01 33 00 ENG 4288 REGISTER.pdf
PDF 162 KB Posted
- Attached to
- Devils Lake Flood Risk Management Phase 3 Embankments construction project Federal contract opportunity
- Solicitation number
- W912ES-11-B-0005
About this file
01 33 00 ENG 4288 REGISTER
View the file
Other files for this federal contract opportunity
Show all 50
Devils Lake Flood Risk Management Phase 3 Embankments construction project has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 34 PAGES
W912ES-11-B-0005
Devils Lake City Embankments, Phase 3
01 32 01.00 13 SD-01 Preconstruction Submittals
3.4.1 G COInitial Project Schedule
3.4.2 G COPeriodic Updates
SD-04 Samples 2.1Software
01 35 29.00 13 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
1.7 GActivity Hazard Analysis (AHA)
GCrane Critical Lift Plan GProof of qualification for Crane
Operators SD-06 Test Reports
1.11Reports 1.11.2Monthly Exposure Reports 1.11.1Accident Reports
Crane Reports SD-07 Certificates Confined Space Entry Permit Hot work permit Certificate of Compliance
01 41 26.00 13 SD-01 Preconstruction Submittals 1.4.3Notice of Intent (NOI)
SD-02 Shop Drawings 2.3Temporary Erosion And
Sediment Control Plan 01 45 04.00 13 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 34 PAGES
Devils Lake City Embankments, Phase 3
01 45 04.00 13 3.2 GQuality Control Plan (QCP)
3.6.2.1 GQuality Management Manual
01 50 02.00 13 SD-02 Shop Drawings
1.3.1 GSite Plan
SD-04 Samples
1.9 GSafety Fencing
01 57 20.00 13 SD-01 Preconstruction Submittals
1.7 G ENVEnvironmental Protection Plan
01 71 23.00 13 SD-01 Preconstruction Submittals
3.3 GSurvey Text Files
01 78 02.00 10 SD-11 Closeout Submittals
1.2 G GENAs-Built Drawings
02 41 00 SD-01 Preconstruction Submittals
1.6.1 GExisting Conditions
SD-07 Certificates GNotifications
3.1.3.3 GGrout in Place
1.9 GDemolition Plan
3.4.1 GDisposal Plan
03 11 13.00 10 SD-02 Shop Drawings GFormwork
SD-03 Product Data Design
2.1Form Materials 2.1.5Form Releasing Agents
03 15 13.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 34 PAGES
Devils Lake City Embankments, Phase 3
03 15 13.00 10 2.4 GWaterstops SD-03 Product Data
2.2 GPreformed Expansion Joint Filler
2.3 GSealant
2.4 GWaterstops
SD-04 Samples Lubricant for Preformed Compression Seals
2.3.3Field-Molded Type 2.4.1Non-metallic Materials
SD-07 Certificates
2.2 GPreformed Expansion Joint Filler
2.3 GSealant
2.4 GWaterstops
03 20 01.00 10 SD-02 Shop Drawings
3.1 GReinforcement
SD-07 Certificates 2.2Reinforcing Steel
03 22 70.01 SD-01 Preconstruction Submittals On-Site Batching and Mixing Water Reducing Concrete Mixture Proportions
SD-07 Certificates Placing
SD-08 Manufacturer’s Instructions Concrete Mixture Proportions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 34 PAGES
Devils Lake City Embankments, Phase 3
03 22 70.01 SD-09 Manufacturer’s Field Reports CLSM Mixture Proportions Tests Cement Aggregates
03 22 70 SD-01 Preconstruction Submittals GFlowable Fill Plan
SD-02 Shop Drawings GDetail Drawings
SD-06 Test Reports Design Mix
SD-07 Certificates Manufacturer's Certificates
03 31 00.00 10 SD-01 Preconstruction Submittals
3.1 G MATConcrete Operation Plan
3.7.3 G MATCold Weather Plan
3.7.4 G MATHot Weather Plan
Joint Treatment Plan 3.15Epoxy Resins
SD-02 Shop Drawings
1.4 G STRShop Drawings
SD-03 Product Data G MATConcrete Mixture Design
