This document outlines a cost proposal in response to solicitation number W912ER22R0010 from the Department of the Army Corps of Engineers Engineering District Middle East for site preparation work in Ta'if, Saudi Arabia. The proposal includes line item costs for conducting surveys, earthwork, construction of storage areas, fencing, and optional additional work. Key work items include topographical and geotechnical surveys of sites; construction of a munitions storage area, life support area, and bulk petroleum storage area including earthwork, roads, and berms; installation of perimeter fencing; and optional additional construction of maintenance and life support areas. Unit costs are provided for labor, materials, equipment, overhead, and profit for each line item, with the total proposed cost and separate base price and options pricing.

View the file

Other files

File Type Posted
Conformed - W912ER22R00100003.pdf PDF
Amendment - W912ER22R00100003.pdf PDF
B.08_W912ER22R001000002_Amendment.pdf PDF
A.03 Proposal Schedule amendment 0002.pdf PDF
A.03_Drawings amendment 0002.pdf PDF
A.03_CBS amendment 0002.xls XLS spreadsheet
A.02_SOW amendment 0002.pdf PDF
A.03_Proposal Schedule.pdf PDF
A.03_CBS.xls XLS spreadsheet
O_M Photos_Part11.pdf PDF
O_M Photos_Part5.pdf PDF
O_M Photos_Part6.pdf PDF
O_M Photos_Part3.pdf PDF
W912ER22R00100001_Amendment.pdf PDF
O_M Photos_Part2.pdf PDF
O_M Photos_Part10.pdf PDF
O_M Photos_Part4.pdf PDF
O_M Photos_Part7.pdf PDF
O_M Photos_Part1.pdf PDF
O_M Photos_Part9.pdf PDF
O_M Photos_Part8.pdf PDF
Attachment 2 - PAST PERFORMANCE OVERVIEW SHEET.pdf PDF
Attachment 7 - PERFORMANCE DISTRIBUTION STATEMENT.pdf PDF
Attachment 1 - CORPORATE CERTIFICATE AUTHORITY TO BIND PARTNERSHIP.pdf PDF
Attachment 5 - PROPOSAL SCHEDULE AND COST BREAKDOWN SHEET.pdf PDF
Endorsement A - Financial Standing Questionnaire.pdf PDF
W912ER22R0010_Solicitation.pdf PDF
ADA_MSA Photos.pdf PDF
Attachment 4 - PAST PERFORMANCE QUESTIONNAIRE (PPQ Form).pdf PDF
A.02_SOW.pdf PDF
Attachment 6 - NON-COLLUSIVE PRICING CERTIFICATION.pdf PDF
A.03_Drawings.pdf PDF
Attachment 8 - CONTRACTOR RESPONSIBILITY.pdf PDF
Attachment 3 - PROJECT SUMMARY FORM.pdf PDF
POL Photos.pdf PDF
LSA Photos.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: W912ER22R0010 P2# 499848

PROJECT: KSA Site Prep - Ta'if PROPOSER:

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND

Mobilization and Demobilization in accordance with the contract documents

0001AA Mobilization in accordance with the contract documents

0001AB De-mobilization in accordance with the contract documents

Total for CLIN 0001AA-AB

Conduct Topographical and Geotechnical Site Survey and any necessary Design in accordance with the contract documents

0002AA

Conduct MSA Site Survey and any necessary Design in accordance with the contract documents

0002AB

Conduct Base LSA Site Survey and any necessary Design in accordance with the contract documents

OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

0002AC

Conduct BPS Complex Site Survey and any necessary Design in accordance with the contract documents

0002AD

Conduct Maintenance Site 1 Survey and any necessary Design in accordance with the contract documents

0002AE

Conduct Maintenance Site 2 Survey and any necessary Design in accordance with the contract documents

0002AF

Conduct ADA Site Survey and any necessary Design in accordance with the contract documents

Total for CLIN 0002AA-AF

Construct Munition Storage Area in accordance with the contract documents

0003AA Perform Site Earthwork in accordance with the contract documents

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

0003AB

Construct Earthen Berms in accordance with the contract documents

0003AC

Construct MSA Inside Perimeter Access Roads in accordance with the conctract documents

0003AD Install Area Fencing in accordance with the contract Documents

Total for CLIN 0003AA-AD

Construct 366,896 square meter Life Support Area in accordance with the contract documents

0004AA Perform Site Earthwork in accordance with the contract documents

0004AB

Place Life Support Area Gravel Pad in accordance with the contract documents

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

0004AC Install Area Fencing in accordance with the contract documents

Total for CLIN 0004AA-AC

Construct Bulk, Petroleum, Oil & Lubricants Storage Area in accordance with the contract documents

0005AA Perform Site Earthwork in accordance with the contract documents

0005AB

Construct Earthen Berms in accordance with the contract documents

0005AC

Construct BPS Complex Inside Perimeter Access Roads in accordance with the contract documents

0005AD Install Area Fencing in accordance with the contract documents

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

Total for CLIN 0005AA-AD

Construct Maintenance Area 1 in accordance with the contract documents

0006AA Perform Site Earthwork in accordance with the contract documents

0006AB

Place Maintenance Area 1 Foundation Gravel Overlay in accordance with the contract documents

Total for CLIN 0006AA-AB

Construct Maintenance Area 2 in accordance with the contract documents

0007AA Perform Site Earthwork in accordance with the contract documents

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

0007AB

Place Maintenance Area 2 Foundation Gravel Overlay in accordance with the contract documents

Total for CLIN 0007AA-AB

Construct Air Defense Artillery Area in accordance with the contract documents

0008AA Perform Site Earthwork in accordance with the contract documents

0008AB Install Area Fencing in accordance with the contract documents

Total for CLIN 0008AA-AB

VAT @ 15% for Base Items in accordance with the contract documents

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

Total for CLIN 0009

OPTION #1 Construct Maintenance Area 3 in accordance with the contract documents

0010AA

Conduct Maintenance Site 3 Survey and Design in accordance with the contract documents

0010AB Perform Site Earthwork in accordance with the contract documents

0010AC

Place Maintenance Area 3 Foundation Gravel Overlay in accordance with the contract documents

Total for CLIN 0010AA-AC

TOTAL BASE PRICE (ITEMS 0001 - 0009)

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

OPTION #2 Construct 189,863 square meter Life Support Area in accordance with the contract documents

0011AA

Conduct LSA Site Survey and any necessary Design in accordance with the contract documents

0011AB Perform Site Earthwork in accordance with the contract documents

0011AC Install Area Fencing in accordance with the contract documents

Total for CLIN 0011AA-AC

OPTION #3 Remove and properly dispose of debris located on Optional LSA site in accordance with the contract documents

Total for CLIN 0012

LOCATION: Areas near Ta'if DATE:

JOOH HOOH BOND OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN SHEET

ITEM DESCRIPTION DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

OPTION #4 Remove and properly dispose of debris located on Base LSA site in accordance with the contract documents

Total for CLIN 0013

OPTION #5 VAT @ 15% for Optional Items in accordance with the contract documents

Total for CLIN 0014

TOTAL BASE + OPTIONS PRICE (ITEMS 0001 -

0014)

TOTAL OPTIONS PRICE (ITEMS 0010 - 0014)