AMENDMENT 0001 SPECIFICATIONS DOCUMENT - 21R0024 - ANTOC LEBANON.pdf

PDF 727 KB Posted

Attached to
Amendment 0001 to Solicitation for Aquora National Training & Operational Center (ANTOC) for a Design Bid Build contract
Solicitation number
W912ER21R00240001
Issued by

About this file

This amendment provides additional details for the solicitation to design and construct the Aquora National Training and Operational Center in Lebanon. The solicitation seeks a design-bid-build contract to survey the site, develop an adapted design in accordance with the specifications, and construct a concrete maintenance pad and associated site work. Optional bid items include a concrete masonry unit demonstration building and aggregate surfacing of access roads. The design must meet all of Lebanon's and international construction standards and codes. Bidders must demonstrate the ability to obtain necessary approvals and permits from the Lebanese Armed Forces to access the site and perform the work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aqoura National Training and Operations Center (ANTOC) LEBANON 496243

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK - REVISED BY AMENDMENT NO. 0001

01 14 00 WORK RESTRICTIONS

01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS - REVISED BY AMENDMENT NO. 0001

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 17.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 00.12 10 SUBMITTAL PROCEDURES FOR DESIGN-BUILD PROJECT -- ADDED BY

AMENDMENT 0001

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.12 10 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 80 00.12 10 TECHNICAL REQUIREMENTS

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 41 63 FABRICATED ROOF PANEL ASSEMBLIES

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

PROJECT TABLE OF CONTENTS Page 1

W912ER21R0024 AMENDMENT 0001

09 22 16 NONSTRUCTURAL METAL FRAMING

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 73 SEISMIC CONTROL FOR MECHANICAL EQUIPMENT

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 30 00 HVAC AIR DISTRIBUTION

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 20 BASE COURSE FOR RIGID PAVING

32 13 14.13 CONCRETE PAVING FOR HEAVY DUTY PAVEMENTS

32 15 00 AGGREGATE SURFACING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK - REVISED BY AMENDMENT NO. 0001

PART 1 GENERAL

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK - REVISED BY AMENDMENT NO. 0001

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

The Contractor's construction must comply with all Lebanon's and International Construction Standards, Codes and technical requirements contained herein. The Contractor shall provide construction using the best blend of cost, construction efficiency, system durability, ease of maintenance and environmental compatibility. The Contractor shall be responsible for obtaining all approvals from the following Lebanese Armed Forces before proceeding with construction:

- G4 Lebanese Armed Forces (LAF)

- G4 Lands and infrastructure Bureau

1.2 PROJECT ITEMS OF WORK

1.2.1 Base

This Design Bid Build (D-B-B) project involves the site survey, site adapt design (please reference Specifications section 01 80 00.12) and construction of concrete maintenance pad and associated site work and grading. The concrete maintenance pad, in its entirety is 26.5 x 15.3 meters (87'-0" x 50'.2"). Site work includes the following: grading and preparing of surface as indicated by drawings. Grading and compacting access as indicated by drawings.

1.2.1.1 Site Improvements

Site improvements include the following: grading and preparing of surface as indicated by drawings. Grading and compacting access roads as indicated by drawings. Surfacing of access roads is optional. See paragraph 1.2.2 Optional Bid Items. Site improvements include the following: grading and preparing of surface as indicated by drawings. Grading and compacting access road as indicated by drawings. Surfacing of access road is optional.

See paragraph 1.2.2 Optional Bid Items.

1.2.2 Optional Bid Items

Option 1 Concrete Masonry Unit (CMU) Demonstration Building

Construct CMU structure dimensions 11,600mm x 15,750mm (38'-0" x 52'-0").

Option 2 Concrete Maintenance Pad Access Road Aggregate

Surfacing graded access road with 6" of aggregate surfacing.

Option 32 Concrete Masonry Unit (CMU) Demonstration Building Access Road Aggregate

SECTION 01 11 00 Page 2

Surfacing graded access road with 6'" of aggregate surfacing.

Access Road Aggregate

1.3 LOCATION

The project site is accessible by a paved road (Kesrouane / Taraya) and is located approximately 60km East of Jounieh and approximately 90km Northeast of Beirut. Approximate grid coordinates are 34°03'07.1"N 35°57'12.9".

1.3.1 Life Support

Base life support is not available. The Contractor will have responsibility for Life Support (food, lodging and transportation to the worksite, private or commercial) for his workforce.

1.4 SECURITY REQUIREMENTS

The Contractor must demonstrate a working understanding of the necessary access requirements for Lebanese Armed Forces property. This process includes:

a. The Contractor shall demonstrate his ability to obtain or be in possession of a current Lebanese Business license. The LAF will provide assistance if required by the contractor.

b. The Contractor shall also demonstrate the ability to obtain or show prior possession of Defense Base Act Insurance (DBA) from previous U.S.

based projects.

c. The Contractor will need to demonstrate the ability by describing how to successfully vet/clear their workforce through Lebanese Armed Forces security.

d. This project will occur in the Aqoura region of Lebanon on Lebanese Armed Forces (LAF) property. LAF will require a complete list of contractor and vendor personnel and copies of their Lebanese civil identifications. In the event contractor’s personnel to include vendors are not Lebanese citizens, LAF requires copies of their work permits and photo copy of their passport to work in Lebanon. This includes foreign citizens (including Syrians and Palestinians) who live in Lebanon. This shall be done prior to any work on this project. Any person with an Israeli stamp in their passport, regardless of nationality, will not be permitted to enter Lebanon. As security requirements are subject to change, it is the Contractor's responsibility to meet current security requirements necessary to both obtain and maintain access to LAF property.

