Attachment_C_-_Construction_Experience_Form_Instructions.docx

DOCX document 27 KB Posted

Attached to
Consolidated Squadron Operations Facility
Solicitation number
W912ER19R0005
Issued by

About this file

Attachment C - Construction Experience Form Instructions

View the file

Other files

File Type Posted
AMEDNEMENT_0002_DRAWINGS_-_162960_-_AM002_-_Drawings.pdf PDF
Bid_Schedule_7-2-19_Amendment_2_-_V2.pdf PDF
A154_Amendment_0002_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.pdf PDF
AMENDMENT_0002_SPECIFICATIONS_DOCUMENT_2_Jul_19.pdf PDF
Cost_Breakdown_7-2-19_Amendment_2.pdf PDF
AMENDMENT_NO_0001_SPECIFICATIONS_DOCUMENT.pdf PDF
AMENDMENT_NO_0001_DRAWINGS_--_CSOF_AM01_Drawings_24Jun2019.pdf PDF
A154_Amendment_0001_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.pdf PDF
SPECIFICATIONS_VOL_3_OF_3_DIVS_21-33.pdf PDF
SPECIFICATIONS_VOL_2_OF_3_DIVS_01-13.pdf PDF
CSOF_100-CF_Drawings_17Apr2019.pdf PDF
Attachment_C_-_Construction_Experience_Form_Fillable.pdf PDF
CSOF_Cost_Breakdown_5-28-19.pdf PDF
Attachment_B_-_Performance_Distribution_Statement_Fillable.pdf PDF
Attachment_A_-_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.docx DOCX document
Attachment_D_-_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.docx DOCX document
Attachment_B_-_Performance_Distribution_Statement_Instructions.docx DOCX document
CSOF_Bid_Schedule_-5-28-19.pdf PDF
Attachment_E_-_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.docx DOCX document
Solicitation_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.pdf PDF
Attachment_F_-_W912ER19R0005_Consolidated_Squadron_Operations_Facility_Qatar.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

CONSTRUCTION EXPERIENCE FORM - INSTRUCTIONS

1. Use one form for each contract.

2. Forms may expand to more than one page, but remember that the entire Factor is limited to sixteen (16) pages.

3. Do not make changes to any of the shaded blocks.

4. Complete all non-shaded blocks in the top summary section.

5. Place an “x” next to all Topics that are applicable to the specific contract (not all topics need to be addressed for each contract).

6. Complete the non-shaded “How experience gained” column to describe your experience with that specific topic and how it will enable successful performance on this project.

7. See example below for details.

Summary Section

#
Contract Name / Title
1
D/B Genesis Operational Facilities
Location (Country/Base or City)
Role
Value ($)
Start / End Dates
Al Udeid Air Base, Qatar
Prime
$93.7 M
May 2016 – Jul 2018

Contract Description - briefly describe the scope and summarize the salient features of the contract

Design and construct environmentally controlled pre-engineered structures with vertical fabric doors for four (4) Genesis aircrafts for the U.S. Naval Facilities Engineering Command (NAVFAC) at Al Udeid Air Base, Qatar. The structures will serve as hangar space for one or more aircrafts of the Genesis Aircraft System platform and each may contain organizational, maintenance, and administration spaces. The facilities shall be of semi-permanent construction which can be disassembled and removed from the site. Supply space shall be provided within one of the structures. Hangar access and parking aprons will also be constructed. The facilities will include the construction of a shielded Forward Operating Base (FOB) Mission Control System (MCS) with an associated communications tower and an emergency generator.

Specific Experience (paragraph letters below align with the solicitation evaluation criteria)

Topic
How experience gained on listed contract will enable successful performance on Falcon 3-Facilities and Infrastructure, Phase 2SAMPLE
x
a.

Hiring / maintaining workforce Due to last-minute requirements initiated by the customer after contract award, the FOB MCS and Comms Tower were modified to have a phased completion date prior to the remainder of the contract. We requested and received authorization to add night shifts, plus weekend/holiday/overtime work. Using our local labor broker, we hired nearly 100 additional laborers and mechanics. The man-hours worked during this phase increased from a typical 2000/week to 26000/week, an increase of more than 300%. We completed the FOB MCS and Comms tower 2 weeks ahead of schedule, allowing the customer to meet their emergency needs. Our proven ability to ramp-up our labor force quickly means that we have the experience to perform similarly on this project, if necessary.

x
b.

Long Lead Procurement Procurement of the Comms Tower described above was originally scheduled for 4-months after submittal approval. We suggested that representatives from the Corps and other approving agencies meet at the fabricator’s plant to expedite review/approval. All concerns were addressed at the meeting, allowing fabrication to start much sooner than in the typical submit/approve process. In addition, we convinced the fabricator to support Qatar national interests to expedite their fabrication and delivery. Our innovative procurement solutions gives us the experience to smoothly handle long lead items on this project.

x
c. Work Access
See below concerning Passes / badges on Qatar military base
x
d. Obtaining Permits and Approvals
See below concerning Permits / Approvals in Qatar
x
e. Phasing, including active airfield
Due to last-minute requirements initiated by the customer after contract award, the FOB MCS and Comms Tower were modified to have a phased completion date prior to the remainder of the contract. We mobilized additional equipment and workforce, and received authorization to add night shifts, plus weekend/holiday/overtime work. The man-hours worked during this phase increased from a typical 2000/week to 26000/week, an increase of more than 300%. We completed the FOB MCS and Comms tower 2 weeks ahead of schedule, allowing the customer to meet their emergency needs. This experience will enable us to successfully perform this project.SAMPLE
x
Greater Weight a.

Similar scope, $, complexity The hangar access and parking aprons are similar to the airfield paving requirements of Falcon 3. The total paving of this contract, approximately $20M, is similar in magnitude to Falcon 3. Our experience with work of similar scope, $, and complexity will enable us to perform similarly on this project.

Greater Weight b.

Phasing on active airfield

x
Greater Weight c.

Qatar military installation Work was performed completely within the Al Udeid Air Base confines, giving us ample construction experience on a Qatar military installation. This experience will enable us to successfully perform this project.

x
Greater Weight d.

Passes / badges on Qatar military base Work was performed on Al Udeid Air Base, giving us considerable experience obtaining base passes and badges. We appoint an in-house Security Coordinator to manage the Site Security Plan and liaise with the Al Udeid authorities and the subcontracted private security firm, XXX company. The XXX company provided security and escorts, and has worked on Al Udeid Air Base for more than 20 years. This experience will enable us to successfully perform this project.

x
Greater Weight e.

Permits / Approvals in Qatar As described above in the Long Lead Procurement section, we obtained approval for the Comms Tower in an innovative method, allowing fabrication to start much sooner than in the typical submit/approve process. In addition, because this contract was in Qatar, we worked all the permits and approvals through QCDD (Fire Protection), QEC (Building and Utility Permits), and/or Kharama (Electrical). This experience will enable us to successfully perform this project.