NSTA_Contractor_Site_Visit_Slides_23AUG19.pdf

PDF 4 MB Posted

Attached to
Design and Construction of Several Projects at Novo Selo Training Area (NSTA), Bulgaria
Solicitation number
W912GB19R0055
Issued by

About this file

NSTA Contractor Site Visit Slides 23AUG19

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

23-Aug-19UNCLASSIFIED

FY19 EDI, NSTA, Bulgaria

FY19, European Deterrence Initiative (EDI)

Site Visit

Novo Selo Training Area (NSTA), Bulgaria

23-Aug-19

AGENDA

FY19 EDI, NSTA, Bulgaria

FY19 EDI, NSTA, Bulgaria

• C-Type Award Project

• Project Location:

Novo Selo Training Area, Bulgaria (NSTA), Bulgaria

• Total of Four New Design-Build Construction Projects:

1) Bridge and Road (Yellow Bridge)

2) Bridge (White Bridge)

3) Resurface Helicopter Apron, Taxiway, and Pads

4) 350-meter Moving Armor Target (MAT) Access Road

Project Location Map

NSTA, Bulgaria

Site Plan, Bridge and Road (White Bridge)

Perspective, Bridge and Road (White Bridge)

Existing Bridge, White Bridge

Site Plan, Bridge and Road (Yellow Bridge)

NSTA, Bulgaria

YELLOW BRIDGE

IS LOCATED HERE

Bridge Perspective, Yellow Bridge

Existing Bridge, Yellow Bridge

Previous Constructed Bridge on NSTA

Existing Site Plan, Helicopter Apron

Proposed Plan, Resurface Helicopter Apron

Existing Images, Resurface Helicopter Apron

NSTA, Bulgaria

View 1

View 2

View 1 View 2

Site Plan, 350m MAT Access Road Improvement

Proposed Road Improvements, 350m MAT

Existing Image, 350m MAT

ProjNet Website https://www.projnet.org

The bidder inquiry key is

XIV4C5-Q5XFBM for NSTA

Key Points

• No installation of Utilities (Electrical, Water, and Sewer) to any of these projects. There will be coordination of existing utilities.

• Helicopter Apron is located Inside the Compound.

• The Two Bridges and 350m MAT are located Outside the Compound.

• There will be military exercises taking place during construction and must be coordinated thru the COR.

FY19 EDI, NSTA, Bulgaria

• Contracting Officer Representative

Kristina Morrow

• Project Manager

Michael W. Huntanar

USACE-Europe District, Wiesbaden, Germany

Office: 011-49-611-9744-2864

Cell: +49-173-207-4967

Email: Michael.W.Huntanar@usace.army.mil

• Resident Engineer

Gwendolyn J. Nelson, PE, located in MK, Romania

• Project Engineer/COR

Orkun Dincer mailto:Michael.W.Huntanar@usace.army.mil

FY19 EDI, NSTA, Bulgaria

QUESTIONS?

File details come from the government source that posted it.