AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
J 1 90
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP25R0005
X 9B. DATED (SEE ITEM 11)
13-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Comprehensive Everglades Restoration Plan (CERP) Broward County Water Preserve Areas Project, Contract 2, C-11 Impoundment and Mitigation Area A, Broward County, Florida.
NOTE: This Amendment w ill include a Stage 3 to include PLAs and w ill reopen the solicitation to be posted publicly to SAM again to allow for additional offerors outside of those w ho previously submitted to Stage 1 and Stage 2 proposals to compete. Any initial offerors submitting revised Volume I and/or Volume II proposal materials shall clearly identify and highlight all changes from their original submission.
Stage 1, Stage 2, And Stage 3 proposals are all due by 24 Nov 2025.
See continuation sheet for additional details.
All other terms and conditions remain the same.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE
DATE
24-Sep-2025
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs and pertain only to changes made by this amendment. The entire section is replaced if there is any change.
Changes to Volume 1 Specifications:
DELETE Section 00010 - SOLICITATION, OFFER, AND AWARD (SF1442) and
REPLACE with the attached revised Section 00010 - SOLICITATION, OFFER, AND AWARD (SF1442)
DELETE Section 00010A Attachment A and REPLACE with the attached revised Section 00010A Attachment A.
DELETE Section 00100A Additional Proposal Preparation/Submission Instructions and
REPLACE with the attached revised Section 00100A Additional Proposal Preparation/Submission Instructions
DELETE SECTION 00800A - WAGE DETERMINATIONS & OTHER ATTACHMENTS and
REPLACE with attached revised SECTION 00800A - WAGE DETERMINATIONS & OTHER ATTACHMENTS.
ADD provision FAR 52.222-33 NOTICE OF REQUIREMENT FOR PROJECT LABOR AGREEMENT (JAN 2024) ADD clause FAR 52.222-34 PROJECT LABOR AGREEMENT (JAN 2024)
Changes to Volume 2 Specifications:
DELETE Section 00 33 50 and REPLACE with the attached revised Section 00 33 50.
DELETE Section 01 57 20 and REPLACE with the attached revised Section 01 57 20.
2. DRAWINGS:
None.
(End of Summary of Changes)
COMPREHENSIVE EVERGLADES RESTORATION PLAN (CERP) BROWARD COUNTY WATER PRESERVE AREAS PROJECT, CONTRACT 2, C-1 1
IMPOUNDMENT AND MITIGATION AREA A, BROWARD COUNTY, FLORIDA
DESCRIPTION OF WORK: REFER TO SECTION 01 11 00 FOR COMPLETE PROJECT DESCRIPTION.
DRAWINGS: SEE DFARS CLAUSE 252.236-7001, IN SECTION 00100.
MAGNITUDE OF CONSTRUCTION IS OVER $500,000,000
THIS IS AN UNRESTRICTED, FULL AND OPEN SOLICITATION, BEST VALUE TRADE-OFF UTILIZING A BIFURCATED APPROACH. STAGE 1 PROPOSALS WERE INITIALLY DUE ON 7 MAY 2025, AND STAGE 2 PROPOSALS WERE DUE 9 MAY 2025.
WITH INCLUSION OF PROJECT LABOR AGREEMENTS (PLAs), STAGE 1, STAGE 2, AND STAGE 3 PROPOSALS ARE ALL DUE BY 24 NOV 2025 WHILE CONCURRENT BIDDABILITY, CONSTRUCTABILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY (BCOES) IS RECERTFIED.
OFFERORS ARE NOTIFIED THAT REAL ESTATE CERTIFCATION IS NOT CURRENTLY AVAILABLE SEE SF 30 CONTINUATION SHEET FOR
ADDITIONAL DETAILS.
NAICS CODE: 237990. SMALL BUSINESS SIZE STANDARD: $45,000,000.00.
A SITE VISIT AND PRE-PROPOSAL CONFERENCE WILL BE HELD (SEE FAR CLAUSE 52.236-27 IN SECTION 00100.) YOU MUST BE REGISTERED ON SAM.GOV IN ORDER TO RECEIVE AN AWARD FROM THIS SOLICITATION. THE SAM WEBSITE IS LOCATED AT
WWW.SAM.GOV.
LIGAYA M LOWE 904-232-2750
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
13-Mar-2025
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______90 calendar days and complete it w ithin ________1947 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time _________ (date).If this is a sealed bid solicitation, of f ers must be publicly opened at that time. shall be marked to show the of f eror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912EP25R0005 130
24 Nov 2025 9 May 2025
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
SECTION 00010A - LINE ITEMS & PRICING SCHEDULE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION, OFFER, AND AWARD
The required response date/time has changed from 07-May-2025 02:00 PM to 24-Nov-2025 02:00 PM.
