01 33 00 ENG 4288 REGISTER.pdf

PDF 162 KB Posted

Attached to
Devils Lake Flood Risk Management Phase 3 Embankments construction project Federal contract opportunity
Solicitation number
W912ES-11-B-0005
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

01 33 00 ENG 4288 REGISTER

View the file

Other files for this federal contract opportunity

Other files attached to Devils Lake Flood Risk Management Phase 3 Embankments construction project, newest first.
File Type Posted
DL Phase 3 Revised abstract.pdf PDF
DL PHASE 3 BID ABSTRACT.pdf PDF
DEMO Table REV.pdf PDF
Devils Lake Phase 3 Amendment 0007 032511.pdf PDF
Devils Lake Phase 3 Amendment 0006 032411.pdf PDF
DLCEP3_REALESTATE_PART1.pdf PDF
DLCEP3_CD115.pdf PDF
27 33 31_00 10.pdf PDF
DLCEP3_CS123.pdf PDF
DLCEP3_CU107.pdf PDF
DLCEP3_C604.pdf PDF
DLCEP3_CD116.pdf PDF
DLCEP3_CD115.pdf PDF
DLCEP3_CD120.pdf PDF
DLCEP3_REALESTATE_PART2.pdf PDF
DLCEP3_CD116.pdf PDF
DLCEP3_CD120 .pdf PDF
DEMO Table.pdf PDF
DLCEP3_C604.pdf PDF
DLCEP3_CS123.pdf PDF
Devils Lake Phase 3 Amendment 0005 032111.pdf PDF
Devils Lake Phase 3 Amendment 0004 031811.pdf PDF
Devils Lake Phase 3 Amendment 0003 031711.pdf PDF
11-B-0005_fullsize_amd3.pdf PDF
11-B-0005_halfsize_amd3.pdf PDF
11-B-0005_halfsize_amend2_part_a.pdf PDF
11-B-0005_halfsize_amend2_part_b.pdf PDF
11-B-0005_fullsize_amend2_part_a.pdf PDF
01 22 00 00 13.pdf PDF
11-B-0005 Amendment 0002.doc DOC document
35 73 13 PLACEMENT AND COMPACTION REQUIREMENTS FOR FILL.pdf PDF
35 73 13.pdf PDF
11-B-0005_fullsize_amend2_part_b.pdf PDF
Mar 8 site visit sign-in sheet.pdf PDF
Mar 1 site visit sign-in sheet.pdf PDF
Devils Lake Phase 3 Amendment 0001.doc DOC document
11-B-0005_DLCEP3_11x17_references.pdf PDF
11-B-0005_DLCEP3_11x17_part1b.pdf PDF
11-B-0005_DLCEP3_11x17_part3a.pdf PDF
11-B-0005_DLCEP3_11x17_part4.pdf PDF
11-B-0005_DLCEP3_11x17_part2.pdf PDF
11-B-0005_DLCEP3_11x17_part3b.pdf PDF
11-B-0005_DLCEP3_11x17_part1a.pdf PDF
Devils Lake Ph3 SolicitationW912ES-11-B-0005 FINAL .pdf PDF
11-B-0005_DLCEP3_22x34_part3b.pdf PDF
11-B-0005_DLCEP3_22x34_part1a.pdf PDF
11-B-0005_DLCEP3_22x34_part3a.pdf PDF
11-B-0005_DLCEP3_22x34_part2.pdf PDF
11-B-0005_DLCEP3_22x34_part1b.pdf PDF
11-B-0005_DLCEP3_22x34_part4.pdf PDF
Show all 50

Devils Lake Flood Risk Management Phase 3 Embankments construction project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 34 PAGES

W912ES-11-B-0005

Devils Lake City Embankments, Phase 3

01 32 01.00 13 SD-01 Preconstruction Submittals

3.4.1 G COInitial Project Schedule

3.4.2 G COPeriodic Updates

SD-04 Samples 2.1Software

01 35 29.00 13 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

1.7 GActivity Hazard Analysis (AHA)

GCrane Critical Lift Plan GProof of qualification for Crane

Operators SD-06 Test Reports

1.11Reports 1.11.2Monthly Exposure Reports 1.11.1Accident Reports

Crane Reports SD-07 Certificates Confined Space Entry Permit Hot work permit Certificate of Compliance

01 41 26.00 13 SD-01 Preconstruction Submittals 1.4.3Notice of Intent (NOI)

SD-02 Shop Drawings 2.3Temporary Erosion And

Sediment Control Plan 01 45 04.00 13 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 34 PAGES

Devils Lake City Embankments, Phase 3

01 45 04.00 13 3.2 GQuality Control Plan (QCP)

3.6.2.1 GQuality Management Manual

01 50 02.00 13 SD-02 Shop Drawings

1.3.1 GSite Plan

SD-04 Samples

1.9 GSafety Fencing

01 57 20.00 13 SD-01 Preconstruction Submittals

1.7 G ENVEnvironmental Protection Plan

01 71 23.00 13 SD-01 Preconstruction Submittals

3.3 GSurvey Text Files

01 78 02.00 10 SD-11 Closeout Submittals

1.2 G GENAs-Built Drawings

02 41 00 SD-01 Preconstruction Submittals

1.6.1 GExisting Conditions

SD-07 Certificates GNotifications

3.1.3.3 GGrout in Place

1.9 GDemolition Plan

3.4.1 GDisposal Plan

03 11 13.00 10 SD-02 Shop Drawings GFormwork

SD-03 Product Data Design

2.1Form Materials 2.1.5Form Releasing Agents

03 15 13.00 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 34 PAGES

Devils Lake City Embankments, Phase 3

03 15 13.00 10 2.4 GWaterstops SD-03 Product Data

2.2 GPreformed Expansion Joint Filler

2.3 GSealant

2.4 GWaterstops

SD-04 Samples Lubricant for Preformed Compression Seals

2.3.3Field-Molded Type 2.4.1Non-metallic Materials

SD-07 Certificates

2.2 GPreformed Expansion Joint Filler

2.3 GSealant

2.4 GWaterstops

03 20 01.00 10 SD-02 Shop Drawings

3.1 GReinforcement

SD-07 Certificates 2.2Reinforcing Steel

03 22 70.01 SD-01 Preconstruction Submittals On-Site Batching and Mixing Water Reducing Concrete Mixture Proportions

SD-07 Certificates Placing

SD-08 Manufacturer’s Instructions Concrete Mixture Proportions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 34 PAGES

Devils Lake City Embankments, Phase 3

03 22 70.01 SD-09 Manufacturer’s Field Reports CLSM Mixture Proportions Tests Cement Aggregates

03 22 70 SD-01 Preconstruction Submittals GFlowable Fill Plan

SD-02 Shop Drawings GDetail Drawings

SD-06 Test Reports Design Mix

SD-07 Certificates Manufacturer's Certificates

03 31 00.00 10 SD-01 Preconstruction Submittals

3.1 G MATConcrete Operation Plan

3.7.3 G MATCold Weather Plan

3.7.4 G MATHot Weather Plan

Joint Treatment Plan 3.15Epoxy Resins

SD-02 Shop Drawings

1.4 G STRShop Drawings

SD-03 Product Data G MATConcrete Mixture Design

SD-06 Test Reports GQuality of Aggregates

MAT

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 34 PAGES

Devils Lake City Embankments, Phase 3

03 31 00.00 10 SD-07 Certificates Manufacturer's Certificates

1.5Qualifications 04 20 00 SD-02 Shop Drawings

1.4.3 GDetail Drawings

SD-03 Product Data

2.1 GConcrete Masonry Units (CMU)

GInsulation

2.5 GFlashing

GWater-Repellant Admixture

1.6.1 GHot Weather Installation

1.6.2 GCold Weather Installation

SD-04 Samples

2.1 GConcrete Masonry Units (CMU)

GAnchors, Ties, and Bar Positioners

GExpansion-Joint Materials GJoint Reinforcement GInsulation

1.4.2 GPortable Panel

SD-06 Test Reports

3.12.1 GField Testing of Mortar

3.12.2 GField Testing of Grout

2.2.3 GMasonry Cement

GField Testing of Core-Fill Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 34 PAGES

