W912ES21B0014 0003 - Amendment 0003.pdf
PDF 1 MB Posted
- Attached to
- Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-2A
- Solicitation number
- W912ES21B0014
About this file
This notice provides details for a solicitation seeking construction services for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-2A. The project consists of constructing an earth dam embankment with a gravel road on top, topsoiled and seeded side slopes, ditches on both sides, and portions of turf reinforcement mat on embankment slopes. Additional work includes removing a portion of an existing gravel road and abandoned water line, placing riprap in ditches, and installing new corrugated steel pipe culverts. The total length of the dam embankment is approximately 1-3/4 miles. The U.S. Army Corps of Engineers, St. Paul District, is seeking these services with an anticipated value between $10-25 million. The resulting contract will be a firm fixed-price contract set aside for total small businesses. The solicitation is an invitation for bid with no hard copies available and offerors must check the website for any updates. Registration in the System for Award Management is required to conduct business with the Department of Defense.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912ES21B0014 0002 - Amendment 0002.pdf | ||
| W912ES21B0014 0001 - Amendment 0001.pdf | ||
| W912ES21B0014_PLANS.pdf | ||
| W912ES21B0014_SPECS.pdf | ||
| W912ES21B0014_REF-DWGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6720606744
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes to the Bid Schedule, Specifications, and Plans.
The hour and date specified for receipt of Offer (Bid Opening) is extended to April 21, 2022 at 2:00pm local time.
All other solicitation terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 56
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES21B0014
X 9B. DATED (SEE ITEM 11)
09-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Apr-2022
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
13-Apr-2022
21B0014
AMEND 0003
The following modifications are made to the BID SCHEDULE, Section 01 22 00.00 13, SUBMITTAL REGISTER, SECTION 31 00 00.00 13, Section 33 40 00, and the DRAWINGS.
BID SCHEDULE
a. ALL PAGES. Delete the Bid Schedule in its entirety, and substitute the revised Bid Schedule, Amendment 0003, dated April 12, 2022.
SECTION 01 22 00.00 13
b. ALL PAGES. Delete Section 01 22 00.00 13 in its entirety, and substitute the revised Section 01 22 00.00 13, Amendment 0003, dated April 12, 2022.
SUBMITTAL REGISTER
c. ALL PAGES. Delete the Submittal Register in its entirety, and substitute the revised Submittal Register, Amendment 0003, dated April 12, 2022.
SECTION 31 00 00.00 13
d. ALL PAGES. Delete Section 31 00 00.00 13 in its entirety, and substitute the revised Section 31 00 00.00 13, Amendment 0003, dated April 12, 2022.
e. ATTACHMENTS 3 AND 4. Delete Section 31 00 00.00 13 ATTACHMENT 3 in its entirety, and substitute the revised and new 31 00 00.00 13 ATTACHMENTS 3 and 4, Amendment 0003, dated April 12, 2022.
SECTION 33 40 00
f. ALL PAGES. Delete Section 33 40 00 in its entirety, and substitute the revised Section 33 40 00, Amendment 0003, dated April 12, 2022.
DRAWINGS (SUPERSEDED)
g. Revised drawings listed below are being issued with this Amendment.
Such revised drawings supersede those of the same sheet identification numbers listed in the INDEX OF DRAWINGS included in the set of drawings furnished with Solicitation No. W912ES21B0014, dated March 9, 2022.
SHEET CS501
ATTACHMENTS: Bid Schedule; Section 01 22 00.00 13; Submittal Register Section 31 00 00.00 13; 31 00 00.00 13 ATTACHMENTS 3 and 4;
Section 33 40 00; and CS501
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End Summary of Changes)
Fargo-Moorhead Area Diversion Southern Embankment Reach SE-2A Cass County, ND BID SCHEDULE
Solicitation No. W912ES21B0014
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Performance and Payment Bonds 1 JOB $_________ $
0002 Demolition 1 JOB $_________ $
0003 Traffic Control Signs 1 JOB $_________ $
0004 Remove Gravel Road 830 CY $ $
0005 Stripping 1 JOB $_________ $
0006 Inspection Trench 9,820 LF $ $
0007 Excavation
0007AA First 2,300 Cubic Yards 2,300 CY $ $
0007AB Over 2,300 Cubic Yards 801 CY $ $
0008 Borrow Excavation and Placement
0008AA First 525,000 Cubic Yards 525,000 CY $ $
0008AB Over 525,000 Cubic Yards 165,000 CY $ $
0009 Geotextile - Type 1 735 SY $ $
0010 Geotextile - Type 2 16,405 SY $ $
0011 Aggregate Surface 5,000 TN $ $
0012 Topsoil Respread 1 JOB $_________ $
0013 Seeding
0013AA Zone 1 149 AC $ $
0013AB Zone 2 54 AC $ $
0013AC Zone 3 14 AC $ $
0013AD Zone 4 18 AC $ $
Fargo-Moorhead Area Diversion Southern Embankment Reach SE-2A Cass County, ND BID SCHEDULE (continued)
Solicitation No. W912ES21B0014
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0014 Turf Reinforcement Mat 78,672 SY $ $
0015 24 inch Corrugated Steel Pipe 45 LF $ $
0016 24 inch Corrugated Steel Flared End 2 EA $ $
0017 49 x 33 inch Corrugated Steel Arch Pipe 100 LF $ $
0018 49 x 33 inch Corrugated Steel Arch Flared End
4 EA $ $
0019 Bedding - B1 60 CY $ $
0020 Bedding - B2 95 CY $ $
0021 Riprap - R30 155 CY $ $
0022 Riprap - R45 170 CY $ $
0023 Monthly Internet Service 26 MO $ $
TOTAL OF ESTIMATED AMOUNTS
(ITEM NOS. 0001 THROUGH 0023, INCL.)
