Flagpole - internal-halyard-installation-instructions-2017.pdf
PDF 353 KB Posted
- Attached to
- Dump Station Removal & Area Improvement Federal contract opportunity
- Solicitation number
- W912ES24Q0137
About this file
This document appears to be a set of installation instructions for an internal halyard flagpole system. It provides detailed steps for assembling and installing the flagpole, winch, and cable components. Key details include:
The document contains instructions for properly setting the flagpole foundation, assembling the sectional pole, installing the winch and cable system, and properly hoisting the flag. It includes diagrams and illustrations to aid the installation process. These instructions are intended to be used in conjunction with a federal contract opportunity for the removal of an existing dump station and related site improvements at the Cross Lake Recreation Area.
The related federal contract opportunity is for the "Dump Station Removal & Area Improvement" project at the U.S. Army Corps of Engineers' Cross Lake Recreation Area in Crosslake, Minnesota. The scope of work includes removal of the existing dump station, installation of new concrete sidewalks and paver paths, construction of a new pergola with swing, installation of a bike rack, sprinkler system updates, and landscaping. The work is to be completed by June 27, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 24Q0137 Amendment 2.pdf | ||
| SOW Attachments 2.pdf | ||
| 24Q0137 Amendment.pdf | ||
| Flag Pole Installation ec45ih.pdf | ||
| 24Q0137 Solicitation.pdf | ||
| SOW Attachments.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERNAL HALYARD FOUNDATION INSTALLATION INSTRUCTIONS
1. Dig foundation hole four to six times the butt diameter of the flagpole.
2. Set the foundation tube so that the top of the foundation tube is two inches above grade.
3. Plumb foundation tube and brace so that it will not move during the pouring of the concrete.
4. Pour concrete and trowel up even with top of foundation tube. Keep inside of foundation tube dry.
| 5. | Lay | pole | on | sawhorses | and | unwrap. | For | sectional | poles | check | both | ends | for | any | burrs. | If |
| any | are | found, | file | them | off | and | wipe | the | areas | clean. | Liquid | Soap | the | jamb | sleeves. | Align |
| the | arrows | and/or | numbers | on | each | section | and | jamb | together. | Numbers | must | be | identical | |||
| for | a | proper | fit. |
6. Turn to the next page for winch and cable assembly.
| 7. | Screw | ball | into | truck | and | tighten | ball | set | screw. | Ball | should | be | tightened | into | truck | tightly |
| by | turning | stem | of | ball | with | wrench. | Do | not | tighten | by | turning | ball | proper. | Ball | optional | on |
| internal | halyard | poles. |
| 8. | If | flash | collar | is | provided | with | pole, | slide | collar | on | from | the | bottom | of | pole | to | above | winch |
| level | and | attach | flash | collar | by | tying | to | the | pole | with | line | to | hold | flash | collar | until | after | |
| erection | of | pole. | Then | remove | line, | slide | collar | down, | caulk | between | the | collar | and | the | ||||
| pole | with | waterproof | sealant | (like | roofing | cement | of | asphaltum | sealant). |
| 9. | Erect | pole | into | foundation | tube | and | center | it. | Turn | so | that | the | access | door | is | in | the |
| direction | desired. |
| 10. | Place | wood | wedges | (supplied | by | others) | between | the | pole | and | the | foundation | tube | and |
| plumb | pole. |
| 11. | Pack | dry | sand | between | the | pole | and | foundation | tube. | Leave | two | inches | void | at | the | top |
| and | fill | with | waterproof | sealant | to | keep | water | out | of | the | sand. |
IMPORTANT:
| When | erecting | sectional | flagpoles, | never | place | your | sling | above | the | joint. | Sling | must | be |
| positioned | below | the | joint, | thus | eliminating | the | possibility | that | the | two | sections | could | |
| separate | during | hoisting. |
CAUTION
Extreme caution should be exercised when installing flagpoles near overhead power lines or in the vicinity of buries cables.
Rev. 8/2015 Page 1
ACCESSORY ASSEMBLY INSTRUCTIONS
1. For ease of assembly, the upper and lower cable assemblies have been pre-assembled at our factory.
| 2. | Locate | truck | with | factory | installed | cable | assemblies | (See | Illustration | #1). | ||||||
| 3. | Locate | lower | cable | assembly; | this | will | be | the | cable | exiting | from | the | threaded | portion | of | the |
| truck | (See | Illustration | #1). | ||||||||||
| 4. | Using | an | electrical | “FISH | TAPE” | feed | lower | cable | assembly | through | the | 1-1/2” | threaded |
| hole | at | the | top | of | the | flagpole, | pull | lower | cable | through | entire | length | of | flagpole. | ||||
| 5. | A | winch | hole | with | a | slotted | keyway | will | be | found | about | 4 | ft. | above | grade | from | the | bottom |
| of | the | pole. | Using | extreme | caution, | reach | into | this | hole, | grasp | cable | and | pull | about | 4 | ft. | of |
| cable | through | this | hole | (See | Illustration | #2). | USE CAUTION, THE EDGES OF THIS HOLE |
MAY BE SHARP!
