W912ES21B0014 0001 - Amendment 0001.pdf
PDF 366 KB Posted
- Attached to
- Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-2A
- Solicitation number
- W912ES21B0014
About this file
This document contains information regarding a federal contract solicitation for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-2A. The U.S. Army Corps of Engineers, St. Paul District is seeking a contractor to construct an earth dam embankment with gravel road and ditches on both sides, as well as remove an existing gravel road and abandoned water line. The project also includes placement of riprap in ditches and construction of new corrugated steel pipe culverts. The solicitation is a total small business set-aside with an anticipated value between $10-25 million under NAICS code 237990. Offerors must register in the System for Award Management and have active representations and certifications prior to award. The solicitation is an invitation for bid with no hard copies available and offerors are responsible for checking the website for any updates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912ES21B0014 0003 - Amendment 0003.pdf | ||
| W912ES21B0014 0002 - Amendment 0002.pdf | ||
| W912ES21B0014_PLANS.pdf | ||
| W912ES21B0014_SPECS.pdf | ||
| W912ES21B0014_REF-DWGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6720606744
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this solicitation amendment is to document the site visit, answ er Vendor submitted questions, revise a section of the specif ications, and replace the Bid Schedule.
All other solicitation terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES21B0014
X 9B. DATED (SEE ITEM 11)
09-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Mar-2022
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES21B0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
Site Visit Attendees:
A site visit was conducted on Tuesday, March 22, 2022. The following firms were in attendance:
HSG Park Joint Venture NW Construction Inc.
Hough Inc.
Vendor Submitted Questions and Answers:
Q - Can you Please confirm that you excavation quantity includes the extra 20" of excavation needed to replace the topsoil? It appears this was left out in calculating the quantities.
A - Confirmed that excavation quantities include the 20" to replace topsoil.
Q - Please confirm that all the Impervious fill needed to construct the Levee embankment is to be obtained from the Borrow ditch in the plans and that no outside source is needed.
A - Confirmed that no outside borrow source is needed.
Q - Please advise to where the contractor is to place excess material if the borrow channel produces more excavation then needed to build the Levee Embankment.
A - Excess material is to be placed in accordance with notes 15 and 16 on sheet G-003.
Q - Please advise to where the contractor is to obtain Imperious fill for the levee embankment if the borrow ditch doesn't produce enough to construct the levee. The amount can vary significantly with compaction requirements due the soils in the area creating either a need for more or excess material. if the typical on sheet CS301 is correct and the bid items are correct there seems to be a significant underrun of material needed to construct the levee embankment.
A - The fill available on the site will be sufficient to construct the embankment.
Q - Can you provide any more information as to what is all included in the Bid item for Monthly Internet service.
Will we only be paid for what the invoice amount is that we need to produce?
A - As stated in 01 22 00 1.8.4.1, Payment will be for furnishing all materials, equipment, and labor and performing all operations necessary for the installation and maintenance of Government Field Office fixed WiFi internet and will be paid based on the Monthly CLIN amount.
Q - Due to the proximity of other USACE project in the area, do you still require office trailer for the Engineer/Corps on site?
A - See paragraph 2.2, Government Field Office, in specification Section 01 50 02.00 13, Temporary Construction Facilities.
Q - Do you require the SSHO, QC Manager, and Superintend to be separate induvial? or can 1 individual be responsible for 2 of those roles? Can the Superintendent run equipment?
A - For the SSHO, see paragraph 1.6.1.1.1 of specification Section 01 35 26, Governmental Safety Requirements.
For the CQC Manager, see paragraph 1.3.2, CQC System Manager, in specification Section 01 45 04.00 13, Contractor Quality Control. The Superintendent is not restricted from operating equipment, but the Government expects the individual to be responsible for all construction activities in accordance with contract clause 52.236-6.
If the Superintendent is operating equipment, that individual will be subject to all applicable Construction Wage Rate Requirements.
