This document is an amendment to a solicitation for the Below Piggott Seepage Remediation project. The project involves channel cleanout of the St. Francis River in Clay County, Arkansas from station 58+00 to station 345+00, including clearing and disposal of debris, construction of 44,060 linear feet of seepage berm on the west-bank levee between Levee Mile 17 to Levee Mile 28, installation of 36,426 linear feet of interior drainage, establishment of turf, environmental protection, and any related incidental work.
The amendment changes the response date from July 23, 2020 to July 28, 2020 at 1:30 PM. It also modifies plans and specifications, updating quantities and material requirements. Cross section intervals for surveys are changed to 500 feet in straight sections and 250 feet in curves. The contract will be awarded as a lump sum with unit prices required for selected items. The U.S. Army Corps of Engineers Memphis District is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Bids.pdf | ||
| Solicitation Amendment-0004.pdf | ||
| Drawing-Plans Vol 2- Amendment 3.pdf | ||
| Drawing-Plans Vol 1- Amendment 3.pdf | ||
| Drawing-Plans Vol 2-Amended.pdf | ||
| Performance Specifications-Amended.pdf | ||
| Solicitation Amendment-0002.pdf | ||
| Solicitation Amendment-0001.pdf | ||
| Drawing-Plans Vol 1-Amended.pdf | ||
| Drawing-Plans -Vol 1.pdf | ||
| Solicitation.pdf | ||
| Drawing-Plans 3.pdf | ||
| Drawing-Plans 2.pdf | ||
| Drawing-Plans 1.pdf | ||
| Specifications.pdf | ||
| Solicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No. W912EQ20B0003 for Below Piggott Seepage Remediation is amended as follow s:
1. The required response date/time has been changed from 23 July 2020 to 28 July 2020 at 1:30pm.
2. Amended Specificaiions and Plans w ill be provided.
3. CLIN 0010 Channel Cleanout Excavation QTY has been changed from 362,041 to 355,228.
4. Change to FAR 52.211-10.
5. Change to section 0800.
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EQ20B0003
X 9B. DATED (SEE ITEM 11)
24-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2020
CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
167 N. MAIN STREET
MEMPHIS TN 38103-1894
W912EQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EQ-20-B-0003
AMENDMENT 0003
BELOW PIGGOTT SEEPAGE REMEDIATION
DESCRIPTION OF CHANGES
PLANS
1. Volume 1:
a. C-200 thru C-205: CHANGE. “CL” changed to “BL” for station annotations in the profile views on these sheets. Stationing values were correct but were mistakenly referring to the centerline (CL) instead of the baseline (BL) alignment.
b. C-201: CHANGE. Points CL 79 thru CL 92 were moved closer to the right descending bank.
c. C-302 thru C-307: CHANGE. CL Sta. values were updated to reflect CL alignment change above & design grade and excavation areas were updated on cross sections BL Sta. 159+15 thru 169+34.
2. Volume 2:
a. C-120: CHANGE. Pipe culvert material changed from Ductile Iron to Steel Pipe.
b. C-122: CHANGE. Pipe culvert material changed from Ductile Iron to Steel Pipe.
SPECIFICATIONS
1. 00 41 00.00 11: CHANGE: Estimated quantity of CLIN 0010 CHANNEL CLEANOUT
EXCAVATION was updated to reflect CL alignment change made in plans, volume 1 above.
2. 00 70 00.00 11: CHANGE: Amended COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK paragraph to address impacts of high river stages on the period of performance.
3. 00 80 00.00 11: CHANGE: Cross section intervals specified in LAYOUT OF WORK changed to 500 ft. in straight sections and 250 ft. in curves and transitions.
4. 31 24 00.00 11: DELETE: Removed last sentence of paragraph 1.4.1(10) requiring a survey profile along the levee.
5. 32 25 00.00 11 CULVERT REMOVAL AND INSTALLATION. DELETE: Removed last sentence of paragraph 2.2 referring to CMP field pipes.
---END---
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following has been added by full text:
AMENDMENT 0003
W912EQ20B0003
Amendment 0003
Below Piggott
DESCRIPTION OF CHANGES
SPECIFICATION CHANGE
Section 31 24 00.00 12: EMBANKMENT
1. Paragraph 1.4.1 (10): Last sentence removed.
“Compliance Surveys. Furnish plotted cross sections at intervals and locations corresponding to the Government's original survey. Upon completion of suitable reaches of embankment, the Contractor shall perform, plot and submit compliance cross section surveys at a maximum of 300-foot intervals.
