM < ds ≤ 12 MM s = 70 CM

Øs > 12 MM *) s = 70 CM Øs > 12 MM *) s = 70 CM

*) IF THE SUPPORTING BARS ARE Øs > 12 MM, THE LAYING DISTANCE CAN BE

VERIFIED BY CALCULATION.

*) IF THE SUPPORTING BARS ARE Øs > 12 MM, THE LAYING DISTANCE

CAN BE VERIFIED BY CALCULATION.

*) SIND DIE UNTERSTUETZENDEN STAEBE Øs > 12 MM, KANN EIN

RECHNERISHER NACHWEIS DES VERLEGEABSTANDES DURCHGEFUEHRT

WERDEN.

*) SIND DIE UNTERSTUETZENDEN STAEBE Øs > 12 MM, KANN EIN

RECHNERISHER NACHWEIS DES VERLEGEABSTANDES

DURCHGEFUEHRT WERDEN.

D D

⌀s

⌀s

D

⌀s

D

D

⌀s

⌀s

D D

⌀s a a

S S S S

S

S

GENERAL NOTES ALLGEMEINE HINWEISE

PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF

THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)

PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES

PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)

US Army Corps of Engineers

C R O

M W

E L L

SHEET ID

D R

AW

N

B Y

C H

EC

KE

D B

Y

SU

BM

IT

TE

D B

Y

D

ES

IG

N

ED

B

Y

SI

ZE

IS

SU

E D

AT

E

P

LO

TT

ED

/ P

LA

N D

AT

U

M

/ G R

O E

SS

E

/ G

EZ

EI

C

H N

E T:

/ G

EP

R U

E

FT

/ V O

R G

E

LE

G T:

/ G

EN

E H

M

IG

T:

/ BLATT

/ R E

V / D

AT

U

M / B

ES

C

H R

E

IB

U N

G M

AR

K

D

AT

E D

ES

C

R

IP

TI

O

N

SO

LI

C

IT

AT

IO

N N

O

AU

FT

R A

G S

-N R

C O

N

TR

AC

T

N O

/ V

E R

TR

A

G S-

N R

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

EU

R

O

PE

D

IS

TR

IC

T -C

O N

TR

AC

TI

N

G D

IV

IS

IO

N

KO

N

R

AD

A D

EN

AU

ER

R

IN

G

W

IE

SB

A D

EN

G

ER

M

A N

Y

IS

O

A

SEAL

FOR

CONSTRUCTIO

N

SEAL

SM

IT

H B

AR

R

AC

KS

, U

SA

G R

H

EI

N

LA

N D

-P

FA

LZ

, B

AU

M

H O

LD

ER

, G

ER

M

AN

Y

FY

P

N

C O

N

ST

R U

C T

AR

M

Y

LO

D G

IN

G

F

AC

IL

IT

Y

C O

R R

EC

TE

D

N O

V

EM

B

ER

W

2G B

F0

W

2G B1

9D

CUI//REL TO DEU

C U

I// R

EL

T

O D

EU

C U

I// R

EL

T

O D

EU

CUI//REL TO DEU

±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN

/1

1/

:3 1:

P

M

S

TR

U C

TU

R

AL

G

EN

ER

AL

R

EB

AR

N O

TE

S

A

EC

O M

D

ES

IG

N

T

EA

M

M . D

E

IE

R

LE

IN

I.

M

IK

LO

S

I.

M

E N

EN

D

EZ

S-003

S

TA

TI

K

A

LL

G E

M E

IN

B

E W

E H

R U

N G

H

IN

W E

IS

E

1. DETAILED REINFORCEMENT FOR PREFABRICATED ELEMENTS IS FOR

INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE TO

PROVIDE SHOP DRAWINGS ACCORDING TO THE MANUFACTURER

REQUIREMENTS; BASED ON 100% APPROVED DRAWINGS.

CONTRACTOR IS RESPONSIBLE TO GET THE SHOP DRAWINGS

APPROVED BY THE PROOFING ENGINEER IN CHARGE.

1. DETAILLIERTE BEWEHRUNGSANGABEN FUER VORGEFERTIGTE

ELEMENTE DIENEN NUR ZU INFORMATIONSZWECKEN. DER

AUFTRAGNEHMER IST DAFUER VERANTWORTLICH, WERKPLANUNG

GEMAESS DEN ANFORDERUNGEN DES HERSTELLERS ZU ERSTELLEN;

DIE AUF 100% GENEHMIGTEN ZEICHNUNGEN BASIEREN. DER

AUFTRAGNEHMER IST DAFUER VERANTWORTLICH, DASS DIE

WERKPLANUNG VOM ZUSTANENDIGEN PRUEFINGENIEUR GENEHMIGT

WERDEN.

2. THE CONTRACTOR IS SOLELY RESPONSIBLE TO MEASURE AND

QUANTIFY ALL PROJECTS REQUIREMENTS.

2. DER AUFTRAGNEHMER IST ALLEIN FUER DIE MESSUNG UND DIE

QUANTIFIZIERUNG ALLER PROJEKTANFORDERUNGEN

VERANTWORTLICH.

3. IN THE AREA OF CONSTRUCTION JOINTS, THE REINFORCEMENT MUST

BE CONTINUES.

3. IM BEREICH VON ARBEITSFUGEN MUSS DIE BEWEHRUNG

DURCHLAUFEND SEIN.

4. CONNECTING IN-SITU CONCRETE (COLUMNS) TO THE DOUBLE WALL

SYSTEM ACCORDING TO SHOP DRAWING / DOUBLE WALL

MANUFACTURER.

4. ANSCHLUESSE ORTBETONTEILE (STUETZEN) AN DOPPLEWAND

GEMAESS WERKSTATTZEICHNUNGEN / DOPPLEWAND HERSTELLER.

