AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment w as issued to reflect the follow ing change(s):
1. Change the bid opening date from 11 Sept 2019 to 17 Sept 2019.
2. See summary of change for all answ ers to questions submitted.
3. Please add the follow ing verbiage to the Solicitation; The Government has the option to reject all bids received in response to the sealed bid advertisement and initiate negotiation. Negotiations w ill include soliciting offers from each responsible bidder that submits a bid in response to the Invitation for Bids. If, after bid opening, the Contracting Officer determines that negotiations are in the best interest of the Government, the follow ing steps w ill be follow ed:
(a) An amendment to the sealed bid advertisement w ill be issued to each responsible bidder changing the Invitation for Bids Number to Request for Proposals Number. The amendment w ill also make any necessary changes to the scope of the w ork.
(b) A cover letter signed by the negotiator w ill accompany the amendment explaining the procedures to be follow ed.
1. CONTRACT ID CODE PAGE OF PAGES
1 77
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EQ19B0007
X 9B. DATED (SEE ITEM 11)
05-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2019
CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
KIRK A. MIDDLETON 167 N MAIN ST
MEMPHIS TN 38103-1894
W912EQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EQ19B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Sep-2019 10:00 AM to 17-Sep-2019 10:00 AM.
The following have been added by full text:
QUESTIONS AND ANSWERS
Question 1: In reference to Compressed Air System Section D on page 53 of the original specification, all piping, fitting, and valves should be Stainless Steel. The drawing has Pipe, Fittings, and valves as different materials. Please advise on what is correct.
Answer 1: The pipes, valves, and fittings shall be supplied and installed in accordance with the contract drawing #858-B690-01, Revision 3.
Current specification reads:
D. PIPING & EQUIPMENT
Piping for the compressed air systems shall be as shown on the contract drawings. All piping, fittings, and valves for the compressed air system shall be stainless steel as shown on the contract drawings.
Revised to read:
D. PIPING & EQUIPMENT
Piping for the compressed air systems shall be as shown on the contract drawings. All material for the piping, fittings, and valves for the compressed air system shall be in accordance with contract drawing #858-B690-01.
Question 2: There is not enough info on the drawing to have someone cast it (the height and there is something where it penetrates the main deck) I was hoping the that was a stock casting the you used on other projects, and the 306 dwg is the drawing that details mooring barge bearing plates. The 306 drawing is referenced on the timberhead drawing.
Answer 2: Drawing #858-B306-01 was referenced in error and will not be issued for this solicitation. There are no additional drawings available for the timberhead.
The Government does not know of any current sources for the timberheads or if a specific OEM manufactures or casts them. These timberheads may not be widely available and may need to be custom fabricated. If more detail is required for construction, the Government can provide that at a later date.
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
SUBMITTALS
Design, construct, and test one Floating Crane Barge for the Corps of Engineers, Memphis District for use as a part of its Bank Grading Unit, in accordance with the attached specifications.
ITEM UNIT TOTAL
NUMBER ITEM
QTY.
UNIT PRICE PRICE
0001 Floating Crane Barge 1 Floating Crane Barge
0001AA PLANNING AND SCHEDULING (The submittals required for
Planning and Scheduling are listed in contract Clause H02). This item is initiated only by a Notice To Proceed issued by the Contracting Officer.
1 JOB XXXX $ _________
0001AB ENGINEERING (The submittals for “Engineering” are listed in contract Clause H02). This item is initiated only by a Notice To Proceed issued by the Contracting Officer. The Contractor may not start this item until he receives a Notice To Proceed for this item.
1 JOB XXXX $_________
0001AC CONSTRUCT & TEST (The submittals for “Construct & Test are listed in contract Clause H02). This item is initiated only by a Notice To Proceed issued by the Contracting Officer. The Contractor may not start this item until he receives a Notice To Proceed for this item.
0001AD DELIVER This item is initiated only by a Notice To Proceed issued by the Contracting Officer. The Contractor may not start this item until he receives a Notice To Proceed for this item.
TOTAL ITEM 0001 1 JOB $_________
TOTAL FOR ITEMS 0001AA to 0001AD
1 VESSEL XXXX $_________
INSERT LOCATION OF THE FACILITY WHERE THE WORK WILL BE PERFORMED:
The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
DESCRIPTION AND SPECIFICATIONS
PART I – THE SCHEDULE – SECTION C
DESCRIPTION/SPECIFICATION/WORK STATEMENT
C000 GENERAL
C001 PROJECT OVERVIEW
The Memphis District (CEMVM) of the U.S. Army Corps of Engineers (USACE) is issuing this solicitation to acquire a new barge and integrate a Government furnished dragline crane into the barge, resulting in a floating crane with duty cycle dragline capability. The completed vessel will be placed in service with the Bank Grading Unit of the Memphis District of the U.S. Army Corps of Engineers and will be used by the District in support of its construction and maintenance mission on the inland navigation system.
