Amendment 0006
View the file
Other files for this federal contract opportunity
Show all 50
Devils Lake Flood Risk Management Phase 3 Embankments construction project has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6700294357
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is to: 1). make draw ing changes, 2). make specification changes, 3). add a bid note, and 4). make a bid schedule change. (See SF30 Box 14 Continuation Page for details.)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Mar-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-11-B-0005
X 9B. DATED (SEE ITEM 11)
18-Feb-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Mar-2011
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 5TH STREET EAST
SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-11-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0006
A. CHANGES TO DRAWINGS
1. THE FOLLOWING LIST OF 4 DRAWINGS (IDENTIFIED BY SHEET ID NUMBER) ARE REVISED WITH
AMENDMENT 0006. DELETE PREVIOUS VERSIONS OF THESE DRAWINGS:
CD115
CD116
CD120
CS123
C604
CU107
2. THE FOLLOWING DRAWING IS DELETED FROM THE DRAWING SET WITH AMENDMENT 0006:
CU401
3. THE FOLLOWING REFERENCE DRAWINGS ARE ADDED WITH AMENDMENT 0006:
Phase 3 Real Estate Drawings (Parts 1 & 2)‐Half Size (11x17) only.
4. THE FOLLOWING DRAWINGS ARE REVISED BY TEXT WITH AMENDMENT 0006:
CS118
The callout “8” Sanitary” in Quadrant A3 shall be changed to “6” Sanitary”.
SJ104
Dimension H shown on Sheet SJ104 in Quadrant B4 shall be changed from 19’‐4 ½” to 16’‐8”.
SL103
Dimension H shown on Sheet SL103 in Quadrant B4 shall be changed from 19’‐4 ½” to 12’
SL201
Horizontal bars are not shown for clarity on SL201. To clarify the dimension notes in Quadrant A3 and Quadrant A5 “#5 Bars spaced @ 48” (TYP)”, this note applied to the entire height of the masonry building and is applicable to all four walls shown on SL201.
The louvers shown in Quadrants B1 and B4 on Sheet SL201 can be made larger (up to 32” x 32”) to fit the block opening. The exact location of the louver can be shifted to fit the block opening. Any change in size and/or location must be coordinated with HVAC manufacture.
The louver lintels shown in Quadrants B1 and B4 on Sheet SL201 shall be a minimum of 8” longer than the masonry opening. The louver lintel shall extend a minimum of 4” on either of the opening.
For clarity bond beams were not shown on Sheet SL201 in Quadrants D1 & B4 along the Rake Edge.
Refer to Detail 2 on Sheet SS506.
For clarity bond beams were not shown on Sheet SJ201 in Quadrants D1 & D4 along the Rake Edge.
Refer to Detail 2 on Sheet SS506.
SL301
The dimensions 11’ ‐ 3 5/8” shown on SL301 in Quadrants C3 and C5 shall be changed to 12’.
B. SUMMARY OF SPECIFICATION CHANGES
Note: Specification deletions are shown as strikethrough, additions are shown as underlined.
1. SECTION 01 14 00.00 13 WORK RESTRICTIONS
a. Revise Paragraph 3.1.1 as follows:
The contractor shall coordinate all utility relocation requirements and make payment to with the utility companies. for all services, fees, and permits required to relocate and reestablish service. The contractor shall be responsible for all costs related to protecting existing utilities.
b. Add paragraph 1.2.6 Golf Course/Eagle Bend Reach Structure Demolition
House at Sta C 22+00 will not be removed by others until 15 July 2011.
Homes between Sta C 52+00 and C 67+00 will not be removed by others until 15 July 2011.
The contractor shall provide to the COR 30 days notice prior to start of demolition of the Golf Course Clubhouse located at Sta. C 91+00.
c. Add paragraph 1.2.7 Lakewood Reach Haul Route Restriction
Sta D37+75 to D49+67 is shown in the plans as an area that no embankment work is required.
This area, as well as all of Woodglen Drive, shall not be used as a haul route.
2. SECTION 01 22 00.00 13 MEASUREMENT AND PAYMENT
Delete the following paragraph in its entirety: Paragraph 1.6.5 Sanitary Sewer Lift Station New, LS, Lump Sum, and insert Not Used
3. SECTION 01 33 00 SUBMITTAL PROCEDURES
Delete all submittals for Section 33 32 13.13.
