ATTACHMENT 2 Concept Site Plan.pdf
PDF 235 KB Posted
- Solicitation number
- W912GB23R0005
- Issued by
-
Department of the Army European Command
About this file
This solicitation is for a design-build construction contract to construct and renovate Ntsasa Primary School in Pumlani, South Africa. The work includes renovating an existing latrine building and office building, as well as constructing a new five-classroom building, kitchen building, and rainwater harvesting tank. The contract is a firm-fixed price award between $500,000 and $1,000,000 issued by the Department of the Army European Command. The solicitation is full and open competition under unrestricted procedures, with the award made and priced in U.S. dollars. Drawings are provided for reference purposes only, with the contractor required to verify conditions and provide a code-compliant design meeting the requirements in the statement of work.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
A
R M
Y
C
O R
P
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L E
N
M
E
I S
S U
E
D
A T
E
C O
N T
R A
C T
S O
L I C
I T
A T
I O
N
N
O
F I
U M
B E
R
1 2 3 4 5
D
C
B
A
ATT. #2
C O
N C
E P
T U
I T
E
P
L A
N
E U
R O
D
I S
T R
I C
T
W I E
S B
A D
E N
G
E R
M A
N Y
CONCEPTUAL SITE PLAN
EXISTING CHILDREN'S LATRINE BUILDING TO BE RENOVATED
1 EXISTING OFFICE BUILDING
2 EXISTING MODULAR SCHOOL BUILDING
3 EXISTING KITCHEN BUILDING
NOTE
9 PROPOSED NEW 5-CLASSROOM BUILDING
6 EXISTING STORAGE CONTAINER
7 EXISTING FENCE
8 EXISTING SITE ENTRANCE GATES
SCALE IN METERS
0 3 15 30
M A
R K
D E
S C
R I P
T I O
N D
A T
E
N T
S A
I M
A R
Y
S
C H
O O
L
P U
M L A
N I
S
O U
T H
F R
I C
A
NOTE:
DRAWINGS PROVIDED FOR REFERENCE ONLY. CONTRACTOR IS TO VERIFY ALL EXISTING
CONDITIONS AND PROVIDE A DESIGN THAT MEETS CODES AND REQUIREMENTS OF THE SOW.
U
N
N
A
M
D
A
D
EXISTING LATRINE BUILDING
12 PROPOSED 5500 LITER RAINWATER HARVESTING TANK
10 PROPOSED NEW KITCHEN BUILDING
11 PROPOSED PAVED WALKWAYS TO TIE INTO EXISTING WALKWAYS
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .