This document package includes a solicitation for construction services and a submittal register for the project. The solicitation is for the Iraq Counterterrorism Warehouse at Baghdad Airport, with an estimated construction cost between $5 million and $10 million. Services required include design-build construction. Offerors must be registered in SAM and provide a CAGE code, DUNS, bonds or bank letters of guarantee. The submittal register outlines submittal requirements for steel windows, resilient flooring, and related operation and maintenance documentation. Submittals include shop drawings, product data, samples, design analysis, and manufacturer instructions. The government reserves the right to incorporate proposals into contracts.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ren ICTS Medical Warehouse, Baghdad Intl Airport, Iraq 498752
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 17.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00.49 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS -- ADDED BY AMENDMENT NO. 0002
08 51 23 STEEL WINDOWS -- ADDED BY AMENDMENT 0003
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING -- ADDED BY AMENDMENT NO. 0003
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 22 13 WIRE MESH PARTITIONS
PROJECT TABLE OF CONTENTS Page 1
W912ER22R0026 AMENDMENT 0003
10 44 16 FIRE EXTINGUISHERS
DIVISION 11 - EQUIPMENT
11 11 37 ELECTRIC CHARGING STATIONS
DIVISION 12 - FURNISHINGS
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 74 33.00 40 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP
AIR-CONDITIONERS
23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS -- REVISED BY
AMENDMENT NO. 0002
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 11 16 SECONDARY UNIT SUBSTATIONS
26 20 00 INTERIOR DISTRIBUTION SYSTEM -- REVISED BY AMENDMENT NO.
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH
AUXILIARIES
26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 20 01.12 10 INTERIOR DISTRIBUTION SYSTEM FOR COMMUNICATIONS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
PROJECT TABLE OF CONTENTS Page 2
28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
28 33 00.00 40 FUEL-GAS DETECTION AND ALARM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 20 BASE COURSE FOR RIGID PAVING
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
DIVISION 33 - UTILITIES
33 16 15 WATER STORAGE STEEL TANKS
33 52 10 FUEL SYSTEMS PIPING (SERVICE STATION)
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SECTION TABLE OF CONTENTS
DIVISION 08 - OPENINGS
SECTION 08 51 23
STEEL WINDOWS -- ADDED BY AMENDMENT 0003
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Shop Drawing Information
1.3.2 Color Coating Samples Information
1.3.3 Design Data Requirements
1.4 WINDOW PERFORMANCE
1.4.1 Structural Performance
1.5 WARRANTY
1.6 DELIVERY AND STORAGE
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Steel Bars
2.1.2 Sheet Steel
2.1.3 Zinc-Coated Sheet Steel
2.1.4 Zinc Coating
2.1.5 Screws and Bolts
2.2 FABRICATION OF WINDOWS
2.3 MULLIONS AND TRANSOM BARS
2.4 METAL-TO-METAL JOINTS
2.5 ACCESSORIES
2.5.1 Anchors
2.5.2 Weatherstripping
2.5.3 Hardware
2.5.3.1 Hardware Materials and Finish
2.5.4 Fasteners
2.5.5 Metal Sub-frames and Stools
2.6 GLASS AND GLAZING
2.7 WINDOW FINISH
2.7.1 Shop Primed Finish
2.7.2 Factory Finish
2.8 WINDOW TYPES
2.8.1 Sliding Window
2.8.2 Fixed Windows
PART 3 EXECUTION
3.1 INSTALLATION
3.2 ANCHORS AND FASTENINGS
3.3 OPERATORS
3.4 WEATHERSTRIPPING
3.5 ADJUSTMENTS AFTER INSTALLATION
SECTION 08 51 23 Page 1
3.6 CLEANING
-- End of Section Table of Contents --
SECTION 08 51 23 Page 2
SECTION 08 51 23
STEEL WINDOWS -- ADDED BY AMENDMENT 0003
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA/WDMA/CSA 101/I.S.2/A440 (2017) North American Fenestration Standard/Specification for Windows, Doors, and Skylights
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B18.6.3 (2013; R 2017) Machine Screws, Tapping Screws, and Machine Drive Screws (Inch Series)
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A1011/A1011M (2018a) Standard Specification for Steel Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength
ASTM E283 (2019) Standard Test Method for Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
STEEL WINDOW INSTITUTE (SWI)
SWI SWS (2017; R 2018) Steel Window Specifications
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification
SECTION 08 51 23 Page 3 identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Windows
SD-03 Product Data Mullions
Hardware
Hardware Materials
Fasteners
Accessories
SD-04 Samples
Color Coating; G R
SD-05 Design Data
Design Analysis; G M
SD-06 Test Reports
SD-10 Operation and Maintenance Data
Windows, Data Package 1; G R
1.3 QUALITY ASSURANCE
1.3.1 Shop Drawing Information
Indicate elevations of windows, full-size sections, thicknesses and gages of metal, fastenings, proposed method of anchoring, size and spacing of anchors, details of construction, method of glazing, details of operating hardware, mullion details, and other related items, and installation details.