The required performance has changed FROM: COMPREHENSIVE EVERGLADES RESTORATION PLAN
(CERP) BROWARD COUNTY WATER PRESERVE AREAS PROJECT, CONTRACT 2, C-11
IMPOUNDMENT AND MITIGATION AREA A, BROWARD COUNTY, FLORIDA
DESCRIPTION OF WORK: REFER TO SECTION 01 11 00 FOR COMPLETE PROJECT DESCRIPTION.
DRAWINGS: SEE DFARS CLAUSE 252.236-7001, IN SECTION 00100.
MAGNITUDE OF CONSTRUCTION IS OVER $500,000,000
THIS IS AN UNRESTRICTED, FULL AND OPEN SOLICITATION, BEST VALUE TRADE-OFF UTILIZING
A BIFURCATED APPROACH. STAGE 1 PROPOSALS WILL BE DUE ON 7 MAY 2025 WHILE
CONCURRENT BIDDABILITY, CONSTRUCTABILITY, OPERABILITY, ENVIRONMENTAL, AND
SUSTAINABILITY (BCOES) REVIEWS ARE BEING CONDUCTED. STAGE 2 PROPOSALS WILL BE DUE 9
MAY 2025. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO SUBMIT PROPOSALS.
NAICS CODE: 237990
SMALL BUSINESS SIZE STANDARD: $45,000,000.00.
A SITE VISIT AND PRE-PROPOSAL CONFERENCE WILL BE HELD (SEE FAR CLAUSE 52.236-27 IN
SECTION 00100.) YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM
THIS SOLICITATION. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.
TO: COMPREHENSIVE EVERGLADES RESTORATION PLAN (CERP) BROWARD COUNTY WATER
PRESERVE AREAS PROJECT, CONTRACT 2, C-11 IMPOUNDMENT AND MITIGATION AREA A,
BROWARD COUNTY, FLORIDA
DESCRIPTION OF WORK: REFER TO SECTION 01 11 00 FOR COMPLETE PROJECT DESCRIPTION.
DRAWINGS: SEE DFARS CLAUSE 252.236-7001, IN SECTION 00100.
MAGNITUDE OF CONSTRUCTION IS OVER $500,000,000
THIS IS AN UNRESTRICTED, FULL AND OPEN SOLICITATION, BEST VALUE TRADE-OFF
UTILIZING A BIFURCATED APPROACH. STAGE 1 PROPOSALS WERE INITIALLY DUE ON 7 MAY
2025, AND STAGE 2 PROPOSALS WERE DUE 9 MAY 2025. WITH INCLUSION OF PROJECT LABOR
AGREEMENTS (PLAs), STAGE 1, STAGE 2, AND STAGE 3 PROPOSALS ARE ALL DUE BY 24 NOV
2025 WHILE CONCURRENT BIDDABILITY, CONSTRUCTABILITY, OPERABILITY,
ENVIRONMENTAL, AND SUSTAINABILITY (BCOES) REVIEWS ARE BEING RECERTIFIED.
OFFERORS ARE NOTIFIED THAT REAL ESTATE CERTIFCATION IS NOT CURRENTLY
AVAILABLE SEE SF 30 CONTINUATION SHEET FOR ADDITIONAL DETAILS.
NAICS CODE: 237990.
SMALL BUSINESS SIZE STANDARD: $45,000,000.00.
A SITE VISIT AND PRE-PROPOSAL CONFERENCE WILL BE HELD (SEE FAR CLAUSE 52.236-27 IN
SECTION 00100.) YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM
THIS SOLICITATION. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.
SECTION 00100 - INSTRUCTIONS TO OFFERORS
The following have been added by full text:
52.222-33 NOTICE OF REQUIREMENT FOR PROJECT LABOR AGREEMENT (JAN 2024)
(a) Definitions. As used in this provision, the following terms are defined in clause 52.222-34, Project Labor Agreement, of this solicitation "construction," "labor organization," "large-scale construction project," and "project labor agreement."
(b) Offerors shall--
(1) Negotiate or become a party to a project labor agreement with one or more labor organizations for the term of the resulting construction contract; and
(2) Require its subcontractors to become a party to the resulting project labor agreement.