Prior to commencement of work, the LAF will conduct a site survey to ensure all hazardous objects or materials have been removed from the site. Prior to commencement of work, the LAF intends to conduct a site survey to ensure all hazardous objects or materials have been removed from the site.

1.5 CONSTRUCTION

The construction must comply with technical requirements contained herein.

Provide construction using the best blend of cost, construction efficiency, system durability, ease of maintenance and environmental compatibility. The requirements for products found in the RFP and specifications are minimum requirements.

SECTION 01 11 00 Page 3

1.5.1 Product Requirements

The requirements for products found in the RFP are minimum requirements.

Detailed product submission requirements, including requirements for alternate products are found in Section 01 33 00.

1.5.2 Asbestos Containing Materials

Do not use asbestos containing material (ACM) in the construction of this project.

1.6 TECHNICAL APPROACH

1.6.1 Task 1 Site Preparation and Setup

a. Perform design, site survey, clearing and grading as necessary to facilitate positive drainage away from the facility.

b. Earthwork including backfilling and compaction.

c. This project is a site adapt project. The contractor will be responsible for ensuring the site meets the requirements detailed in the drawings and specifications.

d. Contractor is responsible for submission of survey and design drawings before start of construction using contract drawings as guidance for design and construction. As stated previously under Section 1.6.1 paragraph (a), the contractor will be responsible for design, survey and prep of the site.

1.6.2 Task 2 Concrete Maintenance Pad and Concrete Masonry Unit (CMU) Demonstration Building

1.6.2.1 Civil and Architectural Work

a. Construct concrete substructure including excavation, backfilling, foundations, and reinforced concrete slab on grade concrete maintenance pad .

b. Construct concrete substructure including excavation, backfilling, foundations, and reinforced concrete slab CMU with metal truss structure , and concrete masonry unit (CMU) demonstration building .

1.6.3 Task 3 Access Road Aggregate

a. Construct concrete maintenance pad access road aggregate. This task will consist of surfacing graded access road with 6" of aggregate surfacing.

b. Construct Concrete Masonry Unit (CMU) demonstration building access road aggregate. This task will consist of surfacing graded access road with 6" of aggregate surfacing.

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section --

SECTION 01 11 00 Page 4

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 15 00.12 10

SUPPLEMENTARY REQUIREMENTS - REVISED BY AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUBMITTALS

1.2 DESIGNER OF RECORD QUALIFICATIONS

1.3 SECURITY AND OPERATIONAL SAFETY

1.3.1 Security

1.3.2 Operational Safety

1.3.2.1 Design Phase Safety

1.3.2.2 Operational Safety Plan

1.4 DIGGING PERMITS

1.4.1 Requirements for Digging Permits

1.4.2 Requests for Digging Permits

1.4.3 Preparation of Requests for Digging Permits

1.4.4 Existing Underground Utilities

1.4.5 Use of Underground Utility Detecting Device

1.4.6 Hand Excavation

1.5 HAUL ROUTES - SPECIAL REQUIREMENTS

1.6 PHYSICAL CONDITIONS

1.7 RESPONSIBILITY FOR PHYSICAL SECURITY

1.8 CERTIFICATES OF COMPLIANCE

1.9 ACCIDENT PREVENTION

1.9.1 Ground Fault Circuit Interrupter (GFCI) Requirement - Overseas

Construction

1.9.2 Temporary Power - Electrical Distribution Boxes

1.9.3 Reinforcement Caps

1.10 LOCALLY AVAILABLE SERVICE FOR EQUIPMENT

1.11 CONTRACTOR'S MOBILIZATION AREA

1.12 NOT USED

1.13 STANDARDIZATION

1.14 ON-BASE PHOTOGRAPHY PROHIBITION

1.15 PUBLIC RELEASE OF INFORMATION

1.15.1 Prohibition

1.15.2 Subcontract and Purchase Orders

1.16 RESIDUAL CONSTRUCTION MATERIAL

1.17 COMPLIANCE WITH HOST COUNTRY RULES AND CUSTOMS

1.17.1 Contractor's Responsibilities

1.18 RADIO TRANSMITTER RESTRICTIONS

1.19 BASE HOT WORK PERMITS

1.19.1 Requirement for Hot Work Permits

1.19.2 Requests for Hot Work Permits

1.19.3 Preparatory Inspections and Inspection of Equipment

1.20 CONTRACTOR TRANSPORTATION AND CUSTOMS CLEARANCE

1.20.1 Shipments of Materials

1.20.2 Contractor's Responsibilities

1.20.3 Physical Handling of Materials

1.20.4 Certification

SECTION 01 15 00.12 10 Page 1

1.21 FOREIGN OBJECTS DAMAGE CONTROL

1.22 NOTICES

1.22.1 1.21.1 Notice Of Construction

1.22.2 Issuance of NOTAMS

1.23 UNSCHEDULED WORK STOPPAGES

1.24 EXHIBIT

-- End of Section Table of Contents --

SECTION 01 15 00.12 10 Page 2

SECTION 01 15 00.12 10

SUPPLEMENTARY REQUIREMENTS - REVISED BY AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Registered Designers' Proof of Degrees and Licensing; G M/R