4. SECTION 02 41 00 DEMOLITION
A revised Utilities Demolotion Table is being added with this amendment.
5. SECTION 05 50 15 CIVIL WORKS FABRICATIONS
Revise Paragraph 2.2.5 Ladder Rungs, Grab Bars as follows:
Fabricate Ladder rungs, grab bars, from stainless galvanized steel rods in accordance with the details.
6. SECTION 26 24 19.01 PUMP CONTROLS FOR LAKEWOOD PUMP
STATION
Revise Paragraph 1.2.1, Intent of Specification, as follows:
The Contractor shall furnish the equipment and place into operation a pump control system designed to automatically operate the pumps and monitor the facilities physical condition as described herein. It is not the intent of this section to limit the equipment to any specific brand, an equal system approved by the government shall be acceptable. The intent is to have the control system at the pump station communicate pump station status with the existing Water Treatment Plant (WTP) at Devils Lake. The current system installed at the WTP is an Allen Bradley Controllogix 1756-L61, utilizing Allen Bradley serial DF1 Half Duplex communications through a GE MDS SD4 master station radio.
7. SECTION 26 24 19.02 PUMP CONTROLS FOR HIGHWAY 20 PUMP
STATION
Add Paragraph 1.3, Intent of Specification:
1.3. Intent of Specification
The Contractor shall furnish the equipment and place into operation a pump control system designed to automatically operate the pumps and monitor the facilities physical condition as described herein. It is not the intent of this section to limit the equipment to any specific brand, an equal system approved by the government shall be acceptable. The intent is to have the control system at the pump station communicate pump station status with the existing Water Treatment Plant (WTP) at Devils Lake. The current system I nstalled at the WTP is an Allen Bradley Controllogix 1756-L61, utilizing Allen Bradley serial DF1 Half Duplex communications through a GE MDS SD4 master station radio.
8. SECTION 27 33 31.00 10 ONE-WAY FM RADIO CONTROL SYSTEM
Section is added as part of this amendment
9. SECTION 33 11 01 WATER DISTRIBUTION
a. Water Distribution quantities table is revised as follows:
Heading on page 2: Lakewood Lakeshore Drive Crossing Sta C 44+65
CU107 10” HDPE Casing Pipe 8” HDPE Casing Pipe 220 LF SDR 11 SDR 17
CU107 6” HDPE Water Main 4” HDPE Water Main 438 LF
CU107 6” HDPE Water Main 4” HDPE Water Main 660 LF Directional Bore SDR 11
CU107 6” Gate Valve & Box 4” Gate Valve & Box 4 EA
b. Revise paragraph 2.3 Polyvinyl Chloride (PVC) Plastic Piping as follows:
Delete second paragraph and replace as follows:
Polyvinyl Chloride (PVC) Plastic Piping: Less than 4 inch diameter, ASTM D 1785, Schedule 40; or ASTM D 2241, with SDR as necessary to provide 150 psi minimum pressure rating. Diameter 4 inch and larger, AWWA C900 with SDR as necessary to provide 150 psi minimum pressure rating.
Fittings, ASTM D 2466 or ASTM D 2467. Pipe and fittings shall be of the same PVC plastic material and shall be one of the following pipe/ fitting combinations, as marked on the pipe and fitting, respectively: PVC 1120/PVC I; PVC 1220/PVC 12; PVC 2120/PVC II; PVC 2116/PVC II. Solvent cement for jointing, ASTM D 2564. Pipe couplings, when used shall be tested as required by ASTM D 2464.
Pipe shall be manufactured of Class 12454-B Polyvinyl Chloride Compound, 2000 psi design stress for water a 73.4 degrees F. and shall conform to ASTM D-1784 compound specifications. All pipe shall conform to the requirements of ASTM D-2241. Pipe shall have SDR as necessary to provide a maximum working pressure of 200 psi. Provide elastomeric seal joints of the twin gasket or integral bell type conforming to ASTM D 3139. Gaskets shall comply with ASTM F 477. Twin gasket couplings shall have a positive stop in the center that will automatically position the pipe ends within the coupling. The pressure rating of the couplings shall equal or exceed that of the pipe and shall be marked on each coupling. Fittings for 5-inch and smaller diameter PVC pipe shall be PVC gasket joint fitting designed for use with ASTM D2241 pipe. Fittings shall be of the same material as the pipe, have a pressure rating no less than the adjoining pipe.
