A154_Amendment 0001 W912ER19R0005 Consolidated Squadron Operations Facility Qatar

View the file

Other files

File Type Posted
A154_Amendment_0002_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.pdf PDF
Cost_Breakdown_7-2-19_Amendment_2.pdf PDF
AMENDMENT_0002_SPECIFICATIONS_DOCUMENT_2_Jul_19.pdf PDF
AMEDNEMENT_0002_DRAWINGS_-_162960_-_AM002_-_Drawings.pdf PDF
Bid_Schedule_7-2-19_Amendment_2_-_V2.pdf PDF
AMENDMENT_NO_0001_DRAWINGS_--_CSOF_AM01_Drawings_24Jun2019.pdf PDF
AMENDMENT_NO_0001_SPECIFICATIONS_DOCUMENT.pdf PDF
SPECIFICATIONS_VOL_3_OF_3_DIVS_21-33.pdf PDF
CSOF_100-CF_Drawings_17Apr2019.pdf PDF
SPECIFICATIONS_VOL_2_OF_3_DIVS_01-13.pdf PDF
CSOF_Bid_Schedule_-5-28-19.pdf PDF
Solicitation_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.pdf PDF
CSOF_Cost_Breakdown_5-28-19.pdf PDF
Attachment_C_-_Construction_Experience_Form_Fillable.pdf PDF
Attachment_E_-_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.docx DOCX document
Attachment_F_-_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.docx DOCX document
Attachment_B_-_Performance_Distribution_Statement_Instructions.docx DOCX document
Attachment_C_-_Construction_Experience_Form_Instructions.docx DOCX document
Attachment_B_-_Performance_Distribution_Statement_Fillable.pdf PDF
Attachment_A_-_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.docx DOCX document
Attachment_D_-_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

459013

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: Consolidated Squadron Operations Facility (CSOF); State of Qatar

The purpose of this Amendment 0001 is to revise (1) Specif ications, (2) Draw ings, (3) Solicitation, and (4) Extend Proposal Due Date.

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jun-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ER19R0005

X 9B. DATED (SEE ITEM 11)

29-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jun-2019

CODE

W912ER DISTRICT (TAM), USACE

MIDDLE EAST DISTRICT (CETAM-CT)

PO BOX 2250

WINCHESTER VA 22604-1450

W912ER 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ER19R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

Amendment 0001 to W912ER19R0005 Consolidated Squadron Operations Facility, Al Udeid Air Base, State of Qatar has been amended as follows:

1. Specifications: Revised sections are replaced in their entirety. Revisions to the specification pages are shown on the pages in the following manner: New text is underlined and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the new or revised sections.

The following have been revised/added:

Project Table of Contents Replaced in entirety

Section 01 15 00.12 10

Paragraph 1.7.2.10, page 8 Paragraph 1.27.3, page 18 Paragraph 1.35.2, page 29 Paragraph 1.35.2.1, page 30 Paragraph 1.35.3, page 30 Paragraph 1.36, page 32

Section 22 00 00

Paragraph 3.11, Table II, pages 46-48

Section 27 05 29.00 10

Title of Section, pages 1 and 3

Section 27 10 00

Paragraph 2.6, page 15

2. Drawings: Revisions to the following drawings of the contract are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.

General:

Index Sheet G-002 Index Sheet G-003

Civil:

VD101

Architecture:

A-611 A-612

Fire Protection:

FX001

Electrical:

ES102

ES103

W912ER19R0005

ES501

E-502 E-608

Telecommunications:

TS101

TS501

T-601

3. Solicitation: Section 00 21 00 – Instructions, Section II: Solicitation Provisions paragraph has been revised to read as follows:

On Page 14, Paragraph d. VOLUME II – PRICE PROPOSAL: Failing to submit or completely fill out the solicitation attachments found at Appendix Attachments A through G may result in a determination that the proposal is unacceptable. Therefore, offerors are urged to follow instructions and raise questions through inquiries if instructions are not understood.

On Page 27, Factor 5 Price, Evaluation Procedures and Descriptions: In accordance with DFARS 252.236-7010, a proposal from a firm that does not qualify as a United States firm will be evaluated for reasonableness by adding twenty percent (20%) to its total price. An award can only be made to a foreign firm in accordance with the provisions of DFARS 236.273.

4. Extend Proposal Due Date: Proposal Submission Instruction Paragraph 1, Proposal due date has been extended and revised to read as follows:

Proposals must be submitted electronically. The electronic submission must include Volume I and Volume II as two separate files in PDF (or comparable) format, submitted to Mr. Jesse Hobbs at Jesse.A.Hobbs@usace.army.mil and Mr. Tino Philip at Tino.Philip@usace.army.mil through the Safe Access File Exchange (SAFE) site located at https://safe.amrdec.army.mil/safe/Welcome.aspx (Non-CAC Users). Proposals are due not later than July 8th 2019 by 10:00 AM Eastern Daylight Time (EDT). This date shall be considered the proposal due date, after which proposal revision will not be accepted.

All other terms and conditions remain unchanged.