The new Crane Barge will replace the existing Bank Grader Crane Barge. The existing Bank Grader Crane Barge is a non-self-propelled barge with a pedestal mounted Bucyrus Erie 9W dragline crane. Its mission is to grade the banks of the Mississippi River to create stability in preparation for the laying of concrete mattresses.
The Bank Grader Crane Barge is attached to a track along a long mooring barge which is used to position the crane barge. Together these barges make up the Bank Grading Unit. The mooring barge has winches with anchor lines that run out to bulldozers on the shore. These bulldozers help position the mooring barge.
The operating mission of the Bank Grader Crane Barge is to drag bank material down the bank slope to provide an acceptable bank grade. Typical finished bank grades range from 3:1 to 7:1 (horizontal:vertical). Sometimes to attain the desired slope it requires moving the material far from the river bank out into the river adjacent to the graded bank. In these cases, the Bank Grader will haul or spar itself out along the mooring barge to move further into the river to allow for the material to be dragged out into the desired displacement location. The Bank Grader barge has mooring winches on the deck which are used to haul the Bank Grader along the length of the mooring barge.
The Bank Grader Crane Barge has sloped deck edges on the land and river side. The bucket is often dragged in close to the bank grader barge, and the sloped edges of the barge allow the dragline to move freely without obstruction when this occurs.
The crane’s primary operating area is the Mississippi River from below New Orleans, LA to Cairo, IL. The crane must be able to grade various materials along the river bank such as various types of soil (sand, silt, and clay), pieces of articulated concrete mattress, and some rocks on land and under water. The material is not lifted and moved, it is simply dragged down the bank.
Bulldozers on the river bank are used for digging and piling material to help the bank grader move material.
The bank grading work is performed primarily with a crescent style dragline bucket attachment. The bucket is often thrown/cast past the tip of the boom to reach a larger working radius on the bank. When required, a dragline rake attachment is utilized to put the finished grade on a slope or for hard to reach areas where the bulldozers cannot reach. The rake is thrown/cast past the boom tip similar to the bucket.
The new crane will perform essentially the same dragging operations as the existing crane. Along with handling the bucket or grade rake, the crane will have to lift and place 6,000 lbs anchors on the river banks to assist with positioning the barge and bank grading unit.
A video of the existing Bank Grader Unit working along the banks of the Mississippi River can be viewed at:
https://www.youtube.com/watch?v=O9l_C73MiAo
The Government has awarded the separate dragline crane procurement contract to Seatrax, Inc. (crane manufacturer). The crane will be a ringer type crane with 50 ft ring diameter. This dragline crane machine, along with the ring that it mounts on, will be supplied as Government Furnished Equipment (GFE) to the shipyard for integration and installation on the barge.
The completed vessel will be ABS classed.
C002 CONTRACT OVERVIEW
For this contract, the barge contractor shall include, as a minimum, all costs to provide and deliver the following:
Using the contract and reference drawings provided in the procurement package, complete the design for production and fabrication of the barge.
Fabricate one barge in accordance with the specifications of this contract.
Test all barge related equipment, systems, piping, and electrical systems.
Install the crane ring on the barge.
Assemble, erect, install, and integrate the crane to the barge.
Start-up of the crane after its installation on the barge.
Operational performance testing and trials of the crane after installation and integration on the barge at the barge manufacturer’s facility.
Deliver the completed barge to a designated location.
Final Acceptance Trials & Demonstrations in conjunction with the crane manufacturer at the Corps’ designated point of Final Acceptance of the completed floating crane barge.
The crane manufacturer will have representation onsite at the barge contractor’s facility to ensure that the installation and assembly are executed properly (by the barge contractor), and according to his (the crane manufacturer’s) approved procedures and practices. The support provided by the crane manufacturer will be advisory only; the barge contractor shall provide all labor for the installation and assembly of the crane.
Once the crane is assembled and installed on the barge, the crane manufacturer will provide the services of crane operators and other qualified personnel to demonstrate proper operation and proper performance of the crane.
C003 STANDARDS
The barge shall be designed and constructed in accordance with the latest edition and interpretations of the rules, regulations, and requirements and standards of the Legislation, Regulatory Agencies, and technical organizations listed as follows or as stipulated in the respective specification clause:
American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways.”
American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Vessels”:
Part 2 – Rules for Materials and Welding
American Bureau of Shipping - ABS Guide for Certification of Lifting Appliances, July 2007 (updated January 2008)
International Association of Classification Societies (IACS) “No. 47: Guide for Shipbuilding and Repair Quality Standard for Hull Structures During Construction”.