1.3.2 Color Coating Samples Information
Submit chart of manufacturer's color coatings if factory finish is to be provided in lieu of field painting.
1.3.3 Design Data Requirements
Submit structural calculations for deflection to substantiate compliance requirements. A registered Professional Engineer must provide calculations. Submit design analysis with calculations showing that the design of each different size and type of steel window unit and its anchorage to the structure. Calculations verifying the structural performance of each window proposed for use, under the given loads, must be prepared and signed by a registered professional engineer. Reflect the window components and anchorage devices to the structure, as determined by the design analysis, in the shop drawings.
SECTION 08 51 23 Page 4
1.4 WINDOW PERFORMANCE
Steel windows must meet the following performance requirements. Perform testing requirements by an independent testing laboratory or agency.
1.4.1 Structural Performance
Structural test pressures on window units must be for positive load (inward) and negative load (outward). After testing, there will be no glass breakage, permanent damage to fasteners, hardware parts, support arms or actuating mechanisms or any other damage which could cause window to be inoperable. There must be no permanent deformation of any main frame, sash or ventilator member in excess of the requirements established by AAMA/WDMA/CSA 101/I.S.2/A440 for the window types and classification specified in this section.
1.5 WARRANTY
Provide Manufacturer's standard performance guarantees or warranties that extend beyond a one year period.
1.6 DELIVERY AND STORAGE
Deliver to project site in undamaged condition. Store windows and components on edge, out of contact with the ground, under weathertight covering, and arranged to avoid bending, warping, or other damage.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Steel Bars
SWI SWS.
2.1.2 Sheet Steel
ASTM A1011/A1011M .
2.1.3 Zinc-Coated Sheet Steel
ASTM A653/A653M .
2.1.4 Zinc Coating
ASTM A123/A123M .
2.1.5 Screws and Bolts
ASME B18.6.3 as applicable.
2.2 FABRICATION OF WINDOWS
Form permanent joints by welding or mechanically fastening as specified for each type window. Use joints of strength to maintain structural value of members connected. Weld joints solid, remove excess metal, and dress smooth on exposed and contact surfaces. Closely fit joints formed with mechanical fastenings and make permanently watertight. Assemble frames
SECTION 08 51 23 Page 5 and sash at the plant and ship as a unit with hardware unattached.
Provide the following construction:
a. Where fixed window sections adjoin ventilator sections, provide fixed sash, fabricated from similar frame members, and of manufacturer's standard type suitable for the purpose.
b. Roll weathering surfaces integrally to provide two-point parallel-surface contact with overlap at both inside and outside points of closure.
c. Design glazed windows and rabbets suitable for glass thickness shown on drawings.
d. Use flathead, cross recessed type, exposed head screws and bolts with standard threads on windows, trim and accessories. Screw heads must finish flush with adjoining surfaces. Self tapping sheet-metal screws are not acceptable.
e. For hot-dipped galvanized windows, use stainless steel or hot-spun galvanized steel fasteners. For windows with painted finish use electro-galvanized fasteners. Finish exposed heads to match finish of windows.