Devils Lake City Embankments, Phase 3

04 20 00 SD-07 Certificates 2.1Concrete Masonry Units (CMU) 2.4Control Joint Keys

Anchors, Ties, and Bar Positioners

Expansion-Joint Materials Joint Reinforcement

2.3Reinforcing Steel Bars and Rods 2.2.3Masonry Cement

Mortar Coloring Insulation Warranty Precast Concrete Items Admixtures for Masonry Mortar Admixtures for Grout qualifications

SD-08 Manufacturer’s Instructions 2.2.3Masonry Cement

Insulation 05 21 16 SD-01 Preconstruction Submittals

1.4.2Welder qualification 1.4.2Material Safety Data Sheet

SD-02 Shop Drawings

1.4.1 GLongspan Steel Joist Framing

SD-06 Test Reports 3.4Erection inspection 3.4Welding inspections

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 34 PAGES

Devils Lake City Embankments, Phase 3

05 21 16 SD-07 Certificates 1.4.1Accessories 1.4.2Certification of Compliance

05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings 2.3.1.1Ridge and Valley Plates 2.3.1.2Metal Closure Strips

SD-03 Product Data 2.2Accessories 2.3Metal Roof Deck Units 2.1.5Galvanizing Repair Paint 2.1.4Joint Sealant Material 1.3.2Piston Tool Operator 2.3.3Repair Paint 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.3Metal Roof Deck Units 2.1.6Flexible Closure Strips 2.3Flexible Closure Strips

SD-05 Design Data 2.3Metal Roof Deck Units

SD-07 Certificates 1.3.3Welding Procedures 1.3.4.1Fire Safety

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 34 PAGES

Devils Lake City Embankments, Phase 3

05 30 00 1.3.4.2Wind Storm Resistance 05 50 14 SD-02 Shop Drawings

1.3.2 GDetail Drawings

SD-03 Product Data

2.2.2.1 GWelding of Structural Steel

2.2.2.2 GWelding of Aluminum

2.3.4 GStructural Steel Welding Repairs

2.1.1Materials List 2.1.2Shipping Bill

SD-06 Test Reports 2.3Tests, Inspections, and

Verifications SD-07 Certificates

1.3.1 GQualification of Welders and

Welding Operators

2.2.2.3 GApplication Qualification for Steel

Studs

2.2.2.2 GWelding of Aluminum

05 50 15 SD-02 Shop Drawings

2.1 GMiscellaneous Metals & Standard

Metal Articles

2.2 GShop Fabricated Metal Items

SD-03 Product Data

2.1 GMiscellaneous Metals & Standard

Metal Articles

2.2 GShop Fabricated Metal Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 34 PAGES

Devils Lake City Embankments, Phase 3

05 50 15 SD-04 Samples

2.2 GShop Fabricated Metal Items

SD-06 Test Reports

2.1 GMiscellaneous Metals & Standard

Metal Articles

2.2 GShop Fabricated Metal Items

06 10 00 SD-06 Test Reports

1.4.3 GPreservative-Treated

SD-07 Certificates

1.7 GPreservative treatment

07 11 13 SD-07 Certificates

1.3 GMaterials

07 22 00 SD-03 Product Data

2.2 GFasteners

2.1 GInsulation

SD-06 Test Reports 1.4Flame spread and smoke developed ratings SD-07 Certificates

