Care_and_Preservation_Capabilities_Statement.pdf

PDF 66 KB Posted

Attached to
Care and Preservation Vehicle Maintenance Facility
Solicitation number
W912ER19R0021
Issued by

About this file

Capabilities Statement for Care and Preservation

View the file

Other files

File Type Posted
Cost_Breakdown_Sheet_Care_and_Preservation_Facility_as_of__8-22-2019.pdf PDF
AMENDMENT_0004_-_DRAWING_DOCUMENT_--_AJ_CPF_Amendment_0004_Drawings.pdf PDF
W912ER19R0021_0004.pdf PDF
AMENDMENT_0004_SPECIFICATIONS_DOCUMENT_-_CARE_AND_PRES_FAC_29_AUG_19.pdf PDF
W912ER19R0021_0003.pdf PDF
W912ER19R0021-P0002.pdf PDF
AMENDMENT_0002_SPECIFICATIONS_DOCUMENT.pdf PDF
Proposal_Schedule_Care_and_Preservation_Facility__8-5-2019.pdf PDF
Cost_Breakdown_Sheet_Care_and_Preservation_Facility_as_of__8-5-2019.pdf PDF
AMENDMENT_0002_DRAWING_FILE_--_15_AUG_19_AJ_CPF_Amendment_0002_Drawings.pdf PDF
W912ER19R0021_Amendment_0001.pdf PDF
Revised_Camp_Arifjan_Base_Access_-_16JULY19.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part2.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part7.pdf PDF
ATTACHMENT_D_SUPPLEMENTAL_COST_BREAKDOWN_(BID_SCHEDULE).pdf PDF
VOLUME_3_OF_3_SPECS_8_JUL_19.pdf PDF
ATTACHMENT_B_OFFERORS_CONSTRUCTION_EXPERIENCE_FORM.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part8.pdf PDF
VOLUME_2_OF_3_SPECS_8_JUL_19.pdf PDF
QUESTIONNAIRE_-_REQUEST_FOR_INFORMATION_FOR_PURPOSES_OF_CONDUCTING_A_RESPONSIBILITY_DETERMINATION.pdf PDF
VOL_1_OF_3_SOLICITATION.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part5.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part4.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part1.pdf PDF
ATTACHMENT_C_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part6.pdf PDF
ATTACHMENT_A_CONSTRUCTION_EXPERIENCE_OVERVIEW_SHEET.pdf PDF
BASE_ACCESS_PROCEDURES_FOR_CAMP_ARIFJAN.pdf PDF
CDC_DRAWING_FILE_-_2019-07-11_Part3.pdf PDF
Part_1_CDC_Drawings.pdf PDF
Part_3_CDC_Drawings.pdf PDF
Part_4_CDC_Drawings.pdf PDF
Part_2_CDC_Drawings.pdf PDF
Care_and_Preservation_Facility.docx DOCX document
DRAFT_Proposal_Schedule_Care_and_Preservation_Facility-369882__5-15-2019.pdf PDF
DRAFT_Cost_Breakdown_Care_and_Preservation_Facility-369882__5-15-2019.pdf PDF
DRAFT_Specifications_for_Care_&_Preservation_Facility,_Camp_Arifjan,_Kuwait.pdf PDF
Draft_Soliocitation_for_Care_and_Preservation_FBO.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Care and Preservation Vehicle Maintenance Facility

W912ER-19-R-0021

Capability Statement

SECTION 1. GENERAL

1. Business Name: (Insert Business Name)

2. Business Address: (Insert Business Address)

3. Cage Code: (Insert Cage Code)

4. NAICS Codes: (Insert all applicable NAICS Codes)

5. Responsible Point of Contact:

Name: (Insert Name)

Telephone: (Insert Telephone Number)

Email: (Insert Email Address)

6. Check All That Apply: Our firm is:

Small business

8(a) small business

Veteran-owned small business

Service-disabled veteran-owned small business

HUBZone small business

Small disadvantaged business

Women-owned small business concern.

None of the above.

SECTION 2. CONTRACTOR ARRANGEMENT

1. Our firm will be proposing on this project as a:

Sole contractor

Prime contractor performing at least 50% of the work with subcontractor(s)

Prime contractor performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted) Joint venture with (Insert business name, business size, and cage code).

(See FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a)

Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403 (c) and 13 CFR 125.15(b). )

SECTION 3. CAPABILITY

1. If awarded a contract, the maximum capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds for any single task/delivery order is (Insert maximum capacity, in dollars, per task/delivery order annually).

2. If awarded a contract, the maximum aggregate contract capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds is (Insert total contract capacity, in dollars, your firm can perform annually).

3. Our firm is capable of performing/delivering 1 order, 2-5 orders simultaneously.

4. Our firm has performed work in Kuwait:

Yes No

5. Our firm has the necessary documents/permits/certifications required to perform work in

Kuwait:

Yes No

6. Our firm has constructed the following facility types/projects:

Check All

That Apply

Construction Project

All of the below projects(skip to question 9)

Housing/Barracks

Dining Facility

Equipment/Vehicle Maintenance Facility

Operations Facility

Administrative/Headquarters Facility

Command and Control Facility

Communications Center

Fire Station

Waste Management Complex

Training Facility

Medical Facility (Clinic/Hospital)

Fuel Storage Facility

Fuel Distribution and Storage System

Munitions Storage

Power Plant

Utilities Infrastructure

RSOI Facilities/Areas

Entry/Access Control Points

Cargo Handling Areas

Perimeter Fence and Guard Towers

Road Construction

Airfields: (Runways/Taxiways/Aprons/Ramps)

Airfield Support Facilities: (Hangars/Control Towers/etc.)

Passenger/Cargo Terminals

Drainage System Projects

Water Treatment Facility

7. If awarded a contract, our firm is/ is not capable to perform at least 20% of the cost of the construction and related services.

8. Based on your previous experience, identify the percent work effort you would expect to subcontract.

9. Our firm is performing, or has successfully performed construction of facilities and associated services for the following U.S. or Foreign military commands/facilities/projects:

(Provide name of project location, type of work performed, role of firm (prime, sub, team member), dollar value of work performed by your firm, percentage of total contract value performed by your firm, and date work was performed. Include no more than two single-spaced, 10 font, 8 1/2" x 11" pages containing this information).

10. Our firm is/ is not experienced in obtaining Defense Base Act (DBA) insurance for our personnel.

11. Our firm is/ is not experienced with operating under SPOT requirements.

SECTION 4. RETURN INSTRUCTIONS

After you have completed all sections of the capability statement, please return the form to the

Contract Specialist via email at Diane.E.deLathouder@usace.army.mil. Your response needs to be received no later than 1400 Daylight Eastern Standard Time on April 25, 2019. Information presented is for market research purposes only.

mailto:Diane.E.deLathouder@usace.army.mil

File details come from the government source that posted it.