A

A1 S-301

3 4 5 6 9

B

D

F

H

J

L

C S-303

C S-303

S-202

S-201

S-203

F S-304

F S-304

E

G

C

K

B2 S-302

M

AT

C H

L

IN

E

/ S

-1

M

AT

C H

L

IN

E

/ S

-1

FN01.2

FN01.1

FN

.1

FN

.1

FN01.1

FN01.2

FN

.1

FN

.1

FN01.1

FN02.1FN02.1

FN02.1

FN

.1

FN01.1

FN01.2

FN

FN08

44,94

525 1,50 6,30 5,20 3,40 15,50 4,36 3,155 5,00

7,55 775 775 7,05 775 775 13,95 775 775 11,74

525525 15,10 775 775 27,24

2, 5 5

4, 3, 4, 5 5

2, 1, 5, 2, 5, 1, 6, 6, 7,55 775 775 7,05 775 775 13,95 775 775 4,575 1,405 1,55 3,525 1,55

1, 1,50 3,50 1,50

1, 5,50

TOF -0,100

BOF -0,350

TOF -0,100

BOF -1,100

TOF -0,100

BOF -1,100

TOF -0,770

BOF -1,170

1, 1, 1, FN13

FN21

TOF -0,770

BOF -1,170

FN21

FN12

FN11

FN

.2

FN02.1

FN09

FN01.2

FN

.2

FN

.2

FN

.2

FN

.2

FN

.2

FN

.2

FN01.3 FN01.4

,6

4, TOF -0,470

BOF -1,270

2,47 2,50 5,865 2,25

2, 1, 1, 1,75

1,25 775 775 30,265 2,47 1,25 1,25 6,905

525525 11,70 775 775 1,85 775 775 27,24

PERFORATED PIPES FOR RADON

PERFORIERTE ROHRE FUER RADON

PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF

THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)

PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES

PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)

GRAPHIC SCALE

MASSSTABSBALKEN

1:100

0 1 32 4 5 10

SCALE:

GENERAL SHEET NOTES

ALLGEMEINE PLANHINWEISE

TR

U

E N

PLAN

NORTH

US Army Corps of Engineers

C R O

M W

E L L

SHEET ID

D R

AW

N

B Y

C H

EC

KE

D B

Y

SU

BM

IT

TE

D B

Y

D

ES

IG

N

ED

B

Y

SI

ZE

IS

SU

E D

AT

E

P

LO

TT

ED

/ P

LA

N D

AT

U

M

/ G R

O E

SS

E

/ G

EZ

EI

C

H N

E T:

/ G

EP

R U

E

FT

/ V O

R G

E

LE

G T:

/ G

EN

E H

M

IG

T:

/ BLATT

/ R E

V / D

AT

U

M / B

ES

C

H R

E

IB

U N

G M

AR

K

D

AT

E D

ES

C

R

IP

TI

O

N

SO

LI

C

IT

AT

IO

N N

O

AU

FT

R A

G S

-N R

C O

N

TR

AC

T

N O

/ V

E R

TR

A

G S-

N R

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

EU

R

O

PE

D

IS

TR

IC

T -C

O N

TR

AC

TI

N

G D

IV

IS

IO

N

KO

N

R

AD

A D

EN

AU

ER

R

IN

G

W

IE

SB

A D

EN

G

ER

M

A N

Y

IS

O

A

SEAL

FOR

CONSTRUCTIO

N

SEAL

NORTH ARROW

NORDPFEIL

SM

IT

H B

AR

R

AC

KS

, U

SA

G R

H

EI

N

LA

N D

-P

FA

LZ

, B

AU

M

H O

LD

ER

, G

ER

M

AN

Y

FY

P

N

C O

N

ST

R U

C T

AR

M

Y

LO

D G

IN

G

F

AC

IL

IT

Y

C O

R R

EC

TE

D

N O

V

EM

B

ER

W

2G B

F0

W

2G B1

9D

CUI//REL TO DEU

C U

I// R

EL

T

O D

EU

C U

I// R

EL

T

O D

EU

CUI//REL TO DEU

±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN

/1

1/

:3 1:

P

M

ST

R

U C

TU

R

AL

FO

U N

D

AT

IO

N

P

LA

N

ST

R

IP

F O

U N

D

AT

IO

N

, P

AR

T

O F

A

EC

O M

D

ES

IG

N

T

EA

M

M . D

E

IE

R

LE

IN

I.

M

IK

LO

S

I.

M

E N

EN

D

EZ

S-101

S

TA

TI

K

FU

N

D A

M E

N

TP

LA

N

S

TR

E

IF

E N

FU

N

D A

M E

N T, T E

IL

V O

N

SCALE / MASSSTAB: 1 : 100

STREIFENFUNDAMENTPLAN, TEIL 1 VON 2

STRIP FOUNDATION PLAN, PART 1 OF 21

FN01.1 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 105x40cm C30/37

FN01.2 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm C30/37

FN01.3 PAD FOUNDATION EINZELFUNDAMENT 155x155x40cm C30/37

FN01.4 PAD FOUNDATION EINZELFUNDAMENT 155x155x40cm C30/37

FN02.1 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm 30/37

FN06 PAD FOUNDATION EINZELFUNDAMENT 250x450x80cm C30/37

FN08 PAD FOUNDATION EINZELFUNDAMENT 225x225x70cm C30/37

FN09 PAD FOUNDATION EINZELFUNDAMENT 175x175x40 cm C30/37 WU

FN11 PAD FOUNDATION EINZELFUNDAMENT 155x155x40cm C30/37

FN12 PAD FOUNDATION EINZELFUNDAMENT 155x155x40cm C30/37

FN13 SLAB FOUNDATION -

VESTIBULE

BODENPLATTE -

WINGFANG

25cm C30/37

FN21 SOCKET FOUNDATION KOECHERFUNDAMENT 150x150x 100 cm C30/37

1 RADON MITIGATION SYSTEM RADONSCHUTZ

MINDERUNGSSYSTEM

2 MASS CONCRETE C12/16 FUNDAMENTUNTERFANGUNG

C12/16

1. RADON PIPING EXTRACTION SYSTEM SUITABLE TO MEET THE

FOOTPRINT OF THE BUILDING: INSTALLATION OF PIPES TO OUTSIDE OF

THE BUILDING WHERE A VERTICAL RISER AND FAN INSTALLATION CAN

BE PLACED IF DEEMED NECESSARY. RADON PIPE ILLUSTRATION IS

FOR INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE

FOR UPDATING THE DESIGN USING THE MOST ADVANCE SOLUTION TO

DATE. CONTRACTOR TO COORDINATE AND AVOID CLASHES BETWEEN

RADON PIPES AND DRAINAGE PIPING.