1.3Qualifications SD-08 Manufacturer’s Instructions

2.2fasteners 2.1insulation

07 41 13 SD-02 Shop Drawings

1.4.5 GRoofing Panels

1.4.5 GFlashing and Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 34 PAGES

Devils Lake City Embankments, Phase 3

07 41 13 1.4.5 GGutter/Downspout Assembly SD-03 Product Data

2.1 GRoof panels

1.4.5 GFactory-Applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GPressure Sensitive Tape

2.6 GUnderlayments

2.7 GGaskets and Sealing/Insulating

Compounds GCoil Stock

SD-04 Samples

2.1 GRoof Panels

1.4.5 GFactory-applied Color Finish

1.4.5 GGaskets and Sealant/Insulating

Compounds SD-05 Design Data

1.2.1.2 GWind Uplift Resistance

SD-06 Test Reports

1.2.1.1 GLeakage Test Report

1.2.1.2 GWind Uplift Test Report

GFire Rating Test Report

2.2 GFactory Finish and Color

Performance Requirements SD-07 Certificates

2.1 GRoof Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 34 PAGES

Devils Lake City Embankments, Phase 3

07 41 13 GCoil stock compatibility

2.6.1 GSelf-Adhering Modified Bitumen

Underlayment

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions

GINSTALLATION MANUAL

SD-09 Manufacturer’s Field Reports

GManufacturer's Field Inspection Reports

SD-11 Closeout Submittals

1.8 GWarranties

3.9Information Card

GDate Of Installation Wall-Mounted Placard

07 60 00 SD-02 Shop Drawings

3.1.13 GCovering on Flat, Sloped, or

Curved Surfaces

3.1.10 GGutters

3.1.11 GDownspouts

3.1.8 GExpansion and Contraction Joints

3.1.12 GSplash Pads

3.1.9 GBase Flashing

07 72 00 SD-02 Shop Drawings

3.1 GRoof Ventilators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 34 PAGES

Devils Lake City Embankments, Phase 3

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond breakers

2.4 GBackstops

SD-07 Certificates 2.1Sealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.4 GFrames

SD-03 Product Data

2.1 GDoors

2.4 GFrames

08 34 19.10 20 SD-02 Shop Drawings

2.1 GOverhead Roll-up Doors

SD-03 Product Data

2.1 GOverhead Roll-up Doors

SD-08 Manufacturer’s Instructions 2.1Overhead Roll-up Doors

SD-10 Operation and Maintenance Data

2.1Overhead Roll-up Doors 08 71 00 SD-02 Shop Drawings

1.3 GHardware Schedule

2.3.2.4 GKeying System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 34 PAGES

Devils Lake City Embankments, Phase 3

08 71 00 2.3 GHardware Items SD-08 Manufacturer’s Instructions

3.1Installation SD-10 Operation and Maintenance Data

1.3 GHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 08 91 00 SD-02 Shop Drawings

1.4 GWall louvers

SD-03 Product Data

2.2 GMetal Wall Louvers

SD-04 Samples

2.4 GFinishes

1.5 GColor Samples

10 14 01 SD-02 Shop Drawings GApproved Detail Drawings

SD-03 Product Data Modular Exterior Signage System

3.1Installation

1.3 GExterior Signage

1.4Wind Load Requirements

SD-04 Samples

1.3 GExterior Signage

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 34 PAGES

Devils Lake City Embankments, Phase 3

10 14 01 3.1.2Protection and Cleaning 22 06 00 SD-07 Certificates

1.4 GQualifications

Welders

3.11Waste Water Disposal Assistance and Training

1.6Delivery, Storage and Handling Materials and Equipment Installation

1.5Pipe Schedule Valve Schedule Check Valves PE Pipe Fusers

2.3Stilling Pipe Installation and Fabrication

SD-02 Shop Drawings

3.1.1 GPipe and Equipment

2.7 GFlap Valves

3.2 GPiping and Appurtenances

22 22 22 SD-02 Shop Drawings GOutline Drawings GCross Sections GCoating (Painting) GPump Capacity Curves GInstallation Details GWarranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 34 PAGES

Devils Lake City Embankments, Phase 3

22 22 22 GFactory Testing GDischarge Elbow GAccess Covers GPump Field Test Reports

