B.08.03 Amend 0003 to RFP W912GB23R0004.pdf

PDF 656 KB Posted

Attached to
Construct Parallel Taxiway and Construct Airfield Upgrades at Kecskemet Air Base, Hungary
Solicitation number
W912GB23R0004
Issued by

View the file

Other files

File Type Posted
B.08.03 W912GB23R0004 Amend 0007 CANCELLATION.pdf PDF
B.08.03 Amendment 0006 to RFP W912GB23R0004.pdf PDF
B.08.03 SF1442 for Amendment 0006 to RFP W912GB23R0004.pdf PDF
B.08.03 SF1442 for Amendment 0005 to RFP W912GB23R0004.pdf PDF
B.08.03 Amendment 0005 to RFP W912GB23R0004.pdf PDF
B.08.03 SF1442 for Amendment 0004 to RFP W912GB23R0004.pdf PDF
B.08.03 Amendment 0004 to RFP W912GB23R0004.pdf PDF
B.08.03.05 ENG-Regeszet_Kecskemet_MH59_repter_EDI_tuzszereszet_ERD_2021.pdf PDF
B.08.03.04 ENG-helyszinrajz- overview.pdf PDF
B.08.03.01 Amendment 0003_Attachment 6_Specifications.pdf PDF
B.08.03.07 HU-Regeszet_Kecskemet_MH59_repter_EDI_tuzszereszet_ERD_2021.pdf PDF
B.08.03.06 HU-Regeszet_helyszínrajz_Kecskemet_MH59_repter_EDI_tuzszereszet_ERD_2021_TM_redukált méret.pdf PDF
B.08.03 Amendment 0002 to RFP W912GB23R0004.pdf PDF
B.08.03 Amendment 0001 to RFP W912GB23R0004.pdf PDF
B.08.03.02 Amendment 0001 20023.02.07 - Hungary Additional Considerations.pdf PDF
B.08.03.01 Amendment 0001 2023.02.07 - Hungary VAT Procedures.pdf PDF
B.08.02.11 Attachment 11_Parallel TWY_AF upgrade Apron Ext IA draft 2022_1010.pdf PDF
B.08.02.09 Attachment 9_TW-Draft DD 1354.pdf PDF
B.08.02.10 Attachment 10_AU-Draft DD 1354.pdf PDF
B.08.02 RFP W912GB23R0004.pdf PDF
B.07.01 PPC and Site Visit Sign in Sheet.pdf PDF
B.07.01 HU Taxiway and Airfield PPC Slide Deck 5Dec22 Final.pdf PDF
B.08.02.03 Attachment 3_Letter of Commitment Sample.docx DOCX document
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
B.08.02.02 Attachment 2_PPQ.pdf PDF
B.08.02 DRAFT RFP W912GB23R0004.pdf PDF
B.08.02.06 Attachment 6_Specifications_R2.pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet.pdf PDF
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Request for Proposal (RFP) to Construct Parallel Taxiway and Construct Airfield Upgrades, Kecskemet Air Base, Hungary

See continuation page for Amendment 0003 details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Feb-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912GB23R0004

X 9B. DATED (SEE ITEM 11)

20-Jan-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended,X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3.EFFECTIVE DATE

28-Feb-2023

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB23R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

The purposes of this Amendment 0003 are to:

1. Provide the Simplified Preliminary Archaeological Documentation and Drawing;

2. Add FAR Clause 52.232-27 Prompt Payment for Construction Contracts (JAN 2017), in by reference;

3. Revise FAR Provision 52.228-1 Bid Guarantee (SEP 1996);

4. Extend the proposal due date from 6 March 2023 at 10:00 AM Central European Time (CET) to 8 March 2023 10:00 AM CET;

and,

5. Revise the following specifications and drawings:

Specifications 33 71 02 – Added clarification that SN4 stiffness rating is required for lighting conduits. Removed requirement for “Electric” or “Telecommunications” to be cast onto manhole covers.

00 74 01 – Added note that requires an archaeologist to supervise and monitor earthwork within archaeological areas in accordance with the Archaeological Study and Hungarian Law.

Construct Parallel Taxiway Drawings TW-G-001 – Noted Amendment 3 and date on cover sheet.

TW-C-151 – TW-C-162 – Clarified stormwater pipe size and material information.

TW-C-340 – TW-C-341 – Clarified stormwater pipe size and material information.

TW-C-344 – Clarified stormwater pipe size and material information.

TW-C-347 – TW-C-349 – Clarified stormwater pipe size and material information.

TW-C-352 – TW-C-353 – Clarified stormwater pipe size and material information.

TW-C-355 – TW-C-357 – Clarified stormwater pipe size and material information.

TW-C-359 – TW-C-362 – Clarified stormwater pipe size and material information.

TW-C-364 – Clarified stormwater pipe size and material information.

TW-C-367 – Clarified stormwater pipe size and material information.

TW-C-500 – TW-C-503 – Clarified the 10cm removal of Humus is a minimum depth of removal. Additional removal may be required per Specification Section 31 00 00, Paragraph 3.1.

TW-C-550 – Adds note to clarify that manhole dimensions provided are minimums. The Contractor must adjust manhole sizes as needed to connect pipes.

TW-C-551 – Adjusts subdrain bedding depth from 18cm to 25cm.

TW-C-552 – Adds note to clarify that manhole dimensions provided are minimums. The Contractor must adjust manhole sizes as needed to connect pipes. Manhole Types are also modified from M2 to M1 and M4 to M3 to accommodate pipe sizes.

TW-C-554 – Adds note to clarify that manhole dimensions provided are minimums. The Contractor must adjust manhole sizes as needed to connect pipes.

TW-C-555 – Adjusts sandy gravel bedding thickness. Adjusts DN500 pipes from 0.42m3/fm to 0.36m3/fm. Adjusts DN600 pipes from 0.36m3/fm to 0.42m3/fm.

TW-C-556 – TW-C-558 – Adds note to clarify that manhole dimensions provided are minimums. The Contractor must adjust manhole sizes as needed to connect pipes. Manhole Types are also modified from M2 to M1 and M4 to M3 to accommodate pipe sizes.

TW-S-501 – Clarifies that Manhole Covers are required to be F900.

TW-E-003 – Adds note clarifying which airfield lights are equipped with Halogen light sources and which lights are LED.

Airfield Upgrades Drawings AU-G-001 – Noted Amendment 3 and date on cover sheet.

AU-C-159 – Clarified stormwater pipe size and material information.

AU-C-340 – Clarified stormwater pipe size and material information.

AU-C-345 – AU-C-347 – Clarified stormwater pipe size and material information.

AU-C-351 – Clarified stormwater pipe size and material information.

AU-C-500 – AU-C-503 – Clarified the 10cm removal of Humus is a minimum depth of removal. Additional removal may be required per Specification Section 31 00 00, Paragraph 3.1.

AU-C-550 – Adds note to clarify that manhole dimensions provided are minimums. The Contractor must adjust manhole sizes as needed to connect pipes.

AU-C-552 – Clarifies that the Oil Water Separator lid must be F900.

AU-C-555 – Adjusts sandy gravel bedding thickness. Adjusts DN500 pipes from 0.42m3/fm to 0.36m3/fm. Adjusts DN600 pipes from 0.36m3/fm to 0.42m3/fm.

AU-C-557 – AU-C-559 – Adds note to clarify that manhole dimensions provided are minimums. The Contractor must adjust manhole sizes as needed to connect pipes. Manhole Types are also modified from M2 to M1 and M4 to M3 to accommodate pipe sizes.

AU-S-503 – Clarifies that Manhole Covers are required to be F900.

AU-E-003 – Adds note clarifying which airfield lights are equipped with Halogen light sources and which lights are LED.

Changes are identified either in red text, underlines, strikethroughs, or a combination of those techniques.

NOTE: The PDF drawings are the binding contract documents and the CAD drawings were provided for informational purposes only and have not been updated to reflect this Amendment 0003.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 6-Mar-2023 10:00 AM to 08-Mar-2023 10:00 AM.

SECTION 00 21 16 - Instructions to Proposers

The following have been modified:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be ten percent (10%) of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been added:

52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)

(End of Summary of Changes)