(c) The project labor agreement reached pursuant to this provision shall--
(1) Bind the Offeror and subcontractors engaged in construction on the construction project to comply with the project labor agreement;
(2) Allow the Offeror and all subcontractors to compete for contracts and subcontracts without regard to whether they are otherwise parties to collective bargaining agreements;
(3) Contain guarantees against strikes, lockouts, and similar job disruptions;
(4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising during the term of the project labor agreement;
(5) Provide other mechanisms for labor-management cooperation on matters of mutual interest and concern, including productivity, quality of work, safety, and health; and
(6) Fully conform to all statutes, regulations, Executive orders, and agency requirements.
(d) Any project labor agreement reached pursuant to this provision does not change the terms of the resulting contract or provide for any price adjustment by the Government.
(e) The Offeror shall submit to the Contracting Officer a copy of the project labor agreement with its offer.
(End of Provision)
The following have been modified:
INSTRUCTIONS TO OFFERORS
SOLICITATION PROVISIONS
A. PROPOSAL SUBMISSION
1. PROPOSAL SUBMISSION REQUIREMENTS
Stage 1, Volume I: The only authorized transmission method for a proposal in response to this solicitation is electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. Please use the following link: https://piee.eb.mil/
a. Instructions to follow on the PIEE website.
(i) Once at the PIEE website, select the Register link or the Start the registration process link. Users shall then select Vendor to register for a PIEE vendor account.
(ii) Users shall complete all registration steps, then add the necessary roles by completing the following:
• Select SOL – Solicitation from the dropdown.
• Select Proposal Manager (or Proposal View Only).
• Click Add Roles.
• Enter the CAGE Code in the Location Code field, then select Next.
• Enter justification for access and upload any necessary attachments. Then, select Next.
• Verify the information on the Registration Summary page is correct. Then, select Next.
• Review the Statement of Accountability Agreement, then select Signature.
• The Password Confirmation modal window will appear.
• Enter password created during registration.
• Click Submit Registration.
• Users will see a success message that registration was successful. Users will receive a confirmation email shortly afterwards. Once the user account has been activated by an Account Administrator, users can login into PIEE.
(iii) When completing the proposal upload, the Proposal Manager will be required to access the Solicitation Module in PIEE to search for the Solicitation Number. After entering the Solicitation Number, select Search. From the Search Results screen, the Proposal Manager will be provided with the Solicitation Number, Response Date, Description, Contracting Office Name and the Set Aside category. Clicking on the Solicitation Number link will take the Proposal Manager to a view of the Solicitation. When viewing a Solicitation, the Proposal Manager will have a tab labelled Offer on the Solicitation. Selecting the Offer tab will take the Proposal Manager to a new screen, where they will have the ability to add/post an offer by completing the following:
• Verify the Proposal Manager CAGE Code.
• Select Add Attachment to upload proposal attachments. The Proposal Manager may select Add Attachment to add more attachments, may use the up or down arrows to change the order of the attachments, and may select the X under Action to delete any Attachments improperly added.
• Once completed, the Proposal Manager will select Post Offer.
• Upon selecting Post Offer, the Proposal Manager will receive a success message that the offer was posted.
b. Any portion of the proposal that is changed (as a result of negotiations or proposal revisions) should be annotated and dated. Each volume shall be clearly labeled with its Title.
c. Each paragraph should be single spaced and shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be produced in landscape mode.
d. By submitting an offer in response to this solicitation, offerors are agreeing to comply with all terms and conditions contained in the solicitation. Unless the solicitation specifically invites the offeror to submit exceptions, the SSA may reject any offer that contains exceptions. Except for any portions of the offeror’s proposal incorporated into the resulting contract by specific reference, the terms and conditions included in the solicitation, including any amendments, shall take precedence over the offeror’s proposal. In this solicitation, the words “offer” and “proposal” are used interchangeably. (See definition of “offer” at FAR 2.101.)
e. Joint Venture Agreements. Proposals from joint ventures must include a copy of the joint venture agreement, signed by authorized representatives of all participants. Offerors are reminded that if it is an 8(a) or HUBZone joint venture, it shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively. In addition, the joint venture must be registered in the System for Award Management website (SAM.gov) as a joint venture in order for an award to be made.
f. In accordance with FAR 52.204-7, an offeror is required to be registered and active in System for Award Management website (SAM.gov) when submitting an offer and must be active before an award can be made.
2. FILE DESCRIPTION
To ensure the submission is received and processed appropriately, it is important that interested parties carefully ensure their electronic files adhere to the following naming convention: Each filename shall begin with the solicitation number, followed by the word “RESPONSE”, followed by the name of the offeror, and finally a brief file description.
