A.03_CBS amendment 0002.xls
XLS spreadsheet 107 KB Posted
- Attached to
- Site Preparation in Ta'if Saudi Arabia
- Solicitation number
- W912ER22R0010
About this file
This document contains a proposal schedule and cost breakdown sheet for a site preparation project in Ta'if, Saudi Arabia. The U.S. Army Corps of Engineers Engineering District Middle East is soliciting proposals for site preparation work including conducting surveys and designs, earthwork, fencing installation, and road and foundation construction at multiple sites near Ta'if. The base work includes mobilization, topographical surveys at seven named sites, constructing a munitions storage area, life support area, bulk storage area, and two maintenance areas, and an air defense artillery area. There are five optional line items including additional surveys, earthwork and fencing. Pricing is provided in Saudi Riyals and includes separate line item costs for labor, equipment, materials, and subcontractors as well as overhead, profit, and VAT. The total base price is listed as $8,611,972 with optional items that could further increase the cost. The deadline to submit proposals in response to solicitation W912ER22R0010 was August 12, 2008.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Schedule
| PROPOSAL SCHEDULE | ||||||||
| RFP: | W912ER22R0010 | P2# | 499848 | |||||
| PROJECT: | KSA Site Prep - Ta'if | |||||||
| LOCATION: | Areas near Ta'if | 12-Aug-08 | ||||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | AMOUNT | TOTAL | TOTAL | ||
| Base Items | ||||||||
| 0001 | Mobilization and Demobilization in accordance with the contract documents | 1 | JA | |||||
| 0002 | Conduct Topographical and Geotechnical Site Survey and any necessary Design in accordance with the contract documents | 1 | JA | $5,886,463 | ||||
| 0003 | Construct Munition Storage Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0004 | Construct 366,896 square meter Life Support Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0005 | Construct Bulk, Petroleum, Oil & Lubricants Storage Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0006 | Construct Maintenance Area 1 in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0007 | Construct Maintenance Area 2 in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0008 | Construct Air Defense Artillery Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0009 | VAT @ 15% for Base Items in accordance with the contract documents | 1 | JA | |||||
| TOTAL BASE PRICE (ITEMS 0001 - 0009) | ||||||||
| Optional Items | ||||||||
| 0010 | OPTION #1 Construct Maintenance Area 3 in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0011 | OPTION #2 Construct 189,863 square meter Life Support Area in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0012 | OPTION #3 Remove and properly dispose of debris located on Optional LSA site in accordance with the contract documents | 1 | JA | |||||
| 0013 | OPTION #4 Remove and properly dispose of debris located on Base LSA site in accordance with the contract documents | 1 | JA | |||||
| 0014 | OPTION #5 VAT @ 15% for Optional Items in accordance with the contract documents | 1 | JA | |||||
| TOTAL OPTIONS PRICE (ITEMS 0010 - 0014) | ||||||||
| TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0014) | ||||||||
| $8,611,972 |
&C&9&P of &N
Cost Breakdown Sheet
| COST BREAKDOWN SHEET | ||||||||||||
| RFP: | W912ER22R0010 | P2# | 499848 | |||||||||
| PROJECT: | KSA Site Prep - Ta'if | PROPOSER: | ||||||||||
| LOCATION: | Areas near Ta'if | DATE: | ||||||||||
| ITEM | DESCRIPTION | DIRECT LABOR COST | DIRECT EQUIPMENT COST | DIRECT MATERIALS COST | SUB CONTRACTOR COST | TOTAL DIRECT COST | JOOH | HOOH | BOND | OVERHEAD/ INDIRECT COST | PROFIT | TOTAL PROPOSED COST |
| 0001 | Mobilization and Demobilization in accordance with the contract documents | |||||||||||
| 0001AA | Mobilization in accordance with the contract documents | |||||||||||
| 0001AB | De-mobilization in accordance with the contract documents | |||||||||||
| Total for CLIN 0001AA-AB | ||||||||||||
| 0002 | Conduct Topographical and Geotechnical Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AA | Conduct MSA Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AB | Conduct Base LSA Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AC | Conduct BPS Complex Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AD | Conduct Maintenance Site 1 Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AE | Conduct Maintenance Site 2 Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0002AF | Conduct ADA Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| Total for CLIN 0002AA-AF | ||||||||||||
| 0003 | Construct Munition Storage Area in accordance with the contract documents | |||||||||||
| 0003AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0003AB | Construct Earthen Berms in accordance with the contract documents | |||||||||||
| 0003AC | Construct MSA Inside Perimeter Access Roads in accordance with the conctract documents | |||||||||||
| 0003AD | Install Area Fencing in accordance with the contract Documents | |||||||||||
| Total for CLIN 0003AA-AD | ||||||||||||
| 0004 | Construct 366,896 square meter Life Support Area in accordance with the contract documents | |||||||||||
| 0004AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0004AB | Place Life Support Area Gravel Pad in accordance with the contract documents | |||||||||||
| 0004AC | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0004AA-AC | ||||||||||||
| 0005 | Construct Bulk, Petroleum, Oil & Lubricants Storage Area in accordance with the contract documents | |||||||||||
| 0005AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0005AB | Construct Earthen Berms in accordance with the contract documents | |||||||||||
| 0005AC | Construct BPS Complex Inside Perimeter Access Roads in accordance with the contract documents | |||||||||||
| 0005AD | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0005AA-AD | ||||||||||||
| 0006 | Construct Maintenance Area 1 in accordance with the contract documents | |||||||||||
| 0006AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0006AB | Place Maintenance Area 1 Foundation Gravel Overlay in accordance with the contract documents | |||||||||||
| Total for CLIN 0006AA-AB | ||||||||||||
| 0007 | Construct Maintenance Area 2 in accordance with the contract documents | |||||||||||
| 0007AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0007AB | Place Maintenance Area 2 Foundation Gravel Overlay in accordance with the contract documents | |||||||||||
| Total for CLIN 0007AA-AB | ||||||||||||
| 0008 | Construct Air Defense Artillery Area in accordance with the contract documents | |||||||||||
| 0008AA | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0008AB | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0008AA-AB | ||||||||||||
| 0009 | VAT @ 15% for Base Items in accordance with the contract documents | |||||||||||
| Total for CLIN 0009 | ||||||||||||
| TOTAL BASE PRICE (ITEMS 0001 - 0009) | ||||||||||||
| 0010 | OPTION #1 Construct Maintenance Area 3 in accordance with the contract documents | |||||||||||
| 0010AA | Conduct Maintenance Site 3 Survey and Design in accordance with the contract documents | |||||||||||
| 0010AB | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0010AC | Place Maintenance Area 3 Foundation Gravel Overlay in accordance with the contract documents | |||||||||||
| Total for CLIN 0010AA-AC | ||||||||||||
| 0011 | OPTION #2 Construct 189,863 square meter Life Support Area in accordance with the contract documents | |||||||||||
| 0011AA | Conduct LSA Site Survey and any necessary Design in accordance with the contract documents | |||||||||||
| 0011AB | Perform Site Earthwork in accordance with the contract documents | |||||||||||
| 0011AC | Install Area Fencing in accordance with the contract documents | |||||||||||
| Total for CLIN 0011AA-AC | ||||||||||||
| 0012 | OPTION #3 Remove and properly dispose of debris located on Optional LSA site in accordance with the contract documents | |||||||||||
| Total for CLIN 0012 | ||||||||||||
| 0013 | OPTION #4 Remove and properly dispose of debris located on Base LSA site in accordance with the contract documents | |||||||||||
| Total for CLIN 0013 | ||||||||||||
| 0014 | OPTION #5 VAT @ 15% for Optional Items in accordance with the contract documents | |||||||||||
| Total for CLIN 0014 | ||||||||||||
| TOTAL OPTIONS PRICE (ITEMS 0010 - 0014) | ||||||||||||
| TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0014) |
&RPage &P of &N
File details come from the government source that posted it. Updated .