Site Security Plan; G M/R

Requests for Digging Permits; G M/R

Proposed Means of Providing Project Security; G M/R

Requests for Hot Work Permits; G M/R

SD-07 Certificates

Certificates Of Compliance

SD-10 Operation and Maintenance Data

Locally Available Service Contacts; G R

SD-11 Closeout Submittals

O&M Performance Period Reports and Records; G M/R

1.2 DESIGNER OF RECORD QUALIFICATIONS

The following shall serve as minimum requirements for Registered Designers, including engineers and architects acting as Designer(s) of Record (DOR).

The Designer(s) of Record shall have responsibility for the preparation and issuing of documents and services pertaining to that specific discipline.

All design work shall be performed or supervised by the appropriate Designer of Record.

Each Registered Designer and/or Design Firm performing design work shall have at minimum one person with a bachelor's degree or equivalent college degree in the applicable discipline, and each shall hold a current professional registration in any of the 50 States of the United States of America, or equivalent recognized international body. Acceptance of equivalency of a university's degree for professional registration and each professional registration shall be at the sole discretion of the Contracting

SECTION 01 15 00.12 10 Page 3

Officer. Proof of degrees and licensing shall be provided.

At a minimum each design discipline shall have at least one person with a minimum of five (5) years of experience in the applicable field designing projects of similar scope, complexity and magnitude, or as otherwise specified in the Contract Documents.

1.3 SECURITY AND OPERATIONAL SAFETY

The Contractor shall prepare a security/safety program that includes the preparation and monitoring of site security and operational safety.

1.3.1 Security

The Contractor shall prepare a site security plan during construction. The plan shall be submitted with the first design submittal. The plan shall include detailed procedures for controlling access to the project site through the use of gate guards, ID badge, entry access lists and/or other measures as required by the Air Base LAF. The Contractor shall become acquainted with all the required security measures of the Air Base LAF during the proposal phase.

1.3.2 Operational Safety

1.3.2.1 Design Phase Safety

The contractor shall follow all of the operational safety requirements and guidelines identified in Appendix B, Section 14 of UFC 3-260-01.

The Contractor shall submit access requirements of design personnel at the Pre-Design Conference. The safety requirements and procedures for design personnel access to the project site will be established at the Pre-Design Conference. It is the Contractor's responsibility to ensure that design personnel are familiar with and follow afety safety procedures.

1.3.2.2 Operational Safety Plan

The Contractor shall prepare an operational safety plan that addresses the requirements and safety considerations of Sections B14-5 and B14-6 in Appendix B of UFC 3-260-01. The plan shall address operational safety during each project phase and sub phase identified in the Phasing Plan. The operational safety plan shall be submitted with the first design submittal.

1.4 DIGGING PERMITS

1.4.1 Requirements for Digging Permits

Prior to the start of any work activity which requires excavation within the current base , the Contractor shall obtain a digging permit.

1.4.2 Requests for Digging Permits

Requests for Digging Permits shall be submitted through the Contracting Officer to the Base a minimum of seven (7) days prior to the start of the work activity covered by the permit. The request for a Digging Permit shall include a narrative description of the work to be performed and a detailed map of the area of the excavation clearly marking the location of all known utilities or other obstructions. If the work activity covered by the Digging Permit request also requires a utility outage, a separate request

SECTION 01 15 00.12 10 Page 4 for the outage shall be submitted.

1.4.3 Preparation of Requests for Digging Permits

Prior to submitting a request for a Digging Permit, the Contractor shall carefully review the area to be excavated to determine the location of existing utilities and other obstructions. The Contractor will review available drawings and will conduct a visual inspection of the site. The Contractor will utilize underground utility detecting devices such as metal and cable detectors to determine the location of existing utilities. All utility lines found shall be clearly flagged or marked and the location of the utility shall be shown on the drawing to be submitted with the request for Digging Permit.

1.4.4 Existing Underground Utilities

Existing utilities may be present in the construction area which may not be shown, or are inaccurately shown, on the base as-built drawings and the contract drawings. The Contractor shall exercise utmost care in researching locations of existing utilities and reducing damage to existing utilities.

Any utilities damaged by the Contractor shall be promptly repaired by the Contractor. The Contracting Officer will review and approve any proposed repairs. Any damage to existing utilities will be immediately reported to the Contracting Officer and the Base .

1.4.5 Use of Underground Utility Detecting Device

Prior to any excavation, a metal and/or cable detecting device shall be used along the route of the excavation. All underground utilities discovered by this method will be flagged a minimum distance of one-half (1/2) meter on each side of the location.

1.4.6 Hand Excavation

Hand excavation methods and special supervisory care shall be used between any flagged markers, in areas of known or suspected hazards, and in areas known or suspected to have multiple and/or concentrated utility lines or connections.