EXAMPLES:
(1) “W912EP25R0005 RESPONSE [Offeror’s Name] [Volume I].pdf”
(2) “W912EP25R0005 RESPONSE [Offeror’s Name] [Volume II].pdf”
(3) W912EP25R0005 RESPONSE [Offeror’s Name] [Volume III].pdf
Volume II Proposal will be submitted via PIEE, and detailed instructions will be provided in the subsequent amendment.
If new offers will be received, all three Volumes/Stages shall be submitted by the deadline via (See Section A.
PROPOSAL SUBMISSION)
Stage 1 Volume I Required Submittal Items
Location Description Descending Order of Importance Maximum Pages
TAB A
SF1442 and Acknowledgement of
Amendments Not Rated N/A
TAB B Representations & Certifications Not Rated N/A
TAB C
JV Agreement or Teaming Agreement (if applicable). Not Rated N/A
TAB D
Factor 1 – Technical Merit
1st Most Important
Factor
Letters of
Commitment are excluded from the page count.
TAB E
Factor 2 – Past Performance
2nd Most Important Factor
No page limit
Stage 2
Volume II Required Submittal Items
LOCATION DESCRIPTION
Descending Order of Importance Maximum
Pages
TAB A
SF1442 and Acknowledgement of
Amendments Not Rated N/A
TAB B Factor 3 – Small Business Participation 3rd Most Important
Factor No page limit
TAB C Factor 4 – Price
The non-price factors, Factors 1 through 3 outlined above, when combined are approximately equal to price
No page limit
TAB D Small Business Subcontracting Plan Acceptable/
Unacceptable No page limit
TAB E
Other: Solicitation, Offer and Award Documents and Certifications and Representations Not Rated No page limit
NOTE: Pages that exceed the required page limitations will not be evaluated.
Stage 3
Volume III Required Submittal Items
LOCATION DESCRIPTION
Descending Order of Importance Maximum
Pages
TAB A
SF1442 and Acknowledgement of
Amendments Not Rated N/A
TAB B Factor 5 – Project Labor Agreement (PLA) 4th Most Important
Factor No page limit
2.PROPOSAL FILES
a. Format. Submission shall be in Adobe PDF format. Offerors shall prepare proposals in the English language. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the section for each factor.
Include a “File Description” for each file(s) uploaded. The “File Description” will be included in the email notice to each of the recipients chosen to have access the file(s). Do not enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)
b. Upload Completion and Deadline. Offerors shall submit proposals no later than the date/time specified in the solicitation. The time and date of proposal receipt will be the upload completion/delivery time and date recorded within the PIEE Solicitation Module. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process.
c. File Packaging. Offerors are limited to five maximum files per upload (total size cannot exceed 1.9 GB). If there are a large number of files, offerors may combine or ZIP files before uploading to the PIEE Solicitation Module. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
**Please note – Self extracting exe files are not acceptable.
d. Instructions to follow on the PIEE website.
(i) Once at the PIEE website, select the Register link or the Start the registration process link. Users shall then select Vendor to register for a PIEE vendor account.
(ii) Users shall complete all registration steps, then add the necessary roles by completing the following:
• Select SOL – Solicitation from the dropdown.
• Select Proposal Manager (or Proposal View Only).
• Click Add Roles.
• Enter the CAGE Code in the Location Code field, then select Next.
• Enter a justification for access and upload any necessary attachments, then, select Next.
• Verify the information on the Registration Summary page is correct. Then, select Next.
• Review the Statement of Accountability Agreement, then select Signature.
o The Password Confirmation modal window will appear.
o Enter password created during registration.
o Click Submit Registration.
• Users will see a success message that registration was successful. Users will receive a confirmation email shortly afterwards. Once the user account has been activated by an Account Administrator, users can login into PIEE.
(iii) When completing the proposal upload, the Proposal Manager will be required to access the
Solicitation Module in PIEE to search for the Solicitation Number. After entering the Solicitation Number, select Search. From the Search Results screen, the Proposal Manager will be provided with the Solicitation Number, Response Date, Description, Contracting Office Name and the Set Aside category. Clicking on the Solicitation Number link will take the Proposal Manager to a view of the Solicitation. When viewing a Solicitation, the Proposal Manager will have a tab labelled Offer on the Solicitation. Selecting the Offer tab will take the Proposal Manager to a new screen, where they will have the ability to add/post an offer by completing the following:
• Verify the Proposal Manager CAGE Code.
• Select Add Attachment to upload proposal attachments. The Proposal Manager may select Add
Attachment to add more attachments, may use the up or down arrows to change the order of the attachments, and may select the X under Action to delete any Attachments improperly added.