American Petroleum Institute - API Specification 2C – Offshore Pedestal-Mounted Cranes, Seventh Edition, effective date October, 2012
33 CFR Subchapter E – USCG, Inland Navigation Rules.
46 CFR Subchapter C – Uninspected Vessels. USCG inspection and certification is not required.
46 CFR Subchapter C – Part 28, Subpart E - Stability
46 CFR Subchapter S – Part 170, Subpart E – Weather Criterion
46 CFR Subchapter S – Part 173, Subpart B – Lifting
46 CFR Subchapter S – Part 174, Subpart B – Special Rules Pertaining to Deck Cargo Barges
46 CFR Subchapter J – Electrical Engineering
U.S. Army Corps of Engineers, Publication No. EM 385-1-1, “Safety and Health Requirements Manual.”
U.S. Maritime Administration Schedule for Pipes, Joints, Valves and Fittings
The National Shipbuilding Research Program (NSRP 0490), January 1998, “Industrial Standards for Hull Structural Penetration Design Criteria and Details.”
Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45 – Recommended Practice for Electrical Installations on Shipboard.
Illuminating Engineering Society, “Recommended Practice for Marine Lighting”
National Electric Code (NEC)
C004 CLASSIFICATION & CERTIFICATION
A. ABS CLASSIFICATION
The barge contractor shall be responsible for obtaining necessary regulatory body reviews and approvals, obtaining necessary inspections and surveys during construction and for the certification and classing of the vessel as follows:
ABS classification for Maltese Cross A1, Floating Crane, Rivers and Intra-Coastal Waterways for use as a Government Floating Crane, and Reinforcement B.
Other ABS Notations: CRC (Crane Register Certificate)
The recommended ABS point of contact is Bob Smith, who can be reached by phone, email or mail, at: (703) 519- 9970, RSmith@eagle.org, or 1525 Wilson Blvd, Suite 625, Alexandria, VA 22209.
The barge contractor shall submit all drawings and reports for review through ABS Government Services in Houston, TX.
When steel construction commences, the barge contractor shall coordinate with ABS to ensure the frequency of onsite inspections are not less than once every two weeks.
If the barge contractor intends to launch, test, operate or tow the barge “out of class”, the barge contractor must specifically advise ABS of such intent and incorporate any and all modifications required by that agency for such operation at no additional cost to the Government and at no additional contract time. Any such modifications which, in the opinion of the COR, affects the arrangements, operability, or suitability of the vessel shall be removed from the vessel by the barge contractor at no additional cost or time and the vessel returned to new condition prior to Final Acceptance.
B. VESSEL DESIGN AND CLASSIFICATION REVIEW STATUS
The Government has developed the barge’s design and drawings in accordance with ABS rules and these specifications. These drawings have not been submitted to ABS for their review or approval.
The barge contractor shall initiate and is responsible for the ABS Class process; including the engineering review.
For the purpose of bidding, all of the contract drawings in this solicitation shall be assumed to be approved by ABS as issued. If ABS issues technical comments that require revisions to the design, the Government will coordinate with the barge contractor to resolve the comments and issue a contract modification(s) if required. The Government does not consider technical comments associated with final equipment selection, material selection, and/or standard shipyard construction/installation practices in the category of those that require revisions to the drawings/design. As such, those types of comments are the responsibility of the contractor.
The contractor shall be responsible for all costs associated with applications, additional plan submittals, and inspections required to obtain such certification\documentation. In addition, the contractor shall be responsible for all ABS Surveyor comments and technical comments related to final equipment, material selection, and standard shipyard construction/installation practices.
C. GFE CRANE CERTIFICATION AND CLASSIFICATION
The Government furnished (GFE) crane will be provided by Seatrax, Inc. Seatrax, Inc. will obtain certification from ABS showing that the crane is certified to ASME B30.8 (for structural considerations) and SAE J67 (Shovel Dipper, Clam Bucket and Dragline Rating). Seatrax, Inc. will procure the services of ABS to perform third party verification to ensure that the crane meets these requirements.
The barge contractor’s regulatory responsibility with respect to the GFE crane is to ensure that the installation and testing of the crane on the barge is in accordance with the crane manufacturer’s recommendations and receives approval from the ABS Surveyor.
