AM 0002_27 Jul 22 - Drawings ICTS Medical Warehouse (IR-498752)_RFR.pdf

PDF 448 KB Posted

Attached to
Iraq Counterterrorism Warehouse, Baghdad Airport (BIAP)
Solicitation number
W912ER22R0026
Issued by

About this file

This document package includes a solicitation for design-build construction services and related drawings for renovating a medical warehouse at Baghdad International Airport in Iraq. The solicitation seeks proposals for construction valued between $5 million and $10 million. Proposals are due by the date specified in the solicitation. The successful offeror must provide performance and payment bonds or bank letters of guarantee after contract award but before the notice to proceed. Funds have been authorized but are not presently available, so no award will be made until funding is in place. All offerors must be registered in the System for Award Management with a valid CAGE code and DUNS number to be considered. The drawings provide details for site plans, reflected ceiling plans, section details, and design notes for the medical warehouse renovation.

View the file

Other files

File Type Posted
AMENDMENT 0003_DRAWINGS ICTS MEDICAL WAREHOUSE_IR-498752_RFR_2022-08-04.pdf PDF
W912ER22R0026 Amendment 0003 4 August 2022.pdf PDF
AMENDMENT 0003 SPECIFICATIONS - 22R0026 - REN CTS MED WH Iraq.pdf PDF
B.08 Solicitation SF1442 W912E026 Iraq CTS Medical Warehouse Attach A.pdf PDF
B.08 Solicitation SF1442 W912E026 Amendment 2 Iraq CTS Medical Warehouse.pdf PDF
B.08 Solicitation SF1442 W912E026 Iraq CTS Medical Warehouse Attach C.pdf PDF
AMENDMENT 0002 SPECIFICATIONS DOC 22R0026 CTS Med Warehouse.pdf PDF
B.08 Solicitation SF1442 W912E026 Iraq CTS Medical Warehouse Attach D.pdf PDF
B.08 Solicitation SF1442 W912E026 Iraq CTS Medical Warehouse Attach H.pdf PDF
B.08 Solicitation SF1442 W912E026 Iraq CTS Medical Warehouse Attach G.pdf PDF
B.08 Solicitation SF1442 W912E026 Iraq CTS Medical Warehouse Attach E.pdf PDF
B.08 Solicitation SF1442 W912E026 Iraq CTS Medical Warehouse Attach B.pdf PDF
Amendment 0001_W912ER22R0026 CTS Medical Warehouse_CDC_Drawings.pdf PDF
Amendment 0001 W912ER22R00260001 Iraq CTS Medical Warehouse_7July22.pdf PDF
B.08_Cost Breakdown Iraqi counterrorisum Service 6-21-2022.pdf PDF
B.08_Proposal Schedule Iraqi Counterrorisum 6-21-2022.pdf PDF
Solicitation SF1442 W912ER22R0026 Iraq CTS Medical Warehouse.pdf PDF
B.08_FINAL FFE BINDER - CDC.pdf PDF
B.08_IR-498752_CTS Medical Warehouse_CDC_Drawings_MARCH 2022_RFR.pdf PDF
498752 ICTS BASE BID SCHEDULE COST BREAKDOWN 6-21-2022.xlsx XLSX spreadsheet
B.08_CDC SPECIFICATIONS - CTS MED WHSE, BAGHDAD INTL AIRPORT - 498752.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L.

S

AN

D

AT

E

E.

S

TI

LL

M

AN

E.

S

TI

LL

M

AN

-0 7-

IR

-4

2- G

-0

-0

G-011

G

EN

ER

AL

IN

D

EX

O

F D

R

AW

IN

G

S D

. R

AC

KM

AL

ES

TR

AN

SA

TL

AN

TI

C M

ID

D

LE

E

AS

T

D

IS

TR

IC

T

PR

IN

C

E

FR

ED

ER

IC

K

D R

IV

E

W

IN

C H

ES

TE

R , V

A

AN

SI

D

BA

G

H D

AD

IN

TE

R

N

AT

IO

N

AL

A

IR

PO

R T, B

AG

H

AD

AD

, I

R

AQ

IR

AQ

C O

U N

TE

R

T

ER

R O

R

IS

M S

ER

VI

C

ES

R

EN

O

VA

TE

C

TS

M

ED

IC

AL

W

AR

EH

O U

SE

IR

-4

AM 0002

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

US Army Corps of Engineers

PL

O

T D

AT

E:

FI

LE

N

AM

E:

INDEX OF DRAWINGS

R

EV

IS

ED

I.

