This federal contract opportunity solicitation seeks bids for a seepage remediation project along the St. Francis River in Clay County, Arkansas. The scope of work includes clearing debris from a channel cleanout between river miles 58 to 345, constructing 44,060 linear feet of a seepage berm along the west-bank levee between Levee Miles 17 to 28, installing 36,426 linear feet of interior drainage, establishing turf, implementing environmental protections, and any related incidental work. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Memphis under number W912EQ20B0003. The deadline to respond and additional details on pricing, terms, or set-asides are not specified in the document provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Bids.pdf | ||
| Solicitation Amendment-0004.pdf | ||
| Drawing-Plans Vol 2- Amendment 3.pdf | ||
| Solicitation Amendment-0003.pdf | ||
| Drawing-Plans Vol 1- Amendment 3.pdf | ||
| Drawing-Plans Vol 2-Amended.pdf | ||
| Performance Specifications-Amended.pdf | ||
| Solicitation Amendment-0002.pdf | ||
| Solicitation Amendment-0001.pdf | ||
| Drawing-Plans -Vol 1.pdf | ||
| Solicitation.pdf | ||
| Drawing-Plans 3.pdf | ||
| Drawing-Plans 2.pdf | ||
| Drawing-Plans 1.pdf | ||
| Specifications.pdf | ||
| Solicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL CROSS-REFERENCING SYMBOLS
GENERAL LEGEND
GENERAL NOTES:
1. HORIZONTAL DATA WAS COMPUTED USING NORTH AMERICAN DATUM OF 1983 (NAD83) AND UNIVERSAL TRANSVERSE MERCATOR
ZONE 15N IN U.S. SURVEY FEET. VERTICAL DATA WAS COMPUTED USING N.A.V.D. 88 IN U.S. SURVEY FEET. STATIONING IS BASED ON
GROUND DISTANCE, WHERE GRID DISTANCE = GROUND DISTANCE X COMBINED GRID FACTOR; COMBINED GRID FACTOR = 1.00047
2. DO NOT BLOCK OR REDIRECT EXISTING DRAINAGE WITH EXCAVATED MATERIAL UNLESS OTHERWISE DIRECTED BY THE CONTRACTING
OFFICER, PLANS OR SPECIFICATIONS.
3. ABOVE GROUND AND UNDERGROUND UTILITIES INDICATED ON THE PLANS ARE APPROXIMATE ONLY, AND THOSE INDICATED ARE NOT
NECESSARILY ALL WHICH MAY EXIST ON THE PROJECT SITE. THE CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION OF ALL
UTILITIES ON THE PROJECT SITE. ALL UTILITIES LOCATED AT THE SITE ARE TO REMAIN IN PLACE AND OPERATIVE DURING THE
CONSTRUCTION. AT LEAST 10 DAYS BEFORE BEGINNING WORK IN THE VICINITY OF A UTILITY, THE CONTRACTOR SHALL CALL THE
APPROPRIATE "CALL BEFORE YOU DIG" NUMBER LISTED IN THE SPECIFICATIONS. THE CONTRACTOR SHALL EXERCISE SPECIAL CARE
WHEN WORKING IN THE VICINITY OF UTILITIES TO PREVENT DAMAGE THERETO OR INJURY TO THE CONTRACTOR'S EMPLOYEES OR
OTHERS. ANY DAMAGE TO THE UTILITIES OR INTERRUPTIONS OF SERVICE OCCASIONED BY THE CONTRACTOR'S OPERATIONS SHALL
BE REPAIRED AND THE SERVICE RESTORED PROMPTLY AT HIS EXPENSE.
4. DESIGN FOR THIS PROJECT WAS DEVELOPED BASED ON 8/31/2018 SURVEY SEA16012SER.
5. ANY AERIAL PHOTOGRAPHY SHOWN ON SHEETS IS FOR REFERENCE ONLY AND SHOULD NOT BE USED TO DETERMINE OR ANTICIPATE
SITE CONDITIONS AT THE TIME OF CONSTRUCTION.
6. BE ADVISED THAT STATIONING BASED ON LEVEE MILE MARKERS INDICATED BY "MX/XX+XX", MAY HAVE MORE OR LESS THAN 5280
FEET PER MILE.
7. GATES AND/OR FENCES ARE NOT TO BE DISTURBED, UNLESS OTHERWISE NOTED. ALL GATES AND FENCES DISTURBED BY THE
CONTRACTOR SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. APPROVAL FROM THE CONTRACTING OFFICER IS REQUIRED
BEFORE ANY GATES OR FENCES ARE TO BE DISTURBED.
8. HAUL ROUTES TO TRANSPORT BORROW MATERIAL TO THE CONSTRUCTION AREA SHALL BE PROPOSED BY THE CONTRACTOR AND
APPROVED BY THE CONTRACTING OFFICER PRIOR TO USE.
9. CONTRACTOR SHALL APPLY TEMPORARY AND PERMANENT STABILIZATION PER LOCAL, STATE, AND FEDERAL NPDES AND DEQ
GUIDELINES AND FOLLOWING THE APPROVED STORM WATER POLLUTION PREVENTION PLAN (SWPPP).
10. FIELD ADJUSTMENTS OF EROSION CONTROL MEASURES ARE ALLOWED AS NECESSARY TO ENSURE PROPER PLACEMENT AND
FUNCTION.
11. UPON CONSTRUCTION COMPLETION AND PRIOR TO FINAL ACCEPTANCE, REMOVE ALL EROSION CONTROL FEATURES.
12. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ADHERENCE TO ALL FEDERAL, STATE, AND LOCAL SAFETY
REGULATIONS THAT ARE APPLICABLE TO THE WORK ASSOCIATED WITH THIS CONSTRUCTION PROJECT.
13. SURVEY MONUMENTATIONS ARE IN ACCORDANCE WITH EM 1110-1-1002 (SURVEY MARKERS AND MONUMENTATION).
CONSTRUCTION NOTES:
1. DO NOT DISTURB EXISTING BRIDGES OR RIPRAP PAVING AREAS
2. RIGHT BANK IS DEFINED BY LOOKING DOWNSTREAM USING THE RIGHT HAND RULE.
3. AREAS OF THE EXISTING CHANNEL BELOW THE DESIGN GRADE SHALL NOT BE FILLED. NO PAYMENT WILL BE MADE FOR FILLING IN
LOW AREAS.
4. THERE SHALL BE 50' OPENINGS AT 500' INTERVALS IN THE EXCAVATED MATERIAL.
5. NO MATERIAL TO BE DISPOSED OF WITHIN 50' OF ROADWAY EMBANKMENTS.
6. NO MATERIAL TO BE DISPOSED OF WITHIN 25' OF EXISTING UTILITIES SUCH AS POWER, GAS, WATER, ETC.
7. ALL ACCESS HAUL ROADS BUILT DURING CONSTRUCTION SHALL BE REMOVED AFTER COMPLETION OF EXCAVATION AND HAULING
OPERATIONS IN THE FLOODWAY AND DISTURBED AREAS RESTORED TO PRE-CONSTRUCTION CONDITIONS.
8. STATION NUMBERS SHOWN IN THE PROFILE ARE BASELINE STATIONS.
9. SECTIONS AREA RELATIVE TO THE CENTERLINE OF THE CHANNEL AND RELATED BACK TO THE BASELINE.
10. SEE SHEET G-003 FOR BASELINE LAYOUT TABLE.
A
DETAIL/SECTION
SUPPLEMENTAL INFORMATION
SCALE:
SECTION/DETAIL TITLE
ON SAME DRAWING
(CENTERED UNDER
SECTION/DETAIL)
DETAIL/SECTION
SCALE:
SECTION/DETAIL TITLE
ON ANOTHER DRAWING
(CENTERED UNDER
SECTION/DETAIL)
99/999
VIEW SUBTITLE
(CENTERED UNDER
EACH VIEW)
TOP FRONT SIDE
ELEVATION
A
SECTION
SCALE:
SECTION CUT W/
VIEW SHOWN ON
SAME DRAWING
SECTION CUT W/
VIEW SHOWN ON
ANOTHER DRAWING
99/999
A
A
99/999
DETAIL SYMBOL W/
VIEW SHOWN ON
SAME DRAWING
DETAIL SYMBOL W/
VIEW SHOWN ON
ANOTHER DRAWING
E E
X X
CP
CONTROL POINT
IRON ROD
PI POINT
BORING LOCATION
PIEZOMETER
EXISTING RELIEF WELL
EXISTING TREE
ELECTRIC POLE
GUY WIRE
OVERHEAD POWER
FENCE
VEGETATION LIMITS
DITCH FLOWLINE
EXIST. CONTOUR MINOR
EXIST. CONTOUR MAJOR
EXIST. STORM CULVERT
RIGHT OF WAY
BASELINE
LEVEE CENTERLINE
COMMUNICATION LINE
CONSTRUCTION LIMIT
CONSTRUCTION EASEMENT
DITCH BOTTOM
DRAIN - STORM
PROPERTY LINE
WATER LINE
TELEPHONE LINE
NATURAL GAS PIPE
SANITARY WASTE LINE
RIPRAP - PLAN VIEW
SANITARY SEWER
SHEET PILE
R/W
TABULATION OF BENCHMARKS: VERTICAL CONTROL
BELOW ARKANSAS HWY 90 CHANNEL CLEANOUT
BENCHMARKS ELEVATION DESCRIPTION
MD-5 267.58
N: 13160746.24
E: 2473215.24
USACE GRID POINT USED AS CONTROL FOR SURVEY SEA 16012 (2018). TO REACH MARK FROM
INTERSECTION OF HWY 90 AND 139 AT HOLLY ISLAND, AR. GO EAST ALONG HWY 90 FOR 2.7 MILES TO
RIGHT BANK LEVEE OF ST. FRANCIS RIVER, TURN RIGHT AND GO SOUTH ALONG LEVEE FOR 2.9 MILES
TO LEVEE MILE POST 23/24 MARK IS ON RIGHT. MARK IS 9' WEST OF CENTER LINE OF LEVEE, 1' EAST
OF LMP 23/24 AND WITNESS POST. SET 1' BELOW GROUND.
