W912ES25B0003 0002 Amendment 0002.pdf

PDF 189 KB Posted

Attached to
FARGO-MOORHEAD FOREST MITIGATION PLANTING Federal contract opportunity
Solicitation number
W912ES25B0003
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This is Amendment 0002 to solicitation W912ES25B0003, issued by the USACE St. Paul District on January 8, 2025, which removes the requirement for fence removal from the original solicitation. The amendment modifies the Performance Work Statement (PWS) and Bid Schedule for a forest mitigation planting project.

The modified Bid Schedule outlines a 5-year project broken into multiple CLINs covering site preparation (47.6 acres), planting of bank stabilization areas (2.3 acres), floodplain forest areas (27.2 acres), oak savannah areas (18.1 acres), and invasive species removal within forest preservation areas (51.5 acres). The work includes initial contract submittals, annual maintenance and monitoring activities, invasive species follow-up treatments, and annual monitoring reports for each year. The schedule maintains blank pricing columns, indicating this is likely part of an ongoing solicitation process where contractors will need to submit their proposed prices.

View the file

Other files for this federal contract opportunity

Other files attached to FARGO-MOORHEAD FOREST MITIGATION PLANTING, newest first.
File Type Posted
W912ES25B0003 0005 Amendment 0005.pdf PDF
W912ES25B0003 0004 Amendment 0004.pdf PDF
W912ES25B0003 Amendment 0004 Attachments 1-6.pdf PDF
W912ES25B0003 Amendment 0004 PWS.pdf PDF
W912ES25B0003 Amendment 0003.pdf PDF
W912ES25B0003 Solicitation Posting with Interested Vendor list.pdf PDF
W912ES25B0003 Amendment 0002 PWS.pdf PDF
W912ES25B0003 0001 Amendment 0001.pdf PDF
W912ES25B0003 PWS Forest Mitigation FMM 2025.pdf PDF
W912ES25B0003.pdf PDF
W912ES25B0003 Attachments 1-6.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to remove the requirement for fence removal. This change results in an amended Bid Schedule and an amended Performance Work Statement (PWS).

All other solicitation terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jan-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES25B0003

X 9B. DATED (SEE ITEM 11)

18-Dec-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jan-2025

CODE

CONTRACTING DIVISION

USACE, ST PAUL

332 MINNESOTA STREET

SUITE E1500

ST PAUL MN 55101-1323

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES25B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SCHEDULE OF SERVICES

CLIN # QTY UNIT PRICE TOTAL

Year 1

0001 Initial Contract Submittals 1 EACH $0 0002 Site Preparation Activities 47.6 ACRE $0 0003 Planting Bank Stabilization Areas 2.3 ACRE $0 0004 Planting Floodplain Forest Areas 27.2 ACRE $0 0005 Planting Oak Savannah Areas 18.1 ACRE $0 0006 Invasive Species Removal within Forest Preservation 51.5 ACRE $0 0007 Year 1 Maintenance and Monitoring 1 JOB $0 0008 Year 1 Annual Monitoring Report 1 EACH $0

Year 2 1001 Year 2 Establishment and Maintenance Activities 1 JOB $0 1002 Year 2 Invasive Species Follow-up Treatments 51.5 ACRE $0 1003 Year 2 Annual Monitoring Report 1 EACH $0

Year 3 2001 Year 3 Establishment and Maintenance Activities 1 JOB $0 2002 Year 3 Invasive Species Follow-up Treatments 51.5 ACRE $0 2003 Year 3 Annual Monitoring Report 1 EACH $0

Year 4 3001 Year 4 Establishment and Maintenance Activities 1 JOB $0 3002 Year 4 Invasive Species Follow-up Treatments 51.5 ACRE $0 3003 Year 4 Annual Monitoring Report 1 EACH $0

Year 5 4001 Year 5 Establishment and Maintenance Activities 1 JOB $0 4002 Year 5 Invasive Species Follow-up Treatments 51.5 ACRE $0 4003 Year 5 Annual Monitoring Report 1 EACH $0

TOTAL ALL YEARS $0

W912ES25B0003

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

PERFORMANCE WORK STATEMENT

See Attachment “W912ES25B0003 Amendment 0002 PWS.pdf”

(End of Summary of Changes)

File details come from the government source that posted it. Updated .