A.

W . A

M

EN

D M

EN

T

JU

L

14.00

8.

.0

20.00

TWO GENERATORS AND

FUEL TANKS PAD

350.00 2.50

2.00

E

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

1.

E

EXISTING

MEDICAL

WAREHOUSE

EXISTING SUB

DISTRIBUTION

PANEL

ROAD

20M WIDE

K

175.006

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

A

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SHEET ID

XE-101

A.

IV

EL

IS

SE

F.

TA

YL

O

R

S.

LI

N

D .H

AR

TM

AN

-0

3-

AN

SI

D

W

2E R

R

M

AR

C H

W

IN

C H

ES

TE

R , V

A

PR

IN

C E

FR

ED

ER

IC

K D

R

IV

E

TR

AN

SA

TL

AN

TI

C

M

ID

D

LE

E

AS

T D

IS

TR

IC

T

IR

AQ

C O

U N

TE

R

T

ER

R O

R

IS

M S

ER

VI

C

ES

R

EN

O

VA

TE

C

TS

M

ED

IC

AL

W

AR

R

EH

O

U

SE

IR

-4

SI

TE

D

ES

IG

N

EL

EC

TR

IC

AL

SI

TE

P

LA

N

FI

LE

N

AM

E:

IR

-4

2A

-X E-

PL

O

T D

AT

E:

1:600

ELECTRICAL SITE PLAN1

SHEET KEYNOTES

LEGEND

1. CONTRACTOR IS TO INTERCEPT EXISTING 11 KV OVERHEAD LINES,

CONNECT TO THE EXISTING POWER GRID, AND EXTEND 11KV OVERHEAD

FEEDERS TO THE NEW POLE. PROVIDE ONE SINGLE CONDUCTOR FOR EACH

PHASE (THREE TOTAL), REFER TO SHEET A-E-503 FOR OVERHEAD LINE DETAILS.

2. NEW 11 METER GALVANIZE POLE WITH SWITCH CUT OFF. REFER TO SHEET

A-E-503 FOR DETAILS.

3. NEW UNDERGROUND 15KV MEDIUM VOLTAGE FROM NEW POLE TO NEW

KIOKS COMPACT TRANSFORMER. REFER TO SHEET A-E-504 FOR MV/LV

UNDERGROUND DETAILS.

4. NEW PAD MOUNTED 250KVA KIOSK TRANSFORMER. REFER TO DETAIL

7/AE-501 FOR GROUNDING REQUIREMENTS.

5. NEW UNDERGROUND LOW VOLTAGE FEEDERS. REFER TO SHEET A-E-504

FOR MV/LV UNDERGROUND DETAILS.

6. NEW ELECTRICAL MANHOLES, REFER TO SHEET A-E-504 FOR MV/LV

UNDERGROUND DETAILS.

7. NEW SERVICE ENTRANCE RATED AUTOMATIC TRANSFER SWITCH (ATS).

REFER TO SHEETS A-E-103 FOR POWER PLAN AND A-E-601 FOR ONE LINE

DIAGRAMS AND OTHER DETAILS.

