A.03_CBS amendment 0002.xls

XLS spreadsheet 107 KB Posted

Attached to
Site Preparation in Ta'if Saudi Arabia
Solicitation number
W912ER22R0010
Issued by

About this file

This document contains a proposal schedule and cost breakdown sheet for a site preparation project in Ta'if, Saudi Arabia. The U.S. Army Corps of Engineers Engineering District Middle East is soliciting proposals for site preparation work including conducting surveys and designs, earthwork, fencing installation, and road and foundation construction at multiple sites near Ta'if. The base work includes mobilization, topographical surveys at seven named sites, constructing a munitions storage area, life support area, bulk storage area, and two maintenance areas, and an air defense artillery area. There are five optional line items including additional surveys, earthwork and fencing. Pricing is provided in Saudi Riyals and includes separate line item costs for labor, equipment, materials, and subcontractors as well as overhead, profit, and VAT. The total base price is listed as $8,611,972 with optional items that could further increase the cost. The deadline to submit proposals in response to solicitation W912ER22R0010 was August 12, 2008.

View the file

Other files

File Type Posted
Conformed - W912ER22R00100003.pdf PDF
Amendment - W912ER22R00100003.pdf PDF
B.08_W912ER22R001000002_Amendment.pdf PDF
A.03_CBS amendment 0002.pdf PDF
A.03 Proposal Schedule amendment 0002.pdf PDF
A.03_Drawings amendment 0002.pdf PDF
A.02_SOW amendment 0002.pdf PDF
A.03_Proposal Schedule.pdf PDF
A.03_CBS.xls XLS spreadsheet
O_M Photos_Part11.pdf PDF
O_M Photos_Part5.pdf PDF
O_M Photos_Part6.pdf PDF
O_M Photos_Part3.pdf PDF
W912ER22R00100001_Amendment.pdf PDF
O_M Photos_Part2.pdf PDF
O_M Photos_Part10.pdf PDF
O_M Photos_Part4.pdf PDF
O_M Photos_Part7.pdf PDF
O_M Photos_Part1.pdf PDF
O_M Photos_Part9.pdf PDF
O_M Photos_Part8.pdf PDF
Attachment 2 - PAST PERFORMANCE OVERVIEW SHEET.pdf PDF
Attachment 7 - PERFORMANCE DISTRIBUTION STATEMENT.pdf PDF
Attachment 1 - CORPORATE CERTIFICATE AUTHORITY TO BIND PARTNERSHIP.pdf PDF
Attachment 5 - PROPOSAL SCHEDULE AND COST BREAKDOWN SHEET.pdf PDF
Endorsement A - Financial Standing Questionnaire.pdf PDF
W912ER22R0010_Solicitation.pdf PDF
ADA_MSA Photos.pdf PDF
Attachment 4 - PAST PERFORMANCE QUESTIONNAIRE (PPQ Form).pdf PDF
A.02_SOW.pdf PDF
Attachment 6 - NON-COLLUSIVE PRICING CERTIFICATION.pdf PDF
A.03_Drawings.pdf PDF
Attachment 8 - CONTRACTOR RESPONSIBILITY.pdf PDF
Attachment 3 - PROJECT SUMMARY FORM.pdf PDF
POL Photos.pdf PDF
LSA Photos.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Schedule

PROPOSAL SCHEDULE
RFP:W912ER22R0010P2#499848
PROJECT:KSA Site Prep - Ta'if
LOCATION:Areas near Ta'if12-Aug-08
ITEM NO.DESCRIPTIONQTYUNITAMOUNTTOTALTOTAL
Base Items
0001Mobilization and Demobilization in accordance with the contract documents1JA
0002Conduct Topographical and Geotechnical Site Survey and any necessary Design in accordance with the contract documents1JA$5,886,463
0003Construct Munition Storage Area in accordance with the contract documents1JA$$$
0004Construct 366,896 square meter Life Support Area in accordance with the contract documents1JA$$$
0005Construct Bulk, Petroleum, Oil & Lubricants Storage Area in accordance with the contract documents1JA$$$
0006Construct Maintenance Area 1 in accordance with the contract documents1JA$$$
0007Construct Maintenance Area 2 in accordance with the contract documents1JA$$$
0008Construct Air Defense Artillery Area in accordance with the contract documents1JA$$$
0009VAT @ 15% for Base Items in accordance with the contract documents1JA
TOTAL BASE PRICE (ITEMS 0001 - 0009)
Optional Items
0010OPTION #1 Construct Maintenance Area 3 in accordance with the contract documents1JA$$$
0011OPTION #2 Construct 189,863 square meter Life Support Area in accordance with the contract documents1JA$$$
0012OPTION #3 Remove and properly dispose of debris located on Optional LSA site in accordance with the contract documents1JA
0013OPTION #4 Remove and properly dispose of debris located on Base LSA site in accordance with the contract documents1JA
0014OPTION #5 VAT @ 15% for Optional Items in accordance with the contract documents1JA
TOTAL OPTIONS PRICE (ITEMS 0010 - 0014)
TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0014)
$8,611,972