Solicitation No. W912ES21B0014 Advertisement
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 13
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 REFERENCES
1.2 COMPENSATION
1.3 APPROVAL OF MATERIALS OR ALTERNATES
1.4 QUANTITY SURVEYS
1.5 MEASUREMENT BY WEIGHT
1.6 MEASUREMENT UNITS
1.7 SUBMITTALS
1.8 JOB PAYMENT ITEMS
1.8.1 Performance and Payment Bonds
1.8.1.1 Payment
1.8.1.2 Unit of Measurement
1.8.2 Demolition
1.8.2.1 Payment
1.8.2.2 Unit of Measurement
1.8.3 Traffic Control Signs
1.8.3.1 Payment
1.8.3.2 Unit of Measurement
1.8.4 Deleted
1.8.4.1 Deleted
1.8.4.2 Deleted
1.8.5 Stripping
1.8.5.1 Payment
1.8.5.2 Unit of Measure
1.8.6 Topsoil Respread
1.8.6.1 Payment
1.8.6.2 Unit of Measure
1.9 UNIT PRICE PAYMENT ITEMS
1.9.1 Remove Gravel Road
1.9.1.1 Payment
1.9.1.2 Measurement
1.9.1.3 Unit of Measure
1.9.2 Deleted
1.9.2.1 Deleted
1.9.2.2 Deleted
1.9.2.3 Deleted
1.9.3 Inspection Trench
1.9.3.1 Payment
1.9.3.2 Measurement
1.9.3.3 Unit of Measure
1.9.4 Excavation
1.9.4.1 Payment
1.9.4.2 Measurement
1.9.4.3 Unit of Measure
1.9.5 Borrow Excavation and Placement
SECTION 01 22 00.00 13 Page 1 AMEND. 0003
12 APR 2022
1.9.5.1 Payment
1.9.5.2 Measurement
1.9.5.3 Unit Of Measure
1.9.6 Geotextile
1.9.6.1 Payment
1.9.6.2 Measurement
1.9.6.3 Unit of Measure
1.9.7 Aggregate Surface
1.9.7.1 Payment
1.9.7.2 Measurement
1.9.7.3 Unit of Measure
1.9.8 Deleted
1.9.8.1 Deleted
1.9.8.2 Deleted
1.9.8.3 Deleted
1.9.9 Seeding
1.9.9.1 Payment
1.9.9.2 Measurement
1.9.9.3 Unit of Measure
1.9.10 Turf Reinforcement Mat (TRM)
1.9.10.1 Payment
1.9.10.2 Measurement
1.9.10.3 Unit of Measure
1.9.11 24-inch Corrugated Steel Pipe
1.9.11.1 Payment
1.9.11.2 Measurement
1.9.11.3 Unit of Measure
1.9.12 24-inch Corrugated Steel Flared End
1.9.12.1 Payment
1.9.12.2 Measurement
1.9.12.3 Unit of Measure
1.9.13 49x33-inch Corrugated Steel Arch Pipe
1.9.13.1 Payment
1.9.13.2 Measurement
1.9.13.3 Unit of Measure
1.9.14 49x33-inch Corrugated Steel Arch Flared End
1.9.14.1 Payment
1.9.14.2 Measurement
1.9.14.3 Unit of Measure
1.9.15 Bedding
1.9.15.1 Payment
1.9.15.2 Measurement
1.9.15.3 Unit of Measure
1.9.16 Riprap
1.9.16.1 Payment
1.9.16.2 Measurement
1.9.16.3 Unit of Measure
1.9.17 Monthly Internet Service
1.9.17.1 Payment
1.9.17.2 Unit of Measure
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 13 Page 2 AMEND. 0003
12 APR 2022
SECTION 01 22 00.00 13
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST HB 44 (2020) Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices
1.2 COMPENSATION
The payment provided for in the Contract shall constitute full compensation for furnishing all materials and for performing all work under the Contract in a complete and acceptable manner. The Contract work shall include providing plant, equipment, tools, supplies, labor, supervision, incidental materials, quality control, environmental protection, and meeting safety requirements, and for performing all work required for which separate payment is not otherwise provided. Compensation for all work shown, specified, or essential to completion of the project (whether or not the specific material or operation is indicated) shall be included on the bidding schedule. The payment provided for in the Contract includes compensation for all risk, loss, damage, and expense arising out of the nature of the work or its prosecution, subject to conditions of the Contract. Payment for each Contract line item will constitute full compensation for furnishing the materials and constructing the work complete in place as specified.
No payment shall be made until the Initial Project Schedule is accepted by the Government and uploaded to RMS, in accordance with section
01 32 01.00 10 PROJECT SCHEDULE.
1.3 APPROVAL OF MATERIALS OR ALTERNATES
Requests for approval of materials and products, or substitutes thereof, will not be considered prior to award of the Contract.