1.5 HAUL ROUTES - SPECIAL REQUIREMENTS

The Contractor shall be responsible for coordinating with the Host Government use of any existing roads as haul routes. Construction, and routing of new haul roads, and/or upgrading of existing roads for the Contractor's use, is the sole responsibility of the Contractor. It shall be the Contractor's responsibility to obtain such local authorizations, permits and licenses necessary to establish his mobilization camp, quarry operations, batching operations and haul routes.

1.6 PHYSICAL CONDITIONS

The indications of physical conditions on the drawings and in the specifications are the result of site investigations. Exploration logs (FOR INFORMATION ONLY) are presented as an exhibit to this section.

1.7 RESPONSIBILITY FOR PHYSICAL SECURITY

Prior to mobilization, the Contractor shall submit his proposed means of providing project security to prevent unauthorized access to equipment, SECTION 01 15 00.12 10 Page 5 facilities, materials and documents, and to safeguard them against sabotage, damage, and theft. The Contractor shall be responsible for physical security of all materials, supplies, and equipment of every description, including property which may be Government-furnished or owned, for all areas occupied jointly by the Contractor and the Government, as well as for all work performed.

1.8 CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Each certificate shall be signed by an official authorized to certify in behalf of the manufacturing company involved and shall contain the name and address of the Contractor, the project name and location, description and the quantity of the items involved, and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies.

Certification shall not be construed as relieving the Contractor from furnishing satisfactory material.

1.9 ACCIDENT PREVENTION

The Contractor shall comply with all applicable Host Country laws and with such additional measures as the Contracting Officer may find necessary in accordance with CONTRACT CLAUSE 52.236-13 entitled ACCIDENT PREVENTION (NOV 1991). Applicable provisions of the Corps of Engineers manual entitled Safety and Health Requirements Manual EM 385-1-1, will be applied to all work under this contract. The referenced manual may be obtained from the Contracting Officer's Representative at the jobsite or from the Middle East District at Winchester, Virginia.

1.9.1 Ground Fault Circuit Interrupter (GFCI) Requirement - Overseas Construction

The Corps of Engineers Health and Safety Manual, EM 385-1-1, section 11.C.05.a. states: "The GFCI device shall be calibrated to trip within the threshold values of 5 ma +/- 1 ma as specified in Underwriters Laboratory (UL) Standard 943." A variance from USACE has been granted allowing 10 ma, in lieu of 5 ma, for overseas activities that use 220 Volts(V)/50 hertz(hz) electrical power.

1.9.2 Temporary Power - Electrical Distribution Boxes

EM 385-1-1 section 11.A.01.a. states "All electrical wiring and equipment shall be a type listed by a nationally recognized testing laboratory for the specific application for which it is to be used." This includes temporary electrical distribution boxes. Locally manufactured electrical boxes will not be allowed. Only manufactured electrical distribution boxes that meet the European CE requirements, with 10 ma CE type GFCIs installed shall be allowed.

Contractors shall:

a. Make no modifications that might void any CE or manufacturer certification.

b. Test the installed systems to demonstrate that they operate properly

SECTION 01 15 00.12 10 Page 6 and provide the 10 ma earth leakage protection.

c. Ensure GFCIs will have an integral push-to-test function. The testing shall be performed on a regular basis.

d. Check that proper grounding is checked regularly and flexible cords, connectors, and sockets inspected before each use.

1.9.3 Reinforcement Caps

All rebar and other protruding reinforcing steel, onto and into which employees could fall, shall be guarded to eliminate the hazard of impalement. The guarding shall meet Code of Regulations, Title 8, Section

344.90 California Impalement Protection. Each protective cover shall be marked with the following information:

(1) Model Number or Trademark.

(2) California Approval Number as issued pursuant to Sections 1712 and 1505 of the above listed Code.

(3) Size(s) designation.

1.10 LOCALLY AVAILABLE SERVICE FOR EQUIPMENT

All equipment furnished under this contract, regardless of country of manufacture or purchase, must have in-country service availability.

Contractor shall submit service contacts of the locally available service for Contracting Officer's approval. In the event that the Contractor proposed to provide equipment for which in-country service is not available, the Contractor must provide written justification for the Contracting Officer's approval. This justification shall be submitted for each product or material for which a waiver is sought concurrently with the submittal required by the Technical Provisions. Submission of group or "blanket" waivers is unacceptable.

1.11 CONTRACTOR'S MOBILIZATION AREA

The Contractor will be permitted to use an area as directed by the Contracting Officer within the contract limits for operation of his construction equipment and plants, shops, warehouses, and offices. The Contractor shall not be authorized to have living accommodations for his work force on the site. The Contractor is responsible for obtaining any required additional mobilization area above that designated. On completion of the contract, all facilities shall be removed from the mobilization area by the Contractor and shall be disposed of in accordance with applicable Host Government Laws and Regulations. The site shall be cleared of construction debris and other materials and the area restored to its final grade. See Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES for additional requirements.

1.12 NOT USED

1.13 STANDARDIZATION

Where two or more items of the same type or class of equipment furnished in this project are required, the units shall be products of the same manufacturer and shall be interchangeable when of the same size, capacity, performance characteristics, and rating. The only exception to this requirement is where the items are interchangeable due to conformance with industry standards (valves, fittings, etc.), they need not be by the same

SECTION 01 15 00.12 10 Page 7 manufacturer. This requirement applies to all manufactured items in the project which normally require repair or replacement during the life of the equipment.