All sections shall be taken at locations corresponding to the Government original survey. They shall be plotted by the Contractor on a minimum scale of 1-inch equal to 10 feet horizontally and 1 inch equal to 5 feet vertically with the theoretical design cross section and allowable grade tolerance superimposed thereon.”
Section 32 25 00.00 11: CULVERT REMOVAL AND INSTALLATION
1. Paragraph 2.2 FLARED END SECTIONS: Last sentence removed.
“Corrugated Metal Pipe placed in ditches shall include flared-end sections as the last section on either end. The flared end sections shall be the pipe manufacturer's standard flared end section for use with the specified pipe. Flared end sections shall be manufactured from galvanized sheet steel.”
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 23-Jul-2020 01:30 PM to 28-Jul-2020 01:30 PM.
The number of offeror copies required 1 has been added.
SECTION 00100 – Bidding Schedule
The following have been added by full text:
BELOW PIGGOTT AND BELOW HWY 90 BPH90
DOCUMENT 00 41 00.00 11
BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
BELOW PIGGOTT SEEPAGE REMEDIATION &
BELOW AR HWY 90 CHANNEL CLEANOUT,
CLAY AND GREENE COUNTIES, AR
1.1 LINE ITEMS
This contract will be awarded as one lump sum with unit prices required for specifically selected work. A schedule of the unit price work is contained in Standard Form SF 1442, "Solicitation, Offer and Award." See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys Alternative I (1984)," "DFARS 52.236-7008, Contract Prices."
Bid Items with Unit Prices Form ITEM DESCRIPTION Estimated Unit
Quantity Unit Price Amount
0001 Mobilization and Demobilization 1 JA XXX.XX $____.__
0002 Environmental Protection 1 JA XXX.XX $____.__
0003 Storm Water Pollution Prevention
0003A Write and Amend Storm Water 1 JA XXX.XX $____.__ Pollution Prevention Plan
0003B Temporary Environmental Seeding 1 JA XXX.XX $____.__
0003C Erosion Control Berm 100,600 LF _______ $____.__
0003D Silt Fence 11,270 LF _______ $____.__
0003E Construction Entrance/Exit 2 EA _______ $____.__
0003F Check Dam 28 EA _______ $____.__
0004 Demolition
0004A Structural Demolition 1 JA XXX.XX $____.__
0004B Pipe and Well Abandonment 1 JA XXX.XX $____.__
0004C Canopy Removal 1 JA XXX.XX $____.__
0004D Demolition, All Other Items 1 JA XXX.XX $____.__
0004E Hazardous Substance Testing 1 JA XXX.XX $____.__
DOCUMENT 00 41 00.00 11 Page 2
ITEM DESCRIPTION Estimated Unit
Quantity Unit Price Amount
0005 Traffic Control and Signage 1 JA XXX.XX $____.__
0006 Haul Roads and Low Water Crossing
0006A Haul Road #1 1 EA XXX.XX $____.__
0006B Haul Road #2 1 EA XXX.XX $____.__
0006C Haul Road #3 1 EA XXX.XX $____.__
0006D Haul Road #4 1 EA XXX.XX $____.__
0007 Geotextile, Non-Woven 75,300 SY _______ $____.__
0008 Clearing - Channel Bank 285 HL _______ $____.__
0009 Clearing and Grubbing - Berm 240 AC _______ $____.__
0010 Channel Cleanout Excavation 355,228 CY _______ $____.__
0011 Excavation 77,100 CY _______ $____.__
0012 Semi-Compacted Fill 764,500 CY _______ $____.__
0013 Corrugated Metal Pipe (CMP) Culvert
0013A 24" CMP Culvert 92 LF _______ $____.__
0013B 30" CMP Culvert 59 LF _______ $____.__
0014 24" Steel Pipe Culvert 528 LF _______ $____.__
0015 Seeding - Channel Bank 129 AC _______ $____.__
0016 Establishment of Turf - Berm 240 AC _______ $____.__
0017 Stone Products
0017A Aggregate Surface Course 19,200 TN _______ $____.__
0017B Coarse Aggregate, Size #1 21,670 TN _______ $____.__
0017C Coarse Aggregate, Size #57 13,240 TN _______ $____.__
Sub-Total Items 0001 thru 0017 $ _______.__
Option 1 Bid Items Bid Items with Unit Prices Form
DOCUMENT 00 41 00.00 11 Page 3 b1ctcslw Highlight
ITEM DESCRIPTION Estimated Unit
Quantity Unit Price Amount
0018 Asbestos Abatement 1 JA XXX.XX $____.__
0019 Lead Abatement 1 JA XXX.XX $____.__
Sub-Total Option 1 $ _______.__
Option 2 Bid Items Bid Items with Unit Prices Form
ITEM DESCRIPTION Estimated Unit
Quantity Unit Price Amount
0020 Mobilization and Demobilization 1 JA XXX.XX $____.__
0021 Environmental Protection 1 JA XXX.XX $____.__
0022 Storm Water Pollution Prevention
0022A Write and Amend Storm Water 1 JA XXX.XX $____.__ Pollution Prevention Plan
0022B Temporary Environmental Seeding 1 JA XXX.XX $____.__
0022C Erosion Control Berm 7,600 LF _______ $____.__
0022D Silt Fence 100 LF _______ $____.__
0022E Check Dam 7 EA _______ $____.__
0023 Demolition, All Other Items 1 JA XXX.XX $____.__
0024 Geotextile, Non-Woven 5,000 SY _______ $____.__
0025 Clearing and Grubbing - Berm 50 AC _______ $____.__
0026 Excavation 17,900 CY _______ $____.__
0027 Semi-Compacted Fill 119,500 CY _______ $____.__