Fittings for 6-inch and larger PVC pipe shall be Ductile-Iron. Size bells specifically for OD of the ASTM PVC pipe including rubber-ring retaining groove.
10. SECTION 33 11 01 SANITARY SEWERS
a. Revise Paragraph 3.3 as follows:
Contractor shall replace existing Hydromatic submersible sewage pumps Model S3HRC.
with Hydromatic Model S3HRC, 2HP, 230 Volt, 1 Phase motors or equal. Pumps shall produce 40 gpm at 30 25 feet TDH, with minimum pump efficiency of 30%.
b. Sanitary Sewer quantities table is revised as follows:
CU107 4” HDPE Force Main 1,394 LF 220 LF 800’ Directional Bore from LS to Embankment
CU107 2” HDPE Force Main 824 LF
CU107 48” Dia. Manholes 3 EA 1 EA
CU107 8” PVC Sanitary Sewer Main 88 FT at LS
C107 Manual Air Relief Valves 1 EA At High Embankment Crossing
CU107 Link Seal 3 EA 1 EA Seals for Casing
11. SECTION 33 32 13.13 DUPLEX PACKAGED SEWAGE LIFT STATIONS
Delete section in its entirety.
12. SECTION 35 31 19.00 13 SLOPE PROTECTION
Revise Paragraph 2.3.3, Seams, as follows:
Sew the seams of the geotextile with thread of a material meeting the chemical requirements given above for geotextile yarn or bond the seams by cementing or by heat. Attach the sheets of geotextile at the factory or another approved location, if necessary, to form sections not less than 17 feet wide. Test seams in accordance with method ASTM D 4884 4632. The strength of the seam shall be not less than 90 percent of the required grab tensile strength of the unaged geotextile in any principal direction.
C. NOTES TO BIDDERS CHANGE
SECTION 00 01 00, Add the following Bid Note to Notes to Bidders:
13 . This solicitation contains the U.S. Department of Labor's Davis-Bacon wage decision number ND100015. That wage decision specifies the minimum compensation (in terms of wages and fringe benefits) that must be paid to Davis-Bacon covered employees working on this contract. The wage rates and fringe benefits identified in the wage decision are not necessarily reflective of the current market conditions in the area of the project. The Government does not warrant, and offerors should not assume, that labor can be obtained at the rates identified in the Davis-Bacon wage decision. In preparing its bid or proposal, each offeror must verify to its own satisfaction its assumptions regarding the cost of labor for this project.
D. SUMMARY OF BID SCHEDULE CHANGES
Delete the following: CLIN 0008 Sanitary Sewer Lift Station New
SECTION 00 01 00 - SOLICITATION CONTRACT FORM
The following have been modified:
BID SCHEDULE
Devils Lake Phase 3 Bid Schedule
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
Base Requirement ‐ Eagle Bend, Golf Course
0001 Performance And Payment Bonds 1.00 LS ____________._____ ____________._____
Demolition Eagle Bend Pump Station 1.00 LS ____________._____ ____________._____
0003 Demolition Utilities 1.00 LS ____________._____ ____________._____
Demolition Aggregate And Bituminous Pavement 1.00 LS ____________._____ ____________._____
0005 Demolition Buildings 1.00 LS ____________._____ ____________._____
0006 Water Distribution 1.00 LS ____________._____ ____________._____
0007 Sanitary Sewers 1.00 LS ____________._____ ____________._____
0008 CLIN DELETED
0009 Clearing And Grubbing 1.00 LS ____________._____ ____________._____
0010 Stripping
0010AA First 43350 CY 43,350.00 CY ____________._____ ____________._____
0010AB Over 43350 CY 10,840.00 CY ____________._____ ____________._____
0011 Excavation
0011AA First 21770 CY 21,770.00 CY ____________._____ ____________._____
0011AB Over 21770 CY 5,440.00 CY ____________._____ ____________._____
0012 Marl Inspection Trench
0012AA First 510 CY 510.00 CY ____________._____ ____________._____
0012AB Over 510 CY 130.00 CY ____________._____ ____________._____