1. RADONSCHUTZ MINDERUNGSSYSTEM DAS AN DIE GRUNFLAECHE

DES GEBAEUDES ANGEPASST IST: EINBAU DER ROHRE AN DER

AUSSENSEITE DES GEBAEUDES, WO EINE VERTIKALE STEIGLEITUNG

UND EIN VENTILATOR ANGEBRACHT WERDEN KOENNTE, FALLS SIE

NOTWENDIG SIND. DIE ABBILDUNG DER RADONLEITUNG DIENT NUR ZU

INFORMATIONSZWECKEN. DER AUFTRAGNEHMER IST FUER DIE

AKTUALISIERUNG DES ENTWURFS UNTER VERWENDUNG DER

AKTUELLSTEN LOESUNG VERANTWORTLICH. AUFTRAGNEHMER ZU

KOORDINIEREN UND KOLLISIONEN ZWISCHEN RADONROHREN UND

ENTWAESSERUNGSROHREN ZU VERMEIDEN.

2. ALL CONCRETE SURFACES IN CONTACT WITH THE GROUND ARE TO BE

BUILT AS WATERTIGHT CONCRETE WITH WATERSTOPS ACCORDING

TO DIN 18451-1.

2. ALLE ERDBERUEHRTEN BETONFLAECHEN SIND ALS

WASSERUNDURCHLAESSIGER BETON MIT FUGENBLECHEN NACH DIN

18451-1 AUSZUFUEHREN.

KEY NOTES

HAUPTANMERKUNGEN

POSITION SCHEDULE

POSITIONSLISTE

LEGEND

LEGENDE

9 10 13 14

B

D

F

H

J

L

S-203

S-201

S-202

A2 S-301

11 16

E

G

C

K

B1 S-302

E S-304

E S-304

D S-303

D S-303

M

AT

C H

L

IN

E

/ S

-1

M

AT

C H

L

IN

E

/ S

-1

TOF -0,470

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

1, 5, 2, 5, 1, 7,785 15,50 3,40 5,20 7,80 2,50 1,50 525

7,01 775 775 13,95 775 775 7,05 775 775 11,55

22,51 775 775 14,85 775 775 2,70 525525

5, 3, 2, 2,25 2,405

1,50

1, 7,01 1,55 13,95 1,55 1,85 1,55 3,65 1,55 6,50 1,05 2,95 1,05

TOF -3,400

BOF -3,650

FN01.2

FN02.2

FN

.2

FN08

FN01.1

FN

.2

FN02.2

FN02.2

FN01.2

FN

.1

FN

.2

FN

.1

FN01.1

FN01.2

FN01.2

FN01.1

2 2

FN13

TOF -0,770

BOF -1,170

FN21

FN10FN09

FN16

FN19

FN20

FN01.2

FN02.2

FN

.2

FN

.1

TOF -1,470

BOF -1,870

7,01 1,55 15,50 7,05 1,55 11,55

7,785 15,50 3,40 5,20 7,80 2,50 1,50 525

FN15

FN01.4

FN

.2

FN

.2

FN

.2

FN

.2

FN

.2

FN

.1

FN

.2

,6

FN01.2

1,50

1, 1, 4, 4, 4, 2, 1, 4, 1, 4, 2, 6, 1, 6, 6, 1, 6, 1,55 595 5,545

44,21

2 2

2 2

2 2

PERFORATED PIPES FOR RADON

PERFORIERTE ROHRE FUER RADON

PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF

THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)

PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES

PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)

GRAPHIC SCALE

MASSSTABSBALKEN

1:100

0 1 32 4 5 10

SCALE:

GENERAL SHEET NOTES

ALLGEMEINE PLANHINWEISE

TR

U

E N

PLAN

NORTH

US Army Corps of Engineers

C R O

M W

E L L

SHEET ID

D R

AW

N

B Y

C H

EC

KE

D B

Y

SU

BM

IT

TE

D B

Y

D

ES

IG

N

ED

B

Y

SI

ZE

IS

SU

E D

AT

E

P

LO

TT

ED

/ P

LA

N D

AT

U

M

/ G R

O E

SS

E

/ G

EZ

EI

C

H N

E T:

/ G

EP

R U

E

FT

/ V O

R G

E

LE

G T:

/ G

EN

E H

M

IG

T:

/ BLATT

/ R E

V / D

AT

U

M / B

ES

C

H R

E

IB

U N

G M

AR

K

D

AT

E D

ES

C

R

IP

TI

O

N

SO

LI

C

IT

AT

IO

N N

O

AU

FT

R A

G S

-N R

C O

N

TR

AC

T

N O

/ V

E R

TR

A

G S-

N R

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

EU

R

O

PE

D

IS

TR

IC

T -C

O N

TR

AC

TI

N

G D

IV

IS

IO

N

KO

N

R

AD

A D

EN

AU

ER

R

IN

G

W

IE

SB

A D

EN

G

ER

M

A N

Y

IS

O

A

SEAL

FOR

CONSTRUCTIO

N

SEAL

NORTH ARROW

NORDPFEIL

SM

IT

H B

AR

R

AC

KS

, U

SA

G R

H

EI

N

LA

N D

-P

FA

LZ

, B

AU

M

H O

LD

ER

, G

ER

M

AN

Y

FY

P

N

C O

N

ST

R U

C T

AR

M

Y

LO

D G

IN

G

F

AC

IL

IT

Y

C O

R R

EC

TE

D

N O

V

EM

B

ER

W

2G B

F0

W

2G B1

9D

CUI//REL TO DEU

C U

I// R

EL

T

O D

EU

C U

I// R

EL

T

O D

EU

CUI//REL TO DEU

±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN

/1

1/

:3 1:

P

M

ST

R

U C

TU

R

AL

FO

U N

D

AT

IO

N

P

LA

N

ST

R

IP

F O

U N

D

AT

IO

N

, P

AR

T

O F

A

EC

O M

D

ES

IG

N

T

EA

M

M . D

E

IE

R

LE

IN

I.

M

IK

LO

S

I.