DIM. NOTE

UNLESS OTHERWISE NOTED, LINEAR

DIMENSIONS SHOWN ARE IN METERS

NEW KIOSK COMPACT SUBSTATION

PROP ELEC MANHOLE

PROPOSED POLE

K

EM

Meters

50250

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

A

B

CAGE

G13

COOLING RM

G12

VAULT

G11

ACIDS

G10

FLAMMABLES

G09

BULK

G08

SHIPPING

G05

RECEIVING

G06

OFFICE

G01

RECEIVE

G02

CONF

G03

PROVIDE 1/2 HOUR THERMAL BARRIER OVER

INTERIOR APPLIED SPRAY-OF INSULATION

US Army Corps of Engineers ®

SHEET ID

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

UNLESS OTHERWISE NOTED, LINEAR

DIMENSIONS SHOWN ARE IN MILLIMETERS.

PL

O

T D

AT

E:

TR

AN

SA

TL

AN

TI

C M

ID

D

LE

E

AS

T

D

IS

TR

IC

T

PR

IN

C

E

FR

ED

R

IC

K

D R

IV

E, W

IN

C H

ES

TE

R , V

A

X:\REVIT PROJECTS\IRAQ\2020\IQ 498752-Renovate CTS Medical Warehouse\IQ-498752-DM-A-RCMW.rvt

7/25/2022 2:43:13 PM

7/

/2 0 2

2:

:1

PM

A-102

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

BA

G

H D

AD

IN

TE

R

N

AT

IO

N

AL

A

IR

PO

R T, B

AG

H

AD

AD

, I

R

AQ

S.

LI

N

S.

LI

N

S.

LI

N

M

AR

C H

W

2E R

R

IR

AQ

C O

U N

TE

R

T

ER

R O

R

IS

M S

EV

IC

ES

A

D .H

AR

TM

AN

N FI

LE

N

AM

E:

IQ

-4

2A -A

M

ED

IC

AL

W

AR

EH

O

U

SE

R

EN

O

VA

TE

C

TS

M

ED

IC

AL

W

AR

EH

O U

SE

1 : 100

GROUND FLOOR

GENERAL NOTES

1. ALL CEILING ARE 600 X 1200 U.N.O.

2. CEILING ARE ARE 2700 AFF U.N.O.

GRAPHIC SCALE

1:100

10m2m 8m6m4m0m

DIM. NOTE & NORTH

FLOOR SYSTEM

MOISTURE RESISTANT 16mm

GWB

92 mm 25 GA MTL STUDS @ 400mm OC

SEALANT

20 GA METAL STUDS TOP

BRACINGS

ACOUSTICAL SEALANT

DEFLECTION HEAD

CEILING (OFFICE, CONF

ONLY)

WALL PENETRATIONS

A .F

.F

SE

E

R C

P

FO

R H

TS

A .F

.F

A2.1 (1 HR RATING)

RUBBER

BASE, CONT.

19mm #9 FLAT, STEEL

EXPANDED

W/ FRAMES.

SEE

1/A-201 FOR

STANDARD

DETAILS.

A .F

.F

A .F

.F

A F.

F.

F

SEALAN

T CONT

A1 A4 A5

A .F

.F

200mm CMU

FILLED GROUT

SOLID.

A3A2

SEE A 1 FOR TYPICAL NOTES

TYPE "X"

GWB BOTH SIDES

WALL PENETRATIONS

A F.

F.

F

MOISTURE RESISTANT

16mm GWB BOTH

SIDES.

