A.03_CBS.xls
XLS spreadsheet 106 KB Posted
- Attached to
- Site Preparation in Ta'if Saudi Arabia
- Solicitation number
- W912ER22R0010
About this file
This document includes a proposal schedule and cost breakdown sheet for site preparation work in Ta'if, Saudi Arabia. The solicitation is from the U.S. Army Corps of Engineers Engineering District Middle East under number W912ER22R0010. The proposal schedule lays out base items and optional items for conducting surveys, constructing storage and support areas including a munitions storage area, western life support area, bulk petroleum storage complex, and two maintenance areas. The cost breakdown sheet provides a template for offerors to provide direct and indirect cost details for the line items. Pricing and response are due based on the solicitation schedule.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Schedule
| PROPOSAL SCHEDULE | ||||||||
| RFP: | W912ER22R0010 | P2# | 499848 | |||||
| PROJECT: | KSA Site Prep - Ta'if | |||||||
| LOCATION: | Areas near Ta'if | 12-Aug-08 | ||||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | AMOUNT | TOTAL | TOTAL | ||
| Base Items | ||||||||
| 0001 | Mobilization and Demobilization in accordance with the contract documents | 1 | JA | |||||
| 0002 | Conduct Topographical and Geotechnical Site Survey and any necessary Design in accordance with the contract documents | 1 | JA | $5,886,463 | ||||
| 0003 | Construct Munition Storage Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0004 | Construct Western Life Support Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0005 | Construct Bulk, Petroleum, Oil & Lubricants Storage Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0006 | Construct Maintenance Area 1 in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0007 | Construct Maintenance Area 2 in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0008 | Construct Air Defense Artillery Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0009 | VAT @ 15% for Base Items in accordance with the contract documents | 1 | JA | |||||
| TOTAL BASE PRICE (ITEMS 0001 - 0009) | ||||||||
| Optional Items | ||||||||
| 0010 | OPTION #1 Construct Maintenance Area 3 in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0011 | OPTION #2 Construct Eastern Life Support Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0012 | OPTION #3 Remove and properly dispose of debris located on LSA site in accordance with the contract documents | 1 | JA | |||||
| 0013 | VAT @ 15% for Optional Items in accordance with the contract documents | 1 | JA | |||||
| TOTAL OPTIONS PRICE (ITEMS 0010 - 0013) | ||||||||
| TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0013) | ||||||||
| $8,611,972 |
&C&9&P of &N
Cost Breakdown Sheet
| COST BREAKDOWN SHEET | ||||||||||||
| RFP: | W912ER22R0010 | P2# | 499848 | |||||||||
| PROJECT: | KSA Site Prep - Ta'if | PROPOSER: | ||||||||||
| LOCATION: | Areas near Ta'if | DATE: | ||||||||||
| ITEM | DESCRIPTION | DIRECT LABOR COST | DIRECT EQUIPMENT COST | DIRECT MATERIALS COST | SUB CONTRACTOR COST | TOTAL DIRECT COST | JOOH | HOOH | BOND | OVERHEAD/ INDIRECT COST | PROFIT | TOTAL PROPOSED COST |
| 0001 | Mobilization and Demobilization in accordance with the contract documents | |||||||||||
| 0001AA | Mobilization in accordance with the contract documents | |||||||||||
| 0001AB | De-mobilization in accordance with the contract documents | |||||||||||
| Total for CLIN 0001AA-AB | ||||||||||||
| 0002 | Conduct Topographical and Geotechnical Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AA | Conduct MSA Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AB | Conduct Western LSA Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AC | Conduct BPS Complex Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AD | Conduct Maintenance Site 1 Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AE | Conduct Maintenance Site 2 Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AF | Conduct ADA Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| Total for CLIN 0002AA-AF | ||||||||||||
| 0003 | Construct Munition Storage Area in accordance with the contract documents | |||||||||||
| 0003AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0003AB | Construct Earthen Berms in accordance with the contract documents | |||||||||||
| 0003AC | Construct MSA Inside Perimeter Access Roads in accordance with the conctract documents | |||||||||||
| 0003AD | Install Area Fencing in accordance with the contract Documents | |||||||||||
| Total for CLIN 0003AA-AD | ||||||||||||
| 0004 | Construct Western Life Support Area in accordance with the contract documents | |||||||||||
| 0004AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0004AB | Place Western Life Support Area Gravel Pad in accordance with the contract documents | |||||||||||
| 0004AC | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0004AA-AB | ||||||||||||
| 0005 | Construct Bulk, Petroleum, Oil & Lubricants Storage Area in accordance with the contract documents | |||||||||||
| 0005AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0005AB | Construct Earthen Berms in accordance with the contract documents | |||||||||||
| 0005AC | Construct BPS Complex Inside Perimeter Access Roads in accordance with the contract documents | |||||||||||
| 0005AD | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0005AA-AD | ||||||||||||
| 0006 | Construct Maintenance Area 1 in accordance with the contract documents | |||||||||||
| 0006AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0006AB | Place Maintenance Area 1 Foundation Gravel Overlay in accordance with the contract documents | |||||||||||
| 0006AC | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0006AA-AC | ||||||||||||
| 0007 | Construct Maintenance Area 2 in accordance with the contract documents | |||||||||||
| 0007AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0007AB | Place Maintenance Area 2 Foundation Gravel Overlay in accordance with the contract documents | |||||||||||
| 0007AC | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0007AA-AC | ||||||||||||
| 0008 | Construct Air Defense Artillery Area in accordance with the contract documents | |||||||||||
| 0008AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0008AB | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0008AA-AB | ||||||||||||
| 0009 | VAT @ 15% for Base Items in accordance with the contract documents | |||||||||||
| Total for CLIN 0009 | ||||||||||||
| TOTAL BASE PRICE (ITEMS 0001 - 0009) | ||||||||||||
| 0010 | OPTION #1 Construct Maintenance Area 3 in accordance with the contract documents | |||||||||||
| 0010AA | Conduct Maintenance Site 3 Survey and Design in accordance with the contract documents | |||||||||||
| 0010AB | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0010AC | Place Maintenance Area 3 Foundation Gravel Overlay in accordance with the contract documents | |||||||||||
| Total for CLIN 0009AA-AC | ||||||||||||
| 0011 | OPTION #2 Construct Eastern Life Support Area in accordance with the contract documents | |||||||||||
| 0011AA | Conduct Eastern LSA Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0011AB | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0011AC | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0010AA-AC | ||||||||||||
| 0012 | OPTION #3 Remove and properly dispose of debris located on LSA site in accordance with the contract documents | |||||||||||
| Total for CLIN 0011 | ||||||||||||
| 0013 | VAT @ 15% for Optional Items in accordance with the contract documents | |||||||||||
| Total for CLIN 0013 | ||||||||||||
| TOTAL OPTIONS PRICE (ITEMS 0010 - 0013) | ||||||||||||
| TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0013) |