RFP: W912ER-17-R-0013 P2#:
PROJECT: Shabaz Security Upgrades Cost Breakdown PROPOSER: _____________________________
LOCATION: Pakistan DATE: _____________________________
ITEM DESCRIPTION
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT MATERIALS COST
M
A
T
E
R
I
SUB
CONTRACTOR
COST
TOTAL
DIRECT COST
BOND COST
INDIRECT HOOH
COST (G&A)
INDIRECT JOOH
COST (G&A)
PROFIT
TOTAL
PROPOSED PRICE
Mobilization and Demobilization in accordance with the
Contract Documents
New 12 Ft. Wide North Asphalt Road in accordance with the Contract Documents
OPTIONAL ITEMS
Option #1
New 24 Ft. Wide (East Asphalt Road), in accordance with contract documents
Option #2
Demolition of Existing 12 Ft. High Concrete Wall (North), in accordance with contract documents
Option #3
12 Ft. High Concrete wall (South), in accordance with contract documents
Option #4
12 Ft. High Concrete Wall (East), in accordance with contract documents
Option #5
Perimeter Lighting Along PAF Base Wall Area, in accordance with contract documents
TOTAL PRICE FOR BASIC plus OPTIONAL ITEMS
(ITEMS 0001-0007)
TOTAL PROPOSED AMOUNT FOR BASIC (ITEMS 0001-0002)
TOTAL PROPOSED AMOUNT FOR ALL OPTIONAL ITEMS
(ITEMS 0003-0007)
RFP: W912ER-17-R-0013 P2# 0
PROJECT:
LOCATION: Pakistan
ITEM NO. DESCRIPTION QTY UNIT TOTAL ($)
Mobilization and Demobilization in accordance with the
Contract Documents
1 JOB $
New 12 Ft. Wide North Asphalt Road in accordance with the Contract Documents
1 JOB $
Option #1
New 24 Ft. Wide (East Asphalt Road), in accordance with contract documents
1 JOB $
Option #2
Demolition of Existing 12 Ft. High Concrete Wall (North), in accordance with contract documents
1 JOB $
Option #3
12 Ft. High Concrete wall (South), in accordance with contract documents
1 JOB $
Option #4
12 Ft. High Concrete Wall (East), in accordance with contract documents
1 JOB $
Option #5
Perimeter Lighting Along PAF Base Wall Area, in accordance with contract documents
1 JOB $
PROPOSAL SCHEDULE
Shabaz Security Upgrades
TOTAL PROPOSED AMOUNT FOR BASIC (ITEMS 0001-0002)
OPTIONAL ITEMS
TOTAL PRICE FOR BASIC plus OPTIONAL ITEMS
(ITEMS 0001-0007)
TOTAL PROPOSED AMOUNT FOR ALL OPTIONAL ITEMS
(ITEMS 0003-0007)
File details come from the government source that posted it. Updated .