2.3 MULLIONS AND TRANSOM BARS
Secure mullions and transom bars to adjoining construction and window units in such a manner as to permit expansion and contraction and to form weathertight joint. Provide mullion covers of manufacturer's stock design on the interior and exterior to completely cover exposed joints and recesses between window units and for neat appearance.
2.4 METAL-TO-METAL JOINTS
Set in mastic, using type recommended by window manufacturer to provide weathertight joints. Remove excess mastic before it hardens.
2.5 ACCESSORIES
Provide windows with hardware, clips, fins, anchors, glazing beads, and fastenings, necessary for complete installation and operation of ventilators.
2.5.1 Anchors
Use hot-dip galvanized steel anchors. Secure anchors and fastenings to heads, jambs, and sills of openings, and fasten securely to windows or frames. Use anchors recommended by window manufacturer for specific type of construction and conceal. Anchor each frame at jambs with minimum of three adjustable steel anchors.
2.5.2 Weatherstripping
Provide on all operable windows so that, when tested before leaving factory, in accordance with ASTM E283, do not exceed a maximum air infiltration of 0.05 cubic meter per minute per meter of crack length when subjected to static pressure of 75 Pa equivalent to wind velocity of 40 kmh.
SECTION 08 51 23 Page 6
2.5.3 Hardware
Equip all operable sash with latching device which can be secured from inside. The item, type, and function of hardware required are specified under individual window type. Attach hardware securely to windows with corrosion resisting bolts or machine screws; do not use sheet metal screws. At fixed screens, adapt hardware to permit operation of ventilators. Fit and test hardware for each window at factory to ensure satisfactory operation and security.
2.5.3.1 Hardware Materials and Finish
Provide non-magnetic type stainless steel exposed hardware with satin finish. Use galvanizedsteel or malleable iron hinges, with nonferrous pins, or with steel pins and non-ferrous bushings or washers.
2.5.4 Fasteners
Stainless steel or aluminum materials. Prime exposed heads of coated or plated fasteners and finish to match adjacent material.
2.5.5 Metal Sub-frames and Stools
Manufacturer's standard type designed to suit the particular window.
Match exposed surfaces to windows.
2.6 GLASS AND GLAZING
Provide 3mm clear glass by manufacturer standard.
2.7 WINDOW FINISH
2.7.1 Shop Primed Finish
After fabrication, clean all surfaces of windows, fins, mullions, cover plates, and screen frames and provide a hot-dip galvanized, phosphate-treated and shop primed finish. Conform to SWI SWS for the methods of cleaning, chemical treatment, galvanizing, and painting.
2.7.2 Factory Finish
In lieu of shop primed finish, factory finish may be provided using the following method, in which case finish field painting will not be required:
a. Finish color coating to be selected from manufacturer's standard color chart.
b. Touch up abraded surfaces with enamel as specified for factory finish.
2.8 WINDOW TYPES
Conform to SWI SWS. Provide combinations, types and sizes indicated.
2.8.1 Sliding Window
Single slider as indicated on drawing. Provide inside lock on operable sash.
SECTION 08 51 23 Page 7
2.8.2 Fixed Windows
Standard Intermediate windows as indicated in drawing..
PART 3 EXECUTION
3.1 INSTALLATION
Install in accordance with window manufacturer's printed instructions and details. . Build in windows as work progresses or install without forcing into prepared window openings. Set at proper elevation, location, and reveal; plumb, square, level, and in alignment. Brace and stay to prevent distortion and misalignment. Protect operating parts against dirt and building materials by keeping closed and locked to frame. Bed screws or bolts in sill members, joints at mullions, contacts of windows with sills, built-in fins, and subframes in mastic sealant recommended by window manufacturer. Install and seal windows in a manner that will prevent entrance of water and wind.
Any materials that show visual evidence of biological growth due to the presence of moisture must not be installed on the building project.
3.2 ANCHORS AND FASTENINGS
Make provision for securing units to each other and to adjoining construction. Design head and jamb members to enter into masonry not less than 11 mm where windows are installed in direct contact with masonry.
Where windows are set in prepared masonry openings, build in anchors and fastenings to jambs of openings and fasten securely to windows or frames and to adjoining construction. Space anchors not more than 450 mm apart on jambs and sills, and install a minimum of three anchors on each side of each opening. Anchors and fastenings must have sufficient strength to hold member firmly in position. Where type, size, or spacing of anchors is not shown or specified, use expansion or toggle bolts or screws as best suited to construction material. Provide expansion shield and bolt assemblies of type designed to give holding power beyond tensile and shearing strength of bolt. Minimum fastener penetration must be not less than that recommended by manufacturer for type fastener and wall material involved.
3.3 OPERATORS
Install operators before glazing. Plumb and level shaft risers and runs.
Adjust ventilators for free opening and tight closing. Secure housings and adjustable supports to wall. Anchor operator parts to steel window mullions with 13 mm bolts. Couple individual lengths of shafting with steel rivets or bolts. Leave mechanical equipment and ventilators in proper operating condition.
3.4 WEATHERSTRIPPING
Use bronze, spring-brass, or stainless steel and secure with non-ferrous screws. Secure weatherstripping or rubbing-blocks to parting-strip and each end of meeting-rails. For solid bar stock windows, use manufacturer's standard weatherstripping inserted into groove.
3.5 ADJUSTMENTS AFTER INSTALLATION
After installation of windows and completion of glazing and field
SECTION 08 51 23 Page 8 painting, adjust all ventilators and hardware to operate smoothly and to provide weathertight sealing when ventilators are closed and locked.
Lubricate hardware and operating parts. Adjust weatherstripping to assure weathertight contact with frames when ventilators are closed and locked.
Weatherstripping must not cause binding of sash, or prevent closing and locking of ventilator. Verify products are properly installed, connected, and adjusted.
3.6 CLEANING
Clean interior and exterior surfaces of window units of mortar, plaster, paint spattering spots, and other foreign matter to present a neat appearance and to prevent fouling of weathering surfaces and weatherstripping, or interference with operation of hardware. Clean and touch up abraded surfaces. Replace with new windows any stained, discolored, or abraded windows that cannot be restored to original condition.
-- End of Section --
SECTION 08 51 23 Page 9
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 65 00
RESILIENT FLOORING -- ADDED BY AMENDMENT NO. 0003
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.4 ENVIRONMENTAL REQUIREMENTS
1.5 SCHEDULING
1.6 WARRANTY
PART 2 PRODUCTS
2.1 VINYL COMPOSITION TILE
2.2 WALL BASE
2.3 ADHESIVES
2.4 SURFACE PREPARATION MATERIALS
2.5 POLISH/FINISH
2.6 CAULKING AND SEALANTS
2.7 MANUFACTURER'S COLOR, PATTERN AND TEXTURE
PART 3 EXECUTION
3.1 EXAMINATION
3.2 SURFACE PREPARATION
3.3 MOISTURE, ALKALINITY AND BOND TESTS
3.4 GENERAL INSTALLATION
3.5 PLACING VINYL COMPOSITION SOLID VINYL TILES
3.6 PLACING WALL BASE
3.7 CLEANING
3.8 PROTECTION
-- End of Section Table of Contents --
SECTION 09 65 00 Page 1
SECTION 09 65 00
RESILIENT FLOORING -- ADDED BY AMENDMENT NO. 0003
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D4078 (2002; R 2015) Water Emulsion Floor Polish
ASTM F710 (2021) Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring
ASTM F1066 (2004; R 2014; E 2014) Standard Specification for Vinyl Composition Floor Tile
ASTM F1482 (2021) Standard Practice for Installation and Preparation of Panel Type Underlayments to Receive Resilient Flooring
ASTM F1861 (2021) Standard Specification for Resilient Wall Base
ASTM F1869 (2016a) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Resilient Flooring and Accessories
Adhesives
SD-04 Samples
SECTION 09 65 00 Page 2
Resilient Flooring and Accessories; G R
SD-08 Manufacturer's Instructions
Surface Preparation
Installation
SD-10 Operation and Maintenance Data
Resilient Flooring and Accessories; G R
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, production run, project identification, and handling instructions. Store materials in a clean, dry, secure, and well-ventilated area with ambient air temperature maintained above 20 degrees C and below 30 degrees C, stacked according to manufacturer's recommendations. Protect materials from the direct flow of heat from hot-air registers, radiators and other heating fixtures and appliances.
Observe ventilation and safety procedures specified in the MSDS.
1.4 ENVIRONMENTAL REQUIREMENTS
Maintain areas to receive resilient flooring at a temperature above 20 degrees C and below 30 degrees C for 3 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 13 degrees C thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
1.5 SCHEDULING
Schedule resilient flooring application after the completion of other work which would damage the finished surface of the flooring.
1.6 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period.
PART 2 PRODUCTS
2.1 VINYL COMPOSITION TILE
Conform to ASTM F1066 Class 1, (solid color tile), Composition 1, asbestos-free, 300 mm square and 3.2 mm thick. Provide color and pattern uniformly distributed throughout the thickness of the tile. Color selected by the user from manufacturer standard.
2.2 WALL BASE
Conform to ASTM F1861, Type TS (vulcanized thermoset rubber) or Type TP (thermoplastic rubber), or Type TV (thermoplastic vinyl), Style C (butt toe cove installed with 3 mm thick flooring). Provide 100 mm high and a minimum 3.175 mm thick wall base. Provide preformed corners in matching
SECTION 09 65 00 Page 3 height, shape, and color.
2.3 ADHESIVES
Provide adhesives for flooring, base and accessories as recommended by the manufacturer and comply with local indoor air quality standards. Submit manufacturer's descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.
2.4 SURFACE PREPARATION MATERIALS
Provide surface preparation materials, such as panel type underlayment, lining felt, and floor crack fillers as recommended by the flooring manufacturer for the subfloor conditions. Comply with ASTM F1482 for panel type underlayment products.
2.5 POLISH/FINISH
Provide polish finish as recommended by the manufacturer and conform to ASTM D4078 for polish.
2.6 CAULKING AND SEALANTS
Provide caulking and sealants in accordance with Section 07 92 00 JOINT
SEALANTS.
2.7 MANUFACTURER'S COLOR, PATTERN AND TEXTURE
Provide color, pattern and texture for resilient flooring and accessories selected from manufacturer's standard colors. Submit manufacturer's descriptive data and three samples of each indicated color and type of flooring, base, mouldings, and accessories sized a minimum 60 by 100 mm.
PART 3 EXECUTION
3.1 EXAMINATION
Examine and verify that site conditions are in agreement with the design package. Report all conditions that will prevent a proper installation.
Do not take any corrective action without written permission from the Government. Work will proceed only when conditions have been corrected and accepted by the installer. Submit manufacturer's printed installation instructions for all flooring materials and accessories, including preparation of substrate, seaming techniques, and recommended adhesives.
3.2 SURFACE PREPARATION
Provide a smooth, true, level plane for surface preparation of the flooring, except where indicated as sloped. Floor to be flat to within
4.75 in 3048 mm. Prepare subfloor in accordance with flooring manufacturer's recommended instructions. Prepare the surfaces of lightweight concrete slabs (as defined by the flooring manufacturer) as recommended by the flooring manufacturer. Comply with ASTM F710 for concrete subfloor preparation. Floor fills or toppings may be required as recommended by the flooring manufacturer. Install underlayments, when required by the flooring manufacturer, in accordance with manufacturer's recommended printed installation instructions. Comply with ASTM F1482 for panel type underlayments. Before any work under this section is begun, correct all defects such as rough or scaling concrete, chalk and dust, SECTION 09 65 00 Page 4 cracks, low spots, high spots, and uneven surfaces. Repair all damaged portions of concrete slabs as recommended by the flooring manufacturer.
Remove concrete curing and sealer compounds from the slabs, other than the type that does not adversely affect adhesion. Remove paint, varnish, oils, release agents, sealers, waxes, and adhesives, as required by the flooring product in accordance with manufacturer's printed installation instructions.
3.3 MOISTURE, ALKALINITY AND BOND TESTS
Determine the suitability of the concrete subfloor for receiving the resilient flooring with regard to moisture content and pH level by moisture and alkalinity tests. Conduct moisture testing in accordance with ASTM F1869 or ASTM F2170, unless otherwise recommended by the flooring manufacturer. Conduct alkalinity testing as recommended by the flooring manufacturer. Determine the compatibility of the resilient flooring adhesives to the concrete floors by a bond test in accordance with the flooring manufacturer's recommendations. Submit copy of test reports for moisture and alkalinity content of concrete slab, and bond test stating date of test, person conducting the test, and the area tested.
3.4 GENERAL INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
3.5 PLACING VINYL COMPOSITION SOLID VINYL TILES
Install tile flooring and accessories in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's directions. Keep tile lines and joints square, symmetrical, tight, and even. Keep each floor in true, level plane, except where slope is indicated. Vary edge width as necessary to maintain full-size tiles in the field, no edge tile to be less than one-half the field tile size, except where irregular shaped rooms make it impossible. Cut flooring to fit around all permanent fixtures, built-in furniture and cabinets, pipes, and outlets. Cut, fit, and scribe edge tile to walls and partitions after field flooring has been applied.
3.6 PLACING WALL BASE
Install wall base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions. Tighten base joints and make even with adjacent resilient flooring. Fill voids along the top edge of base at masonry walls with caulk. Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners.
3.7 CLEANING
Immediately upon completion of installation of flooring in a room or an area, dry and clean the flooring and adjacent surfaces to remove all surplus adhesive. Clean flooring as recommended in accordance with manufacturer's printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and finish in accordance with manufacturer's written instructions.
SECTION 09 65 00 Page 5
3.8 PROTECTION
From the time of installation until acceptance, protect flooring from damage as recommended by the flooring manufacturer. Remove and replace flooring which becomes damaged, loose, broken, or curled and wall base which is not tight to wall or securely adhered.
-- End of Section --
SECTION 09 65 00 Page 6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
Ren ICTS Medical Warehouse, Baghdad Intl Airport, Iraq
08 51 23 SD-02 Shop Drawings
2.2Windows
SD-03 Product Data
2.3Mullions
2.5.3Hardware
2.5.3.1Hardware Materials
2.5.4Fasteners
2.5Accessories
SD-04 Samples
2.7.2 G RColor Coating
SD-05 Design Data
1.3.3 G MDesign Analysis
SD-10 Operation and Maintenance
Data
2.2 G RWindows
09 65 00 SD-03 Product Data
2.7Resilient Flooring and
Accessories
2.3Adhesives
SD-04 Samples
2.7 G RResilient Flooring and
Accessories
SD-08 Manufacturer’s Instructions
3.2Surface Preparation
3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
Ren ICTS Medical Warehouse, Baghdad Intl Airport, Iraq
09 65 00 SD-10 Operation and Maintenance
Data
2.7 G RResilient Flooring and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
| PROJECT TABLE OF CONTENTS |
| DIVISION 08 - OPENINGS |
| 08 51 23 - STEEL WINDOWS -- ADDED BY AMENDMENT 0003 |
| DIVISION 09 - FINISHES |
| 09 65 00 - RESILIENT FLOORING -- ADDED BY AMENDMENT NO. 0003 |