This document contains a cost breakdown sheet submitted in response to Amendment 0001 to a solicitation for the Aquora National Training & Operational Center project. The cost breakdown provides pricing details for various line item numbers (LINs) covering mobilization, demobilization, concrete maintenance pad construction, CMU demonstration building construction, and an optional aggregate access road. Labor hours, direct costs, overhead/indirect costs, profit, and total proposed costs are specified for each LIN. The solicitation amendment was issued by the U.S. Army Corps of Engineers Engineering District Middle East for design-bid-build services at the Aquora National Training Range in Lebanon. Requests for the solicitation documents should be directed to the listed Corps contacts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 1 Page 1 of 3

RFP: W912ER21R0024

PROJECT: Combined Arms Training Center P2 480223 PROPOSER:

LOCATION: Acquora National Training Range, Lebanon DATE:

ITEM DESCRIPTION LABOR MAN-

HOURS

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

DIRECT

MATERIALS COST

DIRECT SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

OVERHEAD/

INDIRECT COST PROFIT TOTAL PROPOSED

COST

Mobilization and Demobilization at the Concrete Maintenance Pad Area in Accordance with the Contract Documents

0001AA

Mobilization at the Concrete Maintenance Pad Area in Accordance with the Contract Documents

0001AB

Demobilization at the Concrete Maintenance Pad Area in Accordance with the Contract Documents

Concrete Maintenance Pad Construction in Accordance with the Contract Documents

Concrete Maintenance Pad Area Sitework in Accordance with the Contract Documents

0003AA

Survey & Design for all Sitework Related to the Concrete Maintenance Pad Area in Accordance with the Contract Documents

0003AB

Construct Concrete Maintenance Pad Area Sitework in Accordance with the Contract Documents

0004 VAT Taxes (CLINS 0001-0003)

COST BREAKDOWN

BASE CONTRACT

EXHIBIT 1 Page 2 of 3

PROJECT: Combined Arms Training Center P2 480223 PROPOSER:

LOCATION: Acquora National Training Range, Lebanon DATE:

ITEM DESCRIPTION LABOR MAN-

HOURS

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

DIRECT

MATERIALS COST

DIRECT SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

OVERHEAD/

INDIRECT COST PROFIT TOTAL PROPOSED

COST

COST BREAKDOWN

CMU Demonstration Building & Site Construction in Accordance with the Contract Documents

0005AA

Mobilization at the CMU Demonstration Building Area in Accordance with the Contract Documents

0005AB

Demobilization at the CMU Demonstration Building Area in Accordance with the Contract Documents

0005AC

CMU Demonstration Building Construction in Accordance with the Contract Documents

0005AD

Survey & Design for Sitework in Support of the CMU Demonstration Building in Accordance with the Contract Documents

0005AE

Construct Sitework in Support of the CMU Demonstration Building in Accordance with the Contract Documents

0005AF VAT Taxes (CLINS 0005AA-0005AE)

TOTAL BASE COST (CLIN 0001 - 0004)

OPTION ITEMS

EXHIBIT 1 Page 3 of 3

PROJECT: Combined Arms Training Center P2 480223 PROPOSER:

LOCATION: Acquora National Training Range, Lebanon DATE:

ITEM DESCRIPTION LABOR MAN-

HOURS

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

DIRECT

MATERIALS COST

DIRECT SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

OVERHEAD/

INDIRECT COST PROFIT TOTAL PROPOSED

COST

COST BREAKDOWN

CMU Demonstration Bldg. Access Road Aggregate in Accordance with the Contract Documents

0006AA

CMU Demonstration Bldg. Access Road Aggregate in Accordance with the Contract Documents

0006AB VAT Taxes (CLIN0006AA)

TOTAL OPTION COST (CLIN 0005 - 0006)

TOTAL CONTRACT COST (CLIN 0001 - 0006)

Cost Breakdown Sheet