1.4 QUANTITY SURVEYS
The Contractor shall provide quantity surveys for bulk materials measured by volume or weight, unless an alternate method of measurement is specified. Quantity surveys are specified in Section 01 71 23.05 13
CONTRACTOR SURVEYS.
SECTION 01 22 00.00 13 Page 3 AMEND. 0003
12 APR 2022
1.5 MEASUREMENT BY WEIGHT
Bulk materials paid for by weight will be measured by weighing each truck load on an approved scale before being placed in the work. Scales shall be of sufficient length to permit simultaneous weighing of all axle loads and shall be sensitive to a change in load of 0.2 percent throughout the range of the scale. The scale's accuracy shall conform to the applicable requirements of NIST HB 44 and shall be certified by a scale servicing company or by an inspector of the State Inspection Bureau. Each load shall be accompanied by a delivery ticket certified by the weighmaster. Delivery tickets shall be collected by the Contractor, and copies thereof shall be furnished to the Contracting Officer. As a minimum, each ticket shall contain the following information:
(1) Date and time.
(2) Vehicle number.
(3) Gross weight.
(4) Vehicle tare weight.
(5) Net weight.
(6) Signature of weighmaster.
(7) Signature of Contractor's receiver.
1.6 MEASUREMENT UNITS
When materials are measured in units other than the measurement units specified as the basis of payment, the measured quantities shall be converted to the specified unit of measure. Factors for conversions from one basis or unit of measurement to another shall be approved by the Contracting Officer.
1.7 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Delivery Ticket
Submit certified delivery tickets.
1.8 JOB PAYMENT ITEMS
Payment items for the work of this Contract for which Contract job payments will be made are listed in the SCHEDULE OF ITEMS and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for performing all work required for which separate payment is not otherwise provided.
SECTION 01 22 00.00 13 Page 4 AMEND. 0003
1.8.1 Performance and Payment Bonds
1.8.1.1 Payment
Payment will be made for the costs associated with performance and payment bonds in accordance with the Contract requirements. Bonds will be paid for on a job basis in accordance with CONTRACT CLAUSE 52.232-5 PAYMENTS UNDER
FIXED-PRICE CONSTRUCTION CONTRACTS.
1.8.1.2 Unit of Measurement
Unit of measure: job.
1.8.2 Demolition
1.8.2.1 Payment
Payment will be made for all costs associated with demolition. Demolition work includes, but is not limited to, furnishing all materials, equipment, and labor and performing all operations necessary for the removal and disposal of the culverts, and removal and capping of the water line as shown and specified.
1.8.2.2 Unit of Measurement
Unit of measure: job.
1.8.3 Traffic Control Signs
1.8.3.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for the installation of all permanent and temporary Traffic Control Signs including barricades as shown and specified.
1.8.3.2 Unit of Measurement
Unit of measure: job.
1.8.4 Deleted
1.8.4.1 Deleted
SECTION 01 22 00.00 13 Page 5 AMEND. 0003
12 APR 2022
1.8.4.2 Deleted
1.8.5 Stripping
1.8.5.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to complete stripping operations as shown and specified. Work shall include, but is not limited to, stripping vegetation, topsoil, and organic material and stockpiling of topsoil for reuse and disposal of excess.
1.8.5.2 Unit of Measure
Unit of measure: job.
1.8.6 Topsoil Respread
1.8.6.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for respreading topsoil collected under the Stripping and Excavation CLINs as shown and specified.
1.8.6.2 Unit of Measure
Unit of measure: job.
1.9 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work, including incidental work, required for each of the unit price items.
1.9.1 Remove Gravel Road
1.9.1.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to remove the existing road as shown and specified. Work shall include, but is not limited to, removal and disposal of the aggregate material and road bed.
1.9.1.2 Measurement
Remove Gravel Road shall be measured for payment by the cubic yard of surface removed. The quantity will be determined by the Quantity Surveys for Measurement and Payment specified in SECTION 01 71 23.05 13 CONTRACTOR
SURVEYS.
SECTION 01 22 00.00 13 Page 6 AMEND. 0003
12 APR 2022
1.9.1.3 Unit of Measure
Unit of measure: cubic yard.
1.9.2 Deleted
1.9.2.1 Deleted
1.9.2.2 Deleted
1.9.2.3 Deleted
1.9.3 Inspection Trench
1.9.3.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to construct the inspection trench as shown and specified. Work shall include, but is not limited to, excavation, backfill, inspection and reports.
1.9.3.2 Measurement
Inspection Trench shall be measured for payment by the lineal foot of excavation to the nearest whole foot. The quantity will be determined by the Quantity Surveys for Measurement and Payment specified in SECTION 01 71 23.05 13 CONTRACTOR SURVEYS. Excavation outside the lines and grades shown will not be measured for payment.
1.9.3.3 Unit of Measure
Unit of measure: linear foot.
1.9.4 Excavation
1.9.4.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for excavations associated with the culvert ditches and the swale as shown and specified. Work shall include, but is not limited to, excavation, subgrade preparation, excavated material placement, and disposal of excess excavated material. Over-excavations and backfill of over-excavations are included in this item. All other excavations that are not included in a separate bid item are included in this bid item.
SECTION 01 22 00.00 13 Page 7 AMEND. 0003
12 APR 2022
1.9.4.2 Measurement
Excavation shall be measured for payment by the cubic yard of excavation.
