W912ER21R0024 Amendment 0001 Lebanon ANTOC.pdf

PDF 387 KB Posted

Attached to
Amendment 0001 to Solicitation for Aquora National Training & Operational Center (ANTOC) for a Design Bid Build contract
Solicitation number
W912ER21R00240001
Issued by

About this file

This document is an amendment to a solicitation for the design and construction of the Aquora National Training & Operational Center in Lebanon through a design-bid-build contract. The amendment revises specifications, drawings, the proposal schedule and cost breakdown, scope of work, volume references, the site visit date, proposal due date, and bidder inquiry period. The revised specifications, drawings, proposal documents, and scope of work are provided in attachments. The site visit is tentatively changed to July 30th with the possibility of further changes, while the proposal due date is extended to August 21st and the last day for bidder inquiries is August 13th. The U.S. Army Corps of Engineers Middle East District is the contracting agency managing this opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please refer to SF30 Block 14 Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ER21R0024

X 9B. DATED (SEE ITEM 11)

09-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jul-2021

CODE

US ARMY CORPS OF ENGINEERS-CETAM-CT

MIDDLE EAST DISTRICT, CETAM-CT

PO BOX 2250

WINCHESTER VA 22604-1450

W912ER 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ER21R0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

1. This Amendment 0001 is issued to accomplish the following:

1.1. Revise Specifications.

1.2. Revise Drawings.

1.3. Revise Proposal Schedule and Cost Breakdown.

1.4. Revise Scope of Work.

1.5. Revise Volume References under 00 21 00.

1.6. Revise Date of Site Visit.

1.7. Extend Proposal Due Date.

1.8. Extend Bidder Inquiry Period.

2. Specifications: Revised sections are replaced in their entirety. Revisions to the specification pages are shown on the pages in the following manner: New text is underlined and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the new or revised sections.

The following have been revised/added:

2.1. Project Table of Contents has been replaced in its entirety.

2.2. Section 01 11 00

Paragraphs 1.2.1.1, page 2 Paragraph 1.2.2, page 2 Paragraph 1.4.a. and d., page 3 Paragraph 1.5, page 3 Paragraph 1.6.2.1a. and b., page 4 Paragraph 1.6.3, page 4

2.3. Section 01 15 00.12 10

Paragraph 1.3.1, page 4 Paragraph 1.3.2.1, page 4

2.4. Section 01 33 00.12 10

Added in its entirety

3. Drawings: The following drawings have been revised per this amendment. Revisions are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.

3.1. Package 1:

G-011

CG101

CS101

3.2. Package 2:

G-012

CG101

CS101

4. Proposal Schedule & Cost Breakdown: As a result of this Amendment 0001, the Proposal Schedule and Cost

Breakdown sheet have both been replaced in their entirety.

5. Scope of Work: As a result of this Amendment 0001, Option 2 Concrete Maintenance Pad Access Road Aggregate has been removed from this requirement in its entirety.

6. Volume References under 00 21 00: As a result of this Amendment 0001, revisions to the below under Section

00 21 00 are shown in red, underlined text.

6.1 SECTION 00 21 00 – BASIS OF AWARD

References to Volume numbers and appendices under BASIS FOR AWARD have been revised as follows:

VOLUME II - FACTOR 2: PAST PERFORMANCE

An Offeror shall submit relevant project experience using the following guidelines:

Construction Experience Overview Sheet (Appendix F - Attachment B), Project Summary Form (Appendix F Attachment C), and Past Performance Questionnaire (PPQ-0) (Appendix F - Attachment D).

VOLUME III - FACTOR 3: PRICE

6.2 SECTION 00 21 00 - GENERAL INFORMATION

References to Volume numbers under GENERAL INFORMATION – PROPOSAL CONTENT have been revised as follows:

An offeror’s proposal shall be submitted electronically, and shall be comprised of three files in Adobe portable document format (PDF), or comparable format: the first file will include the offeror’s Volume I - Non-Price (Technical) Proposal, and the second file will include the offeror’s Volume II – Past Performance, and the third file will include the offeror’s Volume III – Price Proposal. Volume III - Price Proposal must also contain the offeror’s completed Cost Breakdown Sheet and Proposal Schedule in Microsoft Excel, or comparable, format.

VOLUME II – PAST PERFORMANCE:

COVER PAGE: A cover page shall appear at the beginning of Volume II and, at a minimum, shall consist of the following information:

TABLE OF CONTENTS: A table of contents shall be placed in Volume II, which identifies major areas by title and page numbers.

VOLUME III - PRICE PROPOSAL: The information required within an offeror’s price proposal is described under 00 21 00, 2. FACTORS TO BE EVALUTED. Volume III shall include the following:

6.3 SECTION 00 21 00 - PROPOSAL FORMAT:

References to Volume numbers under GENERAL INFORMATION – PROPOSAL FORMAT have been revised as follows:

Volume I, Volume II, and Volume III must be submitted as three separate files in PDF (or comparable) format, along with the requested Cost Breakdown Sheet and Proposal Schedule in Microsoft Excel (or comparable) format.

6.4 SECTION 00 21 00 - PROPOSAL SUBMISSION INSTRUCTIONS

References to Volume numbers under GENERAL INFORMATION – SUBMISSION INSTRUCTIONS have been revised as follows:

Proposals must be submitted electronically. The electronic submission must include Volume I, Volume II, and Volume III as three separate files in PDF (or comparable) format, along with the requested Cost Breakdown Sheet and Proposal Schedule in Microsoft Excel (or comparable) format, submitted through the System for Award Management (SAM) at https://www.sam.gov.

7. Site Visit: As a result of this Amendment 0001, the date of the site visit has tentatively changed from July 23, 2021 to July 30, 2021. Please note that there is a possibility this tentative site visit date may be changed again via an Amendment 00002. There is also a possibility that the site visit may not occur. Please continue to check for additional amendments to this solicitation in order to stay informed regarding the site visit. All other details and logistics surrounding the site visit as currently stated in the solicitation remain unchanged.

8. Proposal Due Date: As a result of this Amendment 0001, the proposal due date has been extended from August

9, 2021 to August 21, 2021 at 12:00pm EST.

9. ProjNET Bidder Inquiries: As a result of this Amendment 0001, ProjNET will now close on August 13, 2021 at 12:00AM EST. No additional inquiries will be accepted after this date and time.

10. All other terms and conditions remain unchanged.

11. Attachments:

11.1. AMENDMENT 0001 SPECIFICATIONS DOCUMENT - 21R0024 - ANTOC LEBANON

11.2. ANTOC - Cost Breakdown - 2021 07 13

11.3. ANTOC - Proposal Schedule - 2021 07 13

11.4. LE-496243_PACKAGE 1_DRAWINGS_AMENDMENT 0001_JULY 2021

11.5. LE-496243_PACKAGE 2_DRAWINGS_AMENDMENT 0001_JULY 2021