&C&9&P of &N

Cost Breakdown Sheet

COST BREAKDOWN SHEET
RFP:W912ER22R0010P2#499848
PROJECT:KSA Site Prep - Ta'ifPROPOSER:
LOCATION:Areas near Ta'ifDATE:
ITEMDESCRIPTIONDIRECT LABOR COSTDIRECT EQUIPMENT COSTDIRECT MATERIALS COSTSUB CONTRACTOR COSTTOTAL DIRECT COSTJOOHHOOHBONDOVERHEAD/ INDIRECT COSTPROFITTOTAL PROPOSED COST
0001Mobilization and Demobilization in accordance with the contract documents
0001AAMobilization in accordance with the contract documents
0001ABDe-mobilization in accordance with the contract documents
Total for CLIN 0001AA-AB
0002Conduct Topographical and Geotechnical Site Survey and any necessary Design in accordance with the contract documents
0002AAConduct MSA Site Survey and any necessary Design in accordance with the contract documents
0002ABConduct Base LSA Site Survey and any necessary Design in accordance with the contract documents
0002ACConduct BPS Complex Site Survey and any necessary Design in accordance with the contract documents
0002ADConduct Maintenance Site 1 Survey and any necessary Design in accordance with the contract documents
0002AEConduct Maintenance Site 2 Survey and any necessary Design in accordance with the contract documents
0002AFConduct ADA Site Survey and any necessary Design in accordance with the contract documents
Total for CLIN 0002AA-AF
0003Construct Munition Storage Area in accordance with the contract documents
0003AAPerform Site Earthwork in accordance with the contract documents
0003ABConstruct Earthen Berms in accordance with the contract documents
0003ACConstruct MSA Inside Perimeter Access Roads in accordance with the conctract documents
0003ADInstall Area Fencing in accordance with the contract Documents
Total for CLIN 0003AA-AD
0004Construct 366,896 square meter Life Support Area in accordance with the contract documents
0004AAPerform Site Earthwork in accordance with the contract documents
0004ABPlace Life Support Area Gravel Pad in accordance with the contract documents
0004ACInstall Area Fencing in accordance with the contract documents
Total for CLIN 0004AA-AC
0005Construct Bulk, Petroleum, Oil & Lubricants Storage Area in accordance with the contract documents
0005AAPerform Site Earthwork in accordance with the contract documents
0005ABConstruct Earthen Berms in accordance with the contract documents
0005ACConstruct BPS Complex Inside Perimeter Access Roads in accordance with the contract documents
0005ADInstall Area Fencing in accordance with the contract documents
Total for CLIN 0005AA-AD
0006Construct Maintenance Area 1 in accordance with the contract documents
0006AAPerform Site Earthwork in accordance with the contract documents
0006ABPlace Maintenance Area 1 Foundation Gravel Overlay in accordance with the contract documents
Total for CLIN 0006AA-AB
0007Construct Maintenance Area 2 in accordance with the contract documents
0007AAPerform Site Earthwork in accordance with the contract documents
0007ABPlace Maintenance Area 2 Foundation Gravel Overlay in accordance with the contract documents
Total for CLIN 0007AA-AB
0008Construct Air Defense Artillery Area in accordance with the contract documents
0008AAPerform Site Earthwork in accordance with the contract documents
0008ABInstall Area Fencing in accordance with the contract documents
Total for CLIN 0008AA-AB
0009VAT @ 15% for Base Items in accordance with the contract documents
Total for CLIN 0009
TOTAL BASE PRICE (ITEMS 0001 - 0009)
0010OPTION #1 Construct Maintenance Area 3 in accordance with the contract documents
0010AAConduct Maintenance Site 3 Survey and Design in accordance with the contract documents
0010ABPerform Site Earthwork in accordance with the contract documents
0010ACPlace Maintenance Area 3 Foundation Gravel Overlay in accordance with the contract documents
Total for CLIN 0010AA-AC
0011OPTION #2 Construct 189,863 square meter Life Support Area in accordance with the contract documents
0011AAConduct LSA Site Survey and any necessary Design in accordance with the contract documents
0011ABPerform Site Earthwork in accordance with the contract documents
0011ACInstall Area Fencing in accordance with the contract documents
Total for CLIN 0011AA-AC
0012OPTION #3 Remove and properly dispose of debris located on Optional LSA site in accordance with the contract documents
Total for CLIN 0012
0013OPTION #4 Remove and properly dispose of debris located on Base LSA site in accordance with the contract documents
Total for CLIN 0013
0014OPTION #5 VAT @ 15% for Optional Items in accordance with the contract documents
Total for CLIN 0014
TOTAL OPTIONS PRICE (ITEMS 0010 - 0014)
TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0014)

&RPage &P of &N

File details come from the government source that posted it. Updated .