SD-06 Test Reports GQuality of Aggregates
MAT
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 34 PAGES
Devils Lake City Embankments, Phase 3
03 31 00.00 10 SD-07 Certificates Manufacturer's Certificates
1.5Qualifications 04 20 00 SD-02 Shop Drawings
1.4.3 GDetail Drawings
SD-03 Product Data
2.1 GConcrete Masonry Units (CMU)
GInsulation
2.5 GFlashing
GWater-Repellant Admixture
1.6.1 GHot Weather Installation
1.6.2 GCold Weather Installation
SD-04 Samples
2.1 GConcrete Masonry Units (CMU)
GAnchors, Ties, and Bar Positioners
GExpansion-Joint Materials GJoint Reinforcement GInsulation
1.4.2 GPortable Panel
SD-06 Test Reports
3.12.1 GField Testing of Mortar
3.12.2 GField Testing of Grout
2.2.3 GMasonry Cement
GField Testing of Core-Fill Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 34 PAGES
Devils Lake City Embankments, Phase 3
04 20 00 SD-07 Certificates 2.1Concrete Masonry Units (CMU) 2.4Control Joint Keys
Anchors, Ties, and Bar Positioners
Expansion-Joint Materials Joint Reinforcement
2.3Reinforcing Steel Bars and Rods 2.2.3Masonry Cement
Mortar Coloring Insulation Warranty Precast Concrete Items Admixtures for Masonry Mortar Admixtures for Grout qualifications
SD-08 Manufacturer’s Instructions 2.2.3Masonry Cement
Insulation 05 21 16 SD-01 Preconstruction Submittals
1.4.2Welder qualification 1.4.2Material Safety Data Sheet
SD-02 Shop Drawings
1.4.1 GLongspan Steel Joist Framing
SD-06 Test Reports 3.4Erection inspection 3.4Welding inspections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 34 PAGES
Devils Lake City Embankments, Phase 3
05 21 16 SD-07 Certificates 1.4.1Accessories 1.4.2Certification of Compliance
05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings 2.3.1.1Ridge and Valley Plates 2.3.1.2Metal Closure Strips
SD-03 Product Data 2.2Accessories 2.3Metal Roof Deck Units 2.1.5Galvanizing Repair Paint 2.1.4Joint Sealant Material 1.3.2Piston Tool Operator 2.3.3Repair Paint 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
SD-04 Samples 2.3Metal Roof Deck Units 2.1.6Flexible Closure Strips 2.3Flexible Closure Strips
SD-05 Design Data 2.3Metal Roof Deck Units
SD-07 Certificates 1.3.3Welding Procedures 1.3.4.1Fire Safety
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 34 PAGES
Devils Lake City Embankments, Phase 3
05 30 00 1.3.4.2Wind Storm Resistance 05 50 14 SD-02 Shop Drawings
1.3.2 GDetail Drawings
SD-03 Product Data
2.2.2.1 GWelding of Structural Steel
2.2.2.2 GWelding of Aluminum
2.3.4 GStructural Steel Welding Repairs
2.1.1Materials List 2.1.2Shipping Bill
SD-06 Test Reports 2.3Tests, Inspections, and
Verifications SD-07 Certificates
1.3.1 GQualification of Welders and
Welding Operators
2.2.2.3 GApplication Qualification for Steel
Studs
2.2.2.2 GWelding of Aluminum
05 50 15 SD-02 Shop Drawings
2.1 GMiscellaneous Metals & Standard
Metal Articles
2.2 GShop Fabricated Metal Items
SD-03 Product Data
2.1 GMiscellaneous Metals & Standard
Metal Articles
2.2 GShop Fabricated Metal Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 34 PAGES
Devils Lake City Embankments, Phase 3
05 50 15 SD-04 Samples
2.2 GShop Fabricated Metal Items
SD-06 Test Reports
2.1 GMiscellaneous Metals & Standard
Metal Articles
2.2 GShop Fabricated Metal Items
06 10 00 SD-06 Test Reports
1.4.3 GPreservative-Treated