MD-6 271.96
N: 13171331.25
E: 2485062.137
USACE GRID POINT USED AS CONTROL FOR SURVEY SEA 16012 (2018). TO REACH THE MARK FROM
THE INTERSECTION OF HIGHWAY 90 AND STATE ROAD 139 AT HOLLY ISLAND, AR, GO EAST ALONG
HIGHWAY 90 FOR 2.7 MILES TO THE RIGHT BANK LEVEE OF THE ST FRANCIS RIVER, TURN LEFT AND
GO NORTH ALONG LEVEE FOR 0.3 MILES TO LMP 20/21. MARK IS ON LEFT, 2' SOUTH OF LEVEE MILE
POST 20/21, 11 FEET WEST OF THE CENTER LINE OF LEVEE AND 1.0' BELOW GROUND.
PROPOSED RELIEF WELL
PROP. CONTOUR MINOR
PROP. CONTOUR MAJOR
SILT FENCE
RIPRAP
SF
MW
T
COMM
C/E
SD
T
W
GAS
SAN
SS
G-002
L E
G E
N D
E
T C
M
L
A M
P O
R T
D
G
R I F
F I T
H
J
G
I A
N N
I N
I
D
S
H A
C
A L
L A
H A
N
D
RTA 20191223
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A I
R
E E
T
M E
M P
H
S
T R
I C
T
PROJECT LOCATION
V O
L U
M
B
E L
W
H
Y
C
H A
N N
L
E
A N
O U
T
C L
Y
G
R E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O
G-003
L I G
N M
E N
T
C
O O
R D
I N
A T
E
T
A B
L E
S
M
L
A M
P O
R T
D
G
R I F
F I T
H
J
G
I A
N N
I N
I
D
S
H A
L
L A
H A
N
D
RTA 20191223
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
BASELINE COORDINATE TABLE
PI Station Monument Type Northing Easting Distance Direction
54+25.00 Type G - P-8-4-97 13153651.38 2467289.61
610.31 N42° 34' 02.83"E
60+35.31 FND Iron Rod 13154100.86 2467702.46
1478.55 N8° 46' 35.77"E
75+13.86 FND Iron Rod 13155562.09 2467928.06
614.27 S87° 18' 29.25"E
81+28.12 Set Iron Rod 13155533.24 2468541.65
375.53 N55° 34' 59.75"E
85+03.66 Set Iron Rod 13155745.50 2468851.44
415.25 N87° 29' 26.13"E
89+18.90 Set Iron Rod 13155763.68 2469266.29
678.32 N10° 36' 11.96"E
95+97.23 FND Iron Rod 13156430.42 2469391.11
430.06 N43° 12' 05.80"E
100+27.29 FND Iron Rod 13156743.91 2469685.52
502.06 N8° 47' 02.68"E
105+29.35 FND Iron Rod 13157240.08 2469762.19
135.99 N35° 46' 43.65"E
106+65.34 FND Iron Rod 13157350.41 2469841.70
405.42 N69° 39' 38.13"E
110+70.76 FND Iron Rod 13157491.33 2470221.84
586.65 S19° 02' 41.19"E
116+57.41 FND Iron Rod 13156936.78 2470413.27
737.14 N56° 31' 16.46"E
123+94.55 FND Iron Rod 13157343.41 2471028.11
286.22 S52° 21' 20.78"E
126+80.77 FND Iron Rod 13157168.60 2471254.74
510.72 N51° 20' 10.18"E
131+91.49 Type G - P-8-7-97 13157487.68 2471653.53
727.91 N1° 44' 56.76"E
139+19.41 FND Iron Rod 13158215.25 2471675.74
431.99 N22° 06' 52.11"E
143+51.40 FND Iron Rod 13158615.46 2471838.37
1129.29 S60° 46' 42.76"E
154+80.68 FND Iron Rod 13158064.16 2472823.94
736.90 N54° 18' 57.85"E
162+17.58 Type G - P-8-8-97 13158494.00 2473422.49
257.61 N11° 39' 47.69"E
164+75.19 FND Iron Rod 13158746.29 2473474.56
354.82 N73° 18' 56.06"E
168+30.01 FND Iron Rod 13158848.16 2473814.45
333.96 N4° 17' 39.83"E
171+63.97 FND Iron Rod 13159181.18 2473839.46
500.93 N77° 19' 51.20"E
176+64.89 FND Iron Rod 13159291.04 2474328.19
578.72 N44° 25' 56.05"E
182+43.61 FND Iron Rod 13159704.29 2474733.33
714.45 N34° 36' 06.45"E
189+58.06 Type G - P-8-9-97 13160292.37 2475139.04
437.76 N0° 50' 43.98"W
193+95.82 FND Iron Rod 13160730.08 2475132.58
229.32 N86° 51' 28.07"E
196+25.14 FND Iron Rod 13160742.65 2475361.56
483.17 S30° 59' 00.61"E
201+08.31 FND Iron Rod 13160328.41 2475610.29
400.10 N76° 42' 54.90"E
205+08.41 FND Iron Rod 13160420.35 2475999.68
398.39 N15° 19' 11.88"E
209+06.80 Set Iron Rod 13160804.59 2476104.94
984.14 S88° 59' 11.72"E
218+90.94 Type G - P-8-10-97 13160787.18 2477088.93
870.97 N47° 31' 40.61"E
227+61.92 Set Iron Rod 13161375.29 2477731.36
283.03 N73° 18' 47.60"E
230+44.95 Set Iron Rod 13161456.56 2478002.47
297.00 N32° 50' 34.63"E
233+41.95 FND Iron Rod 13161706.09 2478163.55
400.36 N7° 23' 31.80"W
237+42.31 FND Iron Rod 13162103.12 2478112.04
321.66 N53° 45' 49.44"W
240+63.97 Set Iron Rod 13162293.26 2477852.59
361.18 N50° 23' 43.17"E
244+25.15 Type G - P-8-11-97 13162523.51 2478130.87
347.75 N77° 15' 31.35"E
247+72.90 Set Iron Rod 13162600.20 2478470.05
902.10 N79° 40' 44.21"E
BASELINE COORDINATE TABLE
PI Station Monument Type Northing Easting Distance Direction
256+75.00 FND Iron Rod 13162761.83 2479357.55
1131.14 N62° 06' 38.41"E
268+06.14 Set Iron Rod 13163290.94 2480357.32
770.98 N71° 58' 45.47"E
275+77.13 Type G - P-8-12-97 13163529.45 2481090.48
463.31 N58° 26' 23.53"E
280+40.44 Set Iron Rod 13163771.94 2481485.26
876.46 N31° 43' 00.53"E
289+16.89 Set Iron Rod 13164517.51 2481946.03
704.22 N41° 40' 15.50"E
296+21.12 Set Iron Rod 13165043.54 2482414.24
325.90 N49° 04' 44.91"E
299+47.01 Set Iron Rod 13165257.01 2482660.49
443.56 N48° 30' 16.16"E
303+90.57 Type G - P-8-13-97 13165550.90 2482992.72
743.77 N31° 08' 04.86"E
311+34.34 Set Iron Rod 13166187.53 2483377.29
233.85 S76° 02' 58.86"E
313+68.19 FND Iron Rod 13166131.15 2483604.24
558.36 S76° 41' 46.86"E
319+26.55 Set Iron Rod 13166002.67 2484147.61
533.10 N70° 36' 42.25"E
324+59.65 FND Iron Rod 13166179.64 2484650.48
420.22 N62° 12' 45.71"E
328+79.86 Type G - P-8-14-97 13166375.54 2485022.24
301.18 N84° 25' 12.82"E
331+81.04 Set Iron Rod 13166404.83 2485321.99
270.18 N78° 15' 06.16"E
334+51.22 Set Iron Rod 13166459.84 2485586.51
600.26 N56° 17' 19.99"E
340+51.48 FND Iron Rod 13166792.99 2486085.83
750.78 N45° 14' 51.49"E
348+02.26 FND Iron Rod 13167321.57 2486619.00
415.52 N29° 06' 58.70"E
352+17.77 FND Iron Rod 13167684.58 2486821.19
578.13 N0° 15' 19.43"W
357+95.90 Type G - P-8-15-97 13168262.70 2486818.61
900.38 N5° 58' 52.74"W
366+96.28 FND Iron Rod 13169158.17 2486724.79
A1
ALIGNMENT COORDINATE TABLES
SCALE: NTS
V O
L U
B
E L
Y
C
H A
N N
E
A N
O U
T
C L
E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O
B-001
B O
R I N
G
L O
G S
M
L
A M
P O
R T
D
G
R I F
F I T
H
J
G
I A
N N
I N
I
D
S
H A
L
L A
H A
N
D
RTA 20191223
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
V O
L U
B
E L
Y
C
H A
N N
E
A N
O U
T
C L
E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O
B-002
B O
R I N
G
L E
G E
N D
M
L
A M
P O
R T
D
G
R I F
F I T
H
J
G
I A
N N
I N
I
D
S
H A
L
L A
H A
N
D
RTA 20191223
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
FIGURES TO THE LEFT OF BORING UNDER COLUMN "K"
Are laboratory permeability in centimeters per second of undisturbed sample**
When in parenthesis denotes natural water contents in percent dry weight
FIGURES TO THE LEFT OF BORING UNDER COLUMN "(W) OR D10"
Denotes D10 size in mm *
FIGURES TO THE LEFT OF BORING UNDER COLUMNS "LL" AND "PL"
Are liquid and plastic limits, respectively
FIGURES TO THE LEFT OF BORING UNDER COLUMN "C (PSF)"
Are values of cohesion in lbs/sq. ft. from unconfined compression or triaxial tests**
FIGURES TO THE LEFT OF BORING UNDER COLUMN "N-VALUE"
Denotes location of unconsolidated - undrained triaxial compression test * *
Denotes free water encountered in boring or sample
Denotes channel grade
C
S
R
Q
T
FW
Denotes location of consolidation test * *
SYMBOLS TO THE LEFT OF BORING
FIGURES TO THE RIGHT OF BORING
Are descriptive symbols***
BORING TYPE
SS - Split Spoon Sampler