D. VESSEL OWNER & ADDRESS
For the ABS certificate of classification, the owner shall be listed as “U.S. Army Corps of Engineers, Memphis District”. The owner’s address of record shall be listed as:
US ARMY CORPS OF ENGINEERS
MEMPHIS DISTRICT
ENSLEY ENGINEERING YARD
2915 RIVERPORT ROAD
MEMPHIS, TENNESSEE 38109
MISSISSIPPI RIVE MILE 725 A.H.P. (McKeller Lake)
PHONE: (901) 481-4477
EMAIL: KEVIN.W.WILLIAMS@USACE.ARMY.MIL
E. ABS ENGINEERING MANAGER ACCESS & DISCLOSURE
The Marine Design Center (CEMDC) will be the “Owner’s Representative” on this project and all correspondence with ABS shall be made available to the COR. In order to facilitate the communication process and reduce the paperwork burden on all parties, the barge contractor, and all sub-contractors, shall utilize the ABS Eagle Construct Engineering Manager Portal (02E) for all drawing submittals and correspondence. The barge contractor and all sub-contractors shall make the necessary arrangements with ABS to ensure that the Marine Design Center is granted the following Oversight Permissions for this contract:
View project and drawing status View comments View transmittals Download approved drawings and review letters E-mail notification of approval E-mail notification of transmittal Status Disclaimer
The Marine Design Center’s ID/WCN number is 615255 and the point of contact with respect to the ABS Coordination/Engineering Manager Portal (02E) is Mr. Tim Keyser, Timothy.J.Keyser@usace.army.mil, phone:
(215) 656-6171.
The barge contractor shall ensure that, as a part of its contract with ABS, the barge contractor authorizes ABS to disclose to and discuss with the Army Corps of Engineers any Rule or certification criteria issues, design assumptions and their impact on classification and certification, and any other technical considerations on which classification is to be based or which may affect future classification or certification of the vessel.
The barge contractor shall authorize ABS to provide the Army Corps of Engineers at its request with a copy of all correspondence related to classification, statutory certification or other compliance verification for which ABS is responsible as it is promulgated and initially distributed. This is to include drawings and other engineering work requiring ABS approval as well as correspondence generated which relates to such approvals, including all such correspondence dealing with vendors.
In addition, the barge contractor shall copy the Army Corps of Engineers with correspondence regarding classification, statutory certification and other compliance verification for which ABS is responsible. The barge contractor shall also authorize ABS to establish and maintain contact with other certification, verification and compliance agents involved on the vessel being built.
Upon request by the COR, the barge contractor shall request ABS to furnish the Government with the project comment list. The list shall include open and closed technical and surveyor comments. The surveyor comments shall not only include comments generated during the drawing review process, but also comments generated by the ABS Surveyor during construction inspections. The comment list shall be sent directly from ABS to the COR via email as a .pdf file.
At the completion of the ABS review process, the barge contractor shall download all ABS “Eagle Stamped” drawings and provide them on a CD or DVD to the Government in .pdf format.
C006 VESSEL IDENTIFICATION & PRINCIPAL CHARACTERISTICS
A. VESSEL IDENTIFICATION
The vessel to be acquired through this solicitation has been assigned the following name and Marine Design Center hull and project numbers:
MDC Hull Number 858 MDC Project Number 3211 Vessel Name TBD
The vessel name has not been selected at this time. For the purpose of initial documents and drawing preparation, the title used shall be:
“CEMVM BANK GRADING BARGE”
Upon selection of the official name for the vessel by the Government, the barge contractor shall incorporate the name into all “As-Built” documents and the construction drawing of the name board and hull markings. The MDC hull number shall be used in lieu of an “Official Number”.
B. PRINCIPAL CHARACTERISTICS
These specifications are intended to describe the contract design for one inland river floating crane. The principal dimensions of the barge are:
Length Overall 130’-0” Beam Overall 70’-0” Molded Depth (@ C.L.) 12’-5” Molded Depth (@ Side) 12’-0” Design Draft 6’-0” Air Draft (from 6’-0” waterline) 71’-11”
C010 DEFINITIONS
The following definitions are applicable to phrases and acronyms used throughout this contract:
ABS – American Bureau of Shipping
API – American Petroleum Institute
COR - Contracting Officer’s Representative - a member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties. A copy of the COR’s authority letter is furnished to the contractor.
GFE – Government Furnished Equipment – Equipment, materials or components furnished by the Government to the contractor for installation on the vessel.
K.O. - Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.
MDC – Acronym for the Marine Design Center.
QC - Quality Control - Quality Control is a function of the contractor. Refer to clause E03. Quality Assurance (QA) is a function of the Government.
USACE – Acronym for United States Army Corps of Engineers.
USCG - Acronym for United States Coast Guard.
C025 CONTRACTOR QUALITY STANDARDS
A. GENERAL
The barge contractor shall be responsible for the construction of a complete and functioning vessel.
Inspection by the Memphis District and Marine Design Center is for the purpose of verifying the proper function of the barge contractor’s quality control measures and is not to be used as a substitute for control of quality by the barge contractor.
Every effort shall be made during production planning to construct the vessel in an efficient sequence minimizing re-work and repair. Care shall be taken to assure the latest revisions of the Final Design plans are being used.
B. STRUCTURAL MATERIALS
Unless otherwise specified or noted on the contract drawings, all structural hull material shall be in accordance with the following specifications:
American Bureau of Shipping (ABS), “Rules for Building and Classing Steel Vessels” and “Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.
