Lac qui Parle Dam Bid Abstract.pdf
PDF 273 KB Posted
- Attached to
- Sluice Gate Installation at Lac qui Parle Dam
- Solicitation number
- W912ES20B0012
About this file
This abstract summarizes bids received for a federal construction contract solicitation. The U.S. Army Corps of Engineers solicited bids to perform work involving construction of a dewatering box with pier extensions and bulkhead slots, and replacement of nine existing sluice gates and actuators at the Lac qui Parle Dam. Bids were due by September 9, 2020. Six contractors submitted bids ranging from $4,760,087 to $6,174,220. The work includes furnishing sheet piling, removals, cofferdams, grout hole drilling, permeation grouting, electrical work, upstream and downstream stoplog dewatering systems, trash racks, work platforms, steel H-piles, concrete work, sluice gate removal and installation, bedding, and riprap. The abstract provides unit prices and totals for each bidder for 18 different items of work. The government estimate was $8,561,710.41. The U.S. Army Corps of Engineers in St. Paul is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd 2 LQPGRP_S-303---.pdf | ||
| Amd 2 LQPGRP_C-107---.pdf | ||
| Amd 2 LQPGRP_S-503---.pdf | ||
| Amd 2 LQPGRP_C-105---.pdf | ||
| Amd 2 LQPGRP_S-506---.pdf | ||
| Amd 2 LQPGRP_S-502---.pdf | ||
| Amd 2 LQPGRP_C-502---.pdf | ||
| Amendment 2 LQP Dam.pdf | ||
| Amd 2 LQPGRP_S-504---.pdf | ||
| Amd 2 LQPGRP_C-501---.pdf | ||
| LQPGRP_E-102---.pdf | ||
| LQPGRP_S-506---.pdf | ||
| LQPGRP_S-504---.pdf | ||
| LQP Reference Pages 11x17.pdf | ||
| LQPGRP_S-505---.pdf | ||
| Amendment 1 LQP Dam.pdf | ||
| LQPGRP_S-503---.pdf | ||
| W912ESB200012_Plans.pdf | ||
| W912ES20B0012_Specs.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lac qui Parle Dam - Sluice Gate Installation and Dewatering System Solicitation W912ES20B0012
US Army Corps of Engineers. 180 5th Street East, Suite 700, St. Paul, MN 55101-1678 Bid Opening: 9 Sept 2020 @ 2:00 p.m.
Contracting Officer: Kenneth J. Eshom Contract Specialist: Justin H. Rose
BASE
Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 0001 Bonds (Performance and Payment) 1 JOB $42,905.00 $42,905.00 $70,000.00 $70,000.00 $55,000.00 $55,000.00 $35,100.00 $35,100.00 0002 Furnish & Install Sheet Pile for Seepage Cutoff 420 SF $140.51 $59,014.20 $150.00 $63,000.00 $150.00 $63,000.00 $64.00 $26,880.00 0003 Removals 1 JOB $460,345.00 $460,345.00 $200,000.00 $200,000.00 $500,000.00 $500,000.00 $24,520.00 $24,520.00 0004 Cofferdams & Temporary Dewatering 1 JOB $781,720.00 $781,720.00 $2,000,000.00 $2,000,000.00 $1,950,000.00 $1,950,000.00 $2,087,490.00 $2,087,490.00 0005 Grout Hole Drilling
0005AA First 70 LF 70 LF $609.88 $42,691.60 $1,400.00 $98,000.00 $150.00 $10,500.00 $850.00 $59,500.00 0005AB Over 70 LF 30 LF $775.35 $23,260.50 $875.00 $26,250.00 $150.00 $4,500.00 $425.00 $12,750.00
0006 Permeation Grouting 0006AA First 70 CF 70 CF $1,972.25 $138,057.50 $1,100.00 $77,000.00 $250.00 $17,500.00 $2,120.00 $148,400.00 0006AB Over 70 CF 30 CF $486.36 $14,590.80 $1,000.00 $30,000.00 $250.00 $7,500.00 $1,590.00 $47,700.00
0007 Electrical Work 1 JOB $51,090.00 $51,090.00 $210,000.00 $210,000.00 $180,000.00 $180,000.00 $48,650.00 $48,650.00 0008 Upstream Stoplog Dewatering System 1 JOB $522,175.00 $522,175.00 $1,300,000.00 $1,300,000.00 $800,000.00 $800,000.00 $1,223,520.00 $1,223,520.00 0009 Downstream Stoplog Dewatering System 1 JOB $730,460.00 $730,460.00 $650,000.00 $650,000.00 $450,000.00 $450,000.00 $494,140.00 $494,140.00 0010 Trash Racks 1 JOB $99,395.00 $99,395.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $65,450.00 $65,450.00 0011 Work Platform Extension 1 JOB $101,825.00 $101,825.00 $200,000.00 $200,000.00 $190,000.00 $190,000.00 $66,550.00 $66,550.00 0012 Furnish & Install Steel H-Piles 408 LF $467.76 $190,846.08 $142.16 $58,001.28 $250.00 $102,000.00 $85.00 $34,680.00 0013 Concrete Base Slab 130 CY $828.02 $107,642.60 $1,950.00 $253,500.00 $5,000.00 $650,000.00 $911.00 $118,430.00 0014 Sitework 1 JOB $28,350.00 $28,350.00 $230,000.00 $230,000.00 $500,000.00 $500,000.00 $1,371,380.00 $1,371,380.00 0015 Concrete Repair - Patching
0015AA First 140 SF 140 SF $229.97 $32,195.80 $305.00 $42,700.00 $250.00 $35,000.00 $270.00 $37,800.00 0015AB Over 140 SF 60 SF $229.97 $13,798.20 $335.00 $20,100.00 $200.00 $12,000.00 $270.00 $16,200.00
0016 Concrete Repair - Patching with Reinforcement 0016AA First 70 SF 70 SF $451.74 $31,621.80 $505.00 $35,350.00 $300.00 $21,000.00 $480.00 $33,600.00 0016AB Over 70 SF 30 SF $451.74 $13,552.20 $561.67 $16,850.10 $250.00 $7,500.00 $480.00 $14,400.00
0017 Sluice Gate Removal and Installation 1 JOB $1,262,700.00 $1,262,700.00 $50,000.00 $50,000.00 $230,000.00 $230,000.00 $198,600.00 $198,600.00 0018 Bedding Gradation B2 20 TON $115.04 $2,300.80 $200.00 $4,000.00 $100.00 $2,000.00 $215.00 $4,300.00 0019 Riprap Gradation R270 55 TON $173.64 $9,550.20 $250.00 $13,750.00 $200.00 $11,000.00 $76.00 $4,180.00
$4,760,087.28 $5,748,501.38 $5,898,500.00 $6,174,220.00
I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
Justin H. Rose Contract Specialist
Kovilic Construction Co., Inc.
3721 N. Carnation Street Franklin Park, IL 60131
TOTAL BID AMOUNT
Drax, Inc.
1213 N. Sherman Ave. #361
Madison, WI 53704
Meyer Contracting Inc.
1000 93rd Ave N.
Maple Grove, MN 55369 Government Estimate
Unit Price Amount Unit Price Amount $55,364.00 $55,364.00 $75,600.00 $75,600.00
$147.40 $61,908.00 $260.00 $109,200.00 $28,254.00 $28,254.00 $70,000.00 $70,000.00
$4,403,572.00 $4,403,572.00 $4,350,000.00 $4,350,000.00
$1,171.81 $82,026.70 $1,370.00 $95,900.00 $160.84 $4,825.20 $1,350.00 $40,500.00
$254.28 $17,799.60 $1,000.00 $70,000.00 $194.12 $5,823.60 $950.00 $28,500.00
$174,774.00 $174,774.00 $53,275.00 $53,275.00 $1,017,586.00 $1,017,586.00 $1,400,000.00 $1,400,000.00 $278,014.00 $278,014.00 $601,375.00 $601,375.00 $83,751.00 $83,751.00 $60,000.00 $60,000.00
$173,191.00 $173,191.00 $200,000.00 $200,000.00 $491.97 $200,723.76 $345.00 $140,760.00
$2,088.71 $271,532.30 $1,650.00 $214,500.00 $1,419,780.00 $1,419,780.00 $750,000.00 $750,000.00
$221.00 $30,940.00 $550.00 $77,000.00 $221.00 $13,260.00 $460.00 $27,600.00
$376.74 $26,371.80 $820.00 $57,400.00 $376.74 $11,302.20 $750.00 $22,500.00
$177,767.00 $177,767.00 $900,000.00 $900,000.00 $308.59 $6,171.80 $120.00 $2,400.00 $308.59 $16,972.45 $125.00 $6,875.00
$8,561,710.41 $9,353,385.00
8,563,433.00$
(Read at bid opening due to clerical errors in highlighted items)
Engineering & Construction Innovations, Inc.
7002 6th Street North Oakdale, MN 55128
Gracon LLC 130 Miners Drive
Lafayete, CO 80026
| 2020-09-09T18:21:13-0500 | |
| ROSE.JUSTIN.H.1137901966 |