23 00 00 SD-02 Shop Drawings

1.4.3 GDetail Drawings

SD-03 Product Data 2.1Standard Products

Dampers 2.8.3Louvers

Fans SD-07 Certificates

1.4.1Bolts SD-08 Manufacturer’s Instructions

3.3Manufacturer's Installation Instructions

SD-10 Operation and Maintenance Data

GDampers

2.8.3 GLouvers

GFans 23 82 46 SD-02 Shop Drawings

1.2Fabrication Drawings SD-03 Product Data

2.1Electric Unit Heaters 2.2Electric Unit Heaters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 34 PAGES

Devils Lake City Embankments, Phase 3

23 82 46 2.5Heating Element 2.6Controls 2.3Casings 2.7Propellers and Motors

SD-08 Manufacturer’s Instructions 1.2Manufacturer's Instructions

26 20 00 SD-02 Shop Drawings

2.15 GPanelboards

2.16 GTransformers

2.3Busway 2.22Wireways

3.1.7.1 GMarking strips

SD-03 Product Data

2.13 GReceptacles

2.15.3 GCircuit Breakers

2.16 GTransformers

2.11 GSwitches

2.23 GMeter base only

2.24 GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.4 GGrounding system test

3.5.3 GGround-fault receptacle test

SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 34 PAGES

Devils Lake City Embankments, Phase 3

26 24 19.00 40 SD-02 Shop Drawings

2.4.2 GDrawings

2.2.1 GShop Drawings

2.6 GMotor Control Centers

3.2 GMotor Control Centers

SD-03 Product Data

1.4 GEquipment

2.9Factory Tests

SD-06 Test Reports 2.9Factory Tests

SD-07 Certificates 2.6Motor Control Centers 3.2Motor Control Centers

26 24 19.02 SD-02 Shop Drawings GEquipment

SD-03 Product Data GManufacturer's Catalog

Bill of Materials SD-07 Certificates UL Certification

SD-08 Manufacturer’s Instructions GEquipment Settings

26 41 00.00 40 SD-02 Shop Drawings

1.4.1 GOverall lightning protection

system

1.4.1 GEach major component

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 34 PAGES

Devils Lake City Embankments, Phase 3

26 41 00.00 40 SD-03 Product Data 2.2.1Air Terminals 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors 2.5Lightning Protection Components 2.1Hardware 2.1Accessories

SD-06 Test Reports

3.5.1 GGrounding system test

3.5.2 GLightning protection system

inspection SD-07 Certificates

1.4.2 GUL listing or label

3.5.3Certificates

26 51 00 SD-03 Product Data GLED lighting fixtures

2.1 GFluorescent lighting fixtures

1.5.1 GFluorescent electronic ballasts

GFluorescent lamps

2.3 GEmergency lighting equipment

1.5.3.3Energy Efficiency

SD-06 Test Reports 3.2Operating test

26 56 00 SD-03 Product Data

2.1 GLuminaires

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 34 PAGES

Devils Lake City Embankments, Phase 3

26 56 00 2.2 GLED Lighting Fixtures SD-05 Design Data

1.4.2 GDesign Data for luminaires

SD-06 Test Reports

3.2Operating test 31 11 00 SD-03 Product Data

3.4 GNonsaleable Materials

SD-04 Samples

2.1Herbicide 32 11 16.00 13 SD-01 Preconstruction Submittals

2.2 GAggregate Sources

SD-04 Samples

2.2 GAggregate Samples

SD-06 Test Reports

3.12 GTesting

32 12 17 SD-05 Design Data

Mixture Data SD-11 Closeout Submittals Delivery Tickets

32 31 13.53 SD-02 Shop Drawings

1.3.2 GInstallation Drawings

1.3.2 GLocation of Gates, Corner, End, and Pull Posts

2.6.1 GGate Assembly

2.6.3 GGate Hardware and Accessories

3.1 GFence Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 34 PAGES

Devils Lake City Embankments, Phase 3

32 31 13.53 SD-03 Product Data

2.6.1 GGate Assembly

2.6.3 GGate Hardware and Accessories

3.1 GFence Installation

SD-04 Samples Gate Posts

2.2Posts 2.2.2Post Caps 2.3Braces 2.3Line Posts 2.4.1Wire Ties 2.4.2Tension Wire 2.6.3Gate Hardware and Accessories 2.7Padlocks 3.3.1Top Rail

