This drawing package and related solicitation provide details for a sluice gate installation project at the Lac Qui Parle Dam. The project involves constructing a dewatering box for pier extensions with slots and replacing the nine existing sluice gates and actuators with government furnished slide gates and actuators. Work will also include installing the pier extensions and bulkhead slots to serve as a new dewatering system, and storing the replacement gates and actuators approximately four miles from the dam. The solicitation is identified as number W912ES20B0012 and is issued by the Department of the Army Corps of Engineers Engineering District St Paul. The drawings specify requirements for the upstream cofferdam design and phased construction, including sheet pile sizes and connections, structural member sizes, and general notes.

View the file

Other files

File Type Posted
Lac qui Parle Dam Bid Abstract.pdf PDF
Amd 2 LQPGRP_S-303---.pdf PDF
Amd 2 LQPGRP_C-107---.pdf PDF
Amd 2 LQPGRP_S-503---.pdf PDF
Amd 2 LQPGRP_S-506---.pdf PDF
Amd 2 LQPGRP_S-502---.pdf PDF
Amd 2 LQPGRP_C-502---.pdf PDF
Amendment 2 LQP Dam.pdf PDF
Amd 2 LQPGRP_S-504---.pdf PDF
Amd 2 LQPGRP_C-501---.pdf PDF
LQPGRP_E-102---.pdf PDF
LQPGRP_S-506---.pdf PDF
LQPGRP_S-504---.pdf PDF
LQP Reference Pages 11x17.pdf PDF
LQPGRP_S-505---.pdf PDF
Amendment 1 LQP Dam.pdf PDF
LQPGRP_S-503---.pdf PDF
W912ESB200012_Plans.pdf PDF
W912ES20B0012_Specs.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

ADVERTISE

A N

S I

D L

Q P

G R

P

C -1 d g n

A S N

O T

E D

W E

S

B

/0

/0

R E

B

C W

L

Y D

C-105

S T P

A U

L D

IS

T R

IC

T

W

A Y

Z A

T A B

L V

D

M

IN

N E

A P

O L

IS

M N

S T

A N

L E

Y C

O N

S U

L T

A N

T S

IN

C

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

B

IL

L H

O L

M A

N

N A

D

M N S

P C

S S

O U

T H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

8 1

B

.9

ST. PAUL DISTRICT

D

A T

E

W A

T S

O N

M N

S L

U

IC

E G

A T

E I

N S

T A

L L

A T

IO

N D

E W

A T

E R

IN

G S

Y S

T E

M

L A

C Q

U I P

A R

L E D

A M

M

IN

N E

S O

T A R

IV

E R

T Y

P

IC

A L U

P S

T R

E A

M C

O F F

E R

D A

M P

L A

N4'0 2' 8'

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

O

ID

5' MIN

FOR LENGTH

SEE SHEET C-501

10' MAX SPACING

THICK STRUT (TYP)

14" O.D. AND 1/2"

(SM = 62 CU IN MIN)

SHEET PILE (TYP)

A1

C-501

A2

C-501

C4

C-502 C-501

C-501

SIM

C-502

C3

A3 C4

N

B2

TYPICAL UPSTREAM COFFERDAM (PHASE 4)

PLAN

F L

O W

S H

E E

T O

F

BAY 2 BAY 1 EAST ABUTMENTBAY 3

P

IE

R

P

IE

R

STRUTS SHALL BE INSTALLED AFTER SHEET PILES ARE INSTALLED.2.

IN COFFERDAM PHASE 4.

ALL SHEET PILES SHOWN ON THIS SHEET SHALL BE INSTALLED1.

NOTES:

AND CONCRETE CONSTRUCTION

PHASE 4 COFFERDAM STRUT INSTALLATION

COFFERDAM. INSTALL PRIOR TO

SHEET PILE CUTOFF FOR PHASE 5

~50'

(SM = 55 CU IN MIN)

W16x36 WALE (FCM, TYP)

(SM = 245 CU IN MIN)

SUPPORTING BEAM (FCM)

W30x90 STRUT

PRIOR TO SHEETPILE INSTALLATION.

AT BOTTOM. SUBMIT FOR REVIEW AND APPROVAL

CONCRETE OR OTHER MEANS TO ANCHOR AND SEAL

CONCRETE AND SEAL THE BOTTOM WITH TREMIE

CONCRETE, INSTALL THE SHEETPILE ON TOP OF

WHERE THE SHEETPILES ARE AT TOP OF EXISTING14.

FOR CONNECTING TO EXTENDED PIERS.