Welding Materials - ABS “Approved Welding Electrodes, Wire-Flux and Wire Gas Combination”.
Bolts, nuts and screws – ASTM A307-82, Specification for Carbon Steel Externally and Internally Threaded Standard Fasteners.
C. STANDARD PARTS AND MATERIALS
All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the vessel shall be new, of the highest grade, free from defects and imperfections, and be the standard product of reputable manufacturers, to the maximum extent practicable. Any material not specified shall be the best of their kind for the purpose intended. All items shall be suitable for workboat application and meet the latest requirements of standard specifications published by National Agencies. No salvaged materials shall be used in the works. Spare parts and service shall be readily obtainable.
D. WORKMANSHIP
All labor shall be especially skilled for each kind of work and under competent direction.
Where work of one trade joins, passes through, or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damage of previously acceptable construction shall be cause for rejection. All parts of the vessel intended to join or bear upon other parts shall have complete and solid contact and shall fit together without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.
All frames and longitudinal members, where applicable, shall be provided with limber holes and/or snipes of adequate size to allow water in bilges to flow to the lowest point of each compartment. Limber holes shall also be provided to allow for the passage of air in tanks. Limber holes shall be located at the plate edge.
Ends of outstanding flanges shall be cropped. Lighting holes may be punched or flame-cut and all edges shall have burrs removed.
All holes for machinery mounting bolts shall be drilled or punched; burning is not acceptable. Holes in members having sharp curvature shall be avoided.
All hull casting shall be machined or ground to bear solidly against the connecting structure.
E. WELDERS
All welding under this contract shall be done only by welders who have successfully passed qualification tests accepted by the American Bureau of Shipping or other regulatory agency acceptable to ABS. The contractor shall bear the expense of conducting these tests and shall certify, by name to the Contracting Officer, welders who have successfully passed the prescribed tests and hold current, valid certifications.
The contractor shall require any welder to repeat these tests when in the opinion of the Contracting Officer’s Representative, the work of the welder indicates a reasonable doubt of his proficiency. In such cases the welder shall be re-certified as above if he successfully passed the retest; otherwise, he shall be disqualified until he has successfully passed the retest.
The barge contractor shall maintain records of the individual welder’s certification during the course of the contract.
The records are to be available for examination upon request of the Contracting Officer or his representative.
F. WELDING
All welding shall be in accordance with the current rules of the American Bureau of Shipping, except where stated otherwise. All welding equipment used on the work shall be of a modern type subject to close control. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld, and be approved by
ABS.
Welding procedures, as to direction, length, numbers and sequence of beads, shall be carefully planned to minimize lock-up stresses. Care shall be exercised to produce smooth even beads, especially on all exposed plating and fittings. Beads shall be ground where directed by the Contracting Officer or his authorized representative.
The barge contractor shall employ appropriate welding procedures and grounding connections to preclude the possibility of anodic erosion of the hull after launching.
A detailed description of all welding procedures being employed in the construction shall be available to the Contracting Officer or his authorized representative.
G. INSTALLATION
Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer, and in compliance of this specification and the contract documents. The installation shall be accomplished by workmen especially skilled for each kind of work and under competent direction.
H. PLATE FAIRNESS
Steel plating shall be installed using proper welding procedures and sequences to ensure fair, undistorted plating panels. The use of filler materials to surface unfair areas is not acceptable.
Maximum allowable plating distortion is depicted in the “Guide For Shipbuilding And Repair Quality Standard For Hull Structure During Construction” from IACS. Distortion shall not exceed the amounts in this guide.
I. CONSTRUCTION STANDARDS
All material, machinery and equipment shall be new, of current manufacture and suitable for the marine service intended. Spare parts and service shall be readily obtainable.
All material, unless otherwise specified in these specifications or in the drawings, shall be of commercial quality to ASTM, ANSI, or SAE specifications.
During construction and before delivery, the barge contractor shall be responsible for protection of all material, equipment, etc., intended for the vessel.
The overweight tolerance of members shall be within the limits defined by the specifications of the American Society for Testing and Materials.
All materials shall be free of imperfections due to manufacturing processes and from defects which adversely affect appearance or serviceability.
All plating shall be neatly cut, fitted and welded. All sharp edges or projections which constitute a personnel hazard shall be removed or ground smooth. All notches shall have a radius to prevent stress concentrations.
Where aluminum must be attached to dissimilar metals or between dissimilar alloys of aluminum, fasteners shall be of stainless steel of an approved design with insulation as required to eliminate metal to metal contact.
All galvanizing shall be done after fabrication by the hot dip process, and the zinc shall be not less than 98% pure.
In instances where some types of metals cannot be hot dip galvanized, zinc silicate coating may then be substituted.