The quantity will be determined by the Quantity Surveys for Measurement and Payment specified in SECTION 01 71 23.05 13 CONTRACTOR SURVEYS. Excavation outside the lines and grades shown will not be measured for payment.
1.9.4.3 Unit of Measure
Unit of measure: cubic yard.
1.9.5 Borrow Excavation and Placement
1.9.5.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for Borrow Excavation and Placement as shown and specified. Work shall include, but not be limited to, excavating, hauling, and placing the borrow material to construct the embankment as specified.
1.9.5.2 Measurement
Borrow Excavation and Placement shall be measured for payment by the cubic yard of excavation. The quantity will be determined by the Quantity Surveys for Measurement and Payment specified in SECTION 01 71 23.05 13 CONTRACTOR SURVEYS. Excavation outside the lines and grades shown will not be measured for payment, unless approved by the Contracting Officer. Only Impervious Fill material will be measured for payment. Stripping of topsoil and respreading topsoil will be measured separately under the respective items.
1.9.5.3 Unit Of Measure
Unit of measure: cubic yard.
1.9.6 Geotextile
1.9.6.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for placement of Geotextile per type as shown and specified. Work shall include, but is not limited to, placing geotextile and any preparation work for the surface on which the material will be placed.
1.9.6.2 Measurement
Geotextile shall be measured for payment by the as-built surface area in square yards covered by Geotextile. No allowance will be made for waste, overlaps, repairs or materials used for the convenience of the Contractor.
Only geotextile associated with the placement of bedding, riprap, and aggregate surface will measured. Geotextile required for other applications will not be measured.
1.9.6.3 Unit of Measure
Unit of measure: square yard.
SECTION 01 22 00.00 13 Page 8 AMEND. 0003
12 APR 2022
1.9.7 Aggregate Surface
1.9.7.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for placing Aggregate Surface as shown and specified. Work shall include, but is not limited to, placing aggregate, subgrade preparation, proof - rolling, and subgrade correction.
1.9.7.2 Measurement
Aggregate Surface shall be measured for payment by the ton (2,000 pounds avoirdupois) in accordance with paragraph MEASUREMENT BY WEIGHT. A Quantity Survey is required to determine if placement is within the neat lines and tolerances. The survey shall be in accordance to the Quantity Surveys for Measurement and Payment specified in SECTION 01 71 23.05 13 CONTRACTOR SURVEYS. Payment will be made only for aggregate placed within the specified tolerances. All aggregate permitted by the Contracting Officer to remain outside the tolerances specified shall be deducted from the payment quantity. The excess volume shall be deducted from the payment quantity at the rate of 1.60 tons per cubic yard, regardless of actual weight per cubic yard.
1.9.7.3 Unit of Measure
Unit of measure: ton.
1.9.8 Deleted
1.9.8.1 Deleted
1.9.8.2 Deleted
1.9.8.3 Deleted
1.9.9 Seeding
1.9.9.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for Seeding as shown and specified.
Work shall include, but is not limited to, soil preparation, placement of seed, mulch, watering, and maintenance.
SECTION 01 22 00.00 13 Page 9 AMEND. 0003
12 APR 2022
1.9.9.2 Measurement
Seeding shall be measured for payment by the acre. The area measured for payment will be limited to the areas designated for seeding as shown on the drawings. The quantity will be determined by the Quantity Surveys for Measurement and Payment specified in SECTION 01 71 23.05 13 CONTRACTOR
SURVEYS.
1.9.9.3 Unit of Measure
Unit of measure: acre.
1.9.10 Turf Reinforcement Mat (TRM)
1.9.10.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for the installation of Turf Reinforcement Mat (TRM) as shown and specified. Work shall include, but is not limited to, soil preparation, anchor pins, and anchor trenches.
1.9.10.2 Measurement
Turf Reinforcement Mat (TRM) shall be measured for payment by the square yard. The area measured for payment will be limited to the areas designated for TRM as shown on the drawings. The quantity will be determined by the Quantity Surveys for Measurement and Payment specified in
SECTION 01 71 23.05 13 CONTRACTOR SURVEYS.
1.9.10.3 Unit of Measure
Unit of measure: square yard.
1.9.11 24-inch Corrugated Steel Pipe
1.9.11.1 Payment
Payment will be made for furnishing all materials, equipment, labor and performing all operations necessary for placement of 24 inch corrugated steel pipe, as shown and specified. Work shall include, but not be limited to, all related excavation, pipe, pipe placement, band fasteners, backfilling and compaction.
1.9.11.2 Measurement
Corrugated Steel Pipe shall be measured for payment by the linear foot (LF), in place along the centerline of the pipe from end to end, not including flared end.
1.9.11.3 Unit of Measure
Unit of measure: linear foot.
1.9.12 24-inch Corrugated Steel Flared End
1.9.12.1 Payment
Payment will be made for furnishing all materials, equipment, labor and performing all operations necessary for placement of 24 inch corrugated
SECTION 01 22 00.00 13 Page 10 AMEND. 0003 steel flared end, as shown and specified. Work shall include, but not be limited to, all related excavation, flared end, placement, band fasteners, backfilling and compaction.
1.9.12.2 Measurement
Corrugated Steel Pipe Flared End shall be measured for payment by each (EA), in place.
1.9.12.3 Unit of Measure
Unit of measure: each.