1.14 ON-BASE PHOTOGRAPHY PROHIBITION

The Contractor shall not engage in any form of photography without prior written approval from the Contracting Officer.

1.15 PUBLIC RELEASE OF INFORMATION

1.15.1 Prohibition

There shall be no public release of information or photographs concerning any aspect of the materials or services relating to this bid, contract, purchase order, or other documents resulting therefrom without the prior written approval of the Contracting Officer.

1.15.2 Subcontract and Purchase Orders

The Contractor agrees to insert the substance of this clause in all purchase orders and subcontract agreements issued under this contract.

1.16 RESIDUAL CONSTRUCTION MATERIAL

All Contractor purchased materials and equipment intended for incorporation into the completed facilities and which are later determined excess to the actual construction requirements, will become the property of the Government. The residual materials and equipment shall be tagged (giving the area where like type material and equipment were installed), and stored in an orderly manner in a designated area as directed and approved by the Contracting Officer.

1.17 COMPLIANCE WITH HOST COUNTRY RULES AND CUSTOMS

The laws of Host Country may prohibit access to certain areas of the country which are under military control. The Contractor shall furnish the Contracting Officer the names of personnel, type, and amounts of equipment, dates and length of time required at the site, and the purpose of entering the host country. It is understood that areas to which rights of entry are provided by the Host Government are to be used only for work carried out under the contract and no destruction or damages shall be caused, except through normal usage, without concurrence of the Host Government.

1.17.1 Contractor's Responsibilities

The following items are the sole responsibility of the Contractor to investigate, estimate as to cost, and assume the risk, as normally encountered by Contractors on fixed-price contracts. The Contractor shall be responsible for determining the effect of the following on its own cost of performance of the contract and for including sufficient amount in the contract price:

a. Official language and type of accounts required to satisfy the officials of the Local Government.

b. Entry and exit visas, residence permits, and residence laws applicable to aliens. This includes any special requirements of the Host Government, including those required by local Labor

SECTION 01 15 00.12 10 Page 8

Offices, which the Contractor may have to fulfill before an application for a regular block of visas will be accepted.

c. Passports, health and immunization certificates, and quarantine clearance.

d. Compliance with local labor and insurance laws, including payment of employer's share of contribution, collecting balance from employee and paying into insurance funds.

e. Strikes, demonstrations and work stoppage.

f. Collection through withholding and payment to local Government, of any Host Country income tax on employees subject to tax.

g. Arranging to perform work in the Host Country, to import personnel, to employ non-indigenous labor, to receive payments and to remove such funds from the country.

h. Operating under local laws, practices, customs and controls, and with local unions, in connection with hiring and firing, mandatory wage scales, vacation pay, severance pay, overtime, holiday pay, 7th day of rest, legal notice or pay in lieu thereof for dismissal of employees, slowdown and curtailed schedules during religious holidays and ratio of local labor employed in comparison to others.

i. Possibility of claims in local bureaus, litigation in local courts, or attachment of local bank accounts.

j. Compliance with workmen's compensation laws and contributions into funds. Provisions of necessary medical service for Contractor employees.

k. Special license required by the local Government for setting up and operating any manufacturing plant in the Host Country, e.g.

concrete batching, precast concrete, concrete blocks, etc.

l. Sales within the host country of Contractor-owned materials, and equipment.

m. Special licenses for physicians, mechanics, tradesmen, drivers, etc.

n. Identification and/or registration with local police of imported personnel.

o. Stamp tax on documents, payments and payrolls.

p. Base passes for permanent staff, day laborers, motor vehicles, etc.

q. Compliance with all customs and import rules, regulations and restrictions, including, but not limited to, local purchase requirements.

1.18 RADIO TRANSMITTER RESTRICTIONS

To preclude accidental actuation of sensitive electronic equipment, the Contractor shall not use radio transmitting equipment without prior approval of the Contracting Officer.

SECTION 01 15 00.12 10 Page 9

1.19 BASE HOT WORK PERMITS

1.19.1 Requirement for Hot Work Permits

Prior to the start of a work activity including hot work (welding, burning, etc.) or the operating of other flame producing devices, the Contractor shall obtain a Hot Work Permit.

1.19.2 Requests for Hot Work Permits

Requests for Hot Work Permits shall be submitted through the Contracting Officer to the Base Fire Department a minimum of 7 days prior to the start of the work activity covered by the permit. The request for a Hot Work Permit shall include a narrative description of the work to be accomplished, a list of equipment to be used, and a description of special safety precautions that the Contractor will put in place during the work to assure compliance with EM 385-1-1 and Base Fire Regulations.

1.19.3 Preparatory Inspections and Inspection of Equipment

During the Preparatory Inspection for any work activity including hot work, the Hot Work Permit shall be reviewed. During the Preparatory inspection, all hot equipment and safety equipment shall be checked to assure that it is in proper working order. Safety equipment required by the Hot Work Permit shall be checked at the beginning of each shift to assure that it is in proper working order.