M

E N

EN

D

EZ

S-102

S

TA

TI

K

FU

N

D A

M E

N

TP

LA

N

S

TR

E

IF

E N

FU

N

D A

M E

N T, T E

IL

V O

N

SCALE / MASSSTAB: 1 : 100

STREIFENFUNDAMENTPLAN, TEIL 1 VON 2

STRIP FOUNDATION PLAN, PART 2 OF 21

FN01.1 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 105x40cm C30/37

FN01.2 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm C30/37

FN01.4 PAD FOUNDATION EINZELFUNDAMENT 155x155x40c m C30/37

FN02.2 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm C30/37

FN08 PAD FOUNDATION EINZELFUNDAMENT 225x225x70c m C30/37

FN09 PAD FOUNDATION EINZELFUNDAMENT

175x175x40 cm C30/37

WU

FN10 PAD FOUNDATION EINZELFUNDAMENT

175x175x40c m C30/37

WU

FN13 SLAB FOUNDATION -

VESTIBULE BODENPLATTE - WINGFANG 25cm C30/37

FN15 GROUND SLAB FOUNDATION

- SPRINKLER TANK

BODENPLATTE FUNDAMENT

- SPRINKLERTANK

25cm C30/37

WU

FN16 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 100x40cm

C30/37 WU

FN19 PAD FOUNDATION EINZELFUNDAMENT 155x150x40c m C30/37

FN20 PAD FOUNDATION EINZELFUNDAMENT 155x180x40c m C30/37

FN21 SOCKET FOUNDATION KOECHERFUNDAMENT

150x150x 100 cm C30/37

1 RADON MITIGATION SYSTEM RADONSCHUTZ

MINDERUNGSSYSTEM

2 MASS CONCRETE C12/16 FUNDAMENTUNTERFANGUNG

C12/16

1. RADON PIPING EXTRACTION SYSTEM SUITABLE TO MEET THE

FOOTPRINT OF THE BUILDING: INSTALLATION OF PIPES TO OUTSIDE OF

THE BUILDING WHERE A VERTICAL RISER AND FAN INSTALLATION CAN

BE PLACED IF DEEMED NECESSARY. RADON PIPE ILLUSTRATION IS

FOR INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE

FOR UPDATING THE DESIGN USING THE MOST ADVANCE SOLUTION TO

DATE. CONTRACTOR TO COORDINATE AND AVOID CLASHES BETWEEN

RADON PIPES AND DRAINAGE PIPING.

1. RADONSCHUTZ MINDERUNGSSYSTEM DAS AN DIE GRUNFLAECHE

DES GEBAEUDES ANGEPASST IST: EINBAU DER ROHRE AN DER

AUSSENSEITE DES GEBAEUDES, WO EINE VERTIKALE STEIGLEITUNG

UND EIN VENTILATOR ANGEBRACHT WERDEN KOENNTE, FALLS SIE

NOTWENDIG SIND. DIE ABBILDUNG DER RADONLEITUNG DIENT NUR ZU

INFORMATIONSZWECKEN. DER AUFTRAGNEHMER IST FUER DIE

AKTUALISIERUNG DES ENTWURFS UNTER VERWENDUNG DER

AKTUELLSTEN LOESUNG VERANTWORTLICH. AUFTRAGNEHMER ZU

KOORDINIEREN UND KOLLISIONEN ZWISCHEN RADONROHREN UND

ENTWAESSERUNGSROHREN ZU VERMEIDEN.

2. ALL CONCRETE SURFACES IN CONTACT WITH THE GROUND ARE TO BE

BUILT AS WATERTIGHT CONCRETE WITH WATERSTOPS ACCORDING

TO DIN 18451-1.

2. ALLE ERDBERUEHRTEN BETONFLAECHEN SIND ALS

WASSERUNDURCHLAESSIGER BETON MIT FUGENBLECHEN NACH DIN

18451-1 AUSZUFUEHREN.

LEGEND

LEGENDE

POSITION SCHEDULE

POSITIONSLISTE

KEY NOTES

HAUPTANMERKUNGEN

A1 S-301

3 4 5 6 9

B

D

F

H

J

L

C S-303

C S-303

S-202

S-201

S-203

F S-304

F S-304

40 44,54

40 125 1,50 6,30 5,20 3,40 15,50 4,36 3,155 5,00

1, 5, 2, 5, 1, 2, 4, 4, 2, M

AT

C H

L

IN

E

/ S

-1

M

AT

C H

L

IN

E

/ S

-1

E

G

7,55 65 25 65 3,65 65 25 65 1,85 65 25 65 13,95 65 25 65 4,325 25 1,405 345 865 345 3,525

50 685

C

K

B2 S-302

EW16EW08

EW12

EW08

EW04 EW12

EW16

IW04

IW04

IW08

IW08

IW12

IW12

FN03

FN03

FN03

FN03

TOF -0,190

BOF -0,340

TOF -0,190

BOF -0,340

S-503

1, 2, 1,50 3,50 1,50

FN05

FN04

FN05

FN05

FN05

,3

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

40 25 40 11,70 65 25 65 1,85 65 25 65 14,815 55 11,875

TOF -0,770

BOF -1,170

TOF -0,190

BOF -0,340

TOF -0,190

BOF -0,340

TOF -0,190

BOF -0,340

FN13

SC01 SC01

EW

EW

40 25 40 15,10 65 25 65 27,24

FN

EW04

EW

EW

EW

EW

EW

EW

EW

EW

IW

IW

IW08

IW

RW01

R W

RW01

CL37

CL37

CL04

CL20 CL28

CL08

CL24

IW04

IW04

IW12

IW12

IW12

IW12

FN09

FN08

FN

FN05

FN21 FN21

A-504

TOF -0,100

BOF -0,350

TOF -0,100

BOF -1,100

TOF -0,100

BOF -1,100

CL12

FN17

6, 6, 1,25 65 25 65 29,715 55 2,47 95 60 95 6,905

6, 1, 1, 1, 6, 4, 7,55 65 25 65 7,05 65 25 65 13,95 65 25 65 11,74

DOPPELWAND

DOUBLE WALL

CAST-IN-PLACE REINFORCED CONCRETE

BEWEHRTER ORTBETON

PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF

THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)

PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES

PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)

GRAPHIC SCALE

MASSSTABSBALKEN

1:100

0 1 32 4 5 10

SCALE:

GENERAL SHEET NOTES

ALLGEMEINE PLANHINWEISE

TR

U

E N

PLAN

NORTH

US Army Corps of Engineers

C R O

M W

E L L

SHEET ID

D R

AW

N

B Y

C H

EC

KE

D B

Y

SU

BM

IT

TE

D B

Y

D

ES

IG

N

ED

B

Y

SI

ZE

IS

SU

E D

AT

E

P

LO

TT

ED

/ P

LA

N D

AT

U

M

/ G R

O E

SS

E

/ G

EZ

EI

C

H N

E T:

/ G

EP

R U

E

FT

/ V O

R G

E

LE

G T:

/ G

EN

E H

M

IG

T:

