AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912ER-16-R-0005, Kingdom of Saudi Arabia Multiple Aw ard Task Order Contract (MATOC), Phase One
The purpose of this amendment is to extend the Phase One proposal due date and clarify format requirements for draw ings and graphics.
See the Summary of Changes for details. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ER-16-R-0005
X 9B. DATED (SEE ITEM 11)
27-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jun-2016
CODE
US ARMY CORPS OF ENGINEERS-CETAM-CT
MIDDLE EAST DISTRICT, CETAM-CT
PO BOX 2250
WINCHESTER VA 22604-1450
W912ER 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ER-16-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SECTION 00 11 00 - STANDARD FORM (SF) 1442 AND CLIN SCHEDULE
The required response date/time has changed from 27-Jun-2016 04:00 PM to 27-Jul-2016 04:00 PM.
SECTION 00 22 10 - PHASE 1 OF A 2 PHASE-DESIGN BUILD SELECTION PROCEDURES
The following have been modified:
C. PHASE ONE – PROPOSAL SUBMISSION
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
Instructions to Prospective Offerors-Phase One
General. Late Submissions will not be considered. Pricing information shall not be submitted in Phase One.
Electronic or faxed proposal submissions will not be considered. Phase One proposals shall be clearly marked on the outside of the package with the solicitation number. The closing date annotated on the pre-solicitation notice via Federal Business Opportunities (FedBizOpps) at www.fbo.gov is for FedBizOpps archiving purpose only.
The Phase One proposal due date is revised to: July 27, 2016, 4:00 PM Eastern Daylight Savings Time.
Only up to five (5) of the most highly qualified firms as evaluated in Phase One will receive the Amendment to the RFP for Phase Two and be requested to provide Phase Two proposals. The following FAR clause is applicable to this acquisition and may be viewed at: http://farsite.hill.af.mil/vffara.htm
FAR clause 52.215-1, Instructions to Offerors-Competitive Acquisition
Summary of Phase One Submission Requirements:
Cover Letter (see content instructions below) Joint Venture (JV) documentation/agreement (if applicable) Subcontractor Letters of Commitment (if applicable) Factor 1 Management/Technical Approach documentation Factor 2 Experience documentation Factor 3 Past Performance documentation Factor 4 Financial Surety documentation
Phase One Proposal Format. Responses to the Phase One solicitation shall be submitted in the following format:
Three ring binders or bound with tabs or separators dividing each of the sections noted below. Page limits, if stipulated under each evaluation factor, shall be adhered to. Proposals shall be submitted on 8.5” X 11” paper (11”x17” for drawings and graphics), utilizing both sides of the paper unless otherwise stated under each factor.
Page is defined as a single sheet of paper with text on both sides. Use 12 Font, Arial for all documents. Font size limitations are not applicable to drawings and graphics. The Government will not evaluate any material that exceeds the page limits specified herein.
(End Summary of Changes)