CONNECTION SIMILAR TO C4/C-502 SHOULD BE USED

ABOVE THE SLAB SHOULD NOT BE EMBEDDED, AND

EXTENSION SLAB WILL REMAIN. THE SHEETS

THE EMBEDDED SHEETPILE PORTION UNDER THE13.

IS COMPLETE. SEE C4/S-503 FOR TYPICAL DETAIL.

RESTORE BRIDGE DECK WHEN CONSTRUCTION

DEMOLITION OF BRIDGE DECK MAY BE REQUIRED.

EXISTING STRUCTURE (PIERS/ABUTMENT), LOCAL

FOR SHEETPILE INSTALLATION ADJACENT TO12.

CAN BE UP TO 4 FEET.

BELOW EL 936. DIFFERENTIAL WATER HEAD

INSTALLATION OF THE STRUTS UNLESS POOL IS

NOT BE LOWERED BELOW EL 932 BEFORE

THE INTERIOR COFFERDAM WATER ELEVATION SHALL11.

CORNER CONNECTION.

REFER TO DETAIL B4/C-502 FOR A TYPICAL SHEET PILE10.

THE SECTION PROPERTIES SHOWN ON THE DRAWING.

FINAL SIZING FOR STEEL MEMBERS SHALL NOT GO BELOW

SHALL FOLLOW APPLICABLE USACE DESIGN GUIDELINES.

ALL COFFERDAM DESIGN AND CONNECTION DETAILING9.

WALE SPLICES MAY BE WELDED AS REQUIRED.8.

HEADWATER ELEVATION IS ABOVE EL 936.

NO WORKERS SHALL ENTER THE COFFERDAM AREA IF

ELEVATION IS AT OR BELOW EL 936. UPON COMPLETION

INSTALLATION SHALL OCCUR ONLY IF THE HEADWATER

CONDITIONS (HEADWATER EL 936). COFFERDAM

BE CONSTRUCTED UNDER NORMAL HEADWATER

THE DESIGN OF THE COFFERDAM ASSUMES THAT IT WILL7.

ON SHEETS C-501 AND C-502.

COFFERDAM SECTIONS AND DETAILS MAY BE FOUND6.

FOR UPSTREAM COFFERDAM.

SEE SPECIFICATION SECTION 05 59 13 FOR REQUIREMENTS5.

FOR SHEET PILE AND STEEL SECTIONS SELECTED.

CONTRACTOR SHALL ADJUST DIMENSIONS AS REQUIRED

ON C-501, AND A3, A4 ON C-502.

SUPPORTING BEAM TO CONCRETE - A3, C3, A5, B5F.

THRUST NO LESS THAN 130 KIPS ALLOWABLE LOAD.

STRUT TO SUPPORTING BEAM - CONNECTION FORE.

LESS THAN 130 KIPS ALLOWABLE LOAD.

STRUT TO WALE - CONNECTION FOR THRUST NOD.

SHEET TO WALE WITH (2) 1" DIA A325 BOLTS.

SHEET PILE TO WALE - CONNECT EVERY OTHERC.

SHEET PILE TO CONCRETE - C4/C-502.B.

SHEET PILE TO SHEET PILE (CORNERS) - B4/C-502.A.

ARE AS FOLLOWS:

REQUIREMENTSSECTION 05 59 13. CONNECTION

FIELD-VERIFIED DIMENSIONS. SEE SPECIFICATION

AND STRUCTURAL STEEL SECTIONS SELECTED AND

LAYOUT FOR EACH PHASE 4-6 BASED ON SHEET PILE

CONTRACTOR SHALL DETERMINE THE SHEET PILE4.

SHEET SHALL BE FAILURE CRITICAL MEMBERS (FLCM).

SHAPES, PIPES, SHEET PILES, AND PLATES SHOWN ON THIS

CRITICAL (FCM), ALL STRUCTURAL STEEL INCLUDING

EXCEPT FOR MEMBERS IDENTIFIED AS FRACTURE 3.

FOR SHEET PILE LOADING NO LESS THAN 3 kip/ft.

WALES, STRUTS, AND BEAMS SHALL BE DESIGNED2.

ALL STEEL SHALL BE GRADE 50 OR HIGHER.1.

W E

H D

R A

W

IN

G R

E

IS

S U

E D W

IT

H A

M E

N D

M E

N T N

O

/3

/2

GENERAL SHEET NOTES:

LQPGRP_C-105---
References
Border, PW_WORKDIR:d0665721
LQPGRP_Border_G-BSDxxx.dgn

Plan, LQPGRP_C-105---.dgn, Default

File details come from the government source that posted it. Updated .