1.9.13 49x33-inch Corrugated Steel Arch Pipe
1.9.13.1 Payment
Payment will be made for furnishing all materials, equipment, labor and performing all operations necessary for placement of 49x33 inch corrugated steel arch pipe, as shown and specified. Work shall include, but not be limited to, all related excavation, pipe, pipe placement, band fasteners, backfilling and compaction.
1.9.13.2 Measurement
Corrugated Steel Arch Pipe shall be measured for payment by the linear foot (LF), in place along the centerline of the pipe from end to end, not including flared end.
1.9.13.3 Unit of Measure
Unit of measure: linear foot.
1.9.14 49x33-inch Corrugated Steel Arch Flared End
1.9.14.1 Payment
Payment will be made for furnishing all materials, equipment, labor and performing all operations necessary for placement of 49x33 inch corrugated steel arch flared end, as shown and specified. Work shall include, but not be limited to, all related excavation, flared end, placement, band fasteners, backfilling and compaction.
1.9.14.2 Measurement
Corrugated Steel Arch Pipe Flared End shall be measured for payment by each (EA), in place.
1.9.14.3 Unit of Measure
Unit of measure: each.
1.9.15 Bedding
1.9.15.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for placing bedding material of each type as shown and specified.
SECTION 01 22 00.00 13 Page 11 AMEND. 0003
1.9.15.2 Measurement
Bedding shall be measured for payment by the cubic yard in place. A survey is required to determine if placement is within the neat lines and tolerances. The survey shall be in accordance to the Quantity Surveys for Measurement and Payment specified in SECTION 01 71 23.05 13 CONTRACTOR SURVEYS. Payment will be made only for rock placed within the specified tolerances. All rock permitted by the Contracting Officer to remain outside the tolerances specified shall be deducted from the payment quantity.
1.9.15.3 Unit of Measure
Unit of measure: cubic yard.
1.9.16 Riprap
1.9.16.1 Payment
Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for placing riprap of each type as shown and specified.
1.9.16.2 Measurement
Riprap shall be measured for payment by the cubic yard in place. A survey is required to determine if placement is within the neat lines and tolerances. The survey shall be in accordance to the Quantity Surveys for Measurement and Payment specified in SECTION 01 71 23.05 13 CONTRACTOR SURVEYS. Payment will be made only for rock placed within the specified tolerances. All rock permitted by the Contracting Officer to remain outside the tolerances specified shall be deducted from the payment quantity.
1.9.16.3 Unit of Measure
Unit of measure: cubic yard.
1.9.17 Monthly Internet Service
1.9.17.1 Payment
Payment will be for furnishing all materials, equipment, and labor and performing all operations necessary for the installation and maintenance of Government Field Office fixed WiFi internet service matching the characteristics and service provided to the Contractor's onsite field office. Payment shall be made with periodic progress payments and shall cover only the service months covered in the periodic progress payment.
The Government shall not be responsible for any late fees accrued as a result Contractor not submitting periodic progress payment request in a timely manner. Payment shall not be made in advance. Monthly Internet Service will be measured on a monthly basis.
1.9.17.2 Unit of Measure
Unit of measure: month
SECTION 01 22 00.00 13 Page 12 AMEND. 0003
12 APR 2022
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00.00 13 Page 13 AMEND. 0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
Fargo-Moorhead Metro FRM Reach SE-2A
01 22 00.00 13 SD-03 Product Data 1.5Delivery Ticket
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
SD-02 Shop Drawings
3.6.2 GPeriodic Schedule Update
3.8.2 GTime Impact Analysis
01 35 26 SD-01 Preconstruction Submittals
1.7 G SOAccident Prevention Plan (APP)
1.8 G SOActivity Hazard Analysis (AHA)
1.7.2.2 G SOCritical Lift Plan
1.7.2.1 GStandard Lift Plan
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.4Crane Operators/Riggers 1.8Activity Hazard Analysis (AHA) 1.12.4Certificate Of Compliance
01 41 26.00 13 SD-01 Preconstruction Submittals Stormwater Pollution Prevention Plan (SWPPP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
AMEND. 0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
01 41 26.00 13 1.3.2Notice of Intent (NOI) SD-11 Closeout Submittals
3.2Notice of Termination (NOT) Records
01 45 04.00 13 SD-01 Preconstruction Submittals