0028 Steel Pipe Culvert
0028A 24" Steel Pipe Culvert 132 LF _______ $____.__
0028B 30" Steel Pipe Culvert 36 LF _______ $____.__
0029 Establishment of Turf - Berm 50 AC _______ $____.__
0030 Stone Products
DOCUMENT 00 41 00.00 11 Page 4
0030A Coarse Aggregate, Size #1 1,430 TN _______ $____.__
0030B Coarse Aggregate, Size #57 860 TN _______ $____.__
Sub-Total Option 2 $ _______.__
Grand Total $ _______.__
1.2 NOTES
NOTE 1: Offerors shall furnish unit prices for all items listed on the schedule of bid items, which require unit prices. If the offeror fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE OFFEROR OMITS BOTH THE UNIT PRICE AND THE EXTENDED
ESTIMATED AMOUNT FOR ANY ITEM, THE BID WILL BE DECLARED NONRESPONSIVE.
In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
Any offer price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced offer is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
Award will be made as a whole to one offeror.
AC = Acre CF = Cubic Feet CY = Cubic Yard DH = Miles EA = Each FC = 1000 Cubic Feet FT = Foot HF = 100 Feet HH = 100 Cubic Feet HL = 100 Linear Feet HR = Hours HS = 100 Square Feet HY = 100 Yards LB = Pound LF = Linear Foot LH = Labor Hour JA = Job (lump sum) LY = Linear Yard MO = Months SB = Square Mile SF = Square Foot SQ = Square SY = Square Yard TL = 1000 Linear Feet TN = Net Ton UN = Unit YD = Yard YL = 100 Linear Yards YM = Cubic Yards Per Mile
All quantities are estimated except where unit is given as "JA" or "EA".
NOTE 2: If an offer or modification to an offer based on unit prices is submitted and provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price, including lump sum units, in bid schedule must be stated, or, if it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
NOTE 3: Offerors are cautioned to read Contract Clause entitled "DFAR 252.204-7004, Alternate A, System for Award Management (FEB 2014) located
DOCUMENT 00 41 00.00 11 Page 5
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 545 calendar days for the base bid, 60 additional calendar days for option 1, and 130 additional calendar days for option 2 after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises. If either option is exercised at the same time as the base award, the Contractor shall complete the options concurrently within the base contract time.
Due to the likelihood that river stages above 8 ft. to 10 ft. on the Holly Island gage (EL. 258 ft. to 260 ft.) may prevent channel cleanout excavation operations from continuing, river stages above those elevations, provided that they do impact the work in the opinion of the COR, will be treated like sever weather days.
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following has been modified:
Section 1.5: LAYOUT OF WORK
Paragraph d (4) & (5)
(4) Quantity Survey Method for Channel. Unless otherwise authorized by the Contracting Officer, the cross-section method shall be used to obtain the topography. Cross-sections shall be conducted to obtain the topography of constructed features including, but not limited to: height, width, grades, and slopes of excavation and/or embankments including berms and excavated material disposal areas. Individual cross-sections will depend upon the terrain but for pre-construction shall not exceed 500' intervals in straight segments and shall not exceed 250' intervals in curves and/or transitions as identified by the Contracting Officer. For post-construction surveys an interval of 500' is acceptable. The Pre-Construction Surveys and the Post-Construction Surveys shall be submitted in MicroStation.dgn format. Observations shall be recorded at all breaks in slopes with a maximum distance of 25' between observations. Cross sections shall be conducted at 90-degrees to the channel and at sufficient width to extend 50-feet beyond the limits of work or to the designated R.O.W. Annotated cross-sections shall be created and included in DGN format at 1"=10'. For work along the right bank, at a minimum, the cross sections shall extend from the existing top left bank to 50' past the proposed landside toe of the EME or 50' past the proposed top right bank whichever comes last. The annotated cross-sections shall indicate the Baseline; the theoretical grades and slope-lines as specified; and the actual grades and slope lines as constructed. The contractor shall plot cross sections from the survey data to visually depict the grade and sections obtained. The contractor shall use this survey data to develop the as-built drawings. During/or post-construction survey data shall be provided at the Contracting Officer's request.