SD-07 Certificates
1.7 GPreservative treatment
07 11 13 SD-07 Certificates
1.3 GMaterials
07 22 00 SD-03 Product Data
2.2 GFasteners
2.1 GInsulation
SD-06 Test Reports 1.4Flame spread and smoke developed ratings SD-07 Certificates
1.3Qualifications SD-08 Manufacturer’s Instructions
2.2fasteners 2.1insulation
07 41 13 SD-02 Shop Drawings
1.4.5 GRoofing Panels
1.4.5 GFlashing and Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 34 PAGES
Devils Lake City Embankments, Phase 3
07 41 13 1.4.5 GGutter/Downspout Assembly SD-03 Product Data
2.1 GRoof panels
1.4.5 GFactory-Applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GPressure Sensitive Tape
2.6 GUnderlayments
2.7 GGaskets and Sealing/Insulating
Compounds GCoil Stock
SD-04 Samples
2.1 GRoof Panels
1.4.5 GFactory-applied Color Finish
1.4.5 GGaskets and Sealant/Insulating
Compounds SD-05 Design Data
1.2.1.2 GWind Uplift Resistance
SD-06 Test Reports
1.2.1.1 GLeakage Test Report
1.2.1.2 GWind Uplift Test Report
GFire Rating Test Report
2.2 GFactory Finish and Color
Performance Requirements SD-07 Certificates
2.1 GRoof Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 34 PAGES
Devils Lake City Embankments, Phase 3
07 41 13 GCoil stock compatibility
2.6.1 GSelf-Adhering Modified Bitumen
Underlayment
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions
GINSTALLATION MANUAL
SD-09 Manufacturer’s Field Reports
GManufacturer's Field Inspection Reports
SD-11 Closeout Submittals
1.8 GWarranties
3.9Information Card
GDate Of Installation Wall-Mounted Placard
07 60 00 SD-02 Shop Drawings
3.1.13 GCovering on Flat, Sloped, or
Curved Surfaces
3.1.10 GGutters
3.1.11 GDownspouts
3.1.8 GExpansion and Contraction Joints
3.1.12 GSplash Pads
3.1.9 GBase Flashing
07 72 00 SD-02 Shop Drawings
3.1 GRoof Ventilators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 34 PAGES
Devils Lake City Embankments, Phase 3
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond breakers
2.4 GBackstops
SD-07 Certificates 2.1Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.4 GFrames
SD-03 Product Data
2.1 GDoors
2.4 GFrames
08 34 19.10 20 SD-02 Shop Drawings
2.1 GOverhead Roll-up Doors
SD-03 Product Data
2.1 GOverhead Roll-up Doors
SD-08 Manufacturer’s Instructions 2.1Overhead Roll-up Doors
SD-10 Operation and Maintenance Data
2.1Overhead Roll-up Doors 08 71 00 SD-02 Shop Drawings
1.3 GHardware Schedule
2.3.2.4 GKeying System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 34 PAGES
Devils Lake City Embankments, Phase 3
08 71 00 2.3 GHardware Items SD-08 Manufacturer’s Instructions
3.1Installation SD-10 Operation and Maintenance Data
1.3 GHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting 08 91 00 SD-02 Shop Drawings
1.4 GWall louvers
SD-03 Product Data
2.2 GMetal Wall Louvers
SD-04 Samples
2.4 GFinishes
1.5 GColor Samples
10 14 01 SD-02 Shop Drawings GApproved Detail Drawings
SD-03 Product Data Modular Exterior Signage System
3.1Installation
1.3 GExterior Signage
1.4Wind Load Requirements
SD-04 Samples
1.3 GExterior Signage
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 34 PAGES
Devils Lake City Embankments, Phase 3
10 14 01 3.1.2Protection and Cleaning 22 06 00 SD-07 Certificates
1.4 GQualifications
Welders
3.11Waste Water Disposal Assistance and Training