C040 SCOPE OF WORK
A. CONTRACTOR’S RESPONSIBILITY
The contract consists of three phases:
Phase I Planning and Scheduling Phase II Engineering Phase III Construct, Test, and Deliver
In accordance with the three phases, the barge contractor assumes complete responsibility for completing the final design, obtaining ABS classification and certification, and constructing, testing, and delivering the barge (with the Government furnished crane installed) to meet the requirements of the contract. Should the barge contractor determine at any time that he is unable to fulfill those responsibilities, he shall notify the COR immediately of the problem experienced and his proposed manner of correction.
B. CONTRACT LEVEL DESIGN
The contract drawings provided with the solicitation have been prepared in accordance with the ABS Rules as stated in contract Clauses C003 and C004 and the performance specification of this solicitation. For the purpose of bidding, the barge contractor shall assume the submitted drawings, as issued in this solicitation, will be approved by ABS without further revision. Technical comments made by ABS during the review process will be addressed as stated in Clause C004.
The contract drawings provide a contract level design assumed to be in accordance with ABS and suitable for bidding with confidence. The contract level design shall serve as the basis for the barge contractor to complete the final design, as well as to prepare his construction and production drawings. Such contractor engineering can include: secondary structure and foundations, electrical systems designs, piping and cable routings, miscellaneous details, complete material list, purchase specifications, shop drawings, construction details, As-Built drawings, and other engineering and technical development necessary to support administration, operation, and production practices. For specific design and engineering drawings and calculations required by the contractor, see paragraph C040 (D) below and respective clauses throughout Section C.
The barge contractor shall not deviate from the contract level design without approval from KO.
C. DRAWING CHANGES
The contract drawings represent a contract level design and are not intended to be revised by the contractor. The contractor is expected to build the barge as shown in the contract drawings once they have been approved by ABS.
The Government recognizes that minor design developments may be required to complete the final design and to suit the contractor’s construction and business practices. All design developments shall be provided to the COR for approval and to determine if a contract modification is required. If approved, any design developments shall be incorporated into the As-Built drawing package.
Should the barge contractor find any issues with the engineering and design of the barge as it relates to this solicitation and contract drawing package, the contractor shall bring it to the attention of the COR for resolution. If determined necessary by the Contracting Officer, an appropriate contract modification will be developed to address the issue.
D. DRAWINGS PROVIDED AND REQUIRED
1. Contract and Reference Drawings Provided
Contract drawings and reference drawings that are part of this solicitation are listed in contract Section J. All contract and reference drawings will be available to the successful bidder in CAD format.
The contract drawings reflect the contract level design described above.
The reference drawings that are part of this solicitation are intended to provide useful information that may have application to this procurement. The exact details presented in the reference drawings may not reflect the specific needs of the barge, but present the contractor with a methodology to develop a specific system or design feature as identified in the specification. The barge contractor shall not build from any reference drawing. It is the responsibility of the barge contractor to use the written specifications and the contract and reference drawings to properly develop the final design and engineering drawings in order to construct the barge.
2. Final Design Drawings Required
Contract Section H, Clause H12, Engineering and Drawings, contains a list with the minimum drawings/calculations required to be finalized and/or developed by the contractor for the final design.
For clarification purposes, the list in contract Clause H12 details the drawings by action groups. The action groups distinguish between separate categories based upon the engineering requirements to be completed by the barge contractor. The following is a description/definition of these categories:
Drawings To Be Finalized: as part of the scope of work for this effort, the contractor shall be required to finalize a certain number of contract drawings to achieve a final design. These drawings have been included as contract drawings. The scope and extent of the necessary finalization has been explained in detail in each respective contract Clause. These drawings shall be updated and submitted to the Government and, if required for class, ABS for review and approval.
Drawings To Be Developed: the barge contractor shall also be required to develop a certain number of drawings to achieve a final design to conform to the requirements of this solicitation. These drawings have been identified but do not currently exist. These drawings shall be developed and submitted to the Government and, if required for class, ABS for review and approval.
As-Built Drawings: the barge contractor shall be required to provide a complete “As-Built” record of the vessel.
The requirements for the “As-Built” drawings are further defined in contract Clause H14.
As stated above, ABS will require drawings to be submitted for review and approval in order to obtain class. It is the barge contractor’s responsibility to coordinate and contract with ABS for any such reviews.
E. DEVIATIONS FROM THE CONTRACT DESIGN
Should the barge contractor desire to deviate from this specification and/or the contract drawings, he shall submit his request in writing to the COR. Each proposed deviation requested shall be accompanied with a detailed analysis and comparison of the equipment, material or arrangement specified, and the equipment, material or arrangement proposed, including features, dimensions, performance characteristics, benefit to the Government, and compelling reason(s) why the deviation should be made. The request shall include, but is not limited to:
Desired deviation Reason(s) for the deviation Detailed analysis (as stated above) Impact on schedule Impact on cost Impact on weight, draft, and trim Impact of regulatory review and classification Supporting documentation (i.e. cut sheets, engineering drawings, photos, etc.