AUG - Auger
TUBE - 3" or 5" Thin Wall Tube
NO SAMPLE
MIXED SAMPLE
WOOD
HIGHLY ORGANIC SOILS
C O
A R
A
I N
I L S
G R
A V
E L
S A
N D
CLEAN
GRAVEL
CLEAN
SAND
GRAVEL
W/ FINES
SAND
W/ FINES
SILTS &
CLAYS
SILTS &
CLAYS
GW
GP
GM
GC
SW
SP
SM
SC
F I N
E
G
R A
I N
I L
S ML
CL
OL
MH
CH
OH
Pt
Wd
VM
NS
M o r e t h a n l f o f c o a r s e f r a c t i o n i s s m a l l e r t h a n
N o s i e v z e
M o l f o f c o a r s e f r a c t i o n i s l a r g e r t h a n
N o e z e
M o l f o f m a t e r i a l b y w e i g h t i s l a r g e r t h o e z e
M o l f o f m a t e r i a l b y w e i g h t i s s m a l l e r t h e z e
(Little or No Fines)
(Little or No Fines)
(Appreciable
Amount of Fines)
(Appreciable
Amount of Fines)
(Liquid Limit < 50)
(Liquid Limit > 50)
NOTE:
- Less than 5% passing No. 200 sieve - GW, GP, SW, SP
- 5% to 12% passing No. 200 sieve - Dual classification (e.g. SP-SM)
- More than 12% passing No. 200 sieve - GM, GC, SM, SC
MAJOR DIVISION TYPE
LETTER
SYMBOL
UNIFIED SOIL CLASSIFICATION SYSTEM
CONSISTENCY SYMBOL
DESCRIPTIVE SYMBOLS
COLOR SYMBOL
TAN
YELLOW
RED
BLACK
GRAY
LIGHT GRAY
DARK GRAY
BROWN
LIGHT BROWN
DARK BROWN
BROWNISH - GRAY
GRAYISH - BROWN
GREENISH - GRAY
GRAYISH - GREEN
GREEN
BLUE
BLUE - GREEN
WHITE
MOTTLED Mot
Wh
BlGn
Bl
Gn grGn gnGr grBr brGr dBr lBr
Br dGr lGr
Gr
BK
R
Y
T
COHESION IN LBS./SQ. FT. FROM
UNCONFINED COMPRESSION TEST
VERY SOFT
SOFT
STIFF
VERY STIFF
HARD
COLOR DESCRIPTORS
CONSISTENCY FOR COHESIVE SOILS
< 250
250 - 500
500 - 1000
1000 - 2000
2000 - 4000
> 4000 vSo
So
St vSt
H
MODIFICATION SYMBOL
Traces
Fine
Medium
Coarse
Concretions
Rootlets
Lignite fragments
Shale fragments
Sandstone fragments
Shell fragments
Organic matter
Clay strata or lenses
Silt strata or lenses
Sand strata or lenses
Sandy
Gravelly
Boulders
Slickensides
Wood
Oxidized
Saturated
Lumps of Clay Clp
Sat
Ox
Wd
SL
B
G
S
SS
SIS
CS
O slf sds sh lg rt cc
C
M
F
Tr -
CL
CH
MH
OH
ML
OL
CL-ML
MODIFICATIONS
U n e n e
0 20 40 60 80 100
P
I
P
L A
S T
I C
I T
Y
I N
D E
X
L.L. - LIQUID LIMIT
PLASTICITY CHART
For Classification of Fine-Grained Soils
NOTES
Where underlined with a solid line denotes laboratory permeability in centimeters per second of sample remoulded to the estimated natural void ratio**
Denotes location of sample subjected to consolidation test and each of the above three types of shear tests * *
* THE D10 SIZE OF A SOIL IS THE GRAIN DIAMETER IN MILLIMETERS OF WHICH 10% OF THE SOIL IS
FINER, AND 90% COARSER THAN SIZE D10.
* * RESULTS OF THESE TESTS ARE AVAILABLE FOR INSPECTION IN THE U.S. ARMY ENGINEER DISTRICT
OFFICE IF THESE SYMBOLS APPEAR BESIDE THE BORING LOGS ON THE DRAWINGS.
* * * BORING LOGS ARE AVAILABLE FOR INSPECTION UPON REQUEST SUBMITTED TO CONTRACTING
OFFICER'S REPRESENTATIVE
GENERAL NOTES:
1. WHILE THE BORINGS ARE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT THEIR RESPECTIVE
LOCATIONS AND FOR THEIR RESPECTIVE VERTICAL REACHES, LOCAL VARIATIONS CHARACTERISTIC
OF SUBSURFACE MATERIALS OF THE REGION ARE ANTICIPATED AND, IF ENCOUNTERED, SUCH
VARIATIONS WILL NOT BE CONSIDERED AS DIFFERING MATERIALLY WITHIN THE PURVIEW OF THE
CONTRACT CLAUSE ENTITLED, "DIFFERING SITE CONDITIONS".
3. CONSISTENCY OF COHESIVE SOILS SHOWN ON THE BORING LOGS IS BASED ON DRILLER'S LOG AND
VISUAL EXAMINATION AND IS APPROXIMATE, EXCEPT WITHIN THOSE VERTICAL REACHES OF THE
BORINGS WHERE SHEAR STRENGTHS FROM UNCONFINED COMPRESSION TESTS ARE SHOWN.
4. ADDITIONAL SUBSURFACE DATA MAY BE AVAILABLE FOR INSPECTION UPON REQUEST. REQUESTS
FOR ADDITIONAL SUBSURFACE BORING DATA AND PILOT HOLE DATA SHALL BE SUBMITTED TO THE
CONTRACTING OFFICER'S REPRESENTATIVE.
Are driving resistances in blows per foot determined with a standard split spoon sampler ( 1 - 3/8 " I.D. 2" O.D. ) and a 140 lb. driving hammer with a 30" drop
MEDIUM STIFF mSt
Denotes location of consolidated - drained direct shear test * *
Denotes location of consolidated - undrained triaxial compression test * *
2. GROUND WATER ELEVATIONS SHOWN ON THE BORING LOGS REPRESENT GROUND WATER SURFACES ENCOUNTERED
IN SUCH BORINGS ON THE DATES SHOWN. ABSENCE OF GROUND WATER SURFACE DATE ON ALL OR CERTAIN BORINGS
INDICATES THAT NO GROUND WATER DATA IS AVAILABLE FROM THE BORING OR THAT NO GROUND WATER SURFACE
WAS RECORDED, AND THE ABSENCE OF SUCH DATA IS NOT A REPRESENTATION THAT GROUND WATER WILL NOT BE
ENCOUNTERED AT THE LOCATION OR WITHIN THE VERTICAL REACH OF THE BORING. THE GROUNDWATER TABLE IS
EXPECTED TO FLUCTUATE DEPENDING ON WATER LEVELS OF NEARBY BODIES OF WATER, SEASONAL VARIATIONS, AND WEATHER CONDITIONS.
Ground water surface at time of drilling
Ground water surface 24 hours after drilling
GRAVEL, Well Graded, gravel-sand mixtures, little or no fines
GRAVEL, Poorly Graded, gravel-sand mixtures, little or no fines
SILTY GRAVEL, gravel-sand-silt mixtures
CLAYEY GRAVEL, gravel-sand-clay mixtures
SAND, Well Graded, gravelly sands
SAND, Poorly Graded, gravelly sands
SILTY SAND, sand-silt mixtures
CLAYEY SAND, sand-clay mixtures
SILT & very fine sand, silty or clayey fine sand or clayey silt with slight plasticity
LEAN CLAY; Sandy Clay; Silty Clay; of low to medium plasticity
ORGANIC SILTS, and organic silty clays of low plasticity
SILT, fine sandy or silty soil with high plasticity
FAT CLAY, inorganic clay of high plasticity
ORGANIC CLAYS of medium to high plasticity, organic silts
PEAT, and other highly organic soil
WOOD
Variable mixed silts, clays and sands
TYPICAL NAMES
UNIFIED SOIL CLASSIFICATION SYSTEM
SYMB
V O
L U
B
E L
Y
C
H A
N N
E
A N
O U
T
C L
E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O
W
R
W
R
W
R /W
R
W
R W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
R /W
R
W
R/W
R
W
R
W
R
W
R
W
R
W
R/W
R
W
R
W
R
W
R
W
R
W
R/W
R/W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R/W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R W
R /W
R /W
R
W
R W
R
W
MATCH LINE - STA. 109+00
M
A
T
C
H
L
I
1 ROW
2 ROW
3 ROW
4 ROW
5 ROW
6 ROW
7 ROW
8 ROW
9 ROW
10 ROW
11 ROW
12 ROW
13 ROW
14 ROW
15 ROW
16 ROW
17 ROW
18 ROW
19 ROW
20 ROW
21 ROW
22 ROW
23 ROW
24 ROW
25 ROW
26 ROW
27 ROW
28 ROW
29 ROW
30 ROW
31 ROW
32 ROW
33 ROW
34 ROW
36 ROW
303 ROW
304 ROW
305 ROW
306 ROW
307 ROW
308 ROW
309 ROW
310 ROW
311 ROW
312 ROW
313 ROW
314 ROW
315 ROW
316 ROW
317 ROW
318 ROW
319 ROW
320 ROW
321 ROW
322 ROW
323 ROW
324 ROW
325 ROW
326 ROW
327 ROW
328 ROW
329 ROW
330 ROW
331 ROW
332 ROW
333 ROW
334 ROW
335 ROW
336 ROW
337 ROW
338 ROW
339 ROW
340 ROW
341 ROW
342 ROW
343 ROW
344 ROW
345 ROW
346 ROW
347 ROW
348 ROW
349 ROW
350 ROW
351 ROW
352 ROW
353 ROW
354 ROW
355 ROW
356 ROW
357 ROW
358 ROW
359 ROW
360 ROW
361 ROW
362 ROW
363 ROW
364 ROW
365 ROW
366 ROW
367 ROW
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
STA: 110+71
S T
A
S T
A
S T
A
54+25=P-8-4-97
BL STA. 54+25.00
FND TYPE G MONUMENT
X = 2467289.610
Y = 13153651.376
Z = 254.51
B
O
R
I
H
U
C
A
T
I O
N
50' WIDE RIGHT OF WAY FOR HAUL ROAD.