1.20 CONTRACTOR TRANSPORTATION AND CUSTOMS CLEARANCE

All materials and equipment which are not to be incorporated into the project, such as office trailers, cranes, metal forms, etc., may be shipped free of duty, if the following actions are taken:

1.20.1 Shipments of Materials

All shipments of materials into the country for use in performance of work under this contract and supplies or services necessary for support of the Contractor's personnel shall be addressed to the shipping address furnished to the Contractor by the Contracting Officer. Address will be furnished upon request by the Contractor.

1.20.2 Contractor's Responsibilities

The Contractor shall be responsible for all customs clearance actions. All necessary arrangements, clearance procedures, and coordination with the Host Government customs, will be the sole responsibility of the Contractor. The Contractor shall submit to the Contracting Officer, with a cover letter, information copies of the shipping documents for the shipment(s) involved. As a minimum, the following shall be included as enclosures, with the cover letter to the Contracting Officer in three (3) copies:

a. Invoice. (Include a copy in Arabic)

b. Bill of Lading.

c. Certificate of Origin.

SECTION 01 15 00.12 10 Page 10

d. Statement on the cover letter as to Port of Customs Clearance, estimated arrival date, general description of the shipment, quantity and the name of the carrier.

e. Serial number or model number of shipment items.

1.20.3 Physical Handling of Materials

The Contractor shall be responsible for performance of all loading, unloading, transportation or other physical handling of materials as may be required, including all movement from carrier unloading site to delivery at the job site and all movement required at the customs area.

1.20.4 Certification

The U.S. Embassy, upon receipt of request of shipping documents, shall issue a letter to the Director of Customs certifying that the materials are being brought into the country under the applicable agreement and should be allowed into country duty-free.

1.21 FOREIGN OBJECTS DAMAGE CONTROL

The Contractor shall prepare and submit to the Contracting Officer, for approval, his plan to control Foreign Objects Damage (FOD) at its mobilization site, construction site and during work on or near aircraft runways and/or taxiways. The plan shall be specific and shall describe in detail measures to be implemented to prevent deposit of foreign objects on runways and/or taxiways during construction. The Foreign Objects Damage (FOD) Control Plan shall be submitted fifteen (15) calendar days prior to the start of any work on or near aircraft runways or taxiways. No work will be allowed near any runways or taxiways without approval of the FOD control plan by the Contracting Officer.

1.22 NOTICES

1.22.1 1.21.1 Notice Of Construction

A Notice Of Proposed Construction Or Alteration must be submitted to Airfield Operations at least 30 days prior to the start of construction.

This notification must be submitted as directed by the Contracting Officer, but the Contractor must provide all information and prepare appropriate documentation for submission.

1.22.2 Issuance of NOTAMS

Only Airfield Operations can close, open, or restrict the use of any part of an airfield facility. Any conditions that would prevent, restrict, or present a hazard to arriving or departing aircraft requires public notification. Public notification is accomplished by the Notice to Airmen (NOTAM) system. NOTAMS are submitted to the managing aviation authority by the KAF. It is the responsibility of the Contractor to coordinate with the Contracting Officer for the issuance of NOTAMS during construction. The Contractor shall provide the necessary information at least 72 hours before occurrence of the event that requires the NOTAM.

1.23 UNSCHEDULED WORK STOPPAGES

The Contractor shall anticipate unscheduled removal from the work site an

SECTION 01 15 00.12 10 Page 11 average of ten {10} hours per month per installation. If the total quantity of delays varies above or below the stated quantity, an equitable adjustment under Contract Clause 52.243-4 CHANGES shall be made upon written demand of either party. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date if, in the judgment of the Contracting Officer, a delay is justified.

1.24 EXHIBIT

Exhibit A - Exploration Data

-- End of Section --

SECTION 01 15 00.12 10 Page 12

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00.12 10

SUBMITTAL PROCEDURES FOR DESIGN-BUILD PROJECT -- ADDED BY AMENDMENT 0001

PART 1 GENERAL

-- End of Section Table of Contents --

SECTION 01 33 00.12 10 Page 1

SECTION 01 33 00.12 10

SUBMITTAL PROCEDURES FOR DESIGN-BUILD PROJECT -- ADDED BY AMENDMENT 0001

PART 1 GENERAL

1.1 REFERENCE

The publication listed below forms a part of this specification to the extent referenced. The publication is referenced to in the text by basic designation only.

CONSTRUCTION SPECIFICATIONS INSTITUTE

Manual of Practice Construction Specifications Institute 601 Madison Street Alexandria, Virginia 22314-1791

NATIONAL INSTITUTE OF BUILDING SCIENCES (NIBS)

Unified Master Reference List (UMRL) National Institute of Building Sciences 1090 Vermont Avenue, NW, Suite 700 Washington, DC 20005-4905 Email: nibs@nibs.org FAX: (202) 289-1092 Tele: (202) 289-7800

MIDDLE EAST DISTRICT (MED)

Design Instructions U.S. Army Corps of Engineers Manual Middle East District 201 Prince Frederick Drive Winchester, Virginia 22602 http://www.tam.usace.army.mil/BusinessWithUs/Engineering/EngineeringFiles.aspx

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

Most equipment is a replacement in kind (i.e., replacement by matching the existing size, capacity, electrical consumption). For this type of replacement, all submittals shall be accompanied by proof of equivalency consisting of clear photographs of the existing equipment, the model and manufacturer and a picture of tags that may be on the equipment.