1.6Delivery, Storage and Handling Materials and Equipment Installation
1.5Pipe Schedule Valve Schedule Check Valves PE Pipe Fusers
2.3Stilling Pipe Installation and Fabrication
SD-02 Shop Drawings
3.1.1 GPipe and Equipment
2.7 GFlap Valves
3.2 GPiping and Appurtenances
22 22 22 SD-02 Shop Drawings GOutline Drawings GCross Sections GCoating (Painting) GPump Capacity Curves GInstallation Details GWarranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 34 PAGES
Devils Lake City Embankments, Phase 3
22 22 22 GFactory Testing GDischarge Elbow GAccess Covers GPump Field Test Reports
23 00 00 SD-02 Shop Drawings
1.4.3 GDetail Drawings
SD-03 Product Data 2.1Standard Products
Dampers 2.8.3Louvers
Fans SD-07 Certificates
1.4.1Bolts SD-08 Manufacturer’s Instructions
3.3Manufacturer's Installation Instructions
SD-10 Operation and Maintenance Data
GDampers
2.8.3 GLouvers
GFans 23 82 46 SD-02 Shop Drawings
1.2Fabrication Drawings SD-03 Product Data
2.1Electric Unit Heaters 2.2Electric Unit Heaters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 34 PAGES
Devils Lake City Embankments, Phase 3
23 82 46 2.5Heating Element 2.6Controls 2.3Casings 2.7Propellers and Motors
SD-08 Manufacturer’s Instructions 1.2Manufacturer's Instructions
26 20 00 SD-02 Shop Drawings
2.15 GPanelboards
2.16 GTransformers
2.3Busway 2.22Wireways
3.1.7.1 GMarking strips
SD-03 Product Data
2.13 GReceptacles
2.15.3 GCircuit Breakers
2.16 GTransformers
2.11 GSwitches
2.23 GMeter base only
2.24 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.4 GGrounding system test
3.5.3 GGround-fault receptacle test
SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 34 PAGES
Devils Lake City Embankments, Phase 3
26 24 19.00 40 SD-02 Shop Drawings
2.4.2 GDrawings
2.2.1 GShop Drawings
2.6 GMotor Control Centers
3.2 GMotor Control Centers
SD-03 Product Data
1.4 GEquipment
2.9Factory Tests
SD-06 Test Reports 2.9Factory Tests
SD-07 Certificates 2.6Motor Control Centers 3.2Motor Control Centers
26 24 19.02 SD-02 Shop Drawings GEquipment
SD-03 Product Data GManufacturer's Catalog
Bill of Materials SD-07 Certificates UL Certification
SD-08 Manufacturer’s Instructions GEquipment Settings
26 41 00.00 40 SD-02 Shop Drawings
1.4.1 GOverall lightning protection
system
1.4.1 GEach major component
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 34 PAGES
Devils Lake City Embankments, Phase 3
26 41 00.00 40 SD-03 Product Data 2.2.1Air Terminals 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors 2.5Lightning Protection Components 2.1Hardware 2.1Accessories
SD-06 Test Reports
3.5.1 GGrounding system test
3.5.2 GLightning protection system
inspection SD-07 Certificates
1.4.2 GUL listing or label
3.5.3Certificates
26 51 00 SD-03 Product Data GLED lighting fixtures
2.1 GFluorescent lighting fixtures
1.5.1 GFluorescent electronic ballasts
GFluorescent lamps
2.3 GEmergency lighting equipment
1.5.3.3Energy Efficiency
SD-06 Test Reports 3.2Operating test
26 56 00 SD-03 Product Data
2.1 GLuminaires
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 34 PAGES
Devils Lake City Embankments, Phase 3
26 56 00 2.2 GLED Lighting Fixtures SD-05 Design Data
1.4.2 GDesign Data for luminaires
SD-06 Test Reports
3.2Operating test 31 11 00 SD-03 Product Data
3.4 GNonsaleable Materials
SD-04 Samples
2.1Herbicide 32 11 16.00 13 SD-01 Preconstruction Submittals
