This file contains attachments 1-6 for a U.S. Army Corps of Engineers forest mitigation planting contract, including deliverables schedule, approved herbicide list, post-application documentation forms, NDPDES general permit, forest mitigation mapbook, and tree farm inventory.

The deliverables schedule outlines key submissions required within specified timeframes after contract award, including project schedule (15 days), safety plan (30 days), SPOC information (10 days), herbicide plan (30 days), quality control plan (30 days), site preparation plan (60 days), and planting plans (90 days). The mapbook identifies three specific sites (20, 20b, and 38a) for forest mitigation activities, with detailed aerial imagery showing floodplain forest, preservation areas, and bank stabilization zones. The herbicide list specifies approved chemicals for the project, including both aquatic and terrestrial formulations. Site 38a includes the JDC Tree Farm, where certain highlighted tree species must be removed by the contractor as part of the work. The NDPDES permit (NDR11-0000) covers stormwater discharge requirements and is valid through March 31, 2025.

View the file

Other files for this federal contract opportunity

Other files attached to FARGO-MOORHEAD FOREST MITIGATION PLANTING, newest first.
File Type Posted
W912ES25B0003 0005 Amendment 0005.pdf PDF
W912ES25B0003 0004 Amendment 0004.pdf PDF
W912ES25B0003 Amendment 0004 PWS.pdf PDF
W912ES25B0003 Amendment 0003.pdf PDF
W912ES25B0003 Solicitation Posting with Interested Vendor list.pdf PDF
W912ES25B0003 Amendment 0002 PWS.pdf PDF
W912ES25B0003 0002 Amendment 0002.pdf PDF
W912ES25B0003 0001 Amendment 0001.pdf PDF
W912ES25B0003.pdf PDF
W912ES25B0003 Attachments 1-6.pdf PDF
W912ES25B0003 PWS Forest Mitigation FMM 2025.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 Deliverables

Fargo-Moorhead Forest Planting

Contract #2

U.S. Army Corps of Engineers

St. Paul District

December 2024

DELIVERABLE SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Project Schedule Within 15 days of contract award

1 Excel or PDF E-mail to Contracting Officer

Safety Plan Within 30 days of contract award

1 Excel or PDF Email to Contracting Officer

Single Point of Contact (SPOC) Contact Information

Within 10 days of contract award

1 Email Email to Contracting Officer

Herbicide Plan Within 30 days of contract award

1 Digital PDF Email to Contracting Officer

Material Safety and Product Labels

Within 30 days of contract award

1 Digital PDF Email to Contracting Officer

Quality Control Plan Within 30 days of contract award

1 Draft: Digital MS Word; Final: Digital

PDF

E-mail to Contracting Officer

Site Preparation Plan Within 60 days of contract award

1 Digital PDF E-mail to Contracting Officer

Planting Plans Within 90 days of contract award

1 Digital PDF E-mail to Contracting Officer

Seed Substitutions Not later than 30 days prior to seeding

1 Digital PDF E-mail to Contracting Officer

Noxious and Invasive Species Control Plan

Within 30 days of contract award

1 Digital PDF E-mail to Contracting Officer

Maintenance Plan Within 30 days of contract award

1 Digital PDF E-mail to Contracting Officer

Monitoring Reports Annually, by January 30th.

1 Digital PDF E-mail to Contracting Officer

Fatigue Management Plan

Within 30 days of contract award

1 Digital PDF Email to Contracting Officer

Attachment 2 Approved Herbicide List

Attachment 2

GOVERNMENT APPROVED HERBICIDE LIST

Chemical name 2,4-D + Clopyralid ^^^ 2,4-D + Dicamba 2,4-D + Triclopyr ^^^ Bentazon Bispyribac-sodium* Carfentrazone-ethyl* Chlorsulfuron Clopyralid ^^^ Complexed Copper* Dicamba !!, ^^^ Diflufenzopyr + Dicamba Diquat* Endothall* Fluazifop-P-butyl Flumioxazin* Fluridone* Glufosinate Glyphosate*, ^^^ Halosulfuron Imazamox*, ^^^ Imazapic ^^^ Imazapyr*, !!, ^^^ Metsulfuron methyl !!, Pendimethalin Penoxsulam* Picloram Sulfometuron-methyl !!, Triclopyr*, ^^^

Key

* Aquatic Formulations Available !! Pre-emergent applications ^^^ Post-emergent applications

Attachment 3 Herbicide Post-Application Documentation Form

Attachment 3

HERBICIDE POST-APPLICATION DOCUMENTATION FORM

POST-APPLICATION DOCUMENTATION FORM

PEST CONTROL PROGRAM

U.S. ARMY CORPS OF ENGINEERS, ST. PAUL DISTRICT

APPLICATION INFORMATION

APPLICATION DATE:

CONTRACTOR: APPLICATOR:

Addr: Addr:

City: City:

Phone: Phone:

TARGET PEST:

DATE OF

TIME OF AIR RELATIVE WIND DIRECTION

APPLICATION DAY TEMP HUMIDITIY CLOUD COVER AND SPEED

ACREAGE

TREATED

DESCRIPTION OF TREATED AREA:

HERBICIDE INFORMATION

Herbicide (TRADE NAME):

FORM APPLIED:

ACTIVE INGREDIENTS:

EPA REGISTRATION: EPA CLASSIFICATON:

HOW THE HERBICIDE WAS

MIXED:

APPLICATION RATE (TOTAL): APPLICATION RATE (ACTIVE)

INGREDIENT (S) :

APPLICATION EQUIPMENT USED:

AMOUNT APPLIED:

DISPOSAL INFORMATION DISPOSAL DATE:

METHOD:

LOCATION:

ADDITTIONAL REMARKS:

Attachment 4 NDPDES General Permit

Fargo-Moorhead Forest Planting

Contract #2

U.S. Army Corps of Engineers

Attachment 4 NDPDES General Permit

Attachment 5 Forest Mitigation Contract #2 Mapbook

Attachment 6 Tree Farm Inventory

Attachment 6. JDC Tree Farm Inventory.

The following tables contain the inventory of trees left at JDC Tree Farm which is part of site 38a. Species that are highlighted are those that need to be removed by the contractor as part of the contract.