SD-01 Preconstruction Submittals

Civil:

Environmental Monitoring Plan; G, RE

1.2.2 CONSTRUCTION SUBMITTALS

SECTION 01 33 00.12 10 Page 2

1.2.2.1 Contractor Furnished Government Accepted Construction Submittals

Government approved construction submittals are primarily related to plans (Contractor Quality Control, Accident Prevention, Resident Management System, Area Use etc) schedules (Project Schedule/Network Analysis), and certificates of compliance. They may also include proposed variations to approved design documents in accordance with the paragraph entitled "VARIATIONS". Follow Section 01 33 00.12 10 SUBMITTAL PROCEDURES FOR DESIGN-BUILD PROJECTS for construction submittals.

1.2.2.2 For Information Only Construction Submittals (FIO)

All submittals not requiring Designer of Record or Government approval will be for information only.

1.3 SUBMITTAL CERTIFICATION

The CQC organization shall be responsible for certifying that all submittals and deliverables have been reviewed in detail for completeness, are correct, and are in strict conformance with the contract drawings, specifications, and reference documents.

1.3.1 Effective Quality Control System

The Design-Build Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with Section 01 45 00.00 10 QUALITY CONTROL.

1.3.1.1 Organizational Responsibility

The quality control system shall cover all design, construction, subcontractor, manufacturer, vendor, and supplier operations at any tier, both onsite and offsite.

1.3.1.2 CQC System Manager Review and Approval

Prior to submittal, all items shall be checked and approved by the Design-Build Contractor's Quality Control (CQC) System Manager. If found to be in strict conformance with the contract requirement, each item shall be stamped, signed, and dated by the CQC System Manager. Copies of the CQC organizations review comments indicating action taken shall be included within each submittal.

1.3.1.3 Determination of Compliance

Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements by the Contracting Officer.

1.3.2 Responsibility for Errors or Omissions

It is the sole responsibility of the Design-Build Contractor to ensure that submittals comply with the contract documents. Government review, clearance for construction, or approval by the Contracting Officer shall not relieve the Design-Build Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract.

1.3.2.1 Government Review

SECTION 01 33 00.12 10 Page 3

Government review, clearance for construction, or approval of post design construction submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory.

1.3.3 Substitutions

After design submittals have been reviewed and cleared for construction by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless justified as indicated in the paragraph entitled VARIATIONS.

1.3.4 Additional Submittals

In conjunction with Contract Clause 52.236-5 MATERIAL AND WORKMANSHIP, the Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work.

1.3.5 Untimely and Unacceptable Submittals

If the Design-Build Contractor fails to submit submittals in a timely fashion, or repetitively submits submittals that are not in strict conformance with the contract documents, no part of the time lost due to such actions shall be made the subject of claim for extension of time or for excess costs or damages by the Design-Build Contractor.

1.3.6 Stamps

Stamps shall be used by the Design-Build Contractor on all design and post design construction submittals to certify that the submittal meets contract requirements and shall be similar to the following:

Design-Build Contractor (Firm Name) Contract Number Contract Name I certify that this submittal is accurate, is in strict conformance with all contract requirements, and has been thoroughly coordinated and cross checked against all other applicable disciplines to prevent the omission of vital information, that all conflicts have been resolved, and that repetition has been avoided. It is complete and in sufficient detail to allow ready determination of compliance with contract requirements by the Contracting Officer.

Name of CQC System Manager: _____________ Signature of CQC System Manager: _____________ Date: _____________

1.4 ENGLISH LANGUAGE

All specifications, drawings, design analysis, design calculations, shop drawings, catalog data, materials lists, and equipment schedules submitted shall be in the English language.

1.5 UNITS OF MEASUREMENT

Design documents shall be prepared in accordance with the guidance offered in

SECTION 01 42 15 METRIC MEASUREMENTS.

The metric units used are the International System of Units (SI) developed and maintained by the General Conference on Weights and Measures (CGPM); the

SECTION 01 33 00.12 10 Page 4 name International System of Units and the international abbreviation SI were adopted by the 11th CGPM in 1960.

1.5.1 Drawings

All site layout data shall be dimensioned in meters or coordinates, as appropriate. All details shall be dimensioned in millimeters.

EXAMPLE: Masonry openings shall be a U.S. module to suit a standard U.S. door. The dimensions of the opening shall be given in SI units.

1.5.2 Design Calculations

Calculations shall be in English (I-P) or metric (SI) units as deemed appropriate by the designer to meet the requirements of the design.

Quantities on the contract drawings stated in metric units, shall also be stated in SI units in the design analysis to match the drawings.

1.5.3 Specifications

All equipment and products shall be specified by U.S. standards and described by SI units.

1.6 WITHHOLDING OF PAYMENT FOR SUBMITTALS

1.6.1 Design Submittals

Payment for Design work will not be made in whole or in part until the Government has reviewed and cleared the design for construction.

1.6.2 Construction Submittals

Payment for materials incorporated in the work will not be made if required approvals have not been obtained. In event under separate clause of the contract, the Design-Build Contractor is allowed partial or total invoice payment for materials shipped from the Continental United States (CONUS), and/or stored at the site, the Design-Build Contractor shall with his request for such payment, submit copies of approvals (ENG Form 4025) utilizing RMS CM in accordance with Section 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) certifying that the materials that are being shipped and/or stored have been approved and are in full compliance with the contract technical specifications.