In the absence of compelling reasons for making the deviation, the barge contractor’s proposal may be denied.
The Government will review the request and render a decision within 14 days of receipt of a complete request for deviation. Requests that do not provide all of the information identified above may not be reviewed within 14 days, or may be returned as incomplete, with no review action.
If approved, the barge contractor shall be responsible for any cascading effects on the design, drawings or scientific reports as determined by the Government. The barge contractor shall be responsible for integrating the deviation into the design at no increase in contract cost or no extension of contract completion.
The barge contractor bears ultimate responsibility for satisfactory performance of all systems/arrangements impacted or affected by approved deviations as well as the operation of the completed vessel, as affected by the deviation.
No work deviation shall commence without a written approval from the KO.
If a deviation is approved by the COR, it is the sole responsibility of the barge contractor to coordinate with ABS and provide any additional engineering effort to meet the conditions of classifications and this specification.
The barge contractor shall bear all costs associated with any requested and/or approved deviations, including engineering, estimating, administrative and overhead, regulatory review and approval, construction and test and trials.
F. CONTRACT DESIGN PERFORMANCE RISK
For the purpose of developing the contract design package and obtaining ABS review and approval, parts and equipment displayed were coordinated with commercial suppliers. The Government assumes the performance risk for any latent defects in the design of the systems as they are shown on the contract drawings and described in this specification..
The barge contractor shall provide and install all of the systems as they are shown on the contract drawings. All major pieces of equipment have performance characteristics shown on the contract drawings or described in the specifications.
If the barge contractor selects equipment that is not as shown on the contract drawings or described in this specification, he shall be responsible for ensuring the overall system(s) performance is maintained, submitting cut sheets and details to the Government for review and approval; and if necessary re-engineering of the system(s) and revising of the drawings, and coordinating with ABS for class review and approval. For further details see contract Clause H15.
C100 SCIENTIFIC
All scientific data shall be provided in United States Customary System units of measurement (pounds, long tons, and feet). Data provided in other units will not be evaluated or considered.
C105 HULL GEOMETRY
A. CONTRACT DRAWINGS
858-B105-01 LINES PLAN
B. DESCRIPTION OF WORK
The hull geometry is defined as shown on the above contract drawing. The hull shall be constructed as shown on contract drawing #858-B105-01.
C. PRINCIPAL CHARACTERISTICS
The hull shall have the following principal dimensions:
Length Overall 130’-0” Beam Overall 70’-0” Molded Depth (@ C.L.) 12’-5” Molded Depth (@ Side) 12’-0”
C115 WEIGHT ESTIMATE
A. CONTRACT DOCUMENT
858-B115-01 WEIGHT ESTIMATE
B. USE OF WEIGHT ESTIMATE FOR BIDDING
The weight estimate has been developed commensurate with the contract level design and uses margins for the purposes of vessel performance. The Government does not consider the weight estimate to be suitable for detailed bidding purposes. The Government is not responsible for contractor use of the weight estimate in bid preparation.
C. WEIGHT & CENTER OF GRAVITY ESTIMATES & MONITORING
The barge contractor shall implement a careful weight estimating and monitoring procedure.
During the Engineering Phase (Phase II), the barge contractor shall update the weight and center of gravities (CG) each month with details on the final equipment selected and purchased, and system/outfitting design developments.
The weight estimate shall be submitted monthly as document #858-C115-01.
During the Construct, Test and Deliver Phase (Phase III), the barge contractor shall continue to update the weight and CG estimate each month. The update shall reflect actual equipment location, quantity and location of piping and wiring runs, actual quantity and location of outfitting items, and any changes to the structural weight.
The Government will review the monthly weight estimate to ensure the anticipated draft, and trim and stability conditions of the barge are satisfactory. If weight growth that adversely impacts the vessel’s trim and stability is found, the Government will coordinate with the barge contractor to determine the cause and develop remedial action.
D. INCLINING & DEADWEIGHT SURVEY
Upon completion of all work and after the crane has been installed, with the barge in the lightship condition and the crane in the stowed position, the barge contractor shall conduct an inclining test and deadweight survey. The inclining test shall be carried out in accordance with ASTM F 1321-14 and contract Clause E05. The barge contractor shall be responsible for developing the inclining test procedure/plan, providing all certified inclining weights, pendulum setups, support equipment and personnel, directing the experiment, recording all data and completing the inclining test report. The Government will participate in the incline experiment as a witness.
The barge contractor shall prepare an inclining test procedure/plan and submit it to the Government and ABS for review and approval. The plan shall be numbered 858-C115-02 and titled: INCLINE EXPERIMENT PLAN. For the Government’s review, the plan shall be submitted at least 60 days prior to the scheduled inclining.
