A-02.02_Price_Schedule.pdf

PDF 44 KB Posted

Attached to
Renovation of Daycare Centers Belgrade, Serbia
Solicitation number
W912GB15R0028
Issued by

View the file

Other files

File Type Posted
01 35 26 Safety and Occupational Health Requirements —
A.07.23 Attachment 3 PPQ.docx DOCX document
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.23 Attachment 1 Experience Overview.docx DOCX document
A.07.23 Attachment 2 Experience Information Sheet.docx DOCX document
01 45 01.01 Additional Quality Control Personnel.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
01 00 15 Design After Award.pdf PDF
H.01.01_Gift_Sign.docx DOCX document
W912GB-15-R-0028.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
Construction Signs.pdf PDF
01525 Safety and Occupational Health Requirements for Projects in Emerging Countries —
A.07.23 Attachment 4 Key Personnel Resume.docx DOCX document
A.07.23 BLG Template.doc DOC document
A.07.23 BLA Template.docx DOCX document
01 78 00 Completion Procedures.pdf PDF
01 32 01.00 15 Project Schedule —
H.01.01_Drawings.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
00 73 15 General Conditions —
01 45 01 USACE Quality Control.pdf PDF
02 82 14.00 10 Asbestos Hazard Control Activities.pdf PDF
00 73 15.50 General Conditions —
A.07.23 Attachment 5 Letter of Commitment.docx DOCX document
A-01.38_SOW.pdf PDF
Site_Visit_Notification_New_Belgrade_Daycare_Ctrs.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Request for Proposal (RFP) Renovate Daycare Centers

Belgrade, Serbia

The Offeror shall propose on all base and option items. Provide completion of all design and construction of award items from the Notice to Proceed as described in the contract FAR Clause 52.211-10 “ COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK” according to the following schedule. Each CLIN duration is as per the price schedule and the calendar days are from issuance of the Notice to Proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance.

See FAR Clause 52.211-12 for Liquidated Damages. Liquidated damages apply to any completion date specified in the contract or Price Schedule including interim completion dates for individual facilities.

Base Item Period of Performance: The base period of performance is 365 calendar days from issuance of the notice to proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance to ensure the students can start school on time.

Award of Options and Period of Performance: The Government reserves the right to award any or all options up to 90 calendar days following issuance of NTP for the base items work. Any optional work awarded shall be completed as noted within a particular CLIN, as described in contract FAR Clause 52.211-10 “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”. If an option is exercised, it must be completed within the base period of performance of 365 calendar days.

This project is a Design-Build and the contractor shall be required to prepare a detailed design as well as provide for construction of the project.

Allowable Work Hours: The allowable working hours are from 0800-1900 Local Time, Monday through Saturday.

Work on US and Serbian holidays and outside of these hours shall not be performed without prior approval from the Contracting Officer. Office hours for coordination with Government representatives are from 0730-1600 hours CET, except U.S. holidays.

Prices: All prices are to be proposed in U.S. Dollars.

BASE ITEMS:

CLIN 0001 Renovation of Day Care Center #34 – Belgrade, Serbia

All work associated with the design and renovation of existing day care center #34 located in Belgrade, Serbia, to include new doors, new windows, new bathrooms, new flooring, new suspended ceiling, plaster and painting the walls, cleaning the brick walls, installation of a new handicap ramp as well any other work directly related to the day care center renovation itself includes in the statement of work dated 21 April 2015 and specifications except those items described in the options.

CLIN 0002 Renovation of Day Care Center #64 – Belgrade, Serbia

#64 located in Belgrade, Serbia, to include new flooring, new bathrooms, new suspended ceiling, installation of a new handicap ramp, removal of partition wall as well any other work directly related to the day care center renovation

PRICE SCHEDULE

Request for Proposal (RFP) Renovate Daycare Centers

Belgrade, Serbia itself includes in the statement of work dated 21 April 2015 and specifications except those items described in the options.

BASE ITEMS TOTAL: $____________

OPTIONAL ITEMS:

CLIN 0003 Option Item 1 – New windows and new doors – Day Care Center #64

All work associated with the installation of new windows and new doors for Day Care Center #64 in Belgrade, Serbia as described in the statement of work dated 21 April 2015 and specifications.

CLIN 0004 Option Item 2 – Patching and Painting – Day Care Center #64

All work associated with the patching and painting for Day Care Center #64 in Belgrade, Serbia as described in the statement of work dated 21 April 2015 and specifications

CLIN 0005 Option Item 3 –Renovation of Day Care Center #42

#42 located in Belgrade, Serbia, to include new flooring, new suspended ceiling, plaster and painting the walls, installation of a new handicap ramp as well any other work directly related to the day care center renovation itself includes in the statement of work dated 21 April 2015 and specifications.

CLIN 0006 Option Item 4 – Restrooms – Day Care Center #42

All work associated with the restrooms for Day Care Center #42 in Belgrade, Serbia as described in the statement of work dated 21 April 2015 and specifications

CLIN 0007 Option Item 5 – New windows and doors – Day Care Center #42

All work associated with the installation of new windows and new doors for Day Care Center #42 in Belgrade, Serbia as described in the statement of work dated 21 April 2015 and specifications.

OPTION ITEMS TOTAL: $____________

TOTAL PRICE – ALL BASE AND OPTION ITEMS: $____________