SEE A 1 FOR TYPICAL NOTES SEE A 2, A3 FOR TYPICAL NOTES

90mm ACOUSTICAL BATT

32mm x 32mm x 3mm STEEL

ANGLE FRAME

10 GA WIRE WOVEN MESH

9mm DIAMETER EXPANSION BOLTS

50mm x 178mm STEEL PLATE

50mm x 50mm x 14 GA STEEL TUBE

32mm x 2mm x 3mm STEEL

ANGLE FRAME

10 GA WIRE WOVEN MESH

9mm DIAMETER CORNER BOLT

50mm x 178mm STEEL PLATE

50mm x 50mm x 14 GA STEEL TUBE

32mm x 32mm x 3mm STEEL

ANGLE FRAME

10 GA WIRE WOVEN MESH

50mm x 50mm x 13mm STEEL PLATE w/

HOLES FOR PADLOCK

32mm X 32mm X 3mm STEEL

ANGLE FRAME

10 GA WIRE WOVEN MESH

9mm DIAMETER STRAIGHT BOLT

50mmx178mm STEEL PLATE

50mm x 50mm x 14 GA STEEL TUBE

32mm X 32mm X 3mm STEEL ANGLE FRAME

10 GA WIRE WOVEN MESH

9mm DIAMETER EXPANSION BOLTS 50mm x 178mm STEEL PLATE

50mm x 50 mm x 14 GA STEEL TUBE

DETAIL AT WALL OR CEILING ANCHOR DETAIL AT DOOR MEETING STILE DETAIL AT LINE POST DETAIL AT DOOR THREE-WAY POST DETAIL AT FOUR-WAY POST

US Army Corps of Engineers ®

SHEET ID

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

UNLESS OTHERWISE NOTED, LINEAR

DIMENSIONS SHOWN ARE IN MILLIMETERS.

PL

O

T D

AT

E:

TR

AN

SA

TL

AN

TI

C M

ID

D

LE

E

AS

T

D

IS

TR

IC

T

PR

IN

C

E

FR

ED

R

IC

K

D R

IV

E, W

IN

C H

ES

TE

R , V

A

APPROVED EQUAL IS ALLOWED FOR ANY MANUFACTURERS MAKE AND OR MODEL SHOWN ON THIS DRAWING AS THE BASIS OF DESIGN THIS FACILITY IS DESIGNED IN ACCORDANCE WITH UFC 1-201-01 AT A FACILITY CONSTRUCTION LEVEL OF "SEMI-PERMANENT"

7/

/2 0 2

8:

:0

AM

A-201

SE

C

TI

O

N D

ET

AI

LS

BA

G

H D

AD

IN

TE

R

N

AT

IO

N

AL

A

IR

PO

R T, B

AG

H

AD

AD

, I

R

AQ

S.

LI

N

S.

LI

N

S.

LI

N

M

AR

C H

W

2E R

R

IR

AQ

C O

U N

TE

R

T

ER

R O

R

IS

M S

EV

IC

ES

A

D .H

AR

TM

AN

N

, C H

IE

F

FI

LE

N

AM

E:

IQ

-4

2A

-A -2

M

ED

IC

AL

W

AR

EH

O

U

SE

R

EN

O

VA

TE

C

TS

M

ED

IC

AL

W

AR

EH

O U

SE

SCHEDULE - FINISH

ROOM

BASE FINISH

FLOORS WALLS CEILINGS

COMMENTSNUMBER NAME FINISH FINISH FINISH

G01 OFFICE RB VCT PTD ACT

G02 RECEIVE RB SC PTD - EXPOSED TO THERMAL BARRIER

G03 CONF RB VCT PTD ACT

G05 SHIPPING - SC - - EXPOSED TO THERMAL BARRIER

G06 RECEIVING - SC - - EXPOSED TO THERMAL BARRIER

G07 LOOSE - SC - - EXPOSED TO THERMAL BARRIER

G08 BULK - SC - - EXPOSED TO THERMAL BARRIER

G09 FLAMMABLES RB SC PTD GWB

G10 ACIDS RB SC PTD GWB

G11 VAULT RB SC PTD GWB

G12 COOLING RM RB SC PTD GWB

G13 CAGE - SC PRE - EXPOSED TO THERMAL BARRIER

SCALE: 1 : 10

PARTITION TYPES2

1 : 10

WIRE PARTITIONS - CONNECTION DETAILS

1:10

1m0.2m 0.8m0.6m0.4m0m

AMENDMENT 0002 - ICTS MEDICAL WAREHOUSE (IR-498752)
GENERAL
G-011 - INDEX OF DRAWINGS
SITE DESIGN
SITE ELECTRICAL
XE-101 - ELECTRICAL SITE PLAN
FACILITY "A" - MEDICAL WAREHOUSE
ARCHITECTURAL
A-102 - REFLECTED CEILING PLAN
A-201 - SECTION DETAILS

File details come from the government source that posted it. Updated .