HAUL ROAD SHALL BE CONSTRUCTED A
MINIMUM OF 10' FROM THE CHANNEL TOP OF
BANK. CONTRACTOR SHALL COORDINATE
WITH THE CONTRACTING OFFICER SHOULD
ADJUSTMENTS IN THE FIELD BE NECESSARY.
L
E
V
N
T
E
R
L
I
N
E
CONSTRUCTION GATE,
REFER TO DETAIL D5/C-501.
CONTRACTOR SHALL
MAINTAIN CONTROL OF
SITE ACCESS 24 HRS/DAY,
7 DAYS/WEEK.
CONTRACTOR SHALL
PROVIDE A MINIMUM OF 2
DUPLICATE KEYS FOR ALL
LOCKS TO THE
CONTRACTING OFFICER.
(TYP)
00 200' 400'
1" = 200'
C-100
B E
L O
W
A
R
H
R
Y
O U
T
P
L A
N
S T
A
M
L A
M P
O R
T
D
G R
I F
F I T
H
J
G I A
N N
I N
I
D
S H
A N
E
C
A L L A
H A
N
D
V O
L U
B
E L O
W
H
W Y
C
H A
N N
E L
C
L E
A N
O U
T
C L A
E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E L
C
L E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O
N
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
FLO
W
A1
BELOW AR HWY 90 ROW LAYOUT PLAN
SCALE: 1"=200'
SITE LAYOUT AND ACCESS NOTES:
1. AERIAL IMAGERY FROM 2018.
2. CONTRACTOR WILL BE REQUIRED TO PROVIDE MATERIAL TO CONSTRUCT
ACCESS HAUL ROADS TO REACH THE PROJECT AREA. ONCE
CONTRACTOR GAINS ACCESS TO EXISTING SPOIL BANK, THE
CONTRACTOR MAY USE THIS MATERIAL CONSTRUCT ALL OTHER ACCESS
ROUTES NECESSARY FOR CONSTRUCTION.
3. CONSTRUCTION ACCESS ROADS SHALL MEET THE REQUIREMENTS OF
EM-385-1-1 FOR ONE-WAY HAULING.
4. CONSTRUCT LOW WATER HAUL ROAD CROSSINGS IN ACCORDANCE WITH
DETAILS ON SHEET C-500.
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
1 ROW 2467308.36 13154182.16 58+28.60 -345.244'
2 ROW 2467421.21 13154329.35 62+18.21 -312.819'
3 ROW 2467437.62 13154822.55 67+08.14 -371.855'
4 ROW 2467437.45 13155142.50 70+24.32 -420.841'
5 ROW 2467477.03 13155347.46 72+32.92 -412.998'
6 ROW 2467590.80 13155609.04 75+08.79 -340.473'
7 ROW 2467682.66 13155719.44 199+78.58 9,169.140'
8 ROW 2467792.73 13155789.10 199+75.53 9,038.915'
9 ROW 2468094.43 13155890.34 76+64.63 -335.700'
10 ROW 2468242.38 13155870.70 78+13.34 -323.031'
11 ROW 2468573.00 13155987.45 84+10.71 -356.978'
12 ROW 2468980.76 13156024.27 86+45.05 -272.845'
13 ROW 2469087.45 13156145.10 92+60.91 -245.975'
14 ROW 2469074.81 13156331.18 94+41.48 -292.640'
15 ROW 2469140.98 13156479.12 88+25.04 -720.244'
16 ROW 2469441.92 13156911.31 101+55.53 -266.305'
17 ROW 2469466.55 13157130.40 103+75.81 -275.422'
18 ROW 2469587.47 13157386.29 105+45.82 -227.228'
19 ROW 2469633.79 13157559.62 132+01.76 -2,020.991'
20 ROW 2469675.79 13157643.91 132+87.29 -1,981.583'
21 ROW 2469819.65 13157720.05 107+73.15 -354.256'
22 ROW 2469663.77 13157952.36 107+07.73 -626.263'
23 ROW 2469565.46 13158107.48 106+69.47 -805.882'
24 ROW 2469605.14 13158137.95 107+17.27 -820.660'
25 ROW 2469706.19 13157978.88 107+56.73 -636.385'
26 ROW 2469872.86 13157730.47 108+26.66 -345.532'
324 ROW 2469858.21 13157514.93 107+38.01 -148.522'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
325 ROW 2469836.52 13157504.30 107+13.98 -146.093'
326 ROW 2469807.19 13157411.39 Out of range Out of range
327 ROW 2469780.32 13157302.56 105+90.64 -21.816'
328 ROW 2469700.96 13157142.19 104+23.26 -45.558'
329 ROW 2469652.14 13157030.74 103+05.66 -76.785'
330 ROW 2469651.71 13156838.65 101+15.76 -47.876'
331 ROW 2469612.66 13156737.47 99+72.72 -48.701'
332 ROW 2469544.69 13156665.49 98+73.72 -48.969'
333 ROW 2469470.45 13156603.32 97+77.58 -60.527'
334 ROW 2469430.16 13156544.13 97+06.85 -49.377'
335 ROW 2469405.49 13156497.38 96+55.89 -35.356'
336 ROW 2469293.58 13156354.07 95+04.24 -81.813'
337 ROW 2469272.88 13156309.45 94+56.57 -93.949'
338 ROW 2469276.48 13156253.55 94+02.29 -80.125'
339 ROW 2469301.32 13156156.24 93+11.21 -37.803'
340 ROW 2469306.44 13156048.33 92+06.09 -12.914'
341 ROW 2469291.77 13156001.87 91+57.72 -18.785'
342 ROW 2469254.73 13155968.80 91+18.40 -49.107'
343 ROW 2469236.85 13155964.27 91+10.66 -65.848'
344 ROW 2469085.80 13155859.84 87+42.80 -103.973'
345 ROW 2468991.33 13155807.09 86+46.11 -55.410'
346 ROW 2468949.47 13155799.90 86+03.97 -50.060'
347 ROW 2468792.92 13155817.36 84+96.00 -92.360'
348 ROW 2468697.25 13155804.59 84+09.86 -135.899'
349 ROW 2468610.31 13155766.04 83+16.35 -153.236'
350 ROW 2468575.23 13155735.00 82+69.86 -147.460'
351 ROW 2468465.30 13155591.76 80+49.12 -54.868'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
352 ROW 2468408.30 13155558.10 79+93.75 -18.568'
353 ROW 2468342.10 13155562.20 79+27.44 -19.554'
354 ROW 2468143.58 13155646.48 77+25.18 -94.418'
355 ROW 2468044.99 13155665.64 76+25.80 -108.927'
356 ROW 2467965.35 13155653.34 75+46.82 -92.900'
357 ROW 2467805.35 13155580.67 75+13.49 -124.102'
358 ROW 2467758.41 13155543.30 74+69.40 -164.790'
359 ROW 2467687.26 13155375.16 72+92.37 -209.456'
360 ROW 2467628.58 13155259.41 71+69.02 -249.784'
361 ROW 2467609.08 13155104.78 70+13.23 -245.465'
362 ROW 2467611.31 13154888.74 68+00.06 -210.298'
363 ROW 2467615.95 13154658.79 65+73.51 -170.622'
364 ROW 2467589.11 13154343.89 62+58.20 -149.103'
365 ROW 2467569.49 13154261.28 61+73.56 -155.889'
366 ROW 2467525.60 13154185.99 60+92.46 -187.773'
367 ROW 2467428.04 13154075.99 58+31.37 -185.279'
N
A
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M D
T
AMENDMENT 0002
AutoCAD SHX Text
IPC
c r o s o f r p o r a t i g i t a l
G l o b
N s t r i b u t i r b u
R
W
R
W
R
W
R
W
R
W
R W
R W
R W
R /W
R W
R W
R W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
R
W
R /W
R
W
R
W
R
W
R
W
R W
R W
R W
R W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R W
R
W
R
W
R
W
R
W
R
W
R W
R
W
R /W
R
W
MATCH LINE - STA. 109+00
M A
T C
H L I N
E
S
T A
M
A
T
C
H
L
I
T
A
16 ROW
17 ROW
18 ROW
19 ROW
20 ROW
21 ROW
22 ROW
23 ROW
24 ROW
25 ROW
26 ROW
27 ROW
28 ROW
29 ROW
30 ROW
31 ROW
32 ROW
33 ROW
34 ROW
35 ROW
36 ROW
37 ROW
38 ROW
39 ROW
40 ROW
41 ROW
42 ROW
43 ROW
44 ROW
45 ROW
46 ROW
47 ROW
48 ROW
49 ROW
50 ROW
51 ROW
52 ROW
53 ROW
58 ROW
59 ROW
60 ROW
61 ROW
62 ROW
63 ROW
250 ROW
251 ROW
252 ROW
253 ROW
254 ROW
255 ROW
256 ROW
257 ROW
258 ROW
259 ROW
260 ROW
261 ROW
262 ROW
263 ROW
264 ROW
265 ROW
266 ROW
267 ROW
268 ROW
269 ROW
270 ROW
271 ROW
272 ROW
273 ROW
274 ROW
275 ROW
276 ROW
277 ROW
278 ROW
279 ROW
280 ROW
281 ROW
282 ROW
283 ROW
284 ROW
285 ROW
286 ROW
287 ROW
288 ROW
289 ROW
290 ROW
291 ROW
292 ROW
293 ROW
294 ROW
295 ROW
296 ROW
297 ROW
298 ROW
299 ROW
300 ROW
301 ROW
302 ROW303 ROW
304 ROW
305 ROW
306 ROW
307 ROW
308 ROW
309 ROW
310 ROW
311 ROW
312 ROW
313 ROW
314 ROW
315 ROW
316 ROW
317 ROW
318 ROW
319 ROW
320 ROW
321 ROW
322 ROW
323 ROW
324 ROW
325 ROW
326 ROW
327 ROW
328 ROW
329 ROW
330 ROW
331 ROW
332 ROW
333 ROW
334 ROW
335 ROW
337 ROW
338 ROW
S T
A
S T
A
S T
A
STA: 110+71
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
132+40=P-8-7-97
BL STA. 131+91.49
FND TYPE G MONUMENT
X = 2471653.529
Y = 13157487.676
Z = 256.81
162+65=P-8-8-97
BL STA. 162+17.58
FOUND TYPE G MON
X = 2473422.485
Y = 13158493.999
Z = 257.39
MD-5 2001
FND MEMPHIS
GRID PT
X = 2473215.24
Y = 13160746.24
Z = 267.58
BORING 2-H90U-97 LOCATION
LEVEE CENTERLINE
50' WIDE RIGHT OF WAY FOR HAUL ROAD.