(5) Quantity Survey Method for EME Removal. Unless otherwise authorized by the Contracting Officer, the cross-section method shall be used to obtain the topography of the existing EME. Cross-sections shall be conducted to obtain the topography of existing and constructed features including, but not limited to: height, width, grades, and slopes of excavation and/or embankments including berms and disposal/storage areas. Individual cross-sections will depend upon the terrain but for pre-construction shall not exceed 500' intervals in straight segments and shall not exceed 250' intervals in curves and/or transitions as identified by the Contracting Officer. For post-construction surveys an interval of 500' is acceptable.
The Pre-Construction Surveys and the Post-Construction Surveys shall be submitted in MicroStation.dgn format. Observations shall be recorded at all breaks in slopes with a maximum distance of 25' between observations. Cross sections shall be conducted at 90-degrees to the embankment and at sufficient width to extend 50-feet beyond the limits of work or to the designated R.O.W. Annotated cross-sections shall be created and included in DGN format at 1"=10'. The annotated cross-sections shall indicate the Baseline; the theoretical grades and slope-lines as specified; and the actual grades and slope lines as constructed. The contractor shall plot cross sections from the survey data to visually depict the grade and sections obtained. The contractor shall use this survey data to develop the as-built drawings. During/or post-construction survey data shall be provided at the Contracting Officer's request.
b1ctcslw Highlight b1ctcslw Highlight b1ctcslw Highlight b1ctcslw Highlight b1ctcslw Highlight b1ctcslw Highlight
| bid schedule.pdf |
| 00 41 00.00 11 - BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| 00 70 00.00 11 - CONTRACT CLAUSE INSERTS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 UAI 31.105-101 Special Contract Requirements |
| 1.3 FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT JUL 2013 |
| 1.4 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR |
| 1.5 FAR 52.211-12 LIQUIDATED DAMAGES CONSTRUCTION SEP 2000 |
| 1.6 FAR 52.211-18 VARIATION IN ESTIMATED QUANTITIES APR 1984 |
| 1.7 FAR 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION JAN 1997 |
| 1.8 FAR 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984 |
| 1.9 FAR 52.236-5 MATERIAL AND WORKMANSHIP APR 1984 |
| 1.10 FAR 52.236-4 PHYSICAL DATA APR 1984 |
| 1.11 FAR 52.236-21 SPECIFICATION AND DRAWING FOR CONSTRUCTION FEB 1997 |
| 1.12 FAR 52.236-16 QUANTITY SURVEYS-ALTERNATE I APR 1984 |
| 1.13 FAR 52.246-21 WARRANTY OF CONSTRUCTION MAR 1994 |
| 1.14 FAR 52.249-10 DEFAULT FIXED-PRICE CONSTRUCTIONAPR 1984 |
| 1.15 UAI 52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS MAR 2013 |
| 1.16 DFARS 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS AUG 2000 |
| 1.17 DFARS 52.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION DEC |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 00 80 00.00 11 - SPECIAL CONTRACT REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 EXCEPTION TO LIQUIDATED DAMAGES |
| 1.4 RIGHTS-OF-WAY |
| 1.5 LAYOUT OF WORK |
| 1.6 PROGRESS CHART |
| 1.7 SAFETY RELATED SPECIAL REQUIREMENTS |
| 1.8 CERTIFICATES OF COMPLIANCE |
| 1.9 CONTRACTOR'S CERTIFICATE |
