About this file

This document announces a forthcoming solicitation for an indefinite delivery, indefinite quantity single award task order contract to provide construction and installation services for anti-terrorism force protection and access control points at United States facilities in Germany, Belgium, Netherlands, Poland, Romania, and Bulgaria. The contract will have a one year base period and four one-year option periods, not to exceed $49.995 million total. Services will include installing fencing, barriers, security lighting, surveillance systems, barriers, and blast and splinter protection. The contract will also include constructing and equipping access control points with structures, equipment, roadways, gatehouses, shelters, and electronic security and access control systems. The solicitation is expected to be released on February 3, 2020 with proposals due March 3, 2020 and award by May 1, 2020. Evaluation will use a best value tradeoff process. The minimum task order value will be $10,000 and maximum $2.5 million.

View the file

Other files

File Type Posted
00 74 10.pdf PDF
01 33 00.pdf PDF
01 30 01.pdf PDF
B.08.02 ATTACH 2A ExperienceOverviewSheet FY20ATFP.docx DOCX document
01 78 23.pdf PDF
B.08.02 ATTACH 9 ATFP Technical Exhibits 2019.pdf PDF
00 74 01.pdf PDF
B.08.02 ATTACH 3 PPQ Form.docx DOCX document
B.08.02 ATTACH 8 - ATFP Unit Price Book (UPB) 2019.xlsx XLSX spreadsheet
00 74 19.pdf PDF
01 35 26.pdf PDF
B.08.02 ATTACH 11 DIN EU Standard.pdf PDF
B.08.02 ATTACH 4 FY20 ATFP Pricing Schedule.xlsx XLSX spreadsheet
B.08.02 ATTACH 5 BLA Template.docx DOCX document
B.08.02 ATTCH 12 CENAU ATFP Guideline.pdf PDF
01 45 00.pdf PDF
01 45 01.pdf PDF
01 45 06.pdf PDF
01 32 16.pdf PDF
B.08.02 ATTACH 6 BLG Template.docx DOCX document
EP310-1-6a Construction Project Signs (German and English) ENGLISH.pdf PDF
B.08.02 ATTACH 10 UPB_Germany_Italy_Europe_2016-2005.pdf PDF
00 74 02.pdf PDF
01 78 00.pdf PDF
EP310-1-6a Construction Project Signs (German and English) 01 June 06.pdf PDF
B.08.02 ATTACH 7 Letter of Commitment.docx DOCX document
00 74 18.pdf PDF
01 33 16.pdf PDF
W912GB20R0017.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2B

FY20 ATFP JOC W912GB20R0017

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 2A) Must have a total of 5 projects, more than 5 will not be evaluated.

Project Name and Location:

Experience:

1. The location work was performed___________________________________

2. The day, month, and year work was completed; work must not be earlier than six calendar years before the closing date of the RFP or has been ongoing for at least one year before the closing date of this RFP: _______________

3. The final cost of this project: $_________________________

4. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower

5. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).

6. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work similar to ATFP/ACP construction, repair and equipment installtion.

(Continue typing if required to provide more information)

ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.

7. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

e. Ensure you provide a letter signed by both the Offeror and the Key Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.