/ BLATT

/ R E

V / D

AT

U

M / B

ES

C

H R

E

IB

U N

G M

AR

K

D

AT

E D

ES

C

R

IP

TI

O

N

SO

LI

C

IT

AT

IO

N N

O

AU

FT

R A

G S

-N R

C O

N

TR

AC

T

N O

/ V

E R

TR

A

G S-

N R

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

EU

R

O

PE

D

IS

TR

IC

T -C

O N

TR

AC

TI

N

G D

IV

IS

IO

N

KO

N

R

AD

A D

EN

AU

ER

R

IN

G

W

IE

SB

A D

EN

G

ER

M

A N

Y

IS

O

A

SEAL

FOR

CONSTRUCTIO

N

SEAL

NORTH ARROW

NORDPFEIL

SM

IT

H B

AR

R

AC

KS

, U

SA

G R

H

EI

N

LA

N D

-P

FA

LZ

, B

AU

M

H O

LD

ER

, G

ER

M

AN

Y

FY

P

N

C O

N

ST

R U

C T

AR

M

Y

LO

D G

IN

G

F

AC

IL

IT

Y

C O

R R

EC

TE

D

N O

V

EM

B

ER

W

2G B

F0

W

2G B1

9D

CUI//REL TO DEU

C U

I// R

EL

T

O D

EU

C U

I// R

EL

T

O D

EU

CUI//REL TO DEU

±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN

/1

1/

:3 1:

P

M

ST

R

U C

TU

R

AL

FO

U N

D

AT

IO

N

P

LA

N G

R O

U N

D S

LA

B

FO

U

N D

A

TI

O N

, P A

R T

O

F

A

EC

O M

D

ES

IG

N

T

EA

M

M . D

E

IE

R

LE

IN

I.

M

IK

LO

S

I.

M

E N

EN

D

EZ

S-103

S

TA

TI

K

FU

N

D A

M E

N

TP

LA

N

B O

D E

N P

LA

TT

E , T

E

IL

V

O N

SCALE / MASSSTAB: 1 : 100

FUNDAMENTPLAN, TEIL 1 VON 2

FOUNDATION PLAN, PART 1 OF 21

CL04 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37

CL08 RC COLUMN - GND FL STB STUETZE - EG 28x60 cm C30/37

CL12 RC COLUMN - GND FL STB STUETZE - EG 50x25 cm C30/37

CL20 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37

CL24 RC COLUMN -GND FL STB STUETZE - EG 28x60 cm C30/37

CL28 RC COLUMN - GND FL STB STUETZE - EG 28x60cm C30/37

CL37 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37

EW04 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW08 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW12 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW16 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW21 RC EXTERIOR WALL-

VESTIBULE

STB AUSSENWAND -

WINGFANG

25cm C30/37

FN03 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37 FN04 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37 FN05 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37

FN06 PAD FOUNDATION EINZELFUNDAMENT 250x450x80c m C30/37

FN08 PAD FOUNDATION EINZELFUNDAMENT 225x225x70c m C30/37

FN09 PAD FOUNDATION EINZELFUNDAMENT

175x175x40 cm C30/37

WU

FN13 SLAB FOUNDATION -

VESTIBULE BODENPLATTE - WINGFANG 25cm C30/37

FN16 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 100x40cm

C30/37 WU

FN17 GROUND SLAB FOUNDATION

- ELEVATOR

BODENPLATTE FUNDAMENT

- AUFZUG

20cm C30/37

WU

FN21 SOCKET FOUNDATION KOECHERFUNDAMENT

150x150x 100 cm C30/37

IW04 RC INTERIOR WALL - GND

FL STB INNENWAND - EG 25cm C30/37

IW08 RC INTERIOR WALL - GND FL STB INNENWAND EG 25cm C30/37 IW12 RC INTERIOR WALL - GND FL STB INNENWAND EG 25cm C30/37

RW01 RC RETAINING WALL -

ELEVATOR

STB STUETZWAND -

AUFZUG

25cm C30/37

WU

SC01 STEEL COLUMN - CANOPY STAHLSTUETZE - VORDACH HEB260 355

1 RADON MITIGATION SYSTEM RADONSCHUTZ

MINDERUNGSSYSTEM

1. RADON PIPING EXTRACTION SYSTEM SUITABLE TO MEET THE

FOOTPRINT OF THE BUILDING: INSTALLATION OF PIPES TO OUTSIDE OF

THE BUILDING WHERE A VERTICAL RISER AND FAN INSTALLATION CAN

BE PLACED IF DEEMED NECESSARY. RADON PIPE ILLUSTRATION IS

FOR INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE

FOR UPDATING THE DESIGN USING THE MOST ADVANCE SOLUTION TO

DATE. CONTRACTOR TO COORDINATE AND AVOID CLASHES BETWEEN

RADON PIPES AND DRAINAGE PIPING.

1. RADONSCHUTZ MINDERUNGSSYSTEM DAS AN DIE GRUNFLAECHE

DES GEBAEUDES ANGEPASST IST: EINBAU DER ROHRE AN DER

AUSSENSEITE DES GEBAEUDES, WO EINE VERTIKALE STEIGLEITUNG

UND EIN VENTILATOR ANGEBRACHT WERDEN KOENNTE, FALLS SIE

NOTWENDIG SIND. DIE ABBILDUNG DER RADONLEITUNG DIENT NUR ZU

INFORMATIONSZWECKEN. DER AUFTRAGNEHMER IST FUER DIE

AKTUALISIERUNG DES ENTWURFS UNTER VERWENDUNG DER

AKTUELLSTEN LOESUNG VERANTWORTLICH. AUFTRAGNEHMER ZU

KOORDINIEREN UND KOLLISIONEN ZWISCHEN RADONROHREN UND

ENTWAESSERUNGSROHREN ZU VERMEIDEN.

2. ALL CONCRETE SURFACES IN CONTACT WITH THE GROUND ARE TO BE

BUILT AS WATERTIGHT CONCRETE WITH WATERSTOPS ACCORDING

TO DIN 18451-1.

2. ALLE ERDBERUEHRTEN BETONFLAECHEN SIND ALS

WASSERUNDURCHLAESSIGER BETON MIT FUGENBLECHEN NACH DIN

18451-1 AUSZUFUEHREN.