2.2 GAggregate Sources
SD-04 Samples
2.2 GAggregate Samples
SD-06 Test Reports
3.12 GTesting
32 12 17 SD-05 Design Data
Mixture Data SD-11 Closeout Submittals Delivery Tickets
32 31 13.53 SD-02 Shop Drawings
1.3.2 GInstallation Drawings
1.3.2 GLocation of Gates, Corner, End, and Pull Posts
2.6.1 GGate Assembly
2.6.3 GGate Hardware and Accessories
3.1 GFence Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 34 PAGES
Devils Lake City Embankments, Phase 3
32 31 13.53 SD-03 Product Data
2.6.1 GGate Assembly
2.6.3 GGate Hardware and Accessories
3.1 GFence Installation
SD-04 Samples Gate Posts
2.2Posts 2.2.2Post Caps 2.3Braces 2.3Line Posts 2.4.1Wire Ties 2.4.2Tension Wire 2.6.3Gate Hardware and Accessories 2.7Padlocks 3.3.1Top Rail
SD-06 Test Reports 1.3.1Zinc Coating 1.3.1Aluminum Alloy Coating
SD-07 Certificates 1.3.1Reports 1.3.1Zinc Coating 1.3.1Aluminum Alloy Coating 2.2.1Chain-Link Fence 2.5Concrete 2.6.3Gate Hardware and Accessories
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 34 PAGES
Devils Lake City Embankments, Phase 3
32 31 13.53 1.3.1Accessories 2.6.1Gate Assembly 3.1Fence Installation 3.5Hardware Assembly
32 92 19.00 13 SD-03 Product Data
1.3.2 GManufacturer's Literature
SD-06 Test Reports
2.1 GSeed Test
3.4.7 GQuantity Check
3.7.4 GMaintenance Record
SD-07 Certificates
2.1 GCertificates of Compliance
2.2 GCertificates of Compliance
2.6.1 GCertificates of Compliance
33 05 23.13 SD-01 Preconstruction Submittals 1.3Statement of Qualifications and
Records 1.3Soil Test Data
SD-02 Shop Drawings 3.11Record Drawings
SD-03 Product Data 1.3Manufacturer's Catalog Data
SD-07 Certificates 2.1Drill Rod
SD-08 Manufacturer’s Instructions 1.3Material Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 34 PAGES
Devils Lake City Embankments, Phase 3
33 05 23.13 SD-11 Closeout Submittals 3.11Work Complete Logs of Guided
Directional Drill Operations 33 11 01 SD-03 Product Data
Piping Materials 2.6Hydrants 2.7Indicator posts 2.10Corporation stops 2.8Valve boxes 2.5Hydrostatic Seal
SD-05 Design Data Design calculations of water piping
SD-06 Test Reports
2.16 GDisinfection
Glaboratory verifying disinfection SD-07 Certificates Water distribution main Water service line lining and coating Lining
2.6hydrants Displacement Type Meters Compound Type Meters
SD-08 Manufacturer’s Instructions Delivery, storage, and handling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 34 PAGES
Devils Lake City Embankments, Phase 3
33 11 01 3.2Installation 33 30 00 SD-01 Preconstruction Submittals
1.6Existing Conditions SD-02 Shop Drawings
1.4.1Drawings Precast concrete manhole
2.3.3Metal items 2.3.3.1Frames, covers, and gratings
SD-03 Product Data 2.1Pipeline materials
SD-06 Test Reports 2.4Reports
SD-07 Certificates 2.2.2Portland Cement
Gaskets 33 32 13.13 SD-01 Preconstruction Submittals
1.7 GMaterial, Equipment, and Fixtures
List
SD-02 Shop Drawings 1.3Fabrication Drawings 1.3Erection/Installation Drawings
SD-03 Product Data 1.7Spare Parts Data 2.1Man Hole Chambers 2.1EPA-CPG Compliance 2.2Access Covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 34 PAGES
Devils Lake City Embankments, Phase 3
33 32 13.13 Sump Pumps
2.4 GSewage Pumps
2.5 GPump Controls
2.7Impellers 2.8Couplings 1.3Bearings 2.13Bearings 2.10Stuffing Boxes 2.16Valves 2.17Piping
Blowers Dehumidifier
2.19Electric Motors SD-05 Design Data
1.3Design Data 1.3Motor/Pumps 1.3Rotor Bars 1.3Stator Slots 1.5Speed of Rotation 1.3Cooling Fan Blades 1.3Bearing Manufacturer 1.3Bearing Style 1.3Bearing Type 1.3Balls/Elements 1.3Commutator Bars 1.3Commutator Brushes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 34 PAGES
Devils Lake City Embankments, Phase 3
33 32 13.13 1.3SCR Firing Frequencies 1.3Pump Impellers
SD-07 Certificates 1.7Listing of Product Installations 1.7Safety Considerations Part 2Recycled Material Content 2.1Man Hole Chambers 2.2Access Covers
Sump Pumps 2.4Sewage Pumps 1.3Bearings 2.13Bearings 2.5Pump Controls 2.7Impellers 2.8Couplings 2.10Stuffing Boxes 2.16Valves 2.17Piping
Blowers Dehumidifier
2.19Electric Motors SD-08 Manufacturer’s Instructions
Part 2Duplex Package Lift Station 2.1Man Hole Chambers 2.2Access Covers
Sump Pumps
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 34 PAGES
Devils Lake City Embankments, Phase 3
33 32 13.13 2.4Sewage Pumps 2.5Pump Controls 2.7Impellers 2.8Couplings 2.10Stuffing Boxes 2.16Valves 2.17Piping
Blowers Dehumidifier
2.19Electric Motors 3.1Preventative Maintenance and
Inspection 3.1Special Tools 3.1Posted Instructions
SD-10 Operation and Maintenance Data
3.3Operation and Maintenance Manuals
3.3Equipment Description 3.3Assembly and Installation
Procedures 3.3Adjustment and Alignment 3.3Checkout Procedures 3.3Procedures of Operation 3.3Troubleshooting
33 40 00.01 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 34 PAGES
Devils Lake City Embankments, Phase 3
33 40 00.01 3.3Placing Pipe 2.1Pipe for Culverts and Storm
Drains SD-07 Certificates
2.1.4Resin Certification 3.8Pipeline Testing 2.6Hydrostatic Test on Watertight
Joints 3.7.5Determination of Density 2.3.3Frame and Cover for Gratings
33 40 00 SD-03 Product Data
2.1.2 GPrecast Components
33 50 00 SD-01 Preconstruction Submittals GDesign Data
Gate Vendor Information
FIO
SD-04 Samples GShop Drawings GOperation and Maintenance
Manuals 33 71 02.00 20 SD-02 Shop Drawings
1.4.1 GPrecast underground structures
SD-03 Product Data
2.9.1.1 GPrecast concrete structures
2.9.1.4Sealing Material 3.5.2Pulling-In Irons
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 34 PAGES
Devils Lake City Embankments, Phase 3
33 71 02.00 20 2.9.2 GManhole frames and covers
2.9.3 GHandhole frames and covers
2.9.5 GComposite/fiberglass handholes
2.10 GCable supports
SD-06 Test Reports 3.3Cable Installation Plan and
Procedure 35 31 19.00 13 SD-01 Preconstruction Submittals
1.5.1.2 GMaterial Sources
SD-03 Product Data
2.2 GRiprap
2.1 GBedding Stone
2.3 GGeotextile Fabric
SD-04 Samples
2.2 GRiprap
2.1 GBedding Stone
2.3 GGeotextile Fabric
SD-06 Test Reports
2.2.1.1 GGradation Test
1.5.1.3 GEvaluation Testing of Stone
SD-07 Certificates
2.1.2 GWeigh Scale Certification
2.4.2 GWeigh Scale Certification
2.1.2Certified Weight Scale Tickets 2.4.2Certified Weight Scale Tickets
2.2 GRiprap
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 34 PAGES
Devils Lake City Embankments, Phase 3
35 31 19.00 13 2.1 GBedding Stone
1.5.1.2 GLaboratory
35 35 27 SD-01 Preconstruction Submittals
3.12.5 GPreconstruction Testing Plan
Plan providing a list of test equipment, procedures, and materials to be used to develop the mix design for the S-B backfill.
3.1 GSlurry Trench Implementation
Plan
WARNING: Text in tags exceeds the maximum length of 300 characters
GContractor's quality control testing Plan
Plan describing quality control equipment and test procedures, sample test forms for reporting test results, and the offsite laboratory proposed for use.
SD-02 Shop Drawings 3.10As-Built Profile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 34 PAGES
Devils Lake City Embankments, Phase 3
35 35 27 A scale drawing providing a log of the subsurface materials excavated from the trench, and a profile of the completed slurry trench.
SD-04 Samples Bentonite: A minimum of 10 pounds of the proposed bentonite at least 1 month prior to use.
Backfill Material: A minimum of 50 pounds of each type of proposed borrow soil at least 1 month prior to use.
SD-06 Test Reports WARNING: Text in tags exceeds the maximum length of 300 characters
Quality Control Testing: The results from quality control testing.
Soundings: A record of soundings and measurements taken during construction of the slurry trench.
Water: A record of the water source and associated chemical analysis.
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 34 PAGES
Devils Lake City Embankments, Phase 3
35 35 27 Bentonite Slurry Mixes, Slurry Properties
A record of bentonite slurry mix quantities, proportions of additives utilized, and adjustments for each batch.
SD-07 Certificates 2.1.1Bentonite
A copy of the test results from the bentonite manufacturer for each lot shipped to the site and a certificate of compliance stating that the bentonite complies with applicable standards.
35 60 00 SD-03 Product Data 2.4Instrumentation
2.1 GSpecifications
SD-07 Certificates
2.2 GMetals
35 73 13 SD-01 Preconstruction Submittals GWork Plan
Shoring and Sheeting Plan G1. Utility Trench Excavation at
Toe of Levee GAction and Response Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 34 PAGES
Devils Lake City Embankments, Phase 3
35 73 13 GINSTRUMENTATION
INSTALLATION PLAN
GPOTENTIAL BORROW
SOURCES LISTED
GCONTRACTOR PROPOSED
BORROW SOURCE
SD-06 Test Reports
3.20 GTesting
GBorrow Source Testing
3.20.1 GDaily Report Forms
GSettlement Plates SD-07 Certificates
3.20 GTesting
41 22 13.14 SD-02 Shop Drawings
1.6.1 GOverhead Electric Crane
1.6.4 GOverhead Electric Crane
2.1 GOverhead Electric Crane
SD-03 Product Data
2.3.1.1 GGear Reducers
1.6.2 GHook
1.6.2 GTrolley
2.3.1.1 GInverter Drives
2.3.1.1 GControl Parameter Settings
2.1.3 GHoist
2.4.2 GControls
2.3 GCouplings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 34 PAGES
Devils Lake City Embankments, Phase 3
41 22 13.14 2.4.7 GPendant Pushbutton Station
2.4.8 GElectrification
2.4.1 GMotors
2.3.10 GBrakes
1.7 GCapacity Overload Protective
Device
2.3.1.2 GLimit Switches
SD-05 Design Data
1.6.5 GLoad and Sizing Calculations
SD-06 Test Reports
2.3.2.1 GHook and Hook Nut
Magnetic-Particle Tests
2.3.3 GWire Rope Breaking Strength
3.3.1 GPost-Erection Inspection
3.3.2 GOperational Tests
1.6.2.3 GHook Proof Test
3.3.4 GHook Tram Measurement
3.3.5 GNo-Load Test
3.3.6 GLoad Tests
SD-07 Certificates
1.6.3 GOverload Test Certificate
1.6.3 GLoss of Power (Panic Test)
Certificate
1.6.3 GHazardous Material Certificate
1.6.3 GCertificate of the Coupling
Alignment Verification Record
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 34 PAGES
Devils Lake City Embankments, Phase 3
41 22 13.14 1.6.3 GBrake Setting Record
1.6.3 GCertificate of Compliance with
Listed Standards SD-10 Operation and Maintenance Data
1.6.1 GOverhead Electric Crane
1.6.4 GOverhead Electric Crane
2.1 GOverhead Electric Crane
2.1 GData Package 3
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .