B.08.02.03 Attachment 3_Letter of Commitment Sample.docx

DOCX document 15 KB Posted

Attached to
Construct Parallel Taxiway and Construct Airfield Upgrades at Kecskemet Air Base, Hungary
Solicitation number
W912GB23R0004
Issued by

View the file

Other files

File Type Posted
B.08.03 W912GB23R0004 Amend 0007 CANCELLATION.pdf PDF
B.08.03 Amendment 0006 to RFP W912GB23R0004.pdf PDF
B.08.03 SF1442 for Amendment 0006 to RFP W912GB23R0004.pdf PDF
B.08.03 SF1442 for Amendment 0005 to RFP W912GB23R0004.pdf PDF
B.08.03 Amendment 0005 to RFP W912GB23R0004.pdf PDF
B.08.03 SF1442 for Amendment 0004 to RFP W912GB23R0004.pdf PDF
B.08.03 Amendment 0004 to RFP W912GB23R0004.pdf PDF
B.08.03.05 ENG-Regeszet_Kecskemet_MH59_repter_EDI_tuzszereszet_ERD_2021.pdf PDF
B.08.03.04 ENG-helyszinrajz- overview.pdf PDF
B.08.03 Amend 0003 to RFP W912GB23R0004.pdf PDF
B.08.03.01 Amendment 0003_Attachment 6_Specifications.pdf PDF
B.08.03.07 HU-Regeszet_Kecskemet_MH59_repter_EDI_tuzszereszet_ERD_2021.pdf PDF
B.08.03.06 HU-Regeszet_helyszínrajz_Kecskemet_MH59_repter_EDI_tuzszereszet_ERD_2021_TM_redukált méret.pdf PDF
B.08.03 Amendment 0002 to RFP W912GB23R0004.pdf PDF
B.08.03 Amendment 0001 to RFP W912GB23R0004.pdf PDF
B.08.03.02 Amendment 0001 20023.02.07 - Hungary Additional Considerations.pdf PDF
B.08.03.01 Amendment 0001 2023.02.07 - Hungary VAT Procedures.pdf PDF
B.08.02.11 Attachment 11_Parallel TWY_AF upgrade Apron Ext IA draft 2022_1010.pdf PDF
B.08.02.09 Attachment 9_TW-Draft DD 1354.pdf PDF
B.08.02.10 Attachment 10_AU-Draft DD 1354.pdf PDF
B.08.02 RFP W912GB23R0004.pdf PDF
B.07.01 PPC and Site Visit Sign in Sheet.pdf PDF
B.07.01 HU Taxiway and Airfield PPC Slide Deck 5Dec22 Final.pdf PDF
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
B.08.02.02 Attachment 2_PPQ.pdf PDF
B.08.02 DRAFT RFP W912GB23R0004.pdf PDF
B.08.02.06 Attachment 6_Specifications_R2.pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet.pdf PDF
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LETTER OF COMMITMENT (SAMPLE)

(PRIME CONTRACTOR LETTERHEAD)

US Army Corps of Engineers (Insert Date) Europe District Konrad Adenauer Ring 39, Box 7 ATTN: Contracting Officer 65187 Wiesbaden, Germany

Subject: Letter of Commitment for Solicitation Number W912GB23R0004 CONSTRUCT PARALLEL TAXIWAY AND CONSTRUCT AIRFIELD UPGRADES KECSKEMET AIR BASE, HUNGARY

In the event that Prime Contractor X is awarded a contract under the subject solicitation, Prime Contractor X commits to using Subcontractor Y as a subcontractor for the services described in this Letter of Commitment and Subcontractor Y agrees to perform as a subcontractor to Prime Contractor X for those services.

Prime Contractor X will perform as the prime contractor while Subcontractor Y will perform the following services as a subcontractor under the resultant contract:

(Describe the work to be performed by the subcontractor, i.e. electrical, mechanical, civil, etc.)

Prime Contractor X may be credited with the experience, expertise and/or past performance of Subcontractor Y as they relate to the services described in this Letter of Commitment.

In the event that Prime Contractor X is awarded the resultant contract, another firm cannot be substituted for Subcontractor Y without prior written approval of the contracting officer. Approval or disapproval of a substitute subcontractor is a matter within the sole discretion of the Contracting Officer, considering such factors as whether the contracting officer considers the proposed substitute to be equally qualified and the substitution to be in the best interests of project execution.

In approving a substitution, the contracting officer may impose such conditions on the substitution as the contracting officer deems appropriate in the exercise of his/her sole discretion.

In the event Prime Contractor X is not awarded a contract under the subject solicitation, this Letter of Commitment is null and void.

John D. PrimeHans Richard
Prime Contractor XSubcontractor Y
TitleTitle