W912ER19R0021_0003.pdf

PDF 127 KB Posted

Attached to
Care and Preservation Vehicle Maintenance Facility
Solicitation number
W912ER19R0021
Issued by

About this file

Solicitation Amendment 0003 - Extend Proposal Due Date

View the file

Other files

File Type Posted
Cost_Breakdown_Sheet_Care_and_Preservation_Facility_as_of__8-22-2019.pdf PDF
AMENDMENT_0004_-_DRAWING_DOCUMENT_--_AJ_CPF_Amendment_0004_Drawings.pdf PDF
W912ER19R0021_0004.pdf PDF
AMENDMENT_0004_SPECIFICATIONS_DOCUMENT_-_CARE_AND_PRES_FAC_29_AUG_19.pdf PDF
W912ER19R0021-P0002.pdf PDF
AMENDMENT_0002_SPECIFICATIONS_DOCUMENT.pdf PDF
Proposal_Schedule_Care_and_Preservation_Facility__8-5-2019.pdf PDF
Cost_Breakdown_Sheet_Care_and_Preservation_Facility_as_of__8-5-2019.pdf PDF
AMENDMENT_0002_DRAWING_FILE_--_15_AUG_19_AJ_CPF_Amendment_0002_Drawings.pdf PDF
W912ER19R0021_Amendment_0001.pdf PDF
Revised_Camp_Arifjan_Base_Access_-_16JULY19.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part2.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part7.pdf PDF
ATTACHMENT_D_SUPPLEMENTAL_COST_BREAKDOWN_(BID_SCHEDULE).pdf PDF
VOLUME_3_OF_3_SPECS_8_JUL_19.pdf PDF
ATTACHMENT_B_OFFERORS_CONSTRUCTION_EXPERIENCE_FORM.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part8.pdf PDF
VOLUME_2_OF_3_SPECS_8_JUL_19.pdf PDF
QUESTIONNAIRE_-_REQUEST_FOR_INFORMATION_FOR_PURPOSES_OF_CONDUCTING_A_RESPONSIBILITY_DETERMINATION.pdf PDF
VOL_1_OF_3_SOLICITATION.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part5.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part4.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part1.pdf PDF
ATTACHMENT_C_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part6.pdf PDF
ATTACHMENT_A_CONSTRUCTION_EXPERIENCE_OVERVIEW_SHEET.pdf PDF
BASE_ACCESS_PROCEDURES_FOR_CAMP_ARIFJAN.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part3.pdf PDF
Part_1_CDC_Drawings.pdf PDF
Part_3_CDC_Drawings.pdf PDF
Part_4_CDC_Drawings.pdf PDF
Part_2_CDC_Drawings.pdf PDF
Care_and_Preservation_Facility.docx DOCX document
DRAFT_Proposal_Schedule_Care_and_Preservation_Facility-369882__5-15-2019.pdf PDF
DRAFT_Cost_Breakdown_Care_and_Preservation_Facility-369882__5-15-2019.pdf PDF
DRAFT_Specifications_for_Care_&_Preservation_Facility,_Camp_Arifjan,_Kuwait.pdf PDF
Draft_Soliocitation_for_Care_and_Preservation_FBO.pdf PDF
Care_and_Preservation_Capabilities_Statement.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Refer to the SF-30 Block 14 Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ER19R0021

X 9B. DATED (SEE ITEM 11)

12-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Aug-2019

CODE

US ARMY CORPS OF ENGINEERS-CETAM-CT

MIDDLE EAST DISTRICT, CETAM-CT

PO BOX 2250

WINCHESTER VA 22604-1450

W912ER 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ER19R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

1. The purpose of this amendment is to extend the hour and date specified for receipt of offer from 4:00PM, 23 August, 2019 to 10:00AM, Eastern Daylight time, 9 September, 2019.

2. All other terms and conditions remain unchanged.

File details come from the government source that posted it.