HAUL ROAD SHALL BE CONSTRUCTED A
MINIMUM OF 10' FROM THE CHANNEL TOP OF
BANK. CONTRACTOR SHALL COORDINATE
WITH THE CONTRACTING OFFICER SHOULD
ADJUSTMENTS IN THE FIELD BE NECESSARY.
50' WIDE RIGHT OF WAY FOR HAUL ROAD. HAUL ROAD
SHALL BE CONSTRUCTED A MINIMUM OF 10' FROM THE
CHANNEL TOP OF BANK. CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER
SHOULD ADJUSTMENTS IN THE FIELD BE NECESSARY.
50'
54 ROW
55 ROW
56 ROW
57 ROW
LEVEE CENTERLINE
CONSTRUCTION GATE, REFER TO
DETAIL D5/C-501. CONTRACTOR SHALL
MAINTAIN CONTROL OF SITE ACCESS
24 HRS/DAY, 7 DAYS/WEEK.
CONTRACTOR SHALL PROVIDE A
MINIMUM OF 2 DUPLICATE KEYS FOR
ALL LOCKS TO THE CONTRACTING
OFFICER. (TYP)
00 200' 400'
1" = 200'
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
C-101
B E
L O
W
A
R
H
R
Y
O U
T
P
L A
N
S T
A
M
L A
M P
O R
T
D
G R
I F
F I T
H
J
G I A
N N
I N
I
D
S H
A N
E
C
A L L A
H A
N
D
F
L
O
W
A1
BELOW AR HWY 90 ROW LAYOUT PLAN
SCALE: 1"=200'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
27 ROW 2470101.77 13157753.34 110+49.25 -287.411'
28 ROW 2470247.10 13157715.90 119+48.60 -741.516'
29 ROW 2470379.29 13157612.59 120+01.87 -582.426'
30 ROW 2470444.84 13157456.21 111+76.72 -199.338'
31 ROW 2470587.50 13157466.35 112+13.69 -337.499'
32 ROW 2470704.48 13157592.14 122+61.82 -385.985'
33 ROW 2470857.91 13157677.42 126+88.80 -645.218'
34 ROW 2471042.99 13157691.24 128+41.95 -540.380'
35 ROW 2471218.96 13157608.81 129+27.85 -366.080'
36 ROW 2471315.75 13157682.05 133+75.47 -343.551'
37 ROW 2471329.74 13157801.23 134+95.02 -333.206'
38 ROW 2471391.22 13158078.94 137+74.48 -280.231'
39 ROW 2471429.99 13158464.10 140+57.43 -321.356'
40 ROW 2471469.53 13158614.40 142+11.56 -341.307'
41 ROW 2471523.16 13158729.40 143+38.29 -334.915'
42 ROW 2471613.64 13158820.95 Out of range Out of range
43 ROW 2471854.90 13158902.49 163+00.73 -1,617.799'
44 ROW 2471980.70 13158907.74 163+31.31 -1,495.658'
45 ROW 2472156.59 13158868.73 145+05.48 -376.392'
46 ROW 2472408.98 13158686.03 148+14.94 -340.156'
47 ROW 2472649.01 13158488.48 151+20.86 -284.925'
48 ROW 2472831.46 13158529.22 157+58.07 -373.361'
49 ROW 2472823.22 13158754.53 158+82.80 -561.175'
50 ROW 2472872.68 13158946.72 160+35.08 -688.430'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
272 ROW 2473076.33 13158870.70 161+56.15 -507.893'
273 ROW 2473045.91 13158815.77 164+56.58 -433.852'
274 ROW 2473033.34 13158697.37 160+20.12 -392.183'
275 ROW 2473042.30 13158663.61 160+07.71 -359.535'
276 ROW 2473084.33 13158594.81 160+01.72 -279.136'
277 ROW 2473137.79 13158476.31 159+76.02 -151.699'
278 ROW 2473124.88 13158437.89 159+43.12 -128.024'
279 ROW 2473064.74 13158372.14 158+55.92 -109.700'
280 ROW 2472951.58 13158272.83 157+06.08 -95.043'
281 ROW 2472893.28 13158213.12 156+23.89 -80.551'
282 ROW 2472776.78 13158159.71 153+92.87 -60.369'
283 ROW 2472710.30 13158175.78 153+27.01 -41.941'
284 ROW 2472603.80 13158260.75 151+92.58 -64.105'
285 ROW 2472548.17 13158315.15 151+17.47 -84.423'
286 ROW 2472399.21 13158416.89 149+37.80 -100.497'
287 ROW 2472250.96 13158560.65 147+38.23 -153.587'
288 ROW 2472144.40 13158647.59 146+02.79 -177.442'
289 ROW 2472050.69 13158704.91 144+93.02 -181.719'
290 ROW 2471956.37 13158714.19 144+06.18 -143.772'
291 ROW 2471860.54 13158707.40 Out of range Out of range
292 ROW 2471745.44 13158674.06 Out of range Out of range
293 ROW 2471700.30 13158644.73 143+26.54 -138.934'
294 ROW 2471638.43 13158546.82 142+12.54 -159.387'
295 ROW 2471633.34 13158538.76 142+03.16 -161.068'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
296 ROW 2471610.63 13158424.06 140+88.35 -138.928'
297 ROW 2471578.91 13158068.98 137+70.25 -92.320'
298 ROW 2471520.14 13157819.18 135+18.77 -143.442'
299 ROW 2471509.92 13157756.84 134+56.15 -151.751'
300 ROW 2471573.17 13157576.59 132+77.91 -83.028'
301 ROW 2471568.32 13157536.47 132+37.67 -86.652'
302 ROW 2471531.85 13157483.39 130+93.81 -72.670'
303 ROW 2471380.34 13157394.96 129+20.26 -98.278'
304 ROW 2471313.86 13157340.99 128+34.63 -97.670'
305 ROW 2471258.47 13157319.37 127+77.88 -115.391'
306 ROW 2471222.19 13157328.33 125+57.45 -106.597'
307 ROW 2471138.10 13157399.95 124+47.12 -111.949'
308 ROW 2471028.88 13157508.80 127+16.96 -406.739'
309 ROW 2470994.64 13157517.83 126+95.86 -435.182'
310 ROW 2470879.16 13157498.47 123+55.85 -211.498'
311 ROW 2470804.73 13157442.30 122+62.79 -205.702'
312 ROW 2470752.32 13157386.76 121+88.43 -188.290'
313 ROW 2470631.04 13157221.17 119+95.93 -117.072'
314 ROW 2470569.06 13157151.36 119+05.73 -93.036'
315 ROW 2470533.64 13157130.33 118+64.58 -95.032'
316 ROW 2470501.32 13157141.38 118+43.72 -122.077'
317 ROW 2470403.39 13157206.57 113+99.17 -78.702'
318 ROW 2470354.47 13157237.18 113+54.27 -42.448'
319 ROW 2470280.19 13157315.07 112+56.41 2.350'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
320 ROW 2470225.23 13157485.54 110+77.34 -1.323'
321 ROW 2470177.93 13157528.21 110+42.41 -49.845'
322 ROW 2470139.51 13157543.08 110+11.56 -77.142'
323 ROW 2470027.47 13157543.84 109+06.77 -116.798'
N
V O
L U
B
E L O
W
H
W Y
C
H A
N N
E L
C
L E
A N
O U
T
C L A
E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E L
C
L E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O
N
A
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M D
T
AMENDMENT 0002
W
R
W
R /W
R /W
R
W
R
W
R
W
R
W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
R /W
R
W
R
W
R
W
R
W
R
W
R W
R W
R W
R /W
R W
R W
R W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R W
R
W
R
W
R
W
R
W
R
W
R W
R
W
R /W
R
W
R/W
R /W
R
W
R
W
R
W
R
W
R W
R
W
R
W
R
W
R/W
R
W
R
W
R
W R
W
R/W R/W
R
W
M A
T C
H L I N
E
S
T A
M
A
T
C
H
L
I
46 ROW
47 ROW
48 ROW
49 ROW
50 ROW
51 ROW
52 ROW
53 ROW
58 ROW
59 ROW
60 ROW
61 ROW
62 ROW
63 ROW
64 ROW
65 ROW
66 ROW
67 ROW
68 ROW
69 ROW
70 ROW
71 ROW
72 ROW
73 ROW
74 ROW
75 ROW
76 ROW
77 ROW
78 ROW
79 ROW
80 ROW
81 ROW
82 ROW
83 ROW
207 ROW
209 ROW
210 ROW
211 ROW
212 ROW
213 ROW
214 ROW
215 ROW
216 ROW
217 ROW
218 ROW
219 ROW
220 ROW
221 ROW
222 ROW
223 ROW
224 ROW
225 ROW
226 ROW
227 ROW
228 ROW
229 ROW
230 ROW
231 ROW
232 ROW
233 ROW
234 ROW
235 ROW
236 ROW
237 ROW
238 ROW
239 ROW
240 ROW
241 ROW
242 ROW
243 ROW
244 ROW
245 ROW
246 ROW
247 ROW
248 ROW
249 ROW
250 ROW
251 ROW
252 ROW
253 ROW
254 ROW
255 ROW
256 ROW
257 ROW
258 ROW
259 ROW
260 ROW
261 ROW
262 ROW
263 ROW
264 ROW
265 ROW
266 ROW
267 ROW
268 ROW
269 ROW
270 ROW
271 ROW
272 ROW
273 ROW
274 ROW
275 ROW
276 ROW
277 ROW
278 ROW
279 ROW
280 ROW
281 ROW
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
162+65=P-8-8-97
BL STA. 162+17.58
FOUND TYPE G MON
X = 2473422.485
Y = 13158493.999
Z = 257.39
190+05=P-8-9-97
BL STA. 189+57.98
FOUND TYPE G MON
X = 2475139.118
Y = 13160292.216
Z = 259.14
219+72=P-8-10-97
BL STA. 218+90.48
FOUND TYPE G MON
X = 2477088.796
Y = 13160787.518
Z = 258.54
MD-5 2001
FND MEMPHIS
GRID PT
X = 2473215.24
Y = 13160746.24
Z = 267.58
P -8
-1 -9
B L S
T A
.4
F O
U N
D T
Y P
E G
M O
N
X
.7
Y
.5
Z
.5
50' WIDE RIGHT OF WAY FOR HAUL ROAD. HAUL ROAD
SHALL BE CONSTRUCTED A MINIMUM OF 10' FROM THE
CHANNEL TOP OF BANK. CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER
SHOULD ADJUSTMENTS IN THE FIELD BE NECESSARY.
54 ROW
55 ROW
56 ROW
57 ROW
CONSTRUCTION GATE, REFER TO
DETAIL D5/C-501. CONTRACTOR SHALL
MAINTAIN CONTROL OF SITE ACCESS
24 HRS/DAY, 7 DAYS/WEEK.
CONTRACTOR SHALL PROVIDE A
MINIMUM OF 2 DUPLICATE KEYS FOR
ALL LOCKS TO THE CONTRACTING
OFFICER. (TYP)
00 200' 400'
1" = 200'
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
C-102
B E
L O
W
A
R
H
R
Y
O U
T
P
L A
N
S T
A
M
L A
M P
O R
T
D
G R
I F
F I T
H
J
G I A
N N
I N
I
D
F L O
W
A1
BELOW AR HWY 90 ROW LAYOUT PLAN
SCALE: 1"=200'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
51 ROW 2472996.56 13159126.32 170+46.15 -836.422'
52 ROW 2473052.44 13159308.50 150+72.63 -1,197.538'
53 ROW 2473172.39 13159501.94 150+82.88 -1,424.919'
54 ROW 2473284.36 13159593.57 165+36.25 -866.216'
55 ROW 2472708.81 13160296.90 189+98.46 -2,429.895'
56 ROW 2472747.51 13160328.57 190+29.55 -2,390.737'
57 ROW 2473323.06 13159625.23 165+82.41 -885.438'
58 ROW 2473363.76 13159658.54 166+30.96 -905.657'
59 ROW 2473655.16 13159756.75 153+79.82 -1,882.983'
60 ROW 2473808.71 13159739.19 172+56.35 -551.170'
61 ROW 2474093.99 13159665.25 175+18.47 -416.463'
62 ROW 2474227.39 13159716.54 178+98.17 -369.853'
63 ROW 2474478.88 13159955.15 183+05.61 -351.894'
64 ROW 2474710.24 13160130.94 185+81.69 -261.283'
65 ROW 2474890.04 13160762.19 205+44.92 -1,160.524'
66 ROW 2474931.09 13160828.68 206+19.90 -1,138.500'
67 ROW 2475044.87 13160937.27 207+54.69 -1,057.454'
68 ROW 2475222.32 13161005.42 195+00.52 -270.010'
69 ROW 2475354.98 13161005.49 209+02.42 -776.388'
70 ROW 2475466.03 13160958.24 201+12.64 -646.122'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
71 ROW 2475567.57 13160841.38 196+46.55 -227.446'
72 ROW 2475681.69 13160762.54 197+72.89 -284.697'
73 ROW 2475839.97 13160800.30 208+32.66 -254.419'
74 ROW 2475931.17 13160946.44 197+43.66 -593.250'
75 ROW 2476050.36 13161037.01 197+27.37 -742.058'
76 ROW 2476261.30 13161116.84 210+57.62 -314.969'
77 ROW 2476358.17 13161123.46 211+54.35 -323.301'
78 ROW 2476687.47 13161089.00 214+84.21 -294.670'
79 ROW 2476790.87 13161089.46 215+87.59 -296.959'
217 ROW 2476850.99 13160908.55 216+50.90 -117.141'
218 ROW 2476576.79 13160912.62 213+76.67 -116.361'
219 ROW 2476470.11 13160933.55 212+69.63 -135.400'
220 ROW 2476405.84 13160941.68 212+05.23 -142.392'
221 ROW 2476231.27 13160886.89 210+31.66 -84.523'
222 ROW 2476158.11 13160856.77 209+59.04 -53.114'
223 ROW 2476101.10 13160823.08 199+36.89 -675.426'
224 ROW 2476047.18 13160749.49 208+38.40 -41.150'
225 ROW 2476002.11 13160648.15 207+28.75 -57.844'
226 ROW 2475921.29 13160537.78 206+00.95 -106.628'
227 ROW 2475880.16 13160506.58 204+11.90 -111.385'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
228 ROW 2475804.88 13160480.36 203+32.61 -103.165'
229 ROW 2475695.22 13160467.20 202+22.86 -115.557'
230 ROW 2475616.61 13160486.92 199+75.68 -87.013'
231 ROW 2475571.82 13160513.63 199+29.72 -62.364'
232 ROW 2475507.42 13160595.81 198+26.11 -49.459'
233 ROW 2475486.36 13160631.21 197+84.92 -49.627'
234 ROW 2475388.82 13160752.44 196+30.78 -28.413'
235 ROW 2475331.50 13160796.79 195+98.09 -55.709'
236 ROW 2475279.30 13160803.29 195+46.33 -65.061'
237 ROW 2475180.03 13160776.39 194+45.73 -43.643'
238 ROW 2475113.52 13160724.45 193+90.47 -19.145'
239 ROW 2475065.72 13160647.02 193+13.76 -68.082'
240 ROW 2475055.71 13160578.71 192+45.60 -79.099'
241 ROW 2475071.76 13160439.11 191+05.78 -65.111'
242 ROW 2475093.48 13160241.67 188+90.46 -8.714'
243 ROW 2475081.03 13160189.28 188+40.27 10.791'
244 ROW 2474995.71 13160094.79 187+14.04 -5.782'
245 ROW 2474882.29 13160003.44 185+74.44 -47.265'
246 ROW 2474745.18 13159901.45 184+12.63 -102.206'
247 ROW 2474649.21 13159830.62 182+99.83 -140.976'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
248 ROW 2474613.85 13159807.58 182+60.78 -157.000'
249 ROW 2474520.25 13159722.84 181+07.69 -165.141'
250 ROW 2474451.02 13159626.81 179+90.65 -147.349'
251 ROW 2474364.05 13159520.25 178+53.67 -134.854'
252 ROW 2474332.95 13159489.34 178+09.83 -135.422'
253 ROW 2474280.13 13159447.77 177+43.17 -144.038'
254 ROW 2474140.28 13159371.69 174+99.25 -119.898'
255 ROW 2474003.64 13159323.72 173+55.42 -103.064'
256 ROW 2473903.65 13159320.83 172+57.23 -122.174'
257 ROW 2473883.41 13159328.25 172+39.11 -133.853'
258 ROW 2473827.40 13159396.65 171+99.46 -212.872'
259 ROW 2473772.02 13159513.10 171+70.97 -338.632'
260 ROW 2473749.44 13159532.44 198+32.76 2,005.099'
261 ROW 2473703.00 13159547.11 197+96.28 2,037.360'
262 ROW 2473593.64 13159523.95 168+12.52 -710.736'
263 ROW 2473445.44 13159459.62 166+52.09 -691.662'
264 ROW 2473392.64 13159418.07 165+89.58 -667.020'
265 ROW 2473324.55 13159350.06 165+04.83 -621.422'
266 ROW 2473276.55 13159280.64 152+81.82 -1,282.630'
267 ROW 2473246.41 13159215.74 171+54.03 -593.972'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
268 ROW 2473233.21 13159187.37 171+24.75 -605.011'
