Base Year 1
| Africa South MATOC | |||||
| PRICING SCHEDULE | |||||
| BASE YEAR 1 | |||||
| Africa South MATOC | |||||
| Countries: | South Africa, Botswana, Swaziland, Lesotho, Namibia | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| Countries: | Zambia, Zimbabwe, Malawi, Mozambique | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| BOTTOM LINE SUM | 0 |
Base Year 2
| Africa South MATOC | |||||
| PRICING SCHEDULE | |||||
| BASE YEAR 2 | |||||
| Africa South MATOC | |||||
| Countries: | South Africa, Botswana, Swaziland, Lesotho, Namibia | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| Countries: | Zambia, Zimbabwe, Malawi, Mozambique | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| BOTTOM LINE SUM | 0 |
Base Year 3
| Africa South MATOC | |||||
| PRICING SCHEDULE | |||||
| BASE YEAR 3 | |||||
| Africa South MATOC | |||||
| Countries: | South Africa, Botswana, Swaziland, Lesotho, Namibia | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| Countries: | Zambia, Zimbabwe, Malawi, Mozambique | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| BOTTOM LINE SUM | 0 |
Option Year 1
| Africa South MATOC | |||||
| PRICING SCHEDULE | |||||
| OPTION YEAR 1 - YEAR 4 | |||||
| Africa South MATOC | |||||
| Countries: | South Africa, Botswana, Swaziland, Lesotho, Namibia | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| Countries: | Zambia, Zimbabwe, Malawi, Mozambique | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| BOTTOM LINE SUM | 0 |
Option Year 2
| Africa South MATOC | |||||
| PRICING SCHEDULE | |||||
| OPTION YEAR 2 - YEAR 5 | |||||
| Africa South MATOC | |||||
| Countries: | South Africa, Botswana, Swaziland, Lesotho, Namibia | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| Countries: | Zambia, Zimbabwe, Malawi, Mozambique | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 260 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 260 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 260 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 260 | 0 | |
| 0002AA | Carpenter | Man-day | 260 | 0 | |
| 0002AB | Mason | Man-day | 260 | 0 | |
| 0002AC | Concrete Worker | Man-day | 260 | 0 | |
| 0002AD | Plumber | Man-day | 260 | 0 | |
| 0002AE | Painter | Man-day | 260 | 0 | |
| 0002AF | Plasterer | Man-day | 260 | 0 | |
| 0002AG | Iron Worker | Man-day | 260 | 0 | |
| 0002AH | Electrician | Man-day | 260 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 260 | 0 | |
| 0002AJ | Truck Driver | Man-day | 260 | 0 | |
| 0002AK | Welder | Man-day | 260 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 260 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 260 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 260 | 0 | |
| Sum | 0 | ||||
| BOTTOM LINE SUM | 0 |
Six Month Ext
| Africa South MATOC | |||||
| PRICING SCHEDULE | |||||
| SIX MONTH EXTENSION | |||||
| Africa South MATOC | |||||
| Countries: | South Africa, Botswana, Swaziland, Lesotho, Namibia | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 130 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 130 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 130 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 130 | 0 | |
| 0002AA | Carpenter | Man-day | 130 | 0 | |
| 0002AB | Mason | Man-day | 130 | 0 | |
| 0002AC | Concrete Worker | Man-day | 130 | 0 | |
| 0002AD | Plumber | Man-day | 130 | 0 | |
| 0002AE | Painter | Man-day | 130 | 0 | |
| 0002AF | Plasterer | Man-day | 130 | 0 | |
| 0002AG | Iron Worker | Man-day | 130 | 0 | |
| 0002AH | Electrician | Man-day | 130 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 130 | 0 | |
| 0002AJ | Truck Driver | Man-day | 130 | 0 | |
| 0002AK | Welder | Man-day | 130 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 130 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 130 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 130 | 0 | |
| Sum | 0 | ||||
| Countries: | Zambia, Zimbabwe, Malawi, Mozambique | ||||
| Contract Line Item Number | Description | Unit Price | Quantity | Price | |
| 0001 | General Contractor's (G.C.) Field Supervisory and Management Overheads | Man-day | 130 | 0 | |
| 0001AA | G.C. Site Superintendent | Man-day | 130 | 0 | |
| 0001AB | G.C. Quality Control Manager | Man-day | 130 | 0 | |
| 0002 | Direct Trade Labor Rates | Man-day | 130 | 0 | |
| 0002AA | Carpenter | Man-day | 130 | 0 | |
| 0002AB | Mason | Man-day | 130 | 0 | |
| 0002AC | Concrete Worker | Man-day | 130 | 0 | |
| 0002AD | Plumber | Man-day | 130 | 0 | |
| 0002AE | Painter | Man-day | 130 | 0 | |
| 0002AF | Plasterer | Man-day | 130 | 0 | |
| 0002AG | Iron Worker | Man-day | 130 | 0 | |
| 0002AH | Electrician | Man-day | 130 | 0 | |
| 0002AI | Heavy Equipment Operator | Man-day | 130 | 0 | |
| 0002AJ | Truck Driver | Man-day | 130 | 0 | |
| 0002AK | Welder | Man-day | 130 | 0 | |
| 0002AL | Asphalt Worker | Man-day | 130 | 0 | |
| 0002AM | Air Conditioning Mechanic | Man-day | 130 | 0 | |
| 0002AN | Unskilled Laborer | Man-day | 130 | 0 | |
| Sum | 0 | ||||
| BOTTOM LINE SUM | 0 |
Sheet6
| Base Period, Option 1, Option 2 | |
| Bottom Line Sum Base Year 1 | 0 |
| Bottom Line Sum Base Year 2 | 0 |
| Bottom Line Sum Base Year 3 | 0 |
| Bottom Line Sum Option Year 1 | 0 |
| Bottom Line Sum Option Year 2 | 0 |
| Total Bottom Line Sum | 0 |