Questions_and_Answers.pdf

PDF 56 KB Posted

Attached to
Bank Grading Unit Barge Federal contract opportunity
Solicitation number
W912EQ19B0007
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

About this file

Question and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Bank Grading Unit Barge, newest first.
File Type Posted
W912EQ19B0007_ABSTRACT-BANK_GRADING_BARGE.pdf PDF
W912EQ19B0007P00004.pdf PDF
Questions_and_Answers.pdf PDF
858-B311-01R3_TIMBERHEAD_ARRANGEMENT__DETAILS.pdf PDF
858-B685-01R4_HVAC_SYSTEM.pdf PDF
A22_W912EQ19B000700003.pdf PDF
858-B105-01R3_LINES_PLAN_-_HULL.pdf PDF
858-B245-01R4_MACHINERY_ARRANGEMENT.pdf PDF
858-B670-01R5_VENTS_FILLS__SOUNDS.pdf PDF
Seatrax_Track_Concept_-_Bank_Grader.pdf PDF
858-B445-01R5_LIFESAVING__SAFETY.pdf PDF
858-B215-01R4_GENERAL_ARRANGEMENT__OUTBOARD_PROFILE.pdf PDF
858-B115-01_WEIGHT_ESTIMATE.pdf PDF
858-B427-01_VERTICAL__INCLINED_LADDERS.pdf PDF
858-B720-01_AC_ELECTRICAL_SYSTEM_ONE_LINE.pdf PDF
858-B415-01_HATCHES.pdf PDF
858-B630-01_FUEL_OIL_SYSTEM.pdf PDF
A22_W912EQ19B000700002.pdf PDF
858-B420-01_DECK_FITTINGS.pdf PDF
858-B690-01_COMPRESSED_AIR_SYSTEM.pdf PDF
858-B730-01_LIGHTING__RECEPTACLE_PLAN.pdf PDF
858-B170-01_DOCKING_PLAN.pdf PDF
858-B425-01_WALKWAYS__GRATING.pdf PDF
858-B410-01_FENDERING__RUB_RAILS.pdf PDF
858-B710-01_AC_ELECTRICAL_LOAD_ANALYSIS.pdf PDF
858-B301-01_MIDSHIP_&_TYPICAL_SECTIONS.pdf PDF
858-B330-02_WINCH_FOUNDATION.pdf PDF
858-B310-01_WELD_SCHEDULE.pdf PDF
A22_W912EQ19B000700001.pdf PDF
858-B315-01_DECKHOUSE_STRUCTURE.pdf PDF
858-B305-01_SCANTLING_PLAN.pdf PDF
A22_W912EQ19B0007_draft.pdf PDF
A02_Drawings.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Answers to solicitation questions:

1.) Question:

Seatrax drawings #BG-1001 and BG-1002 do not provide any details on the integration of the ring, rails and components on the hull of the barge.

Can the Corps provide any details/information on the crane manufacturer’s requirements for the installation of the ring, rails and components?

Details on the crane ring, rails, and components are shown on the Track Concept (Preliminary) – Bank Grader drawing supplied by Seatrax. Seatrax will supply the all materials above the deck for mounting the crane, to include the bull gear, the ring, track, and track surface. These components will be shipped in pieces for the shipyard to install.

Seatrax technicians will be onsite to assist in the assembling of the components and to assure proper alignment of all components. The shipyard shall be responsible for providing the welding materials and personnel to rig, handle, set, and weld the components to form the ring and track for the crane.

2.) Question:

The solicitation in section C, contract Clause C540, page 39 states the contractor is responsible for:

* Assemble, erect, install, and integrate the crane and boom to the barge

* Support crane start-ups and testing

* The Contractor shall provide all equipment and supplies required to assist Seatrax in spooling the wire rope.

For bidding purposes, can the Corps provide an allotment for calendar days and/or man-hours required to accomplish the three tasks outlined above?

The contractor shall allot 120 calendar days to accomplish the three task outlined above.