• Once completed, the Proposal Manager will select Post Offer.
• Upon selecting Post Offer, the Proposal Manager will receive a success message that the offer was posted.
e. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked.
B. BASIS FOR AWARD
1. Award will be made to the offeror whose proposal represents the best value to the Government, taking into consideration both non-price factors and price. The Source Selection Authority (SSA) will use a Best Value Tradeoff (BVTO) process, using a bifurcated-solicitation approach, to determine which proposal represents the best value to the Government. The Tradeoff process will consider three non-price factors that are listed in descending order of importance: (1) Technical; (2) Past Performance; and (3) Small Business Participation.
Additionally, any other than small business offeror must have an acceptable Small Business Subcontracting Plan to receive an award in accordance with FAR 19.702(a). Offerors will be cautioned that the award may not necessarily be made to the lowest priced offer. Non-priced factors (1), (2), and (3), when combined are approximately equal to price.
2. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for Factor 1, Technical (to include all elements) and Factor 3, Small Business Participation. Factor 2, Past Performance will receive a confidence assessment. The Government reserves the right to make award based upon the Cost/Price factor if the Technical, Past Performance, and Small Business Participation evaluation results of all the offerors’ proposals are substantially the same. In order to be eligible for award, a rating of no less than Acceptable is required on factors (1) and (3), and a rating of no less than Neutral Confidence is required on factor (2).
3. Factor 5 – Project Labor Agreement (PLA) - PLA will ensure the offeror has negotiated and entered into a Project Labor Agreement with one or more labor organizations and that it establishes the terms and conditions of employment this project. This PLA factor will be evaluated on an acceptable/unacceptable basis. The PLA Factor will not play a role in the tradeoff analysis discussed above, but an offeror’s PLA must be rated acceptable in order for the offeror to be eligible for award.
C. FACTORS TO BE EVALUATED
The following factors will be used to evaluate each proposal. Award will be made to the offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors described below. The submissions will be bifurcated into 2 Volumes. Each of the two Stages of the solicitation shall include the requirements for the corresponding Volume of the proposal. Finally, an Amendment to the Solicitation will include the requirements for a third Volume of the proposal.
SUBMISSION REQUIREMENTS: STAGE 1
Stage 1 of the solicitation shall include the requirements for submission of Volume I of the proposal. Volume I of the proposal shall include five Tabs, A-E, as described below:
Offerors are responsible for including sufficient details in their Stage 1 proposals, in a concise manner, to permit a complete and accurate evaluation of Volume I proposals.
TAB A STANDARD FORM (SF1442), SOLICITATIONS, OFFER, AND ACKNOWLEDGEMENT OF
AMENDMENTS.
The SF1442 shall be completed by the offeror and duly executed with an original signature by an official authorized to bind the company in accordance with instructions at FAR
4.102. Include with the offeror’s name and address in BLOCK 14 of the SF1442. Offerors shall acknowledge all amendments to the solicitation in Block 19.
TAB B CERTIFICATIONS/REPRESENTATIONS AND OTHER STATEMENTS OF OFFERORS.
This TAB shall contain Section 00101, Representations, Certifications. Offerors shall include in this TAB their completed electronic Representation and Certifications from the SAM.gov website. Since FAR Clause 52.204-7 System for Award Management is applicable to this solicitation, the offeror in accordance with FAR 52.204-8 (d) is required to complete the annual representations and certifications electronically via the SAM website accessed through https://www.sam.gov. After review the SAM database information, the offeror verified by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph ( c ) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified by the offeror under this provision.
TAB C CONTRACTOR TEAM ARRANGEMENTS
If applicable, the offerors shall provide a copy of the firm’s JV Agreement
TAB D FACTOR 1 – TECHNICAL MERIT
Technical Merit is divided into the following elements:
1. Technical Approach Plan
2. Management Plan
Element 1 – Technical Approach Plan
At a minimum, offerors shall adequately address all items (a)-(e) below.
a. Dam and Levee Embankment Construction
Describe approach for sourcing, processing (crushing-screening), testing, storage, and handling of embankment materials.
Describe approach for constructing embankment, including internal drainage features such as the chimney and blanket drain. Include specific means and methods to keep different materials separated and uncontaminated.
Describe quality control measures to be implemented to ensure embankment and drainage features meet contract requirements prior to placing successive lifts.
b. Surface and Subsurface Water management
Describe approach for addressing high groundwater depth at the site, which will impact construction and inspection of key project components.
