Amd 2 LQPGRP_C-501---.pdf

PDF 524 KB Posted

Attached to
Sluice Gate Installation at Lac qui Parle Dam
Solicitation number
W912ES20B0012
Issued by

About this file

This drawing package pertains to a federal contract solicitation to replace sluice gates and install pier extensions at the Lac qui Parle Dam. The work involves constructing a dewatering box with bulkhead slots for pier extension construction, and replacing nine existing sluice gates and actuators with government furnished slide gates and actuators stored nearby. The contractor must detail connections and select structural members to design a cofferdam that can withstand at least 3 kips/ft of loading. All steel must be grade 50 or higher. Strut connections must support over 130 kips of thrust. The contractor may use the provided connection details but must confirm strength and compatibility for the chosen cofferdam elements. The drawing provides general notes on cofferdam assumptions, required elevations during construction, and critical member requirements.

View the file

Other files

File Type Posted
Lac qui Parle Dam Bid Abstract.pdf PDF
Amd 2 LQPGRP_S-303---.pdf PDF
Amd 2 LQPGRP_C-107---.pdf PDF
Amd 2 LQPGRP_S-503---.pdf PDF
Amd 2 LQPGRP_C-105---.pdf PDF
Amd 2 LQPGRP_S-506---.pdf PDF
Amd 2 LQPGRP_S-502---.pdf PDF
Amd 2 LQPGRP_C-502---.pdf PDF
Amendment 2 LQP Dam.pdf PDF
Amd 2 LQPGRP_S-504---.pdf PDF
LQPGRP_E-102---.pdf PDF
LQPGRP_S-506---.pdf PDF
LQPGRP_S-504---.pdf PDF
LQP Reference Pages 11x17.pdf PDF
LQPGRP_S-505---.pdf PDF
Amendment 1 LQP Dam.pdf PDF
LQPGRP_S-503---.pdf PDF
W912ESB200012_Plans.pdf PDF
W912ES20B0012_Specs.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

ADVERTISE

A N

S I

D L

Q P

G R

P

C -5 d g n

A S N

O T

E D

W E

S

B

/0

/0

R E

B

Y D

Y D

C-501

S T P

A U

L D

IS

T R

IC

T

W

A Y

Z A

T A B

L V

D

M

IN

N E

A P

O L

IS

M N

S T

A N

L E

Y C

O N

S U

L T

A N

T S

IN

C

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

B

IL

L H

O L

M A

N

N A

D

M N S

P C

S S

O U

T H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

8 1

B

.9

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

O

ID

C O

F F

E R

D A

M D

E T

A

IL

S

WALKWAY DECK

SUPPORT FROM

@ 7' MAX

1" DIA TIE ROD

PIER

CONCRETE

EXISTING

TIP EL 895 TIP EL 895 TIP EL 895

EL 940.6EL 940.6

EL 938.6

DESIGN

EL 938.6

DESIGN

EL 934.7

EL 933.3

EXCAVATION EL 911 EXCAVATION EL 911

ST. PAUL DISTRICT

S L

U

IC

E G

A T

E I

N S

T A

L L

A T

IO

N D

E W

A T

E R

IN

G S

Y S

T E

M

D

A T

E

W A

T S

O N

M N

L A

C Q

U I P

A R

L E D

A M

M

IN

N E

S O

T A R

IV

E R

0 2' 4'1'0 2' 4'1'

CENTERLINE PIER

CENTERLINE PIER

0 1' 2'6"

0 1' 2'6"

WALL

EXISTING

WALL

EXISTING

BEAM

SUPPORTING

STRUT

BEAM

SUPPORTING

STRUT

BEAM

SUPPORTING

STRUT

OF BEAM

PLATE EACH SIDE

" STIFFENER2

OF BEAM

PLATE EACH SIDE

" STIFFENER2

OF BEAM

PLATE EACH SIDE

" STIFFENER2

EACH SIDE OF BEAM

GRADE 50, ONE ON

" PLATE2

1(2)

TYP

3 SIDES 4

TYP

3 SIDES 4

PIER

EXISTING

2"

2"

4"

TYP

T Y

P

1' 2'0 6"

A5

1' 2'0 6"

VARIES

T Y

P

" DIA A325 BOLT (TYP)4

STIFFENER PLATE (TYP)

STIFFENER PLATE

CONTACT

UNIFORM

GROUT FOR

PROVIDE THIN

A5

CONNECTION

DETAIL

12" MIN WITH EPOXY (TYP)

EMBED INTO CONCRETE

1" DIA A325 BOLT,

THE STRUT SUPPORTING BEAM.

CONNECTION SHALL MATCH THE WIDTH OF3.

" GROOVE WELDS ALL AROUND.8

" FILLET WELDS OR8

3WELDS SHALL BE 2.

ALL STEEL PLATES 1" THICK, GRADE 50.1.

NOTES:

1" DIA A325 BOLT (TYP)

12" MIN WITH EPOXY (TYP)

EMBED INTO CONCRETE

1" DIA A325 BOLT,

2 ROWS OF (5)

(SM = 55 CU IN MIN)

W16x36 WALE

(SM = 55 CU IN MIN)

W16x36 WALE

(SM = 55 CU IN MIN)

W16x36 WALE

(SM = 245 CU IN MIN)

SUPPORTING BEAM

W30x90 STRUT

MAX LENGTH = 20'

@ 10' MAX

STRUT PIPE SPACED

14" O.D. AND 1/2" THICK

MAX LENGTH = 55'

@ 10' MAX

STRUT PIPE SPACED

14" O.D. AND 1/2" THICK

(VARIES)

EL ~920

GRADE

EXISTING

(VARIES)

EL ~920

GRADE

EXISTING

(SM = 62 CU IN MIN PER FOOT)

SHEET PILE

(SM = 62 CU IN MIN PER FOOT)

SHEET PILE

PIER/WALL

EXISTING

EL 936

HEADWATER

CONSTRUCTION

COFFERDAM

MAXIMUM

EL 936

HEADWATER

CONSTRUCTION

COFFERDAM

MAXIMUM

PLATE

18"x18"x1"

EDGES)

(1.5" FROM PLATE

(4) 3/4" DIA BOLTS

1' 2'0 6"

PIER EXTENSION

STRUT

1' 2'0 6"

D1

STRUT TO W-BEAM CONNECTION (TYP)

D1

W-BEAM

D2

1' 2'0 6"

D2

STRUT TO W-BEAM CONNECTION (TYP)

SECTION

STRUT PIPE

14" O.D. AND 1/2" THICK

STRUT PIPE

14" O.D. AND 1/2" THICKSTIFFENERS (TYP)

" THICK PLATE2

STIFFENERS (TYP)

" THICK PLATE2

W-BEAM

A375 BOLTS

DIA4

3(4)

PLATE

" THICK2

115"x20"

C-107 C-106

D3

STRUT TO PIER CONNECTION

TYP

C-107

C-105

C3

(DETAIL ROTATED 90 DEGREES)

@ END PIER OF COFFERDAM

BEAM TO EXISTING PIER CONNECTION

A1

N-S UPSTREAM COFFERDAM

A2

E-W UPSTREAM COFFERDAM

A3

(DETAIL ROTATED 90 DEGREES)

@ MIDDLE PIER OF COFFERDAM

BEAM TO EXISTING PIER CONNECTION

DETAIL

PIER

EXISTING

6""8 51'-10

R 1'-

6"4

(SIM)

SEE DETAIL B5

(SIM)

SEE DETAIL B5

B5

CONNECTION

BELOW EL 932 BEFORE INSTALLATION OF THE STRUTS.

THE INTERIOR COFFERDAM WATER ELEVATION SHALL NOT BE LOWERED6.

ELEVATION IS ABOVE EL 936.

WORKERS SHALL ENTER THE COFFERDAM AREA IF HEADWATER

HEADWATER ELEVATION IS AT OR BELOW EL 936. UPON COMPLETION NO

EL 936). COFFERDAM INSTALLATION SHALL OCCUR ONLY IF THE

CONSTRUCTED UNDER NORMAL HEADWATER CONDITIONS (HEADWATER

THE DESIGN OF THE COFFERDAM ASSUMES THAT IT WILL BE5.

THE UPSTREAM COFFERDAM PLAN.

CONTRACTOR SHALL DETAIL THE CONNECTIONS AND INCLUDE IN

THE COFFERDAM ELEMENTS CHOSEN BY THE CONTRACTOR. THE

CONFIRM THE NECESSARY STRENGTH AND COMPATIBILITY WITH

CONTRACTOR MAY USE THE DETAILS OF C-501 AND C-502 BUT MUST

TYPICAL CONNECTIONS TO CONCRETE PIER. SEE C-501 AND C-502.C.

THAN 130 kips ALLOWABLE LOAD.

STRUT CONNECTIONS SHALL BE DESIGNED TO THRUST NO LESSB.

CONNECT EVERY OTHER SHEET TO WALE WITH (2) 1" DIA A325 BOLTS.A.

MEMBER SIZING.

CONTRACTOR TO DETAIL CONNECTIONS AND SELECT FINAL COFFERDAM4.

CRITICAL MEMBERS.

ALL STRUCTURAL STEEL SHOWN ON THIS SHEET SHALL BE FRACTURE3.

LOADING NO LESS THAN 3 kip/ft.

WALES, STRUTS, AND BEAMS SHALL BE DESIGNED FOR SHEET PILE 2.

ALL STEEL SHALL BE GRADE 50 OR HIGHER.1.

CONCRETE PIER

SHEET PILE OR

D1 TYP

" DIA A325 BOLTS4

D R

A W

IN

G R

E

IS

S U

E D W

IT

H A

M E

N D

M E

N T N

O

/3

/2

W E

H

GENERAL SHEET NOTES:

LQPGRP_C-501---
References
Border, PW_WORKDIR:d0665721
LQPGRP_Border_G-BSDxxx.dgn
A1-T, LQPGRP_C-501---.dgn, Default
A2-T, LQPGRP_C-501---.dgn, Default
A1-B, LQPGRP_C-501---.dgn, Default
A2-B, LQPGRP_C-501---.dgn, Default
D3, LQPGRP_C-501---.dgn, Default
C3, LQPGRP_C-501---.dgn, Default
A3, LQPGRP_C-501---.dgn, Default
A1-M, LQPGRP_C-501---.dgn, Default
B5, LQPGRP_C-501---.dgn, Default
A5, LQPGRP_C-501---.dgn, Default
A2-M, LQPGRP_C-501---.dgn, Default
D1, LQPGRP_C-501---.dgn, Default
D2, LQPGRP_C-501---.dgn, Default

File details come from the government source that posted it. Updated .