PART 2 PRODUCTS

2.1 GENERAL

The following are contract deliverables which expound upon and finalize the design parameters/requirements outlined within the contract documents. They shall be prepared in such a fashion that the Prime Contractor is responsible to the Government and not as an internal document between the Prime Contractor and its Subcontractors, Vendors, Suppliers, etc.

2.2 DESIGN ANALYSIS

A design analysis, written in the English Language with SI units of measure (and I-P units in parenthesis), shall be submitted for review by the Government. The design analysis is a written explanation of the project design which is expanded and revised (updated) as the design progresses. The

SECTION 01 33 00.12 10 Page 5 design analysis shall contain all explanatory material giving the design rationale for any design decisions which would not be obvious to an engineer reviewing the final drawings and specifications. The design analysis contains the criteria for and the history of the project design, including criteria furnished by the Government, letters, codes, references, conference minutes, and pertinent research. Design calculations, computerized and manual, are included in the design analysis. Narrative descriptions of design solutions are also included. Written material may be illustrated by diagrams and sketches to convey design concepts. Catalog cuts and manufacturer's data for all equipment items, shall be submitted. Copies of all previous design phase review comments and the actions assigned to them shall be included with each submission of the design analysis. Specific requirements for the design analysis, listed by submittal phase, are contained hereinafter.

2.3 DESIGN CALCULATIONS

When they are voluminous, they shall be bound separately from the narrative part of the design analysis. The design calculations shall be presented in a clean and legible form incorporating a title page and index for each volume.

A table of contents, which shall be an index of the indices, shall be furnished when there is more than one volume. The source of loading conditions, supplementary sketches, graphs, formulae, and references shall be identified. Assumptions and conclusions shall be explained. Calculation sheets shall carry the names or initials of the computer and the checker and the dates of calculations and checking. No portion of the calculations shall be computed and checked by the same person.

2.3.1 Automatic Data Processing Systems (ADPS)

When ADPS are used to perform design calculations, the design analysis shall include descriptions of the computer programs used and the ADPS input data and output summaries. When the computer output is large, it may be divided into volumes at logical division points.

2.3.1.1 Computer Printouts

Each set of computer printouts shall be preceded by an index and by a description of the computation performed. If several sets of computations are submitted, they shall be accompanied by a general table of contents in addition to the individual indices.

2.3.1.2 Preparation of the Description

Preparation of the description which must accompany each set of ADPS printouts shall include the following.

a. Explain the design method, including assumptions, theories and formulae.

b. Include applicable diagrams, adequately identified.

c. State exactly the computation performed by the computer.

d. Provide all necessary explanations of the computer printout format, symbols, and abbreviations.

e. Use adequate and consistent notation.

f. Provide sufficient information to permit manual checks of the results.

2.4 SPECIFICATIONS

Specifications shall be prepared in accordance with the Construction Specifications Institute (CSI) format. The Design-Build Contractor prepared specifications shall include as a minimum, all applicable specifications

SECTION 01 33 00.12 10 Page 6 sections referenced by the CSI. Where the CSI does not reference a specification section for specific work to be performed by this contract, the Design-Build Contractor shall be responsible for creating the required specification.

2.4.1 Preparation of Proprietary Non-Generic Design Documents

During the course of design, the designer shall specify proprietary materials, equipment, systems, and patented processes by trade name, make, or catalog number. The subsequent use of construction submittals to supplant and/or supplement incomplete design effort is unacceptable. Design submittals containing non-proprietary and/or generic design criteria where proprietary items are available, will be returned for resubmission.

2.4.2 Use of Unified Facilities Guide Specifications (UFGS)

If UFGS are used, it is the sole responsibility of the Design-Build Contractor to prepare these specifications in strict conformance with the paragraph entitled PREPARATION OF PROPRIETARY NON-GENERIC DESIGN DOCUMENTS.

UFGS containing non-proprietary and/or generic design criteria where proprietary items are available will be returned for resubmission. If the UFGS contains a "SUBMITTALS" paragraph, the Design-Build Contractor shall delete it and incorporate all required information directly into the design documents. Under no circumstances will the Design-Build Contractor be permitted to use submittals and shop drawings to finalize an incomplete design.

2.4.3 Quality Control and Testing

Specifications shall include required quality control and further indicate all testing to be conducted by the Design-Build Contractor, its subcontractors, vendors and/or suppliers.

2.4.4 Ambiguities and indefinite specifications

Ambiguities, indefinite specification requirements (e.g., highest quality, workmanlike manner, as necessary, where appropriate, as directed etc)and language open to interpretation is unacceptable.

2.4.5 Industry Standards

2.4.5.1 U.S. Industry Standards

This document lists publications referenced in the Unified Facilities Guide Specifications (UFGS) of the Corps of Engineers (USACE), the Naval Facilities Engineering Command (NAVFAC), the Air Force Civil Engineer Support Agency (AFCESA), and the guide specifications of the National Aeronautics and Space Administration (NASA). This document is maintained by the National Institute of Building Sciences (NIBS) based on information provided by the agencies involved and the standards producing organizations.