Discuss approach for management of stormwater and dewatering with respect to shared discharge point and controlled discharge volume.
c. Cutoff Wall Construction
Describe approach for installation of cementitious slurry wall through varying geology and groundwater conditions.
Describe quality control measures to be implemented to ensure compliance with the contract specifications.
Describe approach for installation of the cutoff wall adjacent embankment chimney drainage and horizontal blanket drain. Include sequencing and specific methods for constructing these features to create the final embankment features.
d. Canal Excavation
Discuss approach for excavation of canals given the site-specific geological conditions.
Describe methods that will be used to excavate zones of harder rock materials without the use of blasting.
e. Soil-Cement Construction Describe approach for production and installation of soil-cement, including sourcing, processing, handling, and testing of materials for soil cement slope protection.
Describe quality control measures to be implemented beginning with preparation of the embankment surface and extending to final placement and testing of soil cement.
Note: The areas of work identified in paragraph (1)(a)-(e) above represent areas of particular concern to the Government. Therefore, for each such area of work, the offeror must affirmatively explain whether it intends to self-perform the work or whether it intends to subcontract the work. If the offeror intends to subcontract the work, the offeror must identify the subcontractor proposed and submit a letter of commitment from that contractor using the template in Attachment 2.
A letter of commitment is defined as a letter from a subcontractor on official company letterhead addressed to the offeror as prime contractor, identifying the work the subcontractor intends to perform, and stating that the subcontractor is willing to be bound to perform the identified work if the offeror is awarded a contract. A letter of commitment simply stating that a subcontractor commits to submit pricing to the offeror does not satisfy this requirement.
Element 2 – Management Plan
At a minimum the Management Plan shall address the three items below:
1. Provide an organization chart of the key positions. The following positions shall be included in the organization chart: Project Manager, Superintendent, Lead Geotechnical Engineer, Quality Control Manager, Site Safety and Health Officer, Data Manager, Design Engineer, and Slurry Wall Specialist in accordance with the Specifications. Offeror shall NOT submit employee resumes. The organization chart shall also include the Quality Control and Safety Teams including their relationship and reporting within the overall organization. Offeror shall provide qualifications the company proposes for each key position included. This includes required education, specialized experience, and certifications. If the offeror proposes qualifications that exceed the specifications, the offeror must clearly call out this fact in its proposal. If the offeror is awarded a contract under this solicitation, the offeror’s proposed qualifications for key positions will be incorporated into the contract.
2. Provide a detailed chart/plan for how the offeror proposes to coordinate and communicate with major subcontractors (that is, subcontractors doing work identified above in paragraphs (1)(a)-(e)) of the technical factor and with other contractors working in and around the project site.
3. Provide a detailed plan for how the contractor will ensure timely submission of acceptable-quality submittals meeting the submittal requirements in the specifications. Include procedures that will ensure quality submittals on the first submission, and a correction plan for any submittal that requires more than one round of corrections before it can be approved
TAB E FACTOR 2 - PAST PERFORMANCE
The offeror shall provide recent and relevant construction projects. There are two submission requirements for Factor 2: the Company Specialized Experience Form, and the NAVFAC/USACE Past Performance Questionnaire.
Offerors are encouraged to submit a combination of projects demonstrating experience with as many relevant characteristics as possible. Projects submitted can be performed by the Offeror’s major subcontractors that will be utilized on this contract.
First, using the Company Specialized Experience Form (Attachment 1), offerors shall provide a minimum of two, not to exceed five, examples of completed projects. In order to be considered relevant, the projects must demonstrate that the offeror and/or their major subcontractors (if applicable) have experience accomplishing the following and submitted projects must demonstrate:
a. Constructing a new dam or levee construction with a minimum height of 10 feet.
b. Managing surface and subsurface water within a construction site where the subsurface is highly permeable (defined as hydraulic conductivity of 500 feet per day or higher, and groundwater level is at or near ground surface (within 5 feet of ground surface).
c. Constructing steel sheet pile water exclusion cofferdams to facilitate excavation dewatering. The difference in water level across the cofferdam must be a minimum of eight feet. Project submitted must include dewatering design and placement of a tremie concrete seal slab as part of the water exclusion cofferdam design.
d. Constructing reinforced, cast-in-place, concrete water control structures with operable gates.
Offerors shall submit a past performance portfolio that collectively satisfies at least one example of all four key scope characteristics above. Offerors do not have to include all 4 characteristics on one project but must demonstrate at least one example of each scope characteristic (Items a to d above) on the totality of the projects submitted.
