AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Refer to SF-30 Block 14 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ER19R0021
X 9B. DATED (SEE ITEM 11)
12-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2019
CODE
W912ER DISTRICT (TAM), USACE
MIDDLE EAST DISTRICT (CETAM-CT)
PO BOX 2250
WINCHESTER VA 22604-1450
W912ER 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ER19R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION PAGE
1. The hour and date specified for receipt of offer is extended four (4) calendar days from 4:00PM, 19 August, 2019 to 4:00PM, 23 August, 2019.
2. Specifications: Revised sections are replaced in their entirety. Revisions to the specification pages are shown on the pages in the following manner: New text is underlined and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the new or revised sections.
The following have been revised/added:
Table of Contents Replaced in entirety
Section 01 11 00
Paragraph 1.2, pages 2 and 3 Paragraph 1.6.5, pages 9 and 10 Paragraph 1.7.3, page 11 Appendix C, added in entirety
Section 01 50 00
Paragraph 2.2.4, page 4
Section 01 91 00.12 10 Paragraph 1.7.2.b, page 9
Section 03 30 00
Paragraph 1.2, page 9 Paragraph 1.3, page 11 Paragraph 1.6.4.1 and 1.6.4.2, page 13 Paragraph 1.7.1, page 15 Paragraph 2.3.1.4, page 18 Paragraph 2.4.1 and 2.4.1.1, pages 18 – 20 Paragraph 2.4.3, page 20
Section 08 35 13.33
Added in entirety
Section 10 51 13 Paragraph 2.1 and 2.1.1, page 3 Paragraph 2.2.2.1, page 4 Paragraph 2.3.4, page 4 Paragraph 2.3.8, page 4 Paragraph 3.2, page 5
Section 14 21 33
Paragraph 2.1.1.1, page 10 Paragraph 2.4, pages 11 and 12 Paragraph 2.5.2, page 13 Paragraph 2.5.2.1, page 13 Paragraph 2.6, page 14 Paragraph 2.6.2, page 15
Paragraph 2.5.2.1 e and g, page 15 Paragraph 2.8.1, page 17 Paragraph 2.8.8, page 18 Paragraph 2.10.1 and 2, page 19
Section 23 00 00
Paragraph 1.3, page 10 Paragraph 2.10.1, page 16 Paragraph 2.18 – 2.18.6, pages 29-30
Section 26 51 00
Paragraph 2.6.3, page 15
Section 27 51 16
Section 28 08 10
Section 41 22 13
3. Drawings: Revisions to the following drawings are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.
General:
G-011 G-012 G-013
Electrical:
XE-100
XE-100_A
Structural:
S-101 S-501 S-504 S-505 S-506 S-507 S-508
Architecture:
A-110 A-302 A-314 A-514 A-516 A-601 A-602 A-603
Interior:
IN-113
IN-602
Fire Protection:
FX-116
FA-116
FA-117
FA-401
FA-501
FA-503
FA-601
FA-602
Mechanical:
PP-111
PP-112
PP-113
PP-114
PP-115
PP-116
P-601
MH-411
MH-602
MH-604
Site Electrical:
E-001 E-501
Telecommunications:
T-123 T-401 T-601
4. Solicitation Section 00 73 00: Appendix D, Attachment F – Supplemental Cost Breakdown Sheet has been revised and is attached in its entirety.
5. All other terms and conditions remain unchanged.