3.2.1 GQuality Control Plan (QCP)
SD-07 Certificates
3.6.2 GTesting Laboratories
01 50 02.00 13 SD-02 Shop Drawings Site Plan
SD-06 Test Reports Formaldehyde Emission Test Results
01 57 20.00 13 SD-01 Preconstruction Submittals
1.7 G ENVEnvironmental Protection Plan
01 71 23.05 13 SD-01 Preconstruction Submittals
3.1.3.2 GSURVConstruction Surveying Work
Plan and Schedule
1.8.1 GSURVQuality Control Plan
3.1.3.1 GSURVPreliminary Surveys
1.9.1 GSURVProfessional Certification and
Work Experience SD-11 Closeout Submittals
3.1.3.3 GSURVAs-Built Surveys
1.5Geospatial Data
01 78 02.00 10 SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
01 78 02.00 10 1.3 GAs-Built Drawings
1.2 GNPDES Closeout Submittals and
Records 31 00 00.00 13 SD-02 Shop Drawings
2.1.9Foundation Preparation Checklist Nuclear Density Calibration Curve
Operator Certifications SD-06 Test Reports
2.3Daily Earthwork Report Forms
2.4 G GEOEarthwork Final Report
2.5Summary of Density Testing
Results Summary of Proctor Tests Daily Standard Count Log
3.18Nuclear Density Gage Correction Factor Worksheet (NDG-CFW)
31 05 19 SD-03 Product Data 2.2Manufacturing Quality Control
Sampling and Testing 2.1.2Thread
SD-07 Certificates 2.1.1Geotextile
31 32 11 SD-02 Shop Drawings GMaintenance Record
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
31 32 11 2.1 GTurf Reinforcement Mat SD-07 Certificates
2.1 GTurf Reinforcement Mat
1.5 GWarranty
32 11 16.00 13 SD-01 Preconstruction Submittals Aggregate Sources
SD-04 Samples 2.2Aggregate Sample
SD-06 Test Reports 3.15Testing
32 92 19.01 13 SD-03 Product Data GManufacturer's Literature
SD-06 Test Reports GSeed Test GQuantity Check GMaintenance Record
SD-07 Certificates GCertificates of Compliance
33 40 00 SD-02 Shop Drawings
1.3.1 GManufacturer's Storage
Instructions
2.1 GCSP Culverts
GCSP Flared End Sections
2.1.2 GJoints For CSP
2.2 GCSAP Culverts
GCSAP Flared End Sections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
33 40 00 2.2.2 GJoints For CSAP 35 31 19.00 13 SD-01 Preconstruction Submittals
G GEOMaterial Sources SD-06 Test Reports
2.5Gradation Test SD-07 Certificates Certified Weight Scale Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 00 00.00 13
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SUBSURFACE INFORMATION
1.3.1 Boring Logs
PART 2 PRODUCTS
2.1 DEFINITIONS
2.1.1 Satisfactory Materials
2.1.2 Unsatisfactory Materials
2.1.3 Cohesionless and Cohesive Materials
2.1.4 Unstable Material
2.1.5 Proctor
2.1.6 Dam Embankment
2.1.7 Foundation
2.1.8 Foundation Evaluation
2.1.9 Foundation Preparation Checklist
2.1.10 Inspection Trench
2.1.11 Proof Rolling
2.1.12 Deleted
2.1.13 Deleted
2.2 MATERIALS
2.2.1 Sherack Material
2.2.2 Brenna Material
2.2.3 Impervious Fill
2.2.4 Topsoil
2.3 DAILY EARTHWORK REPORT FORMS
2.4 EARTHWORK FINAL REPORT
2.5 SUMMARY OF DENSITY TESTING RESULTS
PART 3 EXECUTION
3.1 CLASSIFICATION OF SOIL MATERIALS
3.2 INSPECTION TRENCH
3.3 STOCKPILES
3.4 STRIPPING
3.4.1 Deleted
3.4.2 Deleted
3.5 EXISTING ROAD REMOVAL
3.6 EXCAVATION
3.7 FOUNDATION EVALUATION
3.7.1 Prior to the Foundation Evaluation
3.7.2 During the Foundation Evaluation
3.7.3 Maintaining Dry Conditions
SECTION 31 00 00.00 13 Page 1 AMEND. 0003
12 APR 2022
3.8 DITCH EXCAVATION
3.9 DRAINAGE
3.10 EMBANKMENTS
3.11 SUBGRADE PREPARATION
3.11.1 Subgrades for Dam Embankments and Roads
3.11.2 Subgrade Correction
3.12 COMPACTION
3.12.1 Moisture Control
3.12.2 Placement And Compaction
3.13 COMPACTION CONSTRUCTION EQUIPMENT
3.14 SUBGRADE AND EMBANKMENT PROTECTION
3.15 PLACING TOPSOIL
3.16 FINISHING
3.16.1 Ditch Tolerance
3.16.2 Dam Embankments Tolerance
3.17 TESTING
3.17.1 General
3.17.2 Field Moisture Content Tests
3.17.3 Field Density Tests
3.17.4 Proctor Tests
3.17.5 Grain-Size Tests (Sieve Analysis)
3.17.5.1 Clay Fraction (ASTM D7928) Analysis
3.17.5.2 Percent Passing the No. 200 Sieve
3.17.6 Plasticity Index (ASTM D4318)
3.17.7 Treatment of Oversize Particles for Density Tests
3.17.8 Corrective Action
3.17.9 Testing Schedule
3.18 NUCLEAR DENSITY TESTING EQUIPMENT
3.19 CARE OF WATER
3.20 ATTACHMENTS
-- End of Section Table of Contents --
SECTION 31 00 00.00 13 Page 2 AMEND. 0003
12 APR 2022
SECTION 31 00 00.00 13
EARTHWORK
PART 1 GENERAL
This section covers excavation and dam construction work.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C117 (2017) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing
ASTM D422 (1963; R 2007; E 2014; E 2014)
Particle-Size Analysis of Soils
ASTM D698 (2012; E 2014; E 2015) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft.
(600 kN-m/cu. m.))