A “project” is defined as work performed at a single site under a single contract or task order. An IDIQ contract or other similar ordering vehicle is not considered a “project”; however, a single task order issued under that IDIQ or ordering vehicle may be considered a “project” under this evaluation factor.
If any offeror provides more than five projects, only the first five projects submitted in order of submission will be evaluated. No additional consideration or evaluation will be given for the remaining submissions.
If the offeror proposes to use the past performance of a major subcontractor, the proposal must clearly demonstrate that the same subcontractor will be utilized and will have meaningful involvement in the performance of the contract. Similarly, if any offeror has multiple functions or divisions, limit the project examples to those performed by the division, unit, or team member submitting the offer. If the offeror proposes to use the experience of an affiliate, the proposal must clearly demonstrate that the affiliate will have meaningful involvement in the performance of the contract. A major subcontractor is a subcontractor doing work identified above in Element 1, paragraphs (a)-(e) of the Technical Approach Plan.
NOTE: For purposes of evaluating Past Performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form (SF) 1442. If more than one contractor is listed in Block 14, then a signed joint venture agreement must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the joint venture must submit their own UEI number with the JV proposal.
The Government will consider a proposal that includes with its completed projects the past performance of a major subcontractor, as long as the proposal demonstrates that the subcontractor will have meaningful involvement in the performance of the contract. The subcontractor shall not be listed in Block 14 of the SF 1442.
If submitting a proposal as a joint venture, the experience of each joint venture partners can be submitted separately but may not exceed the maximum of five examples of completed projects. The experience of each joint venture partners can be submitted for the joint venture entity. These projects will be evaluated separately;
however, the overall evaluation for the demonstrated experience will be combined to form one overall evaluation rating for the joint venture.
Second, the offeror shall submit one NAVFAC/USACE Past Performance Questionnaire (PPQ) (Attachment 3) for each project submitted.
If the offeror is unable to obtain a completed NAVFAC/USACE PPQ from the point of contact before the proposal due date, the offeror shall complete and submit with the proposal the first page of the questionnaire (Blocks 1 –
7) that contains contract and client information for the submitted project. It is the offeror’s responsibility to ensure that the client’s point of contact information is current and correct. The client point of contact reflected in Blocks 1 – 7 should also be familiar with the past performance they are being asked to verify and informed that they will be contacted by the Government to verify past performance. If a Contractor Performance Assessment Reporting System (CPARS) record or official performance evaluation form from a non-federal entity is available for any of the projects submitted, the CPARS record or official performance evaluation form from a non-Federal entity may be submitted in lieu of the completed NAVFAC/USACE PPQ.
The Government reserves the right to review all recent past performance records available to make a confidence determination, to include other projects not submitted by the Offeror. The Government also reserves the right to review past performance of any Subcontractors or JV partners the Offeror may have submitted. Key focus areas will include the following (see PPQ Form):
• Quality
• Schedule/Timeliness of Performance
• Customer Satisfaction
• Management/Personnel/Labor
• Cost/Financial Management
• Safety/Security
In order to be RECENT, a project must have been completed, or be at least (80% or more) physically complete within the last ten (10) years from the solicitation issue date as of the date of this solicitation. If the project is less than 100% physically complete, the offeror must explain which elements of the work are completed and provide supporting documentation. Also note that the offeror may utilize different projects to demonstrate experience in each of the areas required above.
A letter of commitment (Attachment 2) shall be provided for any proposed major subcontractor for this solicitation as explained in Factor 1 and Factor 2 sections above. If any of that work is intended to be self-performed, it should be stated in the proposal.
SUBMISSION REQUIREMENTS: VOLUME 2
Volume II will be requested for submission separate from Volume I, via an amendment issued after receipt of Volume I proposals. The amendment will be issued via email only to contractors that submitted proposals for Stage
1. A Price Schedule will be included in the amendment for submission of Volume II and will be due approximately 14 days after issuance of the referenced amendment. This volume shall consist of all information required to support proposed prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award.
TAB A STANDARD FORM (SF1442), SOLICITATIONS, OFFER, AND ACKNOWLEDGEMENT OF
AMENDMENTS.
The SF1442 shall be completed by the offeror and duly executed with an original signature by an official authorized to bind the company in accordance with instructions at FAR 4.102. Include with the offeror’s name and address in BLOCK 14 of the SF1442. Offerors shall acknowledge all amendments to the solicitation in Block 19. If the offeror fails to acknowledge all amendments, the proposal (Volumes I and II) will be considered as non-compliant and will not be evaluated further.