| 6. | You | should | now | have | all | but | a | few | inches | of | the | lower | cable | assembly | inside | of | the | flagpole, | |
| or | at | the | lower | end | of | the | flagpole. | If | this | is | not | the | case, | then | repeat | steps | 1 | thru | 5. |
| 7. | Screw | the | truck | assembly | into | the | top | of | the | flagpole | securely. | ||||||
| 8. | If | steps | 1 | thru | 7 | have | been | satisfactorily | completed, | then | you | are | now | ready | to | install | the |
| WINCH | ASSEMBLY. | ||||||||||||||||
| 9. | Locate | the | winch | assembly. | Remove | the | cylinder | lock | keys | which | are | taped | to | the | side | of | the |
| winch | assembly. | Remove | the | hex | drive | countersunk | stainless | steel | screw | from | the | rear | of | the | ||||
| winch. | Put | keys | and | screw | in | a | safe | location. | You | will | have | to | use | them | in | a | later | step. |
| 10. | To | remove | the | lock | from | winch, | insert | key, | turn | counter-clockwise | and | pull | until | the | cylinder |
| comes | out. |
| 11. | Locate | cable | retaining | hole | and | cable | retaining | set | screw | (See | Illustration | #3). | With | painted | |||||
| surface | of | winch | in | left | hand | and | unpainted | surface | in | your | right | hand, | look | into | window | ||||
| of | winch. | You | will | see | a | 1/8” | hole | located | on | right | side | of | the | winch | drum. | This | is | the | cable |
retaining hole.
| 12. | Take | loose | end | of | cable | that | is | protruding | from | the | winch | hole | and | insert | into | the | cable | |
| retaining | hole. | At | this | point | it | is | important | not | to | expose | any | cable | on | the | other | side | of | the |
| drum | (See | Illustration | #3). |
| 13. | Locate | crank | handle. | Insert | into | recess | and | push | in | and | turn | clockwise | until | cable | retaining |
| set | screw | is | exposed. |
| 14. | Using | appropriate | size, | align | wrench | and | tighten | set | screw | securely | (See | Illustration | #3). | ||||
| 15. | Using | a | square | keyway | as | a | pathway | for | the | 1/8” | cable, | insert | the | cartridge | into | the | winch |
| hole | (See | Illustration | #4). | ||||||||||||||
| 16. | Locate | 1/2” | hole | which | is | directly | opposite | the | winch | hole. | Align | this | hole | with | the | hole | in |
| the | cartridge, | insert | screw | and | tighten | securely | (See | Illustration | #5). | |||||
| 17. | With | cartridge | winch | properly | installed, | insert | crank | into | crank | socket. | Push | in | and | turn |
| CLOCKWISE | until | the | upper | cable | starts | to | move | toward | the | top | of | the | flagpole. | |
| 18. | Locate | the | rubber | coated | counterweight | and | attach | temporarily | to | open | chain | link | at | loose |
end of the upper cable.
Page 2Rev. 8/2015
ILLUSTRATION #1
Secure optional finial here
Lower Cable Assembly
Truck Assembly
Upper Cable Assembly
ILLUSTRATION #2
Use slotted keyway to pull cable assembly through
1/2 inch hex drive winch retaining screw
Insert winch into flagpole
Winch Drum
ILLUSTRATION #3
Cable retaining hole:
Insert cable here
Cable retaining set screw:
Secure cable with this
Weep hole
Lower cable assembly from threaded portion of truck
Note: No exposed cable
ILLUSTRATION #4
To unlock:
• Insert key.
• Turn counter-clockwise.
• Pull out cylinder.
To lock:
• Insert cylinder into recess.
• Turn clockwise until snug.
• Apply slight pulling pressure.
• Turn key about 1/2 turn counterclockwise to remove key.
ILLUSTRATION #5
Lower cable assembly
Lock recess and crank port
Winch Drum
1/2 inch hex drive winch retaining screw
Winch Window
ILLUSTRATION #6
Flag Snap
Flag Snap
Counterweight
Counterweight
Beaded Retainer Ring
Beaded Retainer Ring
Cable Stop Cable Stop
STANDARD FLAG
ARRANGEMENT
DELUXE FLAG
ARRANGEMENT
Copper Duplex Sleeve Copper Duplex Sleeve
Thimble Thimble
Stainless Steel Quick Link
Stainless Steel Quick Link
Stainless Steel Cable
Stainless Steel Cable
Safety Cable
Shock Spring