Section 01 22 00.00 13 paragraph 1.8.4.2 Monthly Internet Service – Unit of Measure which currently reads:
Unit of measure: job
Is hereby changed to read:
Unit of measure: Month
Section 01 22 00.00 13 paragraph 1.8.4.1 Monthly Internet Service – Payment which currently reads:
Payment will be for furnishing all materials, equipment, and labor and performing all operations necessary for the installation and maintenance of Government Field Office fixed WiFi internet service matching the characteristics and service provided to the Contractor's onsite field office. Payment shall be made with periodic progress payments and shall cover only the service months covered in the periodic progress payment. The Government shall not be responsible for any late fees accrued as a result Contractor not submitting periodic progress payment request in a timely manner. Payment shall not be made in advance. Monthly Internet Service will be measured on a monthly basis. Contractor shall include the invoices for service for all service months included in the periodic progress payment.
Is hereby changed to read (last sentence removed):
Payment will be for furnishing all materials, equipment, and labor and performing all operations necessary for the installation and maintenance of Government Field Office fixed WiFi internet service matching the characteristics and service provided to the Contractor's onsite field office. Payment shall be made with periodic progress payments and shall cover only the service months covered in the periodic progress payment. The Government shall not be responsible for any late fees accrued as a result Contractor not submitting periodic progress payment request in a timely manner. Payment shall not be made in advance. Monthly Internet Service will be measured on a monthly basis.
SECTION 00 10 00 - SOLICITATION
CLIN 0023
The pricing detail quantity has increased by 25.00 from 1.00 to 26.00.
The unit of issue has changed from Job to Months.
(End of Summary of Changes)
BID SCHEDULE - AMENDMENT 0001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Performance and Payment Bonds 1 JOB xxxxxxxx $
0002 Demolition 1 JOB xxxxxxxx $
0003 Traffic Control Signs 1 JOB xxxxxxxx $
0004 Remove Gravel Road 830 CY $ $
0005 Stripping
0005M First 210,000 Cubic Yards 210,000 CY $ $
0005AB Over 210,000 Cubic Yards 60,000 CY $ $
0006 Inspection Trench 9,820 LF $ $
0007 Excavation
0007M First 2,300 Cubic Yards 2,300 CY $ $
0007AB Over 2,300 Cubic Yards 801 CY $ $
0008 Borrow Excavation
0008M First 525,000 Cubic Yards 525,000 CY $ $
0008AB Over 525,000 Cubic Yards 165,000 CY $ $
0009 Geotextile - Type 1 735 SY $ $
0010 Geotextile - Type 2 16,405 SY $ $
0011 Aggregate Surface 5,000 TN $ $
0012 Topsoil Respread
0012M First 210,000 Cubic Yards 210,000 CY $ $
0012AB Over 210,000 Cubic Yards 61,800 CY $ $
BID SCHEDULE - AMENDMENT 0001
ITEM NO. SUPPLIES/SERVICES QUANTITY
0013 Seeding
0013M Zone 1
0013AB Zone2
0013AC Zone3
0013AD Zone4
0014 Turf R einforcement Mat
0015 24 inch Corrugated Steel Pipe
0016 24 inch Corrugated Steel Flared E nd
0017 49 x 33 inch Corrugated Steel Arch Pipe
0018 49 x 33 inch Corrugated Steel Arch Flared E nd
0019 Bed ding -81
0020 Bed ding-82
0021 Riprap- R30
0022 Riprap- R45
0023 Monthly Internet Service
TOTAL OF ESTIMATED AMOUNTS
(ITEM NOS. 0001 THROUGH 0023, INCL.)
AC =ACRE
JOB = LUMP SUM
TN= TON
CY= CUBIC YARD
LF = LINEAR FOOT
78,672
W912ES2180014
UNIT UNIT PRICE AMOUNT
AC $ $
AC $ $
AC $ $
AC $ $
SY $ $
LF $ $
EA $ $
LF $ $
EA $ $
CY $ $
CY $ $
CY $ $
CY $ $
EA= EACH
SY= SQUARE YARD
ENSURE UNIT PRICES AND AMOUNT LINES FOR ALL ITEMS ARE COMPLETED.
month
File details come from the government source that posted it. Updated .