269 ROW 2473199.19 13159050.32 169+85.53 -628.673'
270 ROW 2473155.39 13158973.03 169+05.18 -666.562'
271 ROW 2473124.68 13158928.11 168+58.09 -693.822'
N
V O
L U
B
E L O
W
H
W Y
C
H A
N N
E L
C
L E
A N
O U
T
C L A
E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E L
C
L E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O
N
A
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M D
T
/W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R W
R
W
R
W
R
W
R W
R
W
R
W
R
W
R/W
R
W
R
W
R
W
R
W
R
W
R
W
R/W
R/W
R
W
R
W
R
W
R
W
R/W
R
/W
R
W
R
W
R
W
R /W
R/W
R /W
R
W
R
W
R
W
R
W
R
W
R/W
R/W
R
W
R
W
R
W
R
W
R
W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
M
A
T
C
H
L
I
M
A
T
C
H
L
I
74 ROW
75 ROW
76 ROW
77 ROW
78 ROW
79 ROW
80 ROW
81 ROW
82 ROW
83 ROW
84 ROW
85 ROW
86 ROW
87 ROW
88 ROW
89 ROW
90 ROW
91 ROW
92 ROW
93 ROW
94 ROW
95 ROW
96 ROW
97 ROW
98 ROW
99 ROW
100 ROW
176 ROW
177 ROW
178 ROW
179 ROW
180 ROW
181 ROW
182 ROW
183 ROW
184 ROW
185 ROW
186 ROW
187 ROW
188 ROW
189 ROW
190 ROW
191 ROW
192 ROW
193 ROW
194 ROW
195 ROW
196 ROW
197 ROW
198 ROW
199 ROW
200 ROW
201 ROW
202 ROW
203 ROW
204 ROW
205 ROW
206 ROW
207 ROW
208 ROW
209 ROW
210 ROW
211 ROW
212 ROW
213 ROW214 ROW
215 ROW
216 ROW
217 ROW
218 ROW
219 ROW
220 ROW
221 ROW
222 ROW
223 ROW
224 ROW
S T
A
S T
A
S T
A
S T
A
S T
A
STA: 237+42
STA: 240+64
S T
A
S T
A
S T
A
S T
A
S T
A
245+08=P-8-11-97
BL STA. 244+24.59
FOUND TYPE G MON
X = 2478131.091
Y = 13162523.728
Z = 261.88
219+72=P-8-10-97
BL STA. 218+90.48
FOUND TYPE G MON
X = 2477088.796
Y = 13160787.518
Z = 258.54
276+59=P-8-12-97
BL STA. 275+76.25
FOUND TYPE G MON
X = 2481090.433
Y = 13163529.430
Z = 260.92
SEDIMENT TRAP #2
00 200' 400'
1" = 200'
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
C-103
B E
L O
W
A
R
H
R
Y
O U
T
P
L A
N
S T
A
M
L
A M
P O
R T
D
G
R I F
F I T
H
J
G
I A
N N
I N
I
D
S
H A
L
L A
H A
N
D
RTA 20191223
F
L
O
W
A1
BELOW AR HWY 90 ROW LAYOUT PLAN
SCALE: 1"=200'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
80 ROW 2476946.23 13161153.24 217+41.80 -363.477'
81 ROW 2477324.85 13161428.12 224+97.74 -313.457'
82 ROW 2477519.30 13161554.50 227+26.51 -275.377'
83 ROW 2477837.19 13161651.97 229+42.73 -234.642'
84 ROW 2477908.48 13161756.53 232+46.00 -241.652'
85 ROW 2477913.21 13161894.18 235+60.68 -224.053'
86 ROW 2477842.39 13162009.82 239+04.65 -234.646'
87 ROW 2477769.07 13162062.10 239+94.69 -235.819'
88 ROW 2477687.27 13162152.17 229+42.75 -756.827'
89 ROW 2477649.87 13162259.51 229+37.75 -870.384'
90 ROW 2477658.45 13162382.50 229+81.29 -985.731'
91 ROW 2477752.70 13162527.08 241+36.07 -243.827'
92 ROW 2477987.09 13162694.48 244+23.37 -223.382'
93 ROW 2478210.84 13162801.96 245+64.57 -253.957'
94 ROW 2478578.66 13162903.26 249+34.05 -278.694'
95 ROW 2478409.35 13163144.58 248+10.71 -546.443'
96 ROW 2479299.69 13163389.14 259+17.29 -581.518'
97 ROW 2479446.44 13163154.21 259+37.11 -305.230'
98 ROW 2479897.55 13163388.11 264+45.23 -300.950'
180 ROW 2480426.77 13163331.22 268+84.65 -16.821'
181 ROW 2480040.48 13163173.26 264+71.06 -44.196'
182 ROW 2479993.36 13163150.86 264+18.94 -46.439'
183 ROW 2479552.64 13162926.83 259+24.61 -54.583'
184 ROW 2479540.69 13162920.34 259+11.01 -54.438'
185 ROW 2479428.77 13162850.36 257+79.36 -44.937'
186 ROW 2479412.74 13162843.09 257+61.79 -46.011'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
187 ROW 2479116.44 13162736.09 254+33.18 -17.878'
188 ROW 2479096.29 13162730.27 254+12.31 -15.763'
189 ROW 2478779.15 13162659.44 250+87.61 -2.899'
190 ROW 2478759.96 13162657.18 250+68.32 -4.114'
191 ROW 2478632.20 13162652.88 249+41.86 -22.773'
192 ROW 2478610.17 13162649.71 249+19.62 -23.601'
193 ROW 2478344.75 13162597.05 246+49.99 -24.560'
194 ROW 2478320.17 13162589.51 246+24.35 -22.626'
195 ROW 2478141.83 13162512.39 244+33.39 13.262'
196 ROW 2478117.84 13162500.54 244+00.47 9.391'
197 ROW 2477881.84 13162328.75 241+09.13 -8.699'
198 ROW 2477884.26 13162267.89 240+23.43 -1.742'
199 ROW 2478019.16 13162144.54 238+41.71 -21.493'
200 ROW 2478067.54 13162084.06 237+66.93 -41.677'
201 ROW 2478105.03 13162013.37 236+54.21 -18.500'
202 ROW 2478130.41 13161940.63 235+78.80 -2.689'
203 ROW 2478140.49 13161871.83 235+09.28 -1.545'
204 ROW 2478141.70 13161809.08 234+46.90 -8.418'
205 ROW 2478103.95 13161649.99 232+62.49 -19.648'
206 ROW 2478068.86 13161585.72 231+89.47 -14.275'
207 ROW 2477960.01 13161468.92 230+07.82 -24.035'
208 ROW 2477880.55 13161422.94 229+18.50 -2.806'
209 ROW 2477761.92 13161406.46 228+00.14 -21.085'
210 ROW 2477703.43 13161403.63 227+60.45 -39.766'
211 ROW 2477641.52 13161399.82 227+12.21 -78.760'
212 ROW 2477542.39 13161357.59 226+10.58 -114.544'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
213 ROW 2477335.95 13161228.73 223+71.30 -158.891'
214 ROW 2477202.62 13161134.83 222+09.55 -179.658'
215 ROW 2477040.61 13160994.08 219+95.01 -185.234'
216 ROW 2476928.57 13160924.82 217+28.18 -134.780'
N
V O
L U
B
E L
Y
C
H A
N N
E
A N
O U
T
C L
E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O c r o s o r p o r a t i g i t a l
G l o
N s t r i b u t i r b
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
MATCH LINE STA. 324+00
M
A
T
C
H
L
I
T
A
M
A
T
C
H
L
I
T
A
98 ROW
99 ROW
100 ROW
101 ROW
102 ROW
103 ROW
104 ROW
105 ROW 106 ROW
107 ROW
108 ROW
109 ROW
110 ROW
111 ROW
112 ROW
113 ROW
114 ROW
115 ROW
116 ROW
117 ROW
159 ROW
160 ROW
161 ROW
162 ROW
163 ROW
164 ROW
165 ROW
166 ROW
167 ROW
168 ROW
169 ROW
170 ROW
171 ROW
172 ROW
173 ROW
174 ROW
175 ROW
176 ROW
177 ROW
178 ROW
179 ROW
180 ROW
181 ROW
182 ROW
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
276+59=P-8-12-97
BL STA. 275+76.25
FOUND TYPE G MON
X = 2481090.433
Y = 13163529.430
Z = 260.92
304+73=P-8-13-97
BL STA. 303+89.64
FOUND TYPE G MON
X = 2482993.237
Y = 13165550.154
Z = 262.50
50' WIDE RIGHT OF WAY FOR HAUL ROAD. HAUL
ROAD SHALL BE CONSTRUCTED A MINIMUM OF 10'
FROM THE CHANNEL TOP OF BANK. CONTRACTOR
SHALL COORDINATE WITH THE CONTRACTING
OFFICER SHOULD ADJUSTMENTS IN THE FIELD BE
NECESSARY.
