35 73 13 PLACEMENT AND COMPACTION REQUIREMENTS FOR FILL.pdf

PDF 57 KB Posted

Attached to
Devils Lake Flood Risk Management Phase 3 Embankments construction project Federal contract opportunity
Solicitation number
W912ES-11-B-0005
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

35 73 13 PLACEMENT AND COMPACTION REQUIREMENTS FOR FILL

View the file

Other files for this federal contract opportunity

Other files attached to Devils Lake Flood Risk Management Phase 3 Embankments construction project, newest first.
File Type Posted
DL Phase 3 Revised abstract.pdf PDF
DL PHASE 3 BID ABSTRACT.pdf PDF
DEMO Table REV.pdf PDF
Devils Lake Phase 3 Amendment 0007 032511.pdf PDF
Devils Lake Phase 3 Amendment 0006 032411.pdf PDF
DLCEP3_REALESTATE_PART1.pdf PDF
DLCEP3_CD115.pdf PDF
27 33 31_00 10.pdf PDF
DLCEP3_CS123.pdf PDF
DLCEP3_CU107.pdf PDF
DLCEP3_C604.pdf PDF
DLCEP3_CD116.pdf PDF
DLCEP3_CD115.pdf PDF
DLCEP3_CD120.pdf PDF
DLCEP3_REALESTATE_PART2.pdf PDF
DLCEP3_CD116.pdf PDF
DLCEP3_CD120 .pdf PDF
DEMO Table.pdf PDF
DLCEP3_C604.pdf PDF
DLCEP3_CS123.pdf PDF
Devils Lake Phase 3 Amendment 0005 032111.pdf PDF
Devils Lake Phase 3 Amendment 0004 031811.pdf PDF
Devils Lake Phase 3 Amendment 0003 031711.pdf PDF
11-B-0005_fullsize_amd3.pdf PDF
11-B-0005_halfsize_amd3.pdf PDF
11-B-0005_halfsize_amend2_part_a.pdf PDF
01 33 00 ENG 4288 REGISTER.pdf PDF
11-B-0005_halfsize_amend2_part_b.pdf PDF
11-B-0005_fullsize_amend2_part_a.pdf PDF
01 22 00 00 13.pdf PDF
11-B-0005 Amendment 0002.doc DOC document
35 73 13.pdf PDF
11-B-0005_fullsize_amend2_part_b.pdf PDF
Mar 8 site visit sign-in sheet.pdf PDF
Mar 1 site visit sign-in sheet.pdf PDF
Devils Lake Phase 3 Amendment 0001.doc DOC document
11-B-0005_DLCEP3_11x17_references.pdf PDF
11-B-0005_DLCEP3_11x17_part1b.pdf PDF
11-B-0005_DLCEP3_11x17_part3a.pdf PDF
11-B-0005_DLCEP3_11x17_part4.pdf PDF
11-B-0005_DLCEP3_11x17_part2.pdf PDF
11-B-0005_DLCEP3_11x17_part3b.pdf PDF
11-B-0005_DLCEP3_11x17_part1a.pdf PDF
Devils Lake Ph3 SolicitationW912ES-11-B-0005 FINAL .pdf PDF
11-B-0005_DLCEP3_22x34_part3b.pdf PDF
11-B-0005_DLCEP3_22x34_part1a.pdf PDF
11-B-0005_DLCEP3_22x34_part3a.pdf PDF
11-B-0005_DLCEP3_22x34_part2.pdf PDF
11-B-0005_DLCEP3_22x34_part1b.pdf PDF
11-B-0005_DLCEP3_22x34_part4.pdf PDF
Show all 50

Devils Lake Flood Risk Management Phase 3 Embankments construction project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cohesionless N/A 100

Cohesive

Marl

↓ Equipment Type ↓

Tamping Rollers Select Impervious or Impervious Fill 9 95

Rubber-tired Rollers Select Impervious or Impervious Fill 12 95

Hand operated compactors

Select Impervious or Impervious Fill 6 95

Sand Drain Cohesionless 15 95

Filter Stone

Under Riprap

(When required)

Sand 15 90

Filter Stone

Cohesionless 9 100

Cohesive 6 95

Cohesionless 12 95

Cohesive 8 90

Cohesionless 6 95

Cohesive 4 90

Cohesionless 12 95

Cohesive 8 90

Cohesionless 12 95

Cohesive 8 90

Random Fill

General Grading

Cofferdam Earthwork shall comply with the general requirements of SECTION

35 73 13 EARTHWORK.

Sand Trench Drain Controlled movement of dumping and spreading equipment.

S t r u c t u r e s

Building Subgrades ‐ Floor

Slabs and Steps

Building Backfill

Hand operated compactors

Fill with earth similar to the adjacent material and then compact to a density equal to the adjacent in place material.

PLACEMENT & COMPACTION REQUIREMENTS FOR FILL

Fill Zone Soil Type Maximum

Uncompacted Lift

Thickness (inches)

Percent of Standard

Proctor Density

(ASTM D698)

Embankment Foundation

(Subgrade Preparation)

Proof rolled with rubber tired equipment and any soft areas shall be brought to the CO's attention.

See paragraph 3.11.2 for Marl subgrade correction

E m b a n k m e n t Controlled movement of dumping and spreading equipment.