ASTM C136/C136M (2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method
ASTM D2216 (2019) Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass
ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D2488 (2017; E 2018) Standard Practice for Description and Identification of Soils (Visual-Manual Procedure)
ASTM D4318 (2017; E 2018) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D4718/D4718M (2015) Standard Practice for Correction of Unit Weight and Water Content for Soils
SECTION 31 00 00.00 13 Page 3 AMEND. 0003
12 APR 2022
Containing Oversize Particles
ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D1140 (2017) Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing
ASTM D6913/D6913M (2017) Standard Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis
ASTM D7928 (2017) Standard Test Method for Particle-Size Distribution (Gradation) of Fine-Grained Soils Using the Sedimentation (Hydrometer) Analysis
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Foundation Preparation Checklist
Nuclear Density Calibration Curve
Operator Certifications
SD-06 Test Reports
Daily Earthwork Report Forms
Earthwork Final Report; G, GEO
Summary of Density Testing Results
Summary of Proctor Tests
Daily Standard Count Log
SECTION 31 00 00.00 13 Page 4 AMEND. 0003
12 APR 2022
Nuclear Density Gage Correction Factor Worksheet (NDG-CFW)
1.3 SUBSURFACE INFORMATION
Reference clause 52.236-4 PHYSICAL DATA
1.3.1 Boring Logs
Summaries of the boring logs obtained for this project are shown in the Contract drawings. The borings are representative of subsurface conditions at their respective locations. Variations in the stratigraphy and characteristics of the soil are known to occur between borings. Normal variations in site geology will not be considered as differing materially within the purview of Contract Clause FAR 52.236-2, Differing Site Conditions. Ground water elevations measured in borings are not constant and will fluctuate.
Subsurface data including soil boring logs and additional laboratory test data for the project site are available for inspection at the District Office. Contact the Contracting Officer.
PART 2 PRODUCTS
2.1 DEFINITIONS
2.1.1 Satisfactory Materials
All materials shall be of a character and quality satisfactory for the purpose intended and meet the applicable material specifications.
All material placed as compacted fill, semi-compacted fill, or backfill shall consist of material classified by ASTM D2487 as GW, GP, GC, GM, SP, SM, SC, CL, CH or SW. The material shall be free of ice, snow, frozen earth, trash, debris, sod, roots, organic matter, and stones larger than 3 inches in any dimension.
2.1.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Notify the Contracting Officer when encountering any unsatisfactory materials.
2.1.3 Cohesionless and Cohesive Materials
Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Perform testing, required for classifying materials, in accordance with ASTM D4318, ASTM C136/C136M, ASTM D422, ASTM D1140, and ASTM D6913/D6913M.
2.1.4 Unstable Material
Unstable material is material too wet to properly support the proposed structure or utility.
SECTION 31 00 00.00 13 Page 5 AMEND. 0003
2.1.5 Proctor
Degree of compaction required is expressed as a percentage of the maximum density obtained by ASTM D698. The maximum density is hereafter abbreviated as the "Standard Proctor" or "Proctor" value. The optimum moisture content is the water content at which the soil is compacted to the maximum density as determined in ASTM D698.
2.1.6 Dam Embankment
Dam Embankment is defined as the earth fill portions of the dam structure and is constructed out of Impervious Fill.
2.1.7 Foundation
Foundation means any area that has been excavated or stripped and will receive impervious fill or geotextile, including the bottom and side slopes of the inspection trench.
2.1.8 Foundation Evaluation
This is the evaluation to determine the foundation adequacy and document the foundations. This evaluation is performed by the Government with assistance of the Contractor's equipment and staff. Foundation evaluation includes inspection, testing, geologic mapping, sampling, exploratory test pits, interpretation, excavation and disposal of undesirable materials, proof rolling, and decision making.
2.1.9 Foundation Preparation Checklist
A checklist filled out by the Contractor to provide proper notification to the Contracting Officer and ensure the Contractor performs adequate surface preparation for the Foundation Evaluation. This checklist is attached to the end of this section.
2.1.10 Inspection Trench
The inspection trench, as detailed in the plans, is an excavation intended to expose undesirable subsurface features.
2.1.11 Proof Rolling
Proof rolling means driving an appropriate weighted vehicle at walking speed to expose signs of unstable subgrade. An appropriate vehicle is a tandem axle truck with a gross weight of 25 tons or an approved equivalent, driven over the foundation at speeds between 2-1/2 to 3-1/2 miles per hour.
The Contractor and the Contracting Officer shall agree on the appropriate vehicle based on the field conditions and the material being evaluated.
2.1.12 Deleted
2.1.13 Deleted
SECTION 31 00 00.00 13 Page 6 AMEND. 0003
12 APR 2022
2.2 MATERIALS
2.2.1 Sherack Material
Sherack Material is the uppermost clay deposit in the project area under the topsoil. The upper 5 feet are generally dark gray-brown and difficult to distinguish from topsoil by color. The lower portion of the Sherack Material is generally brown to yellow-brown with iron stains.
Sherack Material typically has a liquid limit between 60 and 92, a plasticity index between 38 and 67, and is classified by ASTM D2487 as CL or CH. These liquid limit and plasticity index values are not contractual limitations but are meant to assist in identifying the material.
2.2.2 Brenna Material
Brenna Material is below the Sherack Material and is generally a soft to very soft clay, dark gray in color, and highly plastic. Brenna Material typically has a liquid limit between 75 and 116 and a plasticity index between 50 and 86. These liquid limit and plasticity index values are not contractual limitations but are meant to assist in identifying the material.
2.2.3 Impervious Fill
Impervious fill shall meet the following requirements:
a. The material shall be satisfactory material.
b. The material shall be cohesive material.
c. The material shall be Sherack material.
d. The material shall not include topsoil.
e. The material shall not include Brenna material.