LEGEND

LEGENDE

POSITION SCHEDULE

POSITIONSLISTE

B

D

F

H

J

L

S-203

S-201

S-202

A2 S-301

1,185

595 255 5,29 65 25 65 13,95 65 25 65 1,85 65 25 65 3,65 65 25 65 11,55

M

AT

C H

L

IN

E

/ S

-1

M

AT

C H

L

IN

E

/ S

-1

TOF -1,250

BOF -1,450

E

G

C

K

43,81 40

,3

B1 S-302

EW16

EW12

EW20

EW04

EW20

EW12

EW16

E S-304

E S-304

IW17

IW18

IW18

7,785 15,50 3,40 5,20 7,80 2,50 1,50 125 40

TOF -0,550

BOF -0,750

FN03 FN03

FN03

FN03

TOF -0,190

BOF -0,340

TOF -0,190

BOF -0,340

TOF -0,190

BOF -0,340

A S-505

D S-303

D S-303

S-503

FN01.2

IW19

IW18

73 4,865 8,445 30 4,25 30 4,35 65 25 65 14,85 65 25 65 2,70 40 25 40

FN05

FN05

FN03

FN04

FN03

FN14

FN05

FN05

S-512

TOF -0,100

BOF -1,100

TOF -0,100

BOF -0,350

TOF -0,190

BOF -0,340

TOF -0,190

BOF -0,340

TOF -0,770

BOF -1,170

TOF -0,770

BOF -1,170

TOF -0,190

BOF -0,340

TOF -0,190

BOF -0,340

TOF -0,190

BOF -0,340

TOF -0,770

BOF -1,170

2, 1, FN13

SC01

EW

2,25

2, FN08

STEEL PLATFORM

STAHLPLATTFORM

EW

IW

IW

IW

EW

EW

EW22

EW22

IW

IW

EW

EW

EW

EW

EW

FN14

R W

RW01

RW01

R W

R W

CL36

C L3

CL28

CL16CL12

CL37

CL37IW16 IW17 IW17

IW17 IW18

IW19

IW20

IW20

R W

RW03

RW05

R

W

RW04

A S-507

FN

TOF -1,250

BOF -1,450

A-504

TOF -0,770

BOF -1,170

FN01.1

FN01.1

FN01.2

FN01.2

FN

.1

FN

.1

FN01.2

TOF -0,190

BOF -0,390

FN01.2

EW04

FN03

FN18

FN17

7,01 65 25 65 13,95 65 25 65 7,05 65 25 65 11,55

6,345 97 575 6,525 4,85 21,00 1,05 1,20 65 25 65 1,25

22,51 65 25 65 1,85 65 25 65 11,70 40 25 40 2,95 40 25 40

1, 5, 2, 5, 1, 1, 4, 1, 4, 2, 6, 1, 6, 2, 1, 3, 1, 4, 2, 4, 4, 6, IW17

PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF

THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)

PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES

PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)

GRAPHIC SCALE

MASSSTABSBALKEN

1:100

0 1 32 4 5 10

SCALE:

GENERAL SHEET NOTES

ALLGEMEINE PLANHINWEISE

TR

U

E N

PLAN

NORTH

US Army Corps of Engineers

C R O

M W

E L L

SHEET ID

D R

AW

N

B Y

C H

EC

KE

D B

Y

SU

BM

IT

TE

D B

Y

D

ES

IG

N

ED

B

Y

SI

ZE

IS

SU

E D

AT

E

P

LO

TT

ED

/ P

LA

N D

AT

U

M

/ G R

O E

SS

E

/ G

EZ

EI

C

H N

E T:

/ G

EP

R U

E

FT

/ V O

R G

E

LE

G T:

/ G

EN

E H

M

IG

T:

/ BLATT

/ R E

V / D

AT

U

M / B

ES

C

H R

E

IB

U N

G M

AR

K

D

AT

E D

ES

C

R

IP

TI

O

N

SO

LI

C

IT

AT

IO

N N

O

AU

FT

R A

G S

-N R

C O

N

TR

AC

T

N O

/ V

E R

TR

A

G S-

N R

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

EU

R

O

PE

D

IS

TR

IC

T -C

O N

TR

AC

TI

N

G D

IV

IS

IO

N

KO

N

R

AD

A D

EN

AU

ER

R

IN

G

W

IE

SB

A D

EN

G

ER

M

A N

Y

IS

O

A

SEAL

FOR

CONSTRUCTIO

N

SEAL

NORTH ARROW

NORDPFEIL

SM

IT

H B

AR

R

AC

KS

, U

SA

G R

H

EI

N

LA

N D

-P

FA

LZ

, B

AU

M

H O

LD

ER

, G

ER

M

AN

Y

FY

P

N

C O

N

ST

R U

C T

AR

M

Y

LO

D G

IN

G

F

AC

IL

IT

Y

C O

R R

EC

TE

D

N O

V

EM

B

ER

W

2G B

F0

W

2G B1

9D

CUI//REL TO DEU

C U

I// R

EL

T

O D

EU

C U

I// R

EL

T

O D

EU

CUI//REL TO DEU

±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN

/1

1/

:3 1:

P

M

ST

R

U C

TU

R

AL

FO

U N

D

AT

IO

N

P

LA

N G

R O

U N

D S

LA

B

FO

U

N D

A

TI

O N

, P A

R T

O

F

A

EC

O M

D

ES

IG

N

T

EA

M

M . D

E

IE

R

LE

IN

I.

M

IK

LO

S

I.

M

E N

EN

D

EZ

S-104

S

TA

TI

K

FU

N

D A

M E

N

TP

LA

N

B O

D E

N P

LA

TT

E , T

E

IL

V

O N

SCALE / MASSSTAB: 1 : 100

FUNDAMENTPLAN, TEIL 2 VON 2

FOUNDATION PLAN, PART 2 OF 21

1 RADON MITIGATION SYSTEM RADONSCHUTZ

MINDERUNGSSYSTEM

2 ELEVATOR SHAFT AUFZUGSCHACHT

NON-LOAD BEARING PARTITION

WALL - AERATED CONCRETE

BLOCKS 11,5 cm

NICHT TRAGENDE TRENNWAND -

PORENBETONSTEINE 11,5 cm

CL12 RC COLUMN - GND FL STB STUETZE - EG 50x25 cm C30/37

CL16 RC COLUMN - GND FL STB STUETZE 54x25cm C30/37

CL28 RC COLUMN - GND FL STB STUETZE - EG 28x60cm C30/37

CL32 RC COLUMN - GND FL STB STUETZE - EG 50x25cm C30/37

CL36 RC COLUMN - GND FL STB STUETZE - EG 30x25cm C30/37

CL37 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37

EW04 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW12 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW16 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW20 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW21 RC EXTERIOR WALL-

VESTIBULE

STB AUSSENWAND -

WINGFANG

25cm C30/37

EW22 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

FN01.1 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 105x40cm C30/37

FN01.2 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm C30/37

FN03 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37 FN04 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37 FN05 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37

FN08 PAD FOUNDATION EINZELFUNDAMENT 225x225x70c m C30/37

FN13 SLAB FOUNDATION -

VESTIBULE BODENPLATTE - WINGFANG 25cm C30/37

FN14 GROUND SLAB FOUNDATION BODENPLATTE 20cm C30/37

FN17 GROUND SLAB FOUNDATION

- ELEVATOR

BODENPLATTE FUNDAMENT

- AUFZUG

20cm C30/37

WU

FN18 GROUND SLAB FOUNDATION

- ELEVATOR

BODENPLATTE FUNDAMENT

- AUFZUG

20cm C30/37

WU

FN21 SOCKET FOUNDATION KOECHERFUNDAMENT

150x150x 100 cm C30/37

IW16 RC INTERIOR WALL - GND FL STB INNENWAND EG 25cm C30/37 IW17 RC INTERIOR WALL - GND FL STB INNENWAND EG 25cm C30/37

IW18 RC INTERIOR WALL - GND

FL STB INNENWAND EG 25cm C30/37

IW19 RC INTERIOR WALL - GND

FL STB INNENWAND EG 25cm C30/37

IW20 RC INTERIOR WALL - GND

FL STB INNENWAND EG 25cm C30/37

RW01 RC RETAINING WALL -

ELEVATOR

STB STUETZWAND -

AUFZUG

25cm C30/37

WU

RW02 RC RETAINING WALL -

SPRINKLER TANK

STB STUETZWAND -

SPRINKLERTANK

30cm C30/37

WU

RW03 RC RETAINING WALL -

SPRINKLER TANK

STB STUETZWAND -

SPRINKLERTANK

25cm C30/37

RW04 RC RETAINING WALL -

SPRINKLER TANK

STB STUETZWAND -

SPRINKLERTANK

30cm C30/37

WU

RW05 RC RETAINING WALL -

SPRINKLER TANK

STB STUETZWAND -

SPRINKLERTANK

25cm C30/37

WU

SC01 STEEL COLUMN - CANOPY STAHLSTUETZE - VORDACH HEB260 355

1. RADON PIPING EXTRACTION SYSTEM SUITABLE TO MEET THE

FOOTPRINT OF THE BUILDING: INSTALLATION OF PIPES TO OUTSIDE OF

THE BUILDING WHERE A VERTICAL RISER AND FAN INSTALLATION CAN

BE PLACED IF DEEMED NECESSARY. RADON PIPE ILLUSTRATION IS

FOR INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE

FOR UPDATING THE DESIGN USING THE MOST ADVANCE SOLUTION TO

DATE. CONTRACTOR TO COORDINATE AND AVOID CLASHES BETWEEN

RADON PIPES AND DRAINAGE PIPING.

1. RADONSCHUTZ MINDERUNGSSYSTEM DAS AN DIE GRUNFLAECHE

DES GEBAEUDES ANGEPASST IST: EINBAU DER ROHRE AN DER

AUSSENSEITE DES GEBAEUDES, WO EINE VERTIKALE STEIGLEITUNG

UND EIN VENTILATOR ANGEBRACHT WERDEN KOENNTE, FALLS SIE

NOTWENDIG SIND. DIE ABBILDUNG DER RADONLEITUNG DIENT NUR ZU

INFORMATIONSZWECKEN. DER AUFTRAGNEHMER IST FUER DIE

AKTUALISIERUNG DES ENTWURFS UNTER VERWENDUNG DER

AKTUELLSTEN LOESUNG VERANTWORTLICH. AUFTRAGNEHMER ZU

KOORDINIEREN UND KOLLISIONEN ZWISCHEN RADONROHREN UND

ENTWAESSERUNGSROHREN ZU VERMEIDEN.

2. ALL CONCRETE SURFACES IN CONTACT WITH THE GROUND ARE TO BE

BUILT AS WATERTIGHT CONCRETE WITH WATERSTOPS ACCORDING

TO DIN 18451-1.

2. ALLE ERDBERUEHRTEN BETONFLAECHEN SIND ALS

WASSERUNDURCHLAESSIGER BETON MIT FUGENBLECHEN NACH DIN

18451-1 AUSZUFUEHREN.

KEY NOTES

HAUPTANMERKUNGEN

POSITION SCHEDULE

POSITIONSLISTE

A1 S-301

3 4 5 6 9

B

D

F

H

J

L

C S-303

C S-303

S-202

S-201

S-203

F S-304

F S-304

44,54

7,80 8,85 15,25 12,64

25 7,55 25 8,35 25 15,25 25 12,39

M

AT

C H

L

IN

E

/ S

-1

M

AT

C H

L

IN

E

/ S

-1

7,80 8,85 15,25 12,64

25 7,55 25 8,35 25 15,25 25 12,39

E

G

7,80 5,20 3,40 15,50 7,515 5,00

TOC 4,100

BOC 3,800

TOC 4,100

BOC 3,800

TOC 4,100

BOC 3,800

1,81 1,50 1,00 2,105

1,50 2,00 885 1,34

1,50 2,00 2,175

1,50 2,00 1,34 1,02

1,50 2,00 2,46

1,50 1,00 2,59

1,50 1,00 2,46

1,50 2,00 72 975

1,50 2,00 2,25

2,94 5,55 1,865

ST08

ST07

SL

SL

BM13

BM13

BM13

BM14

BM13 BM13

BM13

BM13

BM13

BM08

BM07CL24

CL08

CL28

CL12

C

K

TOC 4,100

BOC 3,800

TOC 4,100

BOC 3,800

TOC 4,100

BOC 3,800

TOC 4,100

BOC 3,800

1,81 1,50 1,00 2,105

1,50 2,00 885 1,34

1,50 2,00 2,40

2,325

1,01 2,105 1,02 1,50 2,00 2,46

1,50 1,00 2,59

1,50 1,00 2,46

1,50 2,00 72 5,225

2,94 2,00 5,415

B2 S-302

EW04

EW08

EW12

EW16

EW04

EW08

EW12

EW16

SL

SL

IW04

IW04

IW08

IW08 IW12

IW12

S-509

S-511

2, 6, 1, 6, 2, 4, 3, 8, 2, 6, 1, 6, 2, 5, 2, 1, 1, 1, 8, 1, 2, 2, TOC 3,250

BOC 3,000

3, 5, 1, 5, 2, 5, 1, ,5

,5

2, BOC 3,550 BOC 3,400

SL

BOC 3,550

BOC 3,550

BOC 3,550

BOC 3,550 BOC 3,550

BOC 3,550

BOC 3,550

BOC 3,550 BOC 3,400

1,75 2,03 2,77 1,44 3,99 1,405

2,325

1,01 3,745 2,77 7,03 2,27 50 1,005 40 3,97 60 7,64 60

1,50 25 2,03 2,77 1,44 2,54 3,415 2,455 1,74 2,77 7,03 2,77 1,005 40 3,97 60 7,50 25 105

BM08

BM07

BOC 3,400

BOC 3,400

RF09

EW

EW

S-411

BM

EW

BM

EW

EW

IW

IW

IW

EW

08EW

EW

EW

EW

EW

BM16* BM15*

BM15* BM15*

BM15* BM16* BM16* BM15*

BM15* BM10

BM11

BM16*BM15*

BM15*BM16*BM16*BM15*

BM16*BM15*

BM15*BM16*

BM34*

CL04

CL20

CL37

CL37

IW04

IW04

IW12

IW12

IW24

IW

DOPPELWAND

DOUBLE WALL

CAST-IN-PLACE REINFORCED CONCRETE

BEWEHRTER ORTBETON

PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF

THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)

PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES

PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)

GRAPHIC SCALE

MASSSTABSBALKEN

1:100

0 1 32 4 5 10

SCALE:

TR

U

E N

PLAN

NORTH

US Army Corps of Engineers

C R O

M W

E L L

SHEET ID

D R

AW

N

B Y

C H

EC

KE

D B

Y

SU

BM

IT

TE

D B

Y

D

ES

IG

N

ED

B

Y

SI

ZE

IS

SU

E D

AT

E

P

LO

TT

ED

/ P

LA

N D

AT

U

M

/ G R

O E

SS

E

/ G

EZ

EI

C

H N

E T:

/ G

EP

R U

E

FT

/ V O

R G

E

LE

G T:

/ G

EN

E H

M

IG

T:

/ BLATT

/ R E

V / D

AT

U

M / B

ES

C

H R

E

IB

U N

G M

AR

K

D

AT

E D

ES

C

R

IP

TI

O

N

SO

LI

C

IT

AT

IO

N N

O

AU

FT

R A

G S

-N R

C O

N

TR

AC

T

N O

/ V

E R

TR

A

G S-

N R

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

EU

R

O

PE

D

IS

TR

IC

T -C

O N

TR

AC

TI

N

G D

IV

IS

IO

N

KO

N

R

AD

A D

EN

AU

ER

R

IN

G

W

IE

SB

A D

EN

G

ER

M

A N

Y

IS

O

A

SEAL

FOR

CONSTRUCTIO

N

SEAL

NORTH ARROW

NORDPFEIL

SM

IT

H B

AR

R

AC

KS

, U

SA

G R

H

EI

N

LA

N D

-P

FA

LZ

, B

AU

M

H O

LD

ER

, G

ER

M

AN

Y

FY

P

N

C O

N

ST

R U

C T

AR

M

Y

LO

D G

IN

G

F

AC

IL

IT

Y

C O

R R

EC

TE

D

N O

V

EM

B

ER

W

2G B

F0

W

2G B1

9D

CUI//REL TO DEU

C U

I// R

EL

T

O D

EU

C U

I// R

EL

T

O D

EU

CUI//REL TO DEU

±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN

/1

1/

:3 2:

P

M

ST

R

U C

TU

R

AL

FR

AM

IN

G P

LA

N

SL

AB

A

BO

VE

G

R O

U N

D F

LO

O

R , P

AR

T

O

F

A

EC

O M

D

ES

IG

N

T

EA

M

M . D

E

IE

R

LE

IN

I.

M

IK

LO

S

I.

M

E N

EN

D

EZ

S-111

S

TA

TI

K

TR

A

G E

W E

R K

S P

LA

N

D E

C K

E U

E B

E R

E R

D E

G E

S C

H O

S S

, T E

IL

V O

N

SCALE / MASSSTAB: 1 : 100

DECKE UEBER ERDEGESCHOSS, TEIL 1 VON 2

SLAB ABOVE GROUND FLOOR, PART 1 OF 21

BM07 RC T-BEAM - 1ST FL STB PLATTENBALKEN - 1OG bx25x70cm C30/37

BM08 RC T-BEAM - 1ST FL STB PLATTENBALKEN - 1OG bx25x70cm C30/37

BM10 RC BEAM GND FL STB BALKEN EG 25x95cm C30/37

BM11 RC BEAM GND FL STB BALKEN EG 25x70cm C30/37

BM13 TYPICAL RC BEAM BETWEEN

INTERIOR WALLS

TYPISCHER STB BALKEN

ZWISCHEN INNENWAENDE

25x55cm C30/37

BM14 RC BEAM STB BALKEN 25x55cm C30/37

BM15* LINTEL REINFORCEMENT STURZBEWEHRUNG 25x35cm C30/37

BM16* LINTEL REINFORCEMENT STURZBEWEHRUNG 25x35cm C30/37

BM21 RC BEAM-WALL - GND FL STB BALKEN - EG 25x135cm C30/37

BM29* LINTEL REINFORCEMENT STURZBEWEHRUNG 25cm C30/37 BM34* LINTEL REINFORCEMENT STURTZBEWEHRUNG 25cm C30/37

CL04 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37

CL08 RC COLUMN - GND FL STB STUETZE - EG 28x60 cm C30/37

CL12 RC COLUMN - GND FL STB STUETZE - EG 50x25 cm C30/37

CL20 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37

CL24 RC COLUMN -GND FL STB STUETZE - EG 28x60 cm C30/37

CL28 RC COLUMN - GND FL STB STUETZE - EG 28x60cm C30/37

CL37 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37

EW04 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW08 RC EXTERIOR WALL - GND

FL STB AUSSENWAND - EG 25cm C30/37

EW12 RC EXTERIOR…

This is the start of the file's text. The full file is on GovTribe.