W912ES25B0003 Attachments 1-6.pdf
PDF 9 MB Posted
- Attached to
- FARGO-MOORHEAD FOREST MITIGATION PLANTING Federal contract opportunity
- Solicitation number
- W912ES25B0003
About this file
This file contains a collection of attachments (1-6) for a U.S. Army Corps of Engineers forest mitigation planting contract at the Fargo-Moorhead Metropolitan Area. The attachments include a deliverables schedule, approved herbicide list, herbicide post-application documentation form, NDPDES general permit, forest mitigation mapbook, and tree farm inventory.
Key components include detailed maps showing three planting sites (20, 20b, and 38a) with areas designated for floodplain forest and preservation, along with a comprehensive deliverables schedule requiring multiple plans within 30-90 days of contract award including safety, quality control, site preparation, planting, maintenance, and monitoring plans. The attachments specify approved herbicides for use and necessary documentation requirements for their application. The NDPDES permit (NDR11-0000) provides stormwater discharge requirements and procedures. The tree farm inventory at site 38a identifies specific trees that must be removed by the contractor, including Japanese Tree Lilac and Dwarf Korean Lilac species. All deliverables must be submitted electronically to the Contracting Officer in PDF format.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912ES25B0003 0005 Amendment 0005.pdf | ||
| W912ES25B0003 Amendment 0004 Attachments 1-6.pdf | ||
| W912ES25B0003 Amendment 0004 PWS.pdf | ||
| W912ES25B0003 0004 Amendment 0004.pdf | ||
| W912ES25B0003 Amendment 0003.pdf | ||
| W912ES25B0003 Solicitation Posting with Interested Vendor list.pdf | ||
| W912ES25B0003 0002 Amendment 0002.pdf | ||
| W912ES25B0003 Amendment 0002 PWS.pdf | ||
| W912ES25B0003 0001 Amendment 0001.pdf | ||
| W912ES25B0003.pdf | ||
| W912ES25B0003 PWS Forest Mitigation FMM 2025.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 Deliverables
Fargo-Moorhead Forest Planting
Contract #2
U.S. Army Corps of Engineers
St. Paul District
December 2024
DELIVERABLE SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Project Schedule Within 15 days of contract award
1 Excel or PDF E-mail to Contracting Officer
Safety Plan Within 30 days of contract award
1 Excel or PDF Email to Contracting Officer
Single Point of Contact (SPOC) Contact Information
Within 10 days of contract award
1 Email Email to Contracting Officer
Herbicide Plan Within 30 days of contract award
1 Digital PDF Email to Contracting Officer
Material Safety and Product Labels
Within 30 days of contract award
1 Digital PDF Email to Contracting Officer
Quality Control Plan Within 30 days of contract award
1 Draft: Digital MS Word; Final: Digital
E-mail to Contracting Officer
Site Preparation Plan Within 60 days of contract award
1 Digital PDF E-mail to Contracting Officer
Planting Plans Within 90 days of contract award
1 Digital PDF E-mail to Contracting Officer
Seed Substitutions Not later than 30 days prior to seeding
1 Digital PDF E-mail to Contracting Officer
Noxious and Invasive Species Control Plan
Within 30 days of contract award
1 Digital PDF E-mail to Contracting Officer
Maintenance Plan Within 30 days of contract award
1 Digital PDF E-mail to Contracting Officer
Monitoring Reports Annually, by January 30th.
1 Digital PDF E-mail to Contracting Officer
Fatigue Management Plan
Within 30 days of contract award
1 Digital PDF Email to Contracting Officer
Attachment 2 Approved Herbicide List
Attachment 2
GOVERNMENT APPROVED HERBICIDE LIST
Chemical name 2,4-D + Clopyralid ^^^ 2,4-D + Dicamba 2,4-D + Triclopyr ^^^ Bentazon Bispyribac-sodium* Carfentrazone-ethyl* Chlorsulfuron Clopyralid ^^^ Complexed Copper* Dicamba !!, ^^^ Diflufenzopyr + Dicamba Diquat* Endothall* Fluazifop-P-butyl Flumioxazin* Fluridone* Glufosinate Glyphosate*, ^^^ Halosulfuron Imazamox*, ^^^ Imazapic ^^^ Imazapyr*, !!, ^^^ Metsulfuron methyl !!, Pendimethalin Penoxsulam* Picloram Sulfometuron-methyl !!, Triclopyr*, ^^^
Key
* Aquatic Formulations Available !! Pre-emergent applications ^^^ Post-emergent applications
Attachment 3 Herbicide Post-Application Documentation Form
Attachment 3
HERBICIDE POST-APPLICATION DOCUMENTATION FORM
POST-APPLICATION DOCUMENTATION FORM
PEST CONTROL PROGRAM
U.S. ARMY CORPS OF ENGINEERS, ST. PAUL DISTRICT
APPLICATION INFORMATION
APPLICATION DATE:
CONTRACTOR: APPLICATOR:
Addr: Addr:
City: City:
Phone: Phone:
TARGET PEST:
DATE OF
TIME OF AIR RELATIVE WIND DIRECTION
APPLICATION DAY TEMP HUMIDITIY CLOUD COVER AND SPEED
ACREAGE
TREATED
DESCRIPTION OF TREATED AREA:
HERBICIDE INFORMATION
Herbicide (TRADE NAME):
FORM APPLIED:
ACTIVE INGREDIENTS:
EPA REGISTRATION: EPA CLASSIFICATON:
HOW THE HERBICIDE WAS
MIXED:
APPLICATION RATE (TOTAL): APPLICATION RATE (ACTIVE)
INGREDIENT (S) :
APPLICATION EQUIPMENT USED:
AMOUNT APPLIED:
DISPOSAL INFORMATION DISPOSAL DATE:
METHOD:
LOCATION:
ADDITTIONAL REMARKS:
Attachment 4 NDPDES General Permit
Fargo-Moorhead Forest Planting
Contract #2
U.S. Army Corps of Engineers
Attachment 4 NDPDES General Permit
Attachment 5 Forest Mitigation Contract #2 Mapbook
Attachment 6 Tree Farm Inventory
Attachment 6. JDC Tree Farm Inventory.
The following tables contain the inventory of trees left at JDC Tree Farm which is part of site 38a. Species that are highlighted are those that need to be removed by the contractor as part of the contract.
File details come from the government source that posted it. Updated .