A.03_CBS amendment 0002.pdf
PDF 114 KB Posted
- Attached to
- Site Preparation in Ta'if Saudi Arabia
- Solicitation number
- W912ER22R0010
About this file
This document outlines a cost proposal in response to solicitation number W912ER22R0010 from the Department of the Army Corps of Engineers Engineering District Middle East for site preparation work in Ta'if, Saudi Arabia. The proposal includes line item costs for conducting surveys, earthwork, construction of storage areas, fencing, and optional additional work. Key work items include topographical and geotechnical surveys of sites; construction of a munitions storage area, life support area, and bulk petroleum storage area including earthwork, roads, and berms; installation of perimeter fencing; and optional additional construction of maintenance and life support areas. Unit costs are provided for labor, materials, equipment, overhead, and profit for each line item, with the total proposed cost and separate base price and options pricing.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: W912ER22R0010 P2# 499848
PROJECT: KSA Site Prep - Ta'if PROPOSER:
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND
Mobilization and Demobilization in accordance with the contract documents
0001AA Mobilization in accordance with the contract documents
0001AB De-mobilization in accordance with the contract documents
Total for CLIN 0001AA-AB
Conduct Topographical and Geotechnical Site Survey and any necessary Design in accordance with the contract documents
0002AA
Conduct MSA Site Survey and any necessary Design in accordance with the contract documents
0002AB
Conduct Base LSA Site Survey and any necessary Design in accordance with the contract documents
OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
0002AC
Conduct BPS Complex Site Survey and any necessary Design in accordance with the contract documents
0002AD
Conduct Maintenance Site 1 Survey and any necessary Design in accordance with the contract documents
0002AE
Conduct Maintenance Site 2 Survey and any necessary Design in accordance with the contract documents
0002AF
Conduct ADA Site Survey and any necessary Design in accordance with the contract documents
Total for CLIN 0002AA-AF
Construct Munition Storage Area in accordance with the contract documents
0003AA Perform Site Earthwork in accordance with the contract documents
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
0003AB
Construct Earthen Berms in accordance with the contract documents
0003AC
Construct MSA Inside Perimeter Access Roads in accordance with the conctract documents
0003AD Install Area Fencing in accordance with the contract Documents
Total for CLIN 0003AA-AD
Construct 366,896 square meter Life Support Area in accordance with the contract documents
0004AA Perform Site Earthwork in accordance with the contract documents
0004AB
Place Life Support Area Gravel Pad in accordance with the contract documents
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
0004AC Install Area Fencing in accordance with the contract documents
Total for CLIN 0004AA-AC
Construct Bulk, Petroleum, Oil & Lubricants Storage Area in accordance with the contract documents
0005AA Perform Site Earthwork in accordance with the contract documents
0005AB
Construct Earthen Berms in accordance with the contract documents
0005AC
Construct BPS Complex Inside Perimeter Access Roads in accordance with the contract documents
0005AD Install Area Fencing in accordance with the contract documents
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
Total for CLIN 0005AA-AD
Construct Maintenance Area 1 in accordance with the contract documents
0006AA Perform Site Earthwork in accordance with the contract documents
0006AB
Place Maintenance Area 1 Foundation Gravel Overlay in accordance with the contract documents
Total for CLIN 0006AA-AB
Construct Maintenance Area 2 in accordance with the contract documents
0007AA Perform Site Earthwork in accordance with the contract documents
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
0007AB
Place Maintenance Area 2 Foundation Gravel Overlay in accordance with the contract documents
Total for CLIN 0007AA-AB
Construct Air Defense Artillery Area in accordance with the contract documents
0008AA Perform Site Earthwork in accordance with the contract documents
0008AB Install Area Fencing in accordance with the contract documents
Total for CLIN 0008AA-AB
VAT @ 15% for Base Items in accordance with the contract documents
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
Total for CLIN 0009
OPTION #1 Construct Maintenance Area 3 in accordance with the contract documents
0010AA
Conduct Maintenance Site 3 Survey and Design in accordance with the contract documents
0010AB Perform Site Earthwork in accordance with the contract documents
0010AC
Place Maintenance Area 3 Foundation Gravel Overlay in accordance with the contract documents
Total for CLIN 0010AA-AC
TOTAL BASE PRICE (ITEMS 0001 - 0009)
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
OPTION #2 Construct 189,863 square meter Life Support Area in accordance with the contract documents
0011AA
Conduct LSA Site Survey and any necessary Design in accordance with the contract documents
0011AB Perform Site Earthwork in accordance with the contract documents
0011AC Install Area Fencing in accordance with the contract documents
Total for CLIN 0011AA-AC
OPTION #3 Remove and properly dispose of debris located on Optional LSA site in accordance with the contract documents
Total for CLIN 0012
LOCATION: Areas near Ta'if DATE:
JOOH HOOH BOND OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN SHEET
ITEM DESCRIPTION DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
OPTION #4 Remove and properly dispose of debris located on Base LSA site in accordance with the contract documents
Total for CLIN 0013
OPTION #5 VAT @ 15% for Optional Items in accordance with the contract documents
Total for CLIN 0014
TOTAL BASE + OPTIONS PRICE (ITEMS 0001 -
0014)
TOTAL OPTIONS PRICE (ITEMS 0010 - 0014)