| 1.10 SHOP DRAWINGS |
| 1.11 AS-BUILT DRAWINGS |
| 1.12 DAMAGE TO WORK |
| 1.13 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK |
| 1.14 RETESTING OF CONSTRUCTION MATERIALS |
| 1.15 VEHICLE WEIGHT LIMITATIONS |
| 1.16 OBSTRUCTIONS |
| 1.17 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NPDES |
| 1.18 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER 31 OCT 1989 |
| 1.19 STONE SOURCES |
| 1.20 FIELD OFFICE BUILDING |
| 1.21 HAUL ROADS |
| 1.22 TEMPORARY PROJECT FENCING |
| 1.23 MAINTENANCE OF TRAFFIC |
| 1.24 COOPERATION WITH OTHERS |
| 1.25 HOURS OF WORK |
| 1.26 Sunday, HOLIDAY AND NIGHT WORK |
| 1.27 SECURITY REQUIREMENTS |
| 1.28 STORAGE OF EQUIPMENT AND MATERIALS |
| 1.29 UTILITY SERVICES |
| 1.30 COMMERCIAL WARRANTY |
| 1.31 1.39 FLOOD EMERGENCY |
| 1.32 PATENTS, PROPRIETARY RIGHTS |
| 1.33 PROTECTION OF MATERIALS AND WORK |
| 1.34 EXISTING FLOOD PROTECTION |
| 1.35 SEQUENCE OF WORK |
| 1.36 INSURANCE REQUIREMENTS |
| 1.37 ACCEPTANCE SECTIONS |
| 1.38 FINAL ACCEPTANCE |
| 1.39 INSPECTION |
| 1.40 DESIGNATED BILLING OFFICE |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 31 24 00.00 12 - EMBANKMENT |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALITY CONTROL |
| 1.4.1 General |
| PART 2 EQUIPMENT |
| 2.1 General |
| 2.2 Tamping Rollers |
| 2.2.1 Tractor-Drawn |
| 2.2.2 Self-Propelled |
| 2.3 Rubber-Tired Rollers |
| 2.4 Crawler-Type Tractors |
| 2.5 Alternative Compaction Equipment |
| 2.6 Hand Tampers |
| 2.7 Miscellaneous Equipment |
| 2.8 Sprinkling Equipment |
| PART 3 EXECUTION |
| 3.1 EMBANKMENT MATERIALS |
| 3.1.1 Random Fill |
| 3.1.2 Topsoil |
| 3.1.3 Pipe Backfill |
| 3.2 EMBANKMENT FOUNDATION PREPARATION |
| 3.2.1 Foundation Preparation |
| 3.2.2 Drainage |
| 3.2.3 Frozen Ground |
| 3.3 EMBANKMENT CONSTRUCTION |
| 3.3.1 Temporary storage of fill material |
| 3.3.2 Uncompacted Fill |
| 3.3.2.1 Compaction - Uncompacted Fill |
| 3.3.2.2 Moisture Control - Uncompacted Fill |
| 3.3.3 Semi-compacted Fill |
| 3.3.3.1 Compaction - Semi-compacted Fill |
| 3.3.3.2 Definition of Pass |
| 3.3.3.3 Moisture Control - Semi-compacted Fill |
3.3.4 Compacted Backfill
| 3.4 TESTING |
| 3.4.1 Optimum Moisture and Laboratory Maximum Density |
| 3.5 DRESSING |
| 3.6 EMBANKMENT WORK ADVANCEMENT |
| 3.7 CROSS SECTIONS AND ZONING OF MATERIALS |
| 3.7.1 Embankment Sections |
| 3.7.2 Zoning of Materials for Seepage Berm Construction |
| 3.8 ACCESS ROADS, RAMPS AND CROSSINGS, AND DETOURS |
| 3.9 GRADE TOLERANCES |
| 3.10 SETTLEMENT OF FOUNDATION |
| 3.10.1 Additional Fill |
| 3.10.2 Failures |
| 3.10.3 Postpone Operations |
3.11 SLIDES
| 32 25 00.00 11 - CULVERT REMOVAL AND INSTALLATION |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALITY CONTROL |
| PART 2 PRODUCTS |
| 2.1 PIPES |
| 2.1.1 Corrugated Metal Pipe Culverts |
| 2.1.2 Steel Pipe |
| 2.1.2.1 Pipe Material |
| 2.1.2.2 Cement Lining |
| 2.1.2.3 Coating |
| 2.1.2.4 Joints and Jointing Material |
2.2 FLARED END SECTIONS
| PART 3 EXECUTION |
| 3.1 REMOVAL OF EXISTING CULVERTS |
| 3.2 FOUNDATION/BEDDING MATERIAL BENEATH CULVERTS |
| 3.3 INSTALLATION OF CULVERT PIPE |
| 3.3.1 Corrugated Metal Pipe |
| 3.3.2 Steel Pipe |
| 3.3.2.1 Pipe Laying |
| 3.3.2.2 Cement Lining |
| 3.3.2.3 Coating |
| 3.4 BACKFILL |
| 3.4.1 General |
| 3.4.2 Compacted Backfill |
| 3.4.3 Semi-compacted Backfill |