TAB B FACTOR 3 - SMALL BUSINESS PARTICIPATION
All offerors, regardless of size status, shall address their planned small business usage for this requirement and will be evaluated on the level of proposed participation of U.S. small businesses (as a small business prime, joint venture, teaming arrangement, and/or small business subcontractors) in the performance of this acquisition relative to the objectives, requirements and goals established herein.
(1) All Offerors shall demonstrate small business participation by detailing its proposed approach to meet the requirements under the Small Business Participation factor by addressing the following areas in its Small Business Participation Commitment Document (SBPCD) (See Attachment 4):
(a) Proposed Small Business Participation Plan in performance of the potential contract (applies to both Other Than Small Businesses and Small Businesses)
(b) Commitment to Small Business
(i) Payment Procedures (applies to both Other Than Small Businesses and Small Businesses)
(ii) Compliance with Small Business Subcontracting Plans (applies to Other Than Small Businesses only)
(2) Commitment to Small Business
(a) The Offeror shall include a written statement of its established procedures to ensure timely payments to small business subcontractors in accordance with FAR 52.219-8, Utilization of Small Business Concerns (for those contracts under which it was required within the past three years from the closing date of this solicitation). If not required in any recent contracts, the Offeror shall so state.
(b) For Other than Small Businesses ONLY. Compliance with terms and conditions of FAR 52.219-9, Small Business Subcontracting Plan (if required on recent contracts). The Other than Small Business Offeror shall provide three Individual Subcontracting Reports (ISRs) for recent contracts (within the past three years from the closing date of this solicitation) that required a subcontracting plan. If not required in any recent contracts, the Offeror shall so state. If the Offeror has less than three recent contracts, the Offeror shall provide the most recent ISR for each contract it has, and state that the Offeror does not have three recent contracts.
Offerors shall also provide a statement indicating whether any negative information has been reported in the past three years concerning the Offerors’ past compliance in accordance with FAR 52.219-8. If any such negative information has been reported, the Offeror may submit explanations or comments responding to such negative information. Offerors with no prior contracts containing FAR 52.219-8 shall certify stating as such.
TAB C FACTOR 4 - PRICE
Offeror shall submit a Pricing schedule in accordance with the Standard Form 1442, Section 00010A, Line Items and Pricing Schedule. The total price for the construction will be considered for evaluation.
General Instructions. In accordance with Federal Acquisition Regulation (FAR) 15.402 and 15.403-1, certified cost or pricing data are not required based on the fact that adequate competition is expected for this procurement.
Information other than certified cost or pricing data may be provided in contractor format providing that sufficient information is made available. Information submitted shall be prepared following the instruction in FAR 15.403-5. If after receipt of proposals the Contracting Officer determines that there is insufficient information available to determine price reasonableness and none of the exceptions at FAR 15.403-1 apply, the
Offeror may be required to submit cost or pricing data. Additionally, in the event that adequate competition is not obtained, the Contracting Officer may incorporate FAR 52.215-20 entitled, “Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data,” into the solicitation and request a Certificate of Current Cost or Pricing Data. Proposal information included in this volume which is not directly related to Cost will be disregarded.
TAB D Small Business Subcontracting Plan (for other than small business offerors)
For other than small business offerors, a Small Business Subcontracting Plan shall be submitted that contains all the elements required by FAR 52.219-9 ALT II, in Section 00700. This plan shall be submitted separately from the Small Business Participation information required in Factor 3. The Small Business Subcontracting Plan is not a requirement for evaluation in source selection, but rather a requirement for award to another than small business.
The Small Business Subcontracting Plan shall be thorough and complete. The Subcontracting Plan will be incorporated into the contract upon award of the contract to the offeror, if acceptable and upon final approval of the Contracting Officer.
TAB E OTHER: SOLICITATION, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS AND
REPRESENTATIONS: VOLUME II REQUIRED SUBMITTAL ITEMS
The offeror shall submit the following as part of this volume:
a. Proposal Data Sheet (Attachment 5).
b. In accordance with FAR Clause 52.228-1, Bid Guarantee, an electronic copy of the bid guarantee shall be submitted with the offer. The electronic copy must be signed and legible.
c. Responsibility Determination (Attachment 6) along with a copy of your latest financial statements (Balance
Sheet and Income Statement). Note for Joint Ventures (JV): Only one Attachment 6 form must be submitted by the JV. However, if the JV is a new partnership (about less than 3 years old), then each member must submit an Attachment 6 form to determine responsibility of the JV.
SUBMISSION REQUIREMENTS: VOLUME 3
Stage 3 of the solicitation shall include the requirements for submission of Volume III of the…