Amendment 0011 BCWPA CNT2 C-11_Cancellation_FINAL.pdf
PDF 447 KB Posted
- Solicitation number
- W912EP25R0005
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Comprehensive Everglades Restoration Plan, Broward County Water Preserve Areas Project, Contract 2, C-11 Impoundment and Mitigation Area A, Broward County, Florida. The amendment, issued by the USA Engineer District in Jacksonville, Florida, indicates that supplemental funds originally appropriated under the Bipartisan Infrastructure Law (Public Law 117-58) for Solicitation No. W912EP25R0005 have been officially reallocated. Consequently, no alternative funding sources have been identified to facilitate this project, effectively halting the procurement process.
The amendment, dated 22-Dec-2025 with an original solicitation date of 13-Mar-2025, marks the 0011 modification to the original solicitation. The funding determination was initially based on the South Florida Ecosystem Restoration (SFER) Infrastructure Investment and Jobs Act (IIJA) Spend Plan, which was approved by the Office of Management and Budget (OMB) in February 2024. However, the reallocation of funds means that the project will not proceed as originally planned.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Comprehensive Everglades Restoration Plan, Broward County Water Preserve Areas Project, Contract 2, C-11 Impoundment and Mitigation Area A, Broward County, Florida
1. The funds assurance provided to the BCWPA, C-11, Contract 2 project were supplemental funds appropriated under the Bipartisan Infrastructure Law (BIL) (Public Law 117-58), also known as the Infrastructure Investment and Jobs Act (IIJA).The funding determination was based on the South Florida Ecosystem Restoration (SFER) IIJA Spend Plan, which was approved by the Office of Management and Budget (OMB) in February 2024. However, SAJ has received notification that the IIJA funds initially allocated to this project have been officially reallocated. Consequently, the funds that were previously designated for Solicitation No. W912EP25R0005 are no longer available. Additionally, there are no alternative funding sources identified to facilitate this project.
1. CONTRACT ID CODE PAGE OF PAGES
J
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP25R0005
X 9B. DATED (SEE ITEM 11)
13-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE
DATE:
22-Dec-2025
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
1 1
| 00010A_BCWPA_CNT2_BidSchedule_AMD0011.pdf |
| Bid Schedule |
| 01 57 20_Amd0011.pdf |
| ENVIRONMENTAL PROTECTION |
| ENVIRONMENTAL PROTECTION |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 ENVIRONMENTAL LAWS, REGULATIONS, AND DOCUMENTS |
| 1.2.1 Miscellaneous Environmental Laws and Regulations |
| 1.2.2 NEPA Reference |
| 1.3 REFERENCES |
| 1.4 QUALITY CONTROL QC |
| 1.5 PERMITS AND AUTHORIZATIONS |
| 1.6 SUBMITTALS |
| 1.7 ENVIRONMENTAL PROTECTION PLAN EPP |
| 1.8 QUALIFICATIONS |
| 1.8.1 Wetland Biologist Qualifications |
| 1.8.2 Bird Monitoring Qualifications |
| 1.8.3 Eastern Indigo Snake Observer |
| 1.8.4 Florida Bonneted Bat Qualifications |
| 1.8.5 Turbidity Monitor Qualification |
| 1.8.6 Invasive Species Management Qualifications |
| 1.9 SUBCONTRACTORS |
| 1.10 NOTIFICATION |
| 1.11 CONTRACTOR PERSONNEL QUALIFICATIONS IN POLLUTION CONTROL |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION |
| 3.1 PROTECTION OF ENVIRONMENTAL RESOURCES |
| 3.1.1 General Project Environmental Design and Installation Criteria |
| 3.1.1.1 Sewage-Based Systems Environmental Design and Installation Criteria |
| 3.1.2 Protection of Land Resources |
| 3.1.2.1 Work Area Limits |
| 3.1.2.2 Unprotected Erodible Soils |
| 3.1.2.3 Contractor Facilities and Other Work Areas |
| 3.1.2.4 Solid Wastes |
| 3.1.2.5 Fuel, Oil, and Lubricants |
| 3.1.2.6 Hazardous Waste |
| 3.1.2.7 Hazardous Materials |
| 3.1.2.8 Disposal of Other Materials |
| 3.1.3 Preservation and Recovery of Historic, Archeological, and Cultural |
| 3.1.3.1 Applicable Law |
| 3.1.3.2 Known Resources |
| 3.1.3.3 Inadvertent Discoveries |
| 3.1.3.4 Claims for Downtime due to Inadvertent Discoveries |
| 3.1.4 Protection of Water Resources |
| 3.1.4.1 Washing and Curing Water |
| 3.1.4.2 Cofferdam and Diversion Operations |
| 3.1.4.3 Stream Crossings |
| 3.1.4.4 Monitoring of Water Areas |
| 3.1.4.5 Turbidity |
| 3.1.4.6 Oil, Fuel, and Hazardous Substance Spill Prevention and Mitigation |
| 3.1.5 Protection of Fish and Wildlife Resources |
| 3.1.5.1 Listed Species Protection |
| 3.1.5.2 Protected Listed Species Sighting Reports |
| 3.1.5.3 Protected Species Summary Report |
| 3.1.5.4 Protection of Manatees |
| 3.1.5.5 Protection of Migratory Bird Species |
| 3.1.5.6 Protection of American Bald Eagle |
| 3.1.5.7 Protection of Wood Storks |
| 3.1.5.8 Protection of Everglades Snail Kites |
| 3.1.5.9 Protection of the Eastern Black Rail |
| 3.1.5.10 Protection of Crested Caracara |
| 3.1.5.11 Protection of Florida Bonneted Bat FBB |
| 3.1.5.12 Protection of Florida Panther Populations |
| 3.1.5.13 Protection of Eastern Indigo Snake Populations |
| 3.1.6 Protection of Air Resources |
| 3.1.6.1 Particulates |
| 3.1.6.2 Burning |
| 3.1.6.3 Odors |
3.1.7 Protection of Sound Intrusions
| 3.2 STORMWATER |
| 3.2.1 Construction Generic Permit CGP |
| 3.2.1.1 Stormwater Pollution Prevention Plan SWPPP |
| 3.2.1.2 Stormwater Notice of Intent for Construction Activities |
| 3.2.1.3 Record Keeping |
| 3.2.1.4 Stormwater Notice of Termination for Construction Activities |
| 3.2.2 Erosion and Sediment Control Measures |
| 3.2.2.1 Erosion Control |
| 3.2.2.2 Sediment Control |
| 3.2.3 Stormwater Management Plan |
| 3.2.4 Work Area Limits |
| 3.2.5 Contractor Facilities and Work Areas |
| 3.2.6 Municipal Separate Storm Sewer System MS4 Management |
| 3.3 POST-CONSTRUCTION CLEANUP |
| 3.4 PRESERVATION AND RESTORATION OF LANDSCAPE AND MARINE VEGETATION DAMAGES |
| 3.5 INVASIVE AND NUISANCE SPECIES |
| 3.5.1 Prevention of Invasive and Nuisance Species Transfer |
| 3.5.2 Invasive and Nuisance Species Reporting |
| 3.5.2.1 Invasive And Nuisance Species Preconstruction Report |
| 3.5.2.2 Invasive And Nuisance Species Report |
| 3.6 MAINTENANCE OF POLLUTION CONTROL FACILITIES |
| 3.7 CONSTRUCTION FORMS AND DETAILS |
| 01 52 10_Amd0011.pdf |
| CONTRACTING OFFICER'S FIELD OFFICE |
| CONTRACTING OFFICER'S FIELD OFFICE |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 SUBMITTALS |
| 1.3 EXISTING UTILITIES |
| 1.4 TEMPORARY SERVICES |
| PART 2 PRODUCTS |
| 2.1 CONTRACTING OFFICER'S FIELD OFFICE |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.1.1 Parking |
| 3.1.2 Janitorial Service |
| 3.2 AVAILABILITY AND USE OF UTILITY SERVICES |
| 3.3 PROJECT OFFICE |
| 3.3.1 Contracting Officer's Field Office Equipment |