Marl Subgrade Correction Method
0013AA First 4720 CY 4,720.00 CY ____________._____ ____________._____
0013AB Over 4720 CY 7,080.00 CY ____________._____ ____________._____
Marl Subgrade Correction Method 2 Granular Fill
0014AA First 3190 CY 3,190.00 CY ____________._____ ____________._____
0014AB Over 3190 CY 4,790.00 CY ____________._____ ____________._____
Marl Subgrade Correction Method 2 Geotextile Fabric
0015AA First 63680 SF 63,680.00 SF ____________._____ ____________._____
0015AB Over 63680 SF 95,520.00 SF ____________._____ ____________._____
0016 Impervious Fill
0016AA First 125690 CY 125,690.00 CY ____________._____ ____________._____
0016AB Over 125690 CY 31,420.00 CY ____________._____ ____________._____
0017 Select Impervious Fill
0017AA First 215920 CY 215,920.00 CY ____________._____ ____________._____
0017AB Over 215920 CY 53,980.00 CY ____________._____ ____________._____
0018 Random Fill
0018AA First 7560 CY 7,560.00 CY ____________._____ ____________._____
0018AB Over 7560 CY 1,890.00 CY ____________._____ ____________._____
0019 Filter Stone 4,510.00 CY ____________._____ ____________._____
0020 Sand Drain 61,470.00 CY ____________._____ ____________._____
0021 Soil‐Bentonite (S‐B) Slurry Trench
0021AA First 256330 SF 256,330.00 SF ____________._____ ____________._____
0021AB Over 256330 SF 64,080.00 SF ____________._____ ____________._____
0022 Bedding Gradation 2
0022AA First 12110 TON 12,110.00 TON ____________._____ ____________._____
0022AB Over 12110 TON 3,030.00 TON ____________._____ ____________._____
0023 Riprap Gradation 2
0023AA First 27990 TON 27,990.00 TON ____________._____ ____________._____
0023AB Over 27990 TON 7,000.00 TON ____________._____ ____________._____
0024 Geotextile Fabric
0024AA First 377740 SF 377,740.00 SF ____________._____ ____________._____
0024AB Over 377740 SF 94,430.00 SF ____________._____ ____________._____
0025 Aggregate Base Course 3,440.00 TON ____________._____ ____________._____
0026 Topsoil and Seed 30.90 AC ____________._____ ____________._____
0027 Gates and Timber Posts 1.00 LS ____________._____ ____________._____
0028 Instrumentation 1.00 LS ____________._____ ____________._____
0029 Bituminous Pavement 460.00 TN ____________._____ ____________._____
0030 Traffic Control Signs 1.00 LS ____________._____ ____________._____
0031 Interior Drainage Culverts 1.00 LS ____________._____ ____________._____
0032 Spare Pumps 1.00 LS ____________._____ ____________._____
Total Amount Basic Requirement ____________._____
Option 1 ‐ Airport
1001 Performance And Payment Bonds 1.00 LS ____________._____ ____________._____
1002 Demolition Utilities 1.00 LS ____________._____ ____________._____
1003 Water Distribution 1.00 LS ____________._____ ____________._____
1004 Clearing And Grubbing 1.00 LS ____________._____ ____________._____
1005 Stripping
1005AA First 19340 CY 19,340.00 CY ____________._____ ____________._____
1005AB Over 19340 CY 4,830.00 CY ____________._____ ____________._____
1006 Excavation
1006AA First 96480 CY 96,480.00 CY ____________._____ ____________._____
1006AB Over 96480 CY 24,120.00 CY ____________._____ ____________._____
1007 Impervious Fill
1007AA First 79140 CY 79,140.00 CY ____________._____ ____________._____
1007AB Over 79140 CY 19,790.00 CY ____________._____ ____________._____
1008 Select Impervious Fill
1008AA First 82420 CY 82,420.00 CY ____________._____ ____________._____
1008AB Over 82420 CY 20,600.00 CY ____________._____ ____________._____
1009 Random Fill
1009AA First 2050 CY 2,050.00 CY ____________._____ ____________._____
1009AB Over 2050 CY 510.00 CY ____________._____ ____________._____
1010 Filter Stone 2,630.00 CY ____________._____ ____________._____
1011 Sand Drain 25,920.00 CY ____________._____ ____________._____
1012 Bedding Gradation 1
1012AA First 6830 TON 6,830.00 TON ____________._____ ____________._____
1012AB Over 6830 TON 1,710.00 TON ____________._____ ____________._____
1013 Riprap Gradation 1
1013AA First 18190 TON 18,190.00 TON ____________._____ ____________._____
1013AB Over 18190 TON 4,550.00 TON ____________._____ ____________._____
1014 Geotextile Fabric
1014AA First 247380 SF 247,380.00 SF ____________._____ ____________._____
1014AB Over 247380 SF 61,840.00 SF ____________._____ ____________._____
1015 Aggregate Base Course 13,340.00 TON ____________._____ ____________._____
1016 Topsoil and Seed 34.30 AC ____________._____ ____________._____
1017 Traffic Control Signs 1.00 LS ____________._____ ____________._____
1018 Interior Drainage Culverts 1.00 LS ____________._____ ____________._____
Total Amount Option 1 ‐ Airport ____________._____
Option 2 ‐ Lakewood
2001 Performance And Payment Bonds 1.00 LS ____________._____ ____________._____
2002 Demolition Utilities 1.00 LS ____________._____ ____________._____
Demolition Aggregate And Bituminous Pavement 1.00 LS ____________._____ ____________._____
2004 Demolition Buildings 1.00 LS ____________._____ ____________._____
2005 Water Distribution 1.00 LS ____________._____ ____________._____
2006 Sanitary Sewers 1.00 LS ____________._____ ____________._____
Sanitary Sewer Lift Station Reconstruct 1.00 LS ____________._____ ____________._____
2008 Clearing And Grubbing 1.00 LS ____________._____ ____________._____
2009 Stripping
2009AA First 12710 CY 12,710.00 CY ____________._____ ____________._____
2009AB Over 12710 CY 3,180.00 CY ____________._____ ____________._____
2010 Excavation
2010AA First 22550 CY 22,550.00 CY ____________._____ ____________._____
2010AB Over 22550 CY 5,640.00 CY ____________._____ ____________._____
2011 Impervious Fill
2011AA First 18750 CY 18,750.00 CY ____________._____ ____________._____
2011AB Over 18750 CY 4,690.00 CY ____________._____ ____________._____
2012 Select Impervious Fill
2012AA First 45790 CY 45,790.00 CY ____________._____ ____________._____
2012AB Over 45790 CY 11,450.00 CY ____________._____ ____________._____
2013 Random Fill
2013AA First 8000 CY 8,000.00 CY ____________._____ ____________._____
2013AB Over 8000 CY 2,000.00 CY ____________._____ ____________._____
2014 Filter Stone 940.00 CY ____________._____ ____________._____
2015 Sand Drain 8,600.00 CY ____________._____ ____________._____
2016 Sand Trench Drain 1.00 LS ____________._____ ____________._____
2017 Soil‐Bentonite (S‐B) Slurry Trench
2017AA First 4480 SF 4,480.00 SF ____________._____ ____________._____
2017AB Over 4480 SF 1,120.00 SF ____________._____ ____________._____
2018 Bedding Gradation 3
2018AA First 8580 TON 8,580.00 TON ____________._____ ____________._____
2018AB Over 8580 TON 2,140.00 TON ____________._____ ____________._____
2019 Bedding Gradation 2
2019AA First 1610 TON 1,610.00 TON ____________._____ ____________._____
2019AB Over 1610 TON 400.00 TON ____________._____ ____________._____
2020 Riprap Gradation 3
2020AA First 17430 TON 17,430.00 TON ____________._____ ____________._____
2020AB Over 17430 TON 4,360.00 TON ____________._____ ____________._____
2021 Riprap Gradation 2
2021AA First 3250 TON 3,250.00 TON ____________._____ ____________._____
2021AB Over 3250 TON 810.00 TON ____________._____ ____________._____
2022 Geotextile Fabric
2022AA First 154580 SF 154,580.00 SF ____________._____ ____________._____
2022AB Over 154580 SF 38,650.00 SF ____________._____ ____________._____
2023 Aggregate Base Course 2,790.00 TON ____________._____ ____________._____
2024 Aggregate Surface Course 660.00 TON ____________._____ ____________._____
Concrete Driveway With Crushed Concrete Base 1.00 LS ____________._____ ____________._____
2026 Topsoil and Seed 5.20 AC ____________._____ ____________._____
2027 Gates and Timber Posts 1.00 LS ____________._____ ____________._____
2028 Fence 1.00 LS ____________._____ ____________._____
2029 Bituminous Pavement 860.00 TN ____________._____ ____________._____
2030 Traffic Control Signs 1.00 LS ____________._____ ____________._____
2031 Interior Drainage Culverts 1.00 LS ____________._____ ____________._____
2032 Lakewood Pump Station 1.00 LS ____________._____ ____________._____
2033 Lakewood Gatewell 1.00 LS ____________._____ ____________._____
2034 Lakewood 30" Rcp 1.00 LS ____________._____ ____________._____
2035 Lakewood 42" Rcp 1.00 LS ____________._____ ____________._____
2036 Lakewood Outlet Apron 1.00 LS ____________._____ ____________._____
2037 Lakewood Electrical Service 1.00 LS ____________._____ ____________._____
2038 Lakewood Electrical Work 1.00 LS ____________._____ ____________._____
2039 Lakewood Pumps, Piping, Valves 1.00 LS ____________._____ ____________._____
2040 Lakewood Mechanical Work 1.00 LS ____________._____ ____________._____
2041 Lakewood Sluice Gates 1.00 LS ____________._____ ____________._____
2042 Lakewood Cofferdam 1.00 LS ____________._____ ____________._____
Total Amount Option 2 ‐Lakewood ____________._____
Option 3 ‐ North Tieback, East End
3001 Performance And Payment Bonds 1.00 LS ____________._____ ____________._____
3002 Demolition Utilities 1.00 LS ____________._____ ____________._____
Demolition Aggregate And Bituminous Pavement 1.00 LS ____________._____ ____________._____
3004 Demolition Buildings 1.00 LS ____________._____ ____________._____
3005 Water Distribution 1.00 LS ____________._____ ____________._____
3006 Clearing And Grubbing 1.00 LS ____________._____ ____________._____
3007 Stripping
3007AA First 26700 CY 26,700.00 CY ____________._____ ____________._____
3007AB Over 26700 CY 6,680.00 CY ____________._____ ____________._____
3008 Excavation
3008AA First 26230 CY 26,230.00 CY ____________._____ ____________._____
3008AB Over 26230 CY 6,560.00 CY ____________._____ ____________._____
3009 Impervious Fill
3009AA First 47840 CY 47,840.00 CY ____________._____ ____________._____
3009AB Over 47840 CY 11,960.00 CY ____________._____ ____________._____
3010 Select Impervious Fill
3010AA First 130330 CY 130,330.00 CY ____________._____ ____________._____
3010AB Over 130330 CY 32,580.00 CY ____________._____ ____________._____
3011 Random Fill
3011AA First 12020 CY 12,020.00 CY ____________._____ ____________._____
3011AB Over 12020 CY 3,000.00 CY ____________._____ ____________._____
3012 Filter Stone 2,100.00 CY ____________._____ ____________._____
3013 Sand Drain 26,580.00 CY ____________._____ ____________._____
3014 Bedding Gradation 1
3014AA First 11700 TON 11,700.00 TON ____________._____ ____________._____
3014AB Over 11700 TON 2,920.00 TON ____________._____ ____________._____
3015 Riprap Gradation 1
3015AA First 15230 TON 15,230.00 TON ____________._____ ____________._____
3015AB Over 15230 TON 3,810.00 TON ____________._____ ____________._____
3016 Geotextile Fabric
3016AA First 369130 SF 369,130.00 SF ____________._____ ____________._____
3016AB Over 369130 SF 92,280.00 SF ____________._____ ____________._____
3017 Aggregate Base Course 2,190.00 TON ____________._____ ____________._____
3018 Aggregate Surface Course 820.00 TON ____________._____ ____________._____
3019 Topsoil and Seed 8.60 AC ____________._____ ____________._____
3020 Gates and Timber Posts 1.00 LS ____________._____ ____________._____
3021 Traffic Control Signs 1.00 LS ____________._____ ____________._____
3022 North Tie Back Cofferdam 1.00 LS ____________._____ ____________._____
Total Amount Option 3 ‐ North Tie Back, East End ____________._____
Option 4 ‐ Roberts
4001 Performance And Payment Bonds 1.00 LS ____________._____ ____________._____
4002 Demolition Buildings 1.00 LS ____________._____ ____________._____
4003 Clearing And Grubbing 1.00 LS ____________._____ ____________._____
4004 Stripping
4004AA First 32430 CY 32,430.00 CY ____________._____ ____________._____
4004AB Over 32430 CY 8,110.00 CY ____________._____ ____________._____
4005 Marl Inspection Trench
4005AA First 250 CY 250.00 CY ____________._____ ____________._____
4005AB Over 250 CY 60.00 CY ____________._____ ____________._____
Marl Subgrade Correction Method
4006AA First 5060 CY 5,060.00 CY ____________._____ ____________._____
4006AB Over 5060 CY 7,580.00 CY ____________._____ ____________._____
Marl Subgrade Correction Method 2 Granular Fill
4007AA First 4210 CY 4,210.00 CY ____________._____ ____________._____
4007AB Over 4210 CY 6,320.00 CY ____________._____ ____________._____
Marl Subgrade Correction Method 2 Geotextile Fabric
4008AA First 68250 SF 68,250.00 SF ____________._____ ____________._____
4008AB Over 68250 SF 102,380.00 SF ____________._____ ____________._____
4009 Impervious Fill
4009AA First 55230 CY 55,230.00 CY ____________._____ ____________._____
4009AB Over 55230 CY 13,810.00 CY ____________._____ ____________._____
4010 Select Impervious Fill
4010AA First 129440 CY 129,440.00 CY ____________._____ ____________._____
4010AB Over 129440 CY 32,360.00 CY ____________._____ ____________._____
4011 Random Fill
4011AA First 380 CY 380.00 CY ____________._____ ____________._____
4011AB Over 380 CY 100.00 CY ____________._____ ____________._____
4012 Filter Stone 930.00 CY ____________._____ ____________._____
4013 Sand Drain 51,250.00 CY ____________._____ ____________._____
4014 Bedding Gradation 1
4014AA First 4170 TON 4,170.00 TON ____________._____ ____________._____
4014AB Over 4170 TON 1,040.00 TON ____________._____ ____________._____
4015 Riprap Gradation 1
4015AA First 8160 TON 8,160.00 TON ____________._____ ____________._____
4015AB Over 8160 TON 2,040.00 TON ____________._____ ____________._____
4016 Geotextile Fabric
4016AA First 121480 SF 121,480.00 SF ____________._____ ____________._____
4016AB Over 121480 SF 30,370.00 SF ____________._____ ____________._____
4017 Aggregate Base Course 1,190.00 TON ____________._____ ____________._____
4018 Aggregate Surface Course 220.00 TON ____________._____ ____________._____
4019 Topsoil and Seed 16.00 AC ____________._____ ____________._____
4020 Fence 1.00 LS ____________._____ ____________._____
4021 Instrumentation 1.00 LS ____________._____ ____________._____
4022 Highway 20 Pump Station 1.00 LS ____________._____ ____________._____
Highway 20 Pump Station Modification 1.00 LS ____________._____ ____________._____
4024 Highway 20 Drop Inlet 1.00 LS ____________._____ ____________._____
4025 Highway 20 Manhole 1.00 LS ____________._____ ____________._____
4026 Highway 20 36" Rcp 1.00 LS ____________._____ ____________._____
4027 Highway 20 42" Rcp 1.00 LS ____________._____ ____________._____
4028 Highway 20 Electrical Service 1.00 LS ____________._____ ____________._____
4029 Highway 20 Electrical Work 1.00 LS ____________._____ ____________._____
4030 Highway 20 Pumps, Piping, Valves 1.00 LS ____________._____ ____________._____
4031 Highway 20 Mechanical Work 1.00 LS ____________._____ ____________._____
4032 Highway 20 Sluice Gates 1.00 LS ____________._____ ____________._____
Total Amount Option 4 ‐ Roberts ____________._____
Total Amount Base Requirement Plus All 4 Options ______________._____
(End of Summary of Changes)