Based on the intended ABS class of the vessel, ABS will require engineering review and surveyor witness with the inclining experiment. The barge contractor shall coordinate submittals and on-site surveyor representation with ABS to ensure the construction and testing schedules are maintained.
Following the completion of the inclining experiment, the barge contractor shall complete the incline test report and determine the lightship displacement, centers of gravity and hydrostatic properties of the floating crane. The report, numbered 858-D115-03 and titled: INCLINE EXPERIMENT RESULT, shall be submitted to the Government and ABS for review and approval.
The barge contractor shall be responsible for all costs associated with ABS reviews (including at least one iteration to reflect any ABS comments made) and all surveyor costs.
E. NO LOAD CRANE MOVEMENTS
After the inclining test, several (no load) crane movements shall be performed (crane operated by the crane manufacturer):
With no load on the hook, the crane shall swing to 90 degrees (starboard side), and next to 270 degrees, (port side).
The crane rigging radius shall not change. Pendulum readings shall be taken after each movement, as well as the vessel draft readings at the four corners of the barge. This will be used to assess the heeling moment due to the crane’s own weight and CG. The change in LCG shall be ignored during the experiment.
With the crane at 90 degrees over the starboard side, and next with the crane at 270 degrees over the port side, the crane boom angle shall be changed to cause the boom point to move transversely a known distance. Pendulum and draft readings shall be taken at each position. The initial and final boom angle shall be recorded. The change in the rigging radius shall be calculated. The heeling moment divided by the change in the rigging radius shall equal the boom point dead load by experiment. The change in VCG shall be ignored during the experiment.
Document #858-C115-02 (INCLINE EXPERIMENT PLAN) shall include the plan and description for these movements. Document #858-D115-03 (INCLINE EXPERIMENT RESULTS) shall include the data and results of these movements.
F. FINAL STABILITY & CRANE LOAD HANDLING TESTS
The Government will maintain responsibility for updating the damage, intact and load handling stability with the results of the incline experiment. Within 14 days of receipt of 858-D115-03 (INCLINE EXPERIMENT RESULTS), the Government will update and issue the following to the barge contractor:
858-D125-01 HYDROSTATICS
858-D130-01 TANK CAPACITY TABLES
858-D150-01 DAMAGE STABILITY CALCULATIONS
858-D155-01 INTACT STABILITY CALCULATIONS
858-D155-02 LOAD HANDLING STABILITY CALCULATIONS
858-D155-03 NAVAL ARCHITECTURAL ANALYSIS
858-D155-04 FLOATING SERVICE LOAD CHARTS
The barge contractor shall be responsible for submitting the above documents to ABS for review and approval, including all ABS costs. Note that the ABS stability documents review occurs after the 14 days which the Government has to prepare the final stability documents. For planning purposes the contractor shall allow at least 30 days between the incline experiment and the first load test.
After inclining, load handling tests (CRANE TESTS) shall not commence until the barge contractor receives ABS approval to do so. ABS surveyor attendance shall be required for all load handling tests. The barge contractor shall coordinate the schedule of submissions and testing with ABS to maintain the construction and testing schedules.
C130 TANK CAPACITIES
858-B215-01 GENERAL ARRANGEMENT & OUTBOARD PROFILE
858-B630-01 FUEL OIL SYSTEM
B. GENERAL
The tank capacities as shown on the contract drawings are as follows:
Fuel Oil Tank (Port) 9,150 gallons Ballast Tank 4W.P…………………………….. TBD Ballast Tank 2W.P…………………………….. TBD Ballast Tank 2W.S…………………………….. TBD Ballast Tank 4W.S…………………………….. TBD
The barge contractor shall prepare the “As-Built” Sounding Tables upon completion of the barge.
C170 DOCKING PLAN
A. CONTRACT DRAWING
858-B170-01 DRY DOCKING PLAN
B. DESCRIPTION OF WORK
The Government has developed a dry docking plan for the vessel. The plan was developed using the contract hull form, weight and centers of gravity estimate, contract structural drawings and other hull features that impact dry docking arrangements. Additionally, the standard dry docking blocks from the US Army Corps of Engineer’s Ensley Shipyard & Repair Facility in Memphis, TN, were used in the development of the block arrangements and loading calculations.
The plan shows all major hull structure on the bottom, all hull penetrations, all cooler void and hull cutouts, anodes, and other features which could interfere with the setting and shifting of the blocks. The plan includes the vessel’s lightship and full load weight and centers of gravity. The plan also lists the total amount of square foot coverage and the maximum load on the blocks.
The dry docking plan also includes alternate blocking arrangements to allow for the servicing of all areas of the bottom of the vessel.
The Contractor is not responsible for revising the dry docking plan. After the results of the incline experiment have been submitted to the Government, MDC shall update the dry docking…