SD-06 Test Reports 1.3.1Zinc Coating 1.3.1Aluminum Alloy Coating

SD-07 Certificates 1.3.1Reports 1.3.1Zinc Coating 1.3.1Aluminum Alloy Coating 2.2.1Chain-Link Fence 2.5Concrete 2.6.3Gate Hardware and Accessories

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 34 PAGES

Devils Lake City Embankments, Phase 3

32 31 13.53 1.3.1Accessories 2.6.1Gate Assembly 3.1Fence Installation 3.5Hardware Assembly

32 92 19.00 13 SD-03 Product Data

1.3.2 GManufacturer's Literature

SD-06 Test Reports

2.1 GSeed Test

3.4.7 GQuantity Check

3.7.4 GMaintenance Record

SD-07 Certificates

2.1 GCertificates of Compliance

2.2 GCertificates of Compliance

2.6.1 GCertificates of Compliance

33 05 23.13 SD-01 Preconstruction Submittals 1.3Statement of Qualifications and

Records 1.3Soil Test Data

SD-02 Shop Drawings 3.11Record Drawings

SD-03 Product Data 1.3Manufacturer's Catalog Data

SD-07 Certificates 2.1Drill Rod

SD-08 Manufacturer’s Instructions 1.3Material Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 34 PAGES

Devils Lake City Embankments, Phase 3

33 05 23.13 SD-11 Closeout Submittals 3.11Work Complete Logs of Guided

Directional Drill Operations 33 11 01 SD-03 Product Data

Piping Materials 2.6Hydrants 2.7Indicator posts 2.10Corporation stops 2.8Valve boxes 2.5Hydrostatic Seal

SD-05 Design Data Design calculations of water piping

SD-06 Test Reports

2.16 GDisinfection

Glaboratory verifying disinfection SD-07 Certificates Water distribution main Water service line lining and coating Lining

2.6hydrants Displacement Type Meters Compound Type Meters

SD-08 Manufacturer’s Instructions Delivery, storage, and handling

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 34 PAGES

Devils Lake City Embankments, Phase 3

33 11 01 3.2Installation 33 30 00 SD-01 Preconstruction Submittals

1.6Existing Conditions SD-02 Shop Drawings

1.4.1Drawings Precast concrete manhole

2.3.3Metal items 2.3.3.1Frames, covers, and gratings

SD-03 Product Data 2.1Pipeline materials

SD-06 Test Reports 2.4Reports

SD-07 Certificates 2.2.2Portland Cement

Gaskets 33 32 13.13 SD-01 Preconstruction Submittals

1.7 GMaterial, Equipment, and Fixtures

List

SD-02 Shop Drawings 1.3Fabrication Drawings 1.3Erection/Installation Drawings

SD-03 Product Data 1.7Spare Parts Data 2.1Man Hole Chambers 2.1EPA-CPG Compliance 2.2Access Covers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 34 PAGES

Devils Lake City Embankments, Phase 3

33 32 13.13 Sump Pumps

2.4 GSewage Pumps

2.5 GPump Controls

2.7Impellers 2.8Couplings 1.3Bearings 2.13Bearings 2.10Stuffing Boxes 2.16Valves 2.17Piping

Blowers Dehumidifier

2.19Electric Motors SD-05 Design Data

1.3Design Data 1.3Motor/Pumps 1.3Rotor Bars 1.3Stator Slots 1.5Speed of Rotation 1.3Cooling Fan Blades 1.3Bearing Manufacturer 1.3Bearing Style 1.3Bearing Type 1.3Balls/Elements 1.3Commutator Bars 1.3Commutator Brushes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 34 PAGES

Devils Lake City Embankments, Phase 3

33 32 13.13 1.3SCR Firing Frequencies 1.3Pump Impellers

SD-07 Certificates 1.7Listing of Product Installations 1.7Safety Considerations Part 2Recycled Material Content 2.1Man Hole Chambers 2.2Access Covers

Sump Pumps 2.4Sewage Pumps 1.3Bearings 2.13Bearings 2.5Pump Controls 2.7Impellers 2.8Couplings 2.10Stuffing Boxes 2.16Valves 2.17Piping

Blowers Dehumidifier

2.19Electric Motors SD-08 Manufacturer’s Instructions

Part 2Duplex Package Lift Station 2.1Man Hole Chambers 2.2Access Covers

Sump Pumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 34 PAGES

Devils Lake City Embankments, Phase 3

33 32 13.13 2.4Sewage Pumps 2.5Pump Controls 2.7Impellers 2.8Couplings 2.10Stuffing Boxes 2.16Valves 2.17Piping

Blowers Dehumidifier

2.19Electric Motors 3.1Preventative Maintenance and

Inspection 3.1Special Tools 3.1Posted Instructions

SD-10 Operation and Maintenance Data

3.3Operation and Maintenance Manuals

3.3Equipment Description 3.3Assembly and Installation

Procedures 3.3Adjustment and Alignment 3.3Checkout Procedures 3.3Procedures of Operation 3.3Troubleshooting

33 40 00.01 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 34 PAGES

Devils Lake City Embankments, Phase 3

33 40 00.01 3.3Placing Pipe 2.1Pipe for Culverts and Storm

Drains SD-07 Certificates

2.1.4Resin Certification 3.8Pipeline Testing 2.6Hydrostatic Test on Watertight

Joints 3.7.5Determination of Density 2.3.3Frame and Cover for Gratings

33 40 00 SD-03 Product Data

2.1.2 GPrecast Components

33 50 00 SD-01 Preconstruction Submittals GDesign Data

Gate Vendor Information

FIO

SD-04 Samples GShop Drawings GOperation and Maintenance

Manuals 33 71 02.00 20 SD-02 Shop Drawings

1.4.1 GPrecast underground structures

SD-03 Product Data

2.9.1.1 GPrecast concrete structures

2.9.1.4Sealing Material 3.5.2Pulling-In Irons

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 34 PAGES

Devils Lake City Embankments, Phase 3

33 71 02.00 20 2.9.2 GManhole frames and covers

2.9.3 GHandhole frames and covers

2.9.5 GComposite/fiberglass handholes

2.10 GCable supports

SD-06 Test Reports 3.3Cable Installation Plan and

Procedure 35 31 19.00 13 SD-01 Preconstruction Submittals

1.5.1.2 GMaterial Sources

SD-03 Product Data

2.2 GRiprap

2.1 GBedding Stone

2.3 GGeotextile Fabric

SD-04 Samples

2.2 GRiprap

2.1 GBedding Stone

2.3 GGeotextile Fabric

SD-06 Test Reports

2.2.1.1 GGradation Test

1.5.1.3 GEvaluation Testing of Stone

SD-07 Certificates

2.1.2 GWeigh Scale Certification

2.4.2 GWeigh Scale Certification

2.1.2Certified Weight Scale Tickets 2.4.2Certified Weight Scale Tickets

2.2 GRiprap

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 34 PAGES

Devils Lake City Embankments, Phase 3

35 31 19.00 13 2.1 GBedding Stone

1.5.1.2 GLaboratory

35 35 27 SD-01 Preconstruction Submittals

3.12.5 GPreconstruction Testing Plan

Plan providing a list of test equipment, procedures, and materials to be used to develop the mix design for the S-B backfill.

3.1 GSlurry Trench Implementation

Plan

WARNING: Text in tags exceeds the maximum length of 300 characters

GContractor's quality control testing Plan

Plan describing quality control equipment and test procedures, sample test forms for reporting test results, and the offsite laboratory proposed for use.

SD-02 Shop Drawings 3.10As-Built Profile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 34 PAGES

Devils Lake City Embankments, Phase 3

35 35 27 A scale drawing providing a log of the subsurface materials excavated from the trench, and a profile of the completed slurry trench.

SD-04 Samples Bentonite: A minimum of 10 pounds of the proposed bentonite at least 1 month prior to use.

Backfill Material: A minimum of 50 pounds of each type of proposed borrow soil at least 1 month prior to use.

SD-06 Test Reports WARNING: Text in tags exceeds the maximum length of 300 characters

Quality Control Testing: The results from quality control testing.

Soundings: A record of soundings and measurements taken during construction of the slurry trench.

Water: A record of the water source and associated chemical analysis.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 34 PAGES

Devils Lake City Embankments, Phase 3

35 35 27 Bentonite Slurry Mixes, Slurry Properties

A record of bentonite slurry mix quantities, proportions of additives utilized, and adjustments for each batch.

SD-07 Certificates 2.1.1Bentonite

A copy of the test results from the bentonite manufacturer for each lot shipped to the site and a certificate of compliance stating that the bentonite complies with applicable standards.

35 60 00 SD-03 Product Data 2.4Instrumentation

2.1 GSpecifications

SD-07 Certificates

2.2 GMetals

35 73 13 SD-01 Preconstruction Submittals GWork Plan

Shoring and Sheeting Plan G1. Utility Trench Excavation at

Toe of Levee GAction and Response Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 34 PAGES

Devils Lake City Embankments, Phase 3

35 73 13 GINSTRUMENTATION

INSTALLATION PLAN

GPOTENTIAL BORROW

SOURCES LISTED

GCONTRACTOR PROPOSED

BORROW SOURCE

SD-06 Test Reports

3.20 GTesting

GBorrow Source Testing

3.20.1 GDaily Report Forms

GSettlement Plates SD-07 Certificates

3.20 GTesting

41 22 13.14 SD-02 Shop Drawings

1.6.1 GOverhead Electric Crane

1.6.4 GOverhead Electric Crane

2.1 GOverhead Electric Crane

SD-03 Product Data

2.3.1.1 GGear Reducers

1.6.2 GHook

1.6.2 GTrolley

2.3.1.1 GInverter Drives

2.3.1.1 GControl Parameter Settings

2.1.3 GHoist

2.4.2 GControls

2.3 GCouplings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 34 PAGES

Devils Lake City Embankments, Phase 3

41 22 13.14 2.4.7 GPendant Pushbutton Station

2.4.8 GElectrification

2.4.1 GMotors

2.3.10 GBrakes

1.7 GCapacity Overload Protective

Device

2.3.1.2 GLimit Switches

SD-05 Design Data

1.6.5 GLoad and Sizing Calculations

SD-06 Test Reports

2.3.2.1 GHook and Hook Nut

Magnetic-Particle Tests

2.3.3 GWire Rope Breaking Strength

3.3.1 GPost-Erection Inspection

3.3.2 GOperational Tests

1.6.2.3 GHook Proof Test

3.3.4 GHook Tram Measurement

3.3.5 GNo-Load Test

3.3.6 GLoad Tests

SD-07 Certificates

1.6.3 GOverload Test Certificate

1.6.3 GLoss of Power (Panic Test)

Certificate

1.6.3 GHazardous Material Certificate

1.6.3 GCertificate of the Coupling

Alignment Verification Record

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 34 PAGES

Devils Lake City Embankments, Phase 3

41 22 13.14 1.6.3 GBrake Setting Record

1.6.3 GCertificate of Compliance with

Listed Standards SD-10 Operation and Maintenance Data

1.6.1 GOverhead Electric Crane

1.6.4 GOverhead Electric Crane

2.1 GOverhead Electric Crane

2.1 GData Package 3

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR