B.08.03 23R0005_Ntsasa Primary School Renovation 0002.pdf

PDF 475 KB Posted

Attached to
Design-Build construction contract for the Construction and Renovation of Ntsasa Primary School in Pumlani, South Africa
Solicitation number
W912GB23R0005
Issued by

About this file

This is an amendment to a solicitation for a design-build construction contract. The amendment extends the response deadline from January 9, 2023 to January 17, 2023 for a project that includes constructing a new 5-classroom building, renovating an existing children's latrine building, and potentially constructing a new kitchen building as an option item. The estimated value of construction is between $500,000 and $1,000,000. The Department of the Army European Command seeks these services for the Construction and Renovation of Ntsasa Primary School in Pumlani, South Africa on a firm-fixed price basis under full and open competition. Payment will be made in US dollars according to a schedule of job and option items defined in the amendment.

View the file

Other files

File Type Posted
B.08.03 23R0005_Ntsasa Primary School Amendment 0004.pdf PDF
B.08.02 W912GB23R0005-0004_Ntsasa Primary School Renovation_Conformed.pdf PDF
ProjNet Inquiry Report 9JAN23 Final.pdf PDF
ATTACHMENT 14 _ (Amendment 1) Pay Terms Bid Schedule-Price Schedule.docx DOCX document
B.08.02 W912GB23R0005_Ntsasa Primary School Renovation_Conformed.pdf PDF
ProjNet Inquiry Report.pdf PDF
ATTACHMENT 5.1 Revised Statement of Work (SOW).pdf PDF
ATTACHMENT 13 VAT Information.docx DOCX document
ATTACHMENT 6 Dedication Plaque.pdf PDF
ATTACHMENT 11 Past Performance Questionnaire.docx DOCX document
ATTACHMENT 9 Bank Letter of Guarantee Sample.docx DOCX document
ATTACHMENT 7 SPECIFICATIONS BINDER.pdf PDF
ATTACHMENT 1 Project Location Map.pdf PDF
B.08.02 W912GB23R0005_Ntsasa Primary School Renovation_Full.pdf PDF
ATTACHMENT 4 Structural calculations Guideline.pdf PDF
ATTACHMENT 5 Rainwater Tank Example.pdf PDF
ATTACHMENT 14 Pay Terms Bid Schedule-Price Schedule.docx DOCX document
ATTACHMENT 8 Bank Letter of Assurance Sample.docx DOCX document
ATTACHMENT 2 Concept Site Plan.pdf PDF
ATTACHMENT 10 Commitment Letters.docx DOCX document
ATTACHMENT 3 Conceptual Architecture Plans.pdf PDF
ATTACHMENT 15 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
ATTACHMENT 5.1 Statement of Work (SOW).pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IAF-23-0002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amend Statement of Work; and "Pay Terms Bid Schedule-Price Schedule" attachment. Extended due date to 17 January 2023.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Dec-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912GB23R0005

X 9B. DATED (SEE ITEM 11)

21-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Dec-2022

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB23R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 09-Jan-2023 10:00 AM to 17-Jan-2023 10:00 AM.

The performance code Notice has been added.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

PRICE AND PAYMENT PROCEDURES

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

01/21

PART 1 GENERAL

1.1 PAYMENT TYPES

The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 0001).

1.1.1 Single Job Payment Items

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2 SCHEDULE OF ITEMS: BASE ITEMS

1.2.1 Base Item 0001: Construct one (1) 5-classroom Building

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction for one (1) 5-classroom buildings as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions

W912GB23R0005

of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item, inclusive of work pertaining to pavement of pedestrian paths for the 5-classroom building and replacement of existing pavement sections where trenching is required for utility installation. Payment will be made for costs associated with landscaping work as detailed in SECTION 01 10 10 subpart 2.12 LANDSCAPING.

1.2.2 Base Item 0002: Renovation of Existing Children’s Latrine Building

Payment will be made for costs associated with the design and renovation of the existing children’s latrine building as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

1.3 SCHEDULE OF ITEMS: OPTION ITEMS

1.3.1 Option 1: Item 0003: Construct Kitchen Building

Payment will be made for costs associated with the design and construction of the new kitchen building as indicated in SECTION 01 10 10 and the conceptual layout, inclusive of work associated to pavement of pedestrian paths for the new kitchen building as detailed in

ATTACHMENT 2 CONCEPT SITE PLAN.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section -

(End of Summary of Changes)