During subsurface investigations, the highest contact elevation located between the Brenna and Sherack formations occured at EL 897.7. The contact elevation varies throughout the project and could occur at a higher elevation within the project footprint.
2.2.4 Topsoil
Topsoil for this project shall be obtained from the on-site stripping and excavations. It shall be free of subsoil, stumps, rocks larger than one inch in any one dimension, brush, weeds, toxic substances, and other material detrimental to plant growth.
2.3 DAILY EARTHWORK REPORT FORMS
Use the daily earthwork report forms in the attachments at the end of this section to document earthwork.
SECTION 31 00 00.00 13 Page 7 AMEND. 0003
12 APR 2022
2.4 EARTHWORK FINAL REPORT
After the earthwork is complete, submit the Earthwork Final Report for review in pdf format.
Throughout the performance of the Contract, the Contractor shall continually compile all the information for the Earthwork Final Report and have the information available for review by Contracting Officer at all times. Include the following information in the Earthwork Final Report:
a. Testing results indicated in paragraph TESTING, ordered by test number;
b. Full size as-built plans with test numbers inserted to show location and elevation in plan and profile view;
c. Finalized daily earthwork reports with all attachments, ordered by date;
d. Narrative including unusual conditions or situations encountered;
remedies applied to address these conditions or situations; and description of job sequencing and work schedule with workdays per week (by season) and any extended "no work" period.
2.5 SUMMARY OF DENSITY TESTING RESULTS
Submit weekly an electronic version (EXCEL) of all density testing results, including the Summary of Density Testing Results form attached at the end of this Section.
PART 3 EXECUTION
3.1 CLASSIFICATION OF SOIL MATERIALS
Classification of soil materials shall be performed by the Contractor in accordance with ASTM D2488. The Contracting Officer reserves the right to revise the Contractor classifications. In the case of disagreement, the Contracting Officer's classification will govern unless the soils are classified in accordance with ASTM D2487. Not withstanding provisions of CONTRACT CLAUSE 52.246-12 INSPECTION OF CONSTRUCTION, testing completed by the Contractor in conjunction with soil material classification will be considered incidental to the Contract work.
3.2 INSPECTION TRENCH
Excavate so that trench is continuous at all points, aligned with smooth curves, and free from abrupt changes in alignment
Remove any pipes, tiles, and conduits.
Clean bottom and side slopes surfaces to a smooth appearance.
If caving occurs, either widen the trench and/or dewater to keep the trench stable.
Perform all work directed by the Contracting Officer as a result of the Foundation Evaluation.
Backfill trench after the Contracting Officer has performed the Foundation Evaluation and has approved the foundation.
SECTION 31 00 00.00 13 Page 8 AMEND. 0003
12 APR 2022
Remove all water before backfill is placed. Backfill with impervious fill. Use existing material which was excavated from the trench if it meets the requirements of impervious fill.
Backfill in lifts and compact as specified in paragraph COMPACTION.
3.3 STOCKPILES
Stockpiles shall be kept in a neat and well drained condition, giving due consideration to drainage at all times. Different materials shall be separately stockpiled. Stockpiles of satisfactory materials shall be protected from contamination which may destroy the quality and fitness of the stockpiled material.
3.4 STRIPPING
Topsoil and vegetation shall be stripped where indicated on the plans to the depth at which is indicated on the plans. The area to be stripped shall be surveyed prior to starting stripping operations as specified in Section 01 71 23.05 13 CONTRACTOR SURVEYS. Topsoil shall be spread on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive topsoil later, or at locations indicated or specified. Topsoil shall be kept separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 1 inch in diameter, and other materials that would interfere with planting and maintenance operations.
3.4.1 Deleted
3.4.2 Deleted
3.5 EXISTING ROAD REMOVAL
Strip the existing aggregate surface from the existing road as indicated and salvage for Contractor use.
3.6 EXCAVATION
Excavation of every description, regardless of material encountered, within the grading limits of the project shall be performed to the lines and grades indicated. The Contractor shall plan the excavation operations such that the excavation material suitable and necessary for use as impervious fill and topsoil can be transported and placed within the required fill areas or stockpiles to the quantities required by this Contract. Any excess impervious or topsoil material shall be disposed of as indicated elsewhere in the plans and specifications. Excavations carried below the depths indicated shall be refilled to the proper grade with satisfactory material and compacted to the same density as the surrounding material.
During construction, excavation and fill shall be performed in a manner and
SECTION 31 00 00.00 13 Page 9 AMEND. 0003
12 APR 2022
sequence that will provide proper drainage at all times.
Excavated slopes and backfill surfaces shall be constructed and protected to prevent erosion and sloughing.
The Contractor shall perform all work such that existing drainage measures from adjacent fields are not blocked or disturbed. If during Contract performance it becomes necessary to negatively impact adjacent field drainage, it shall be the Contractor's responsibility to take necessary measures to offset the negative impacts. These measures may include, but are not limited to, installation of side ditch inlets and ditching to maintain sufficient drainage from the fields.
3.7 FOUNDATION EVALUATION
The Contractor will cooperate to the extent necessary to assist the Government in this evaluation. This will include having equipment and personnel available to assist excavating, compacting, proof rolling, etc.
The Contractor shall coordinate…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .