AMENDMENT 0003_DRAWINGS ICTS MEDICAL WAREHOUSE_IR-498752_RFR_2022-08-04.pdf
PDF 606 KB Posted
- Solicitation number
- W912ER22R0026
About this file
This document contains drawings and specifications for the design-bid-build construction of the Iraq Counterterrorism Warehouse at Baghdad Airport in Baghdad, Iraq. The scope of work includes renovating an existing medical warehouse building and associated site work. The drawings provide floor plans, mechanical schematics for the fuel oil system, and a single line diagram for electrical work. Specifications require the contractor to provide performance and payment bonds. The estimated cost of construction is between $5 million and $10 million. The solicitation number for the project is W912ER22R0026 and was issued by the U.S. Army Corps of Engineers Middle East District. The submission deadline and award date are not specified.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L.
SA
N D
AT
E
E.
ST
IL
LM
AN
E.
ST
IL
LM
AN
-0 8-
IR
-4
2- G
-0
-0
G-011
G
EN
ER
AL
IN
D
EX
O
F D
R
AW
IN
G
S D
.R
AC
KM
AL
ES
TR
AN
SA
TL
AN
TI
C M
ID
D
LE
E
AS
T
D
IS
TR
IC
T
PR
IN
C
E
FR
ED
ER
IC
K
D R
IV
E
W
IN
C H
ES
TE
R , V
A
AN
SI
D
BA
G
H D
AD
IN
TE
R
N
AT
IO
N
AL
A
IR
PO
R T, B
AG
H
AD
AD
, I
R
AQ
IR
AQ
C O
U N
TE
R
T
ER
R O
R
IS
M S
ER
VI
C
ES
R
EN
O
VA
TE
C
TS
M
ED
IC
AL
W
AR
EH
O U
SE
IR
-4
AM 0003
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
PL
O
T D
AT
E:
FI
LE
N
AM
E:
INDEX OF DRAWINGS
R
EV
IS
ED
I.
A.
W . A
M
EN
D M
EN
T
AU
G n0enmems
FN -03
n0enmems
FN -03
n0enmems
FN -03
n0enmems
FN -03
n0enmems
FN -03
n0enmems
FN -03
AA
BB
CAGE
G13
COOLING RM
G12
VAULT
G11
OFFICE
G01
RECEIVE
G02
CONF
G03
LOOSE
G07
ACIDS
G10
FLAMMABLES
G09
2945 2400 3500 2400 3500 2400
BULK
G08
SHIPPING
G05
RECEIVING
G06
FORKLIFT
CHARGING
EYE
WASH
FEC
FEC
FEC
FEC
FEC
EX
A2.1
A2.1
A2
A2
A2
A2
A5
A5
A5
A5
A3
08A
FORKLIFT
CHARGING
G05
NOTE 2.NOTE 2
NOTE 2
A1
A1
A1
A1
NOTE 3
NOTE 3
NOTE 3
A5
A5
A5
STEEL FRAME
SLIDING WINDOW
W/ 3MM CLEAR GLASS
JAMB SIMILAR
50 900 50
STEEL FRAME FIX
GLAZING W/ 3MM
CLEAR GLAZING.
US Army Corps of Engineers ®
SHEET ID
US
A
RM
Y
CO
RP
S O
F
EN
G
IN
EE
RS
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
UNLESS OTHERWISE NOTED, LINEAR
DIMENSIONS SHOWN ARE IN MILLIMETERS.
PL
O
T D
AT
E:
TR
AN
SA
TL
AN
TI
C M
ID
D
LE
E
AS
T
D
IS
TR
IC
T
PR
IN
C
E
FR
ED
R
IC
K
D R
IV
E, W
IN
C H
ES
TE
R , V
A
X:\REVIT PROJECTS\IRAQ\2020\IQ 498752-Renovate CTS Medical Warehouse\IQ-498752-DM-A-RCMW.rvt
8/2/2022 9:33:22 AM
8/ 2/
:3
3:
2 2
A M
A-101
FL
O
O R
P
LA
N
BA
G
H D
AD
IN
TE
R
N
AT
IO
N
AL
A
IR
PO
R T, B
AG
H
AD
AD
, I
R
AQ
S.
LI
N
S.
LI
N
S.
LI
N
M
AR
C H
W
2E R
R
IR
AQ
C O
U N
TE
R
T
ER
R O
R
IS
M S
EV
IC
ES
A
D .H
AR
TM
AN
N FI
LE
N
AM
E:
IR
-4
2A -A
1-
M
ED
IC
AL
W
AR
EH
O
U
SE
R
EN
O
VA
TE
C
TS
M
ED
IC
AL
W
AR
EH
O U
SE
R
1 : 100
GROUND FLOOR
GENERAL NOTES
1. ALL DOORS ARE LOCATED 200 MM TO HINGE SIDE WALL
UNLESS NOTED OTHERWISE.
2. REMOVE PORTION OF WALL AS INDICATED TO ACCOMODATE
NEW DOOR. PATCH DISTURBED WALL TO MATCH ADJACENT
FINISH. FIELD VERIFY THE FINAL LOCATION TO AVOID
CONFLICT WITH EXISTING STRUCTURAL, UTILITY ELEMENTS.
3. SLIDING GATE BY FENCE PARTITION MANUFACTURER. SEE
DOOR TYPES AND A-201 FOR DETAILS.
4. PROVIDE WOOD BLOCKING FOR METAL STUDS WALLS
WHERE WALL MOUNTED EQUIPMENT ARE INDICATED. SEE
FEE AND COMM DRAWING FOR LOCATIONS OF EQUIPMENT.
GRAPHIC SCALE
1:100
10m2m 8m6m4m0m
DIM. NOTE & NORTH
1 : 20
SLIDING WINDOW - TYPE 2
1 : 20
WINDOW HEAD
1 : 20
RECEPTION WINDOW - TYPE 1
1:20
2m0.4m 1.6m1.2m0.8m0m
-0
AM 0003
AU
G
AM 0003
AU
AM 0003
A U
200A 3P
DISTRIBUTION PANEL,
MDP
400/230V, 3Ø, 4W
400A BUS
IP65
400A 3P
30A 3P
SPD
FEEDER SCHEDULE:
31 (4) 10mm2 + (1) 10mm2 GND IN 25mm C
101 (4) 50mm2 + (1) 10mm2 GND IN 40mm C
4 SETS OF (4) 150mm2 + (1) 25mm2 GND EACH IN 100mm C
71 (4) 35mm2 + (1) 10mm2 GND IN 32mm C
100A 3P
SPD
630A 3P
N
LATS1
N E
L BYPASS
SWITCH
E
RP
400/230V 3Ø, 4W
100A MCB
42 POLE
IP65
Y
NEW PAD MOUNTED
PACKAGED SUSBSTATION
11KV- 400/230V, 3PH, 4W, 50 Hz
250 KVA
GEN
PRIME RATED DIESEL GENERATOR IN
MANUFACTURER'S WEATHER PROOF ENCLOSURE
400/230V, 3PH, 4W, 50 Hz
240 KW
400A
LSIFROM UTILITY
630A 3P
N
LMTS
N E
L BYPASS
SWITCH
E
GEN
400A
LSI
400A - 400V - 4P
MANUAL TRANSFER SWITCH WITH
IN NEMA 4X ENCLOUSURE
630A - 400V - 4P
SERVICE RATED AUTOMATIC
TRANSFER SWITCH WITH BYPASS
ISOLATION IN NEMA 4X ENCLOUSURE
3- 150MM², 15KV MV-105 EPR CABLE IN
128MM CONDUIT.
2 SETS OF (4) 150mm2 + (1) 25mm2 GND EACH IN 100mm C
250 (4) 120mm2 + (1) 120mm2 GND IN 50mm C
EXISTING AIR
HANDLING
AHU-1
200A 3P
EXISTING AIR
HANDLING
AHU-2
30A 3P
DB
400/230V 3Ø, 4W
EXISTING
NEW POLE
WITH
11KV LINK
FUSE
PRIME RATED DIESEL GENERATOR IN
MANUFACTURER'S WEATHER PROOF ENCLOSURE
400/230V, 3PH, 4W, 50 Hz
240 KW
GEN 1
GEN 2
US Army Corps of Engineers ®
SHEET ID
US
A
RM
Y
CO
RP
S O
F
EN
G
IN
EE
RS
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
UNLESS OTHERWISE NOTED, LINEAR
DIMENSIONS SHOWN ARE IN MILLIMETERS.
PL
O
T D
AT
E:
TR
AN
SA
TL
AN
TI
C M
ID
D
LE
E
AS
T
D
IS
TR
IC
T
PR
IN
C
E
FR
ED
R
IC
K
D R
IV
E, W
IN
C H
ES
TE
R , V
A
APPROVED EQUAL IS ALLOWED FOR ANY MANUFACTURERS MAKE AND OR MODEL SHOWN ON THIS DRAWING AS THE BASIS OF DESIGN THIS FACILITY IS DESIGNED IN ACCORDANCE WITH UFC 1-201-01 AT A FACILITY CONSTRUCTION LEVEL OF "SEMI-PERMANENT"
C:\Users\n0eneia3\Desktop\IQ-498752-DM-E-RCMW.rvt
8/3/2022 11:56:52 AM
8/ 3/
2 2
1:
:5
AM
E-601
EL
EC
TR
IC
AL
O N
E
LI
N E
D
IA
G R
AM
C
AM
P
TA
JI
, B
AG
H
AD
AD
, I R
AQ
I.
AY
AL
A
I.
AY
AL
A
I.
AY
AL
A
M
AR
C H
W
2E R
R
IR
AQ
C O
U N
TE
R
T
ER
R O
R
IS
M S
EV
IC
ES
IR
-4
A
D .H
AR
TM
AN
N FI
LE
N
AM
E:
IR
-4
2A -E
-6
-0
EL
EC
TR
IC
AL
R
EN
O
VA
TE
C
TS
M
ED
IC
AL
W
AR
EH
O U
SE
NTS
ELECTRICAL - SINGLE LINE DIAGRAM
1. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES
AND ABBREVIATIONS.
2. ALL MAIN PANELBOARDS SHALL HAVE AN INTEGRAL TRANSIENT
VOLTAGE SURGE SUPPRESSORS (TVSS). PROVIDE TVSS AS PER
MANUFACTURER'S REQUIREMENTS.
3. REFER TO SHEET A-EP602 FOR PANEL SCHEDULES AND FOR
CONDUCTOR SIZES NOT SHOWN ON THIS SHEET.
GENERAL NOTES
R
EV
IS
ED
IA
W A
M E N
D M
EN
T
AU
G
| AM 0003 - ICTS MEDICAL WAREHOUSE (IR-498752) |
| GENERAL |
| G-011 - INDEX OF DRAWINGS |
| FACILITY "A" - MEDICAL WAREHOUSE |
| ARCHITECTURE |
| A-101 - FLOOR PLAN |
| MECHANICAL |
| M-102 - FUEL OIL SYSTEM GENERAL GROUND FLOOR PLAN |
| M-401 - FUEL OIL SYSTEM ENLARGED GROUND FLOOR PLAN |
| M-901 - FUEL OIL SYSTEMS ISOMETRIC |
| ELECTRICAL |
| E-601 - ELECTRICAL - ONE LINE DIAGRAM |
File details come from the government source that posted it. Updated .