S E
D
IM
E N
T T
R A
P
CONSTRUCTION GATE, REFER TO
DETAIL D5/C-501. CONTRACTOR SHALL
MAINTAIN CONTROL OF SITE ACCESS
24 HRS/DAY, 7 DAYS/WEEK.
CONTRACTOR SHALL PROVIDE A
MINIMUM OF 2 DUPLICATE KEYS FOR
ALL LOCKS TO THE CONTRACTING
OFFICER. (TYP)
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
00 200' 400'
1" = 200'
C-104
B E
L O
W
A
R
H
R
Y
O U
T
P
L A
N
S T
A
M
L A
M P
O R
T
D
G R
I F
F I T
H
J
G I A
N N
I N
I
D
S H
A N
E
C
A L L A
H A
N
D
F
L
O
W
A1
BELOW AR HWY 90 ROW LAYOUT PLAN
SCALE: 1"=200'
EXIST LOW WATER HAUL
ROAD CROSSING. REPAIR
AS NECESSARY
EXIST 9'x6' STEEL
ARCH PIPE CULVERTS
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
99 ROW 2480470.21 13163619.17 270+15.04 -277.207'
100 ROW 2480812.89 13163757.44 273+83.69 -302.682'
101 ROW 2481179.64 13164106.30 281+64.19 -435.759'
102 ROW 2481404.16 13164319.46 284+63.55 -356.832'
103 ROW 2482179.66 13165140.66 295+37.70 -239.795'
104 ROW 2481321.73 13165950.84 295+72.49 -1,419.295'
105 ROW 2480967.91 13166333.13 239+39.22 5,100.021'
106 ROW 2481039.85 13166386.12 239+12.53 5,185.290'
107 ROW 2481396.58 13166017.19 Out of range Out of range
108 ROW 2481359.29 13165984.14 Out of range Out of range
109 ROW 2482213.99 13165177.01 295+87.68 -238.321'
110 ROW 2482455.84 13165433.12 299+07.73 -267.120'
111 ROW 2482802.15 13165858.02 305+54.92 -321.918'
112 ROW 2483109.24 13166305.21 310+96.48 -290.283'
113 ROW 2483252.93 13166410.84 Out of range Out of range
114 ROW 2483659.75 13166403.62 313+56.38 -277.813'
115 ROW 2483446.03 13166444.25 311+39.17 -265.720'
116 ROW 2484147.20 13166398.59 320+57.59 -373.603'
160 ROW 2484167.38 13166152.06 319+94.79 -134.355'
161 ROW 2483702.87 13166163.28 314+56.79 -53.961'
162 ROW 2483389.40 13166199.87 311+43.12 -14.896'
163 ROW 2483337.99 13166180.81 311+08.27 -30.161'
164 ROW 2483297.19 13166148.27 310+59.32 -48.261'
165 ROW 2483230.48 13166031.13 309+24.56 -44.794'
166 ROW 2483076.80 13165807.09 306+53.33 -60.499'
167 ROW 2483005.65 13165738.55 305+57.88 -85.959'
168 ROW 2482933.49 13165647.65 304+42.76 -100.728'
169 ROW 2482898.32 13165615.10 303+62.40 -110.637'
170 ROW 2482855.76 13165569.31 303+00.19 -104.539'
171 ROW 2482764.38 13165456.47 301+56.98 -80.565'
172 ROW 2482746.79 13165413.31 301+15.21 -59.893'
173 ROW 2482663.00 13165281.57 299+65.17 -16.731'
174 ROW 2481402.34 13163969.48 281+64.88 -174.388'
175 ROW 2481262.44 13163831.94 278+81.97 -167.747'
176 ROW 2481116.03 13163702.47 276+89.46 -134.057'
177 ROW 2480916.81 13163531.87 274+12.73 -56.029'
178 ROW 2480899.04 13163521.37 273+92.58 -51.542'
179 ROW 2480753.17 13163462.63 272+35.69 -40.809'
N
V O
L U
B
E L O
W
H
W Y
C
H A
N N
E L
C
L E
A N
O U
T
C L A
E
E N
E
C
O U
N T
I E
S
A
R K
A N
S A
S
B E
L O
W
H
W Y
C
H A
N N
E L
C
L E
A N
O U
T
B E
L O
W
P
I G
G O
T T
S E
E P
A G
E
R
E M
E D
I A
T I O
N
A
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M D
T c r o s o r p o r a t i g i t a l G l o
N s t r i b u t i r b c r o s o r p o r a t i g i t a l G l o
N s t r i b u t i r b
R
W
R
W
R
W
R /W
R/W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R W
R W
R W
R W
R W
R W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
R /W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R /W
R /W
MATCH LINE STA. 324+00
M
A
T
C
H
L
I
111 ROW
112 ROW
113 ROW
114 ROW
115 ROW
116 ROW
117 ROW
118 ROW
119 ROW
120 ROW
121 ROW
122 ROW
123 ROW
124 ROW
125 ROW
126 ROW
127 ROW
153 ROW
154 ROW
155 ROW
156 ROW
157 ROW
158 ROW
159 ROW
160 ROW
161 ROW
162 ROW
163 ROW
164 ROW
165 ROW
166 ROW
167 ROW
168 ROW
169 ROW
170 ROW
171 ROW
172 ROW
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
329+17=P-8-14-97
BL STA. 328+79.56
FOUND TYPE G MON
X = 2485022.375
Y = 13166375.697
Z = 264.18
358+03=P-8-15-97
BL STA. 357+95.44
FOUND TYPE G MON
X = 2486818.608
Y = 13168262.698
Z = 265.50
BORING 1-H90U-97
LOCATION
H
128 ROW
129 ROW
130 ROW
131 ROW
132 ROW
133 ROW
142 ROW
143 ROW
144 ROW
145 ROW
146 ROW
147 ROW
148 ROW
149 ROW
150 ROW
151 ROW
152 ROW
50' WIDE RIGHT OF WAY FOR HAUL
ROAD. HAUL ROAD SHALL BE
CONSTRUCTED A MINIMUM OF 10'
FROM THE CHANNEL TOP OF BANK.
CONTRACTOR SHALL COORDINATE
WITH THE CONTRACTING OFFICER
SHOULD ADJUSTMENTS IN THE FIELD
BE NECESSARY.
SEDIMENT TRAP #1
134 ROW
135 ROW
136 ROW
137 ROW
138 ROW
139 ROW
140 ROW
141 ROW
CONSTRUCTION GATE. REFER TO
DETAIL D5/C-501. CONTRACTOR SHALL
MAINTAIN CONTROL OF SITE ACCESS
24 HRS/DAY, 7 DAYS/WEEK.
CONTRACTOR SHALL PROVIDE A
MINIMUM OF 2 DUPLICATE KEYS FOR
ALL LOCKS TO THE CONTRACTING
OFFICER. (TYP)
DEMOLISH CANOPY STRUCTURE, INCLUDING STEEL STRUCTURE,
COLUMNS, AND ANY CONCRETE PEDESTALS DOWN TO AN ELEVATION
2” BELOW SURROUNDING CONCRETE SURFACE. GRIND SMOOTH ALL
STEEL, REBAR, AND ANCHOR BOLTS FLUSH 2” BELOW SURROUNDING
CONCRETE SURFACE. REMOVE ALL MATERIAL FROM CONSTRUCTION
SITE AND DISPOSE IN ACCORDANCE WITH ALL SPECIFICATIONS,
LOCAL, STATE, AND FEDERAL LAWS AND ORDINANCES.
CONSTRUCT BARRICADES AT ALL
ENTRANCES NOT USED BY
CONSTRUCTION TRAFFIC. AT THE
END OF EACH DAY THE
CONTRACTOR SHALL BARRICADE
ALL ENTRANCES AND LOCK ALL
GATES.
CONSTRUCTION GATE. REFER TO DETAIL
D5/C-501. CONTRACTOR SHALL MAINTAIN
CONTROL OF SITE ACCESS 24 HRS/DAY, 7
DAYS/WEEK. CONTRACTOR SHALL
PROVIDE A MINIMUM OF 2 DUPLICATE
KEYS FOR ALL LOCKS TO THE
CONTRACTING OFFICER. (TYP)
00 200' 400'
1" = 200'
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
M E
M P
H I S
T
N
N
M
A
R
E E
T
M E
M P
H
S
T R
I C
T
C-105
B E
L O
W
A
R
H
R
Y
O U
T
P
L A
N
S T
A
M
L A
M P
O R
T
D
G R
I F
F I T
H
J
G I A
N N
I N
I
D
S H
A N
E
C
A L L A
H A
N
D
F
L
O
W
A1
BELOW AR HWY 90 ROW LAYOUT PLAN
SCALE: 1"=200'
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
117 ROW 2484525.09 13166444.12 324+29.17 -291.104'
118 ROW 2484998.65 13166641.12 328+82.21 -266.612'
119 ROW 2484900.11 13166909.15 Out of range Out of range
120 ROW 2485803.49 13167269.26 341+86.29 -537.009'
121 ROW 2485928.38 13167012.71 340+94.36 -266.890'
122 ROW 2486252.02 13167213.40 344+65.49 -181.555'
123 ROW 2486290.51 13167259.82 345+25.50 -187.421'
124 ROW 2486442.37 13167562.85 349+27.10 -271.720'
125 ROW 2486446.87 13167594.38 349+56.84 -283.121'
126 ROW 2486467.29 13168082.54 356+17.31 -352.115'
127 ROW 2486429.72 13168258.26 358+32.01 -387.237'
128 ROW 2486469.30 13168832.94 363+99.44 -287.985'
129 ROW 2486414.59 13168992.47 365+63.80 -325.771'
130 ROW 2486370.24 13169181.63 Out of range Out of range
131 ROW 2486358.71 13169197.32 Out of range Out of range
132 ROW 2485893.40 13169200.02 Out of range Out of range
133 ROW 2485807.71 13169185.93 Out of range Out of range
134 ROW 2485656.54 13169098.07 Out of range Out of range
135 ROW 2485459.53 13169182.89 Out of range Out of range
136 ROW 2485483.39 13169254.19 Out of range Out of range
137 ROW 2485446.78 13169270.60 Out of range Out of range
ROW COORDINATES
Point No. EASTING NORTHING BL Station Offset
138 ROW 2485123.98 13169483.53 Out of range Out of range
139 ROW 2485165.91 13169515.77 Out of range Out of range
140 ROW 2485470.92 13169314.57 Out of range Out of range
141…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .