This solicitation seeks proposals for construction services for the Central Everglades Planning Project (CEPP) Everglades Agricultural Area (EAA) A-2 Reservoir Project located in Palm Beach County, Florida. The scope of work includes constructing approximately 7.2 miles of parallel open channels and a maintenance road with benches separating the canals. Work will also include crushing, processing, and stockpiling excavated material within construction limits, as well as potentially constructing or modifying site access and haul roads. The estimated task order magnitude is $25 million to $100 million, with a performance period of 730 calendar days. Proposals will be evaluated for technical merit, past performance, small business participation, and price using best value procedures. The solicitation is seeking proposals due by an unspecified date. The Department of the Army Corps of Engineers Engineering District Jacksonville is the issuing agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Provide changes to specifications: Volume II - Technical Specifications

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP21R0024

X 9B. DATED (SEE ITEM 11)

30-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2021

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SF 30 CONTINUATION SHEET

W912EP21R0024 Amendment 0003

Central Everglades Planning Project (CEPP) Contract 10A, EAA Seepage and Inflow/Outflow Canal

Palm Beach County Florida

SUMMARY OF CHANGES

1. SPECIFICATIONS:

Text changes are in underline green lettering only and deleted text is simply removed to maintain neatness in the Line Items and Pricing Schedule. For other sections, text changes have been updated with additions noted by underlined text (green in PDF) and deletions noted by line/cross-outs (red in PDF). These text changes pertain only to changes made by this amendment.

Changes to Specifications:

Volume 2 of 2 – Technical Specifications

DELETE Submittal Register and Replace with the attached Submittal Register.

DELETE Section 01 74 19.

(End of Summary of Changes)

EAA A-2 Seepage and Inflow/Outflow Canals Palm Beach County, Florida

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 31 21 CONTROL MONUMENT DESCRIPTIONS

00 31 32 GEOTECHNICAL DATA REPORT

00 33 50 WEATHER, WATER, STAGE AND TIDE DATA

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04 CONTRACTOR QUALITY CONTROL

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 52 10 CONTRACTING OFFICER'S FIELD OFFICE

01 55 26 TRAFFIC CONTROL

01 57 20 ENVIRONMENTAL PROTECTION

01 57 25 TURBIDITY AND DISPOSAL MONITORING

01 78 02 CLOSEOUT SUBMITTALS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING GRUBBING AND DE-MUCKING

31 23 16 BLASTING AND ROCK REMOVAL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 92 23 SODDING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1 W912EP21R0024 Amendment 0003

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

Central Everglades Planning Project, (CEPP) Contract 10A, EAA

01 22 00 SD-01 Preconstruction Submittals

1.4 G ROSchedule of Values

SD-07 Certificates

3.1.1 G RORequest for Progress Payment

01 30 00 SD-01 Preconstruction Submittals

1.6.3Draft Joint Risk Register

1.6.4List of Subcontractors

1.6.5Liability Insurance Policy

SD-07 Certificates

1.7.1.2 G ROPartnering Meeting(s) Written

Synopsis

3.3Signature Authority

3.4Drug-Free Work Place Record

01 32 01 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

SD-07 Certificates

3.4.3 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 G ROExport File

01 35 26 SD-01 Preconstruction Submittals

1.7 G DOAccident Prevention Plan (APP)

1.6.1.1 G DOSite Safety and Health Officer

SD-06 Test Reports

1.4Monthly Exposure Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

01 35 26 1.4.1Monthly Qualification Summary

Report

1.12.1Mishap Notification

1.12.2 G DOAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.2 G DOCompetent Person

1.6.1.3Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G DOCritical Lift Plan

1.7.2.4 G DONaval Architecture Analysis

1.8 G DOActivity Hazard Analysis (AHA)

1.9.1 G DOConfined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

1.12.5 G DOCrane Inspection Reports

01 45 04 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-07 Certificates

3.7.2 G ROLaboratory Qualifications

3.2.2Letter of Authority

01 50 02 SD-01 Preconstruction Submittals

1.4.1 G ROMobilization/Demobilization Plan

1.4.2 G ROSecurity Plan

3.6 G ROSecurity Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

01 50 02 SD-02 Shop Drawings

2.1Contractor's Temporary Facilities

3.5Contractor's Temporary Facilities

3.2.6Temporary Electric Drawings

01 52 10 SD-02 Shop Drawings

2.1Contracting Officer's Field Office

01 55 26 SD-01 Preconstruction Submittals

1.3 G ROTraffic Control Plan

01 57 20 SD-01 Preconstruction Submittals

1.6 G DOEnvironmental Protection Plan

3.1.5.9 G DOIndigo Snake

Protection/Education Plan

SD-07 Certificates

1.7.1 G DOBird Monitoring Qualifications

1.7.2 G DOEastern Indigo Snake Observer

SD-11 Closeout Submittals

3.1.5.3 G DOProtected Species Summary

Report

3.1.5.9 G DOEastern Indigo Snake Monitoring

Report

3.1.5.4 G DOLogs/Summary Of Bird Nesting

Monitoring Report

3.4.2.1Invasive And Nuisance Species

Report

01 57 25 SD-01 Preconstruction Submittals

1.3 G DOTurbidity Monitor Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

01 57 25 SD-03 Product Data

3.1.1.1Calibration Standard

SD-06 Test Reports

3.4.2Turbidity Monitoring Reports

01 78 02 SD-02 Shop Drawings

1.3 G ROAs-Builts

1.3.1.2 G ROWorking As-Built Drawings

SD-03 Product Data

1.4.2 G ROWarranty Tags

1.6 G ROFinal Cleaning

31 00 00 SD-01 Preconstruction Submittals

1.7.1 GCanal Excavation and

Embankment Contruction Work

Plan

SD-03 Product Data

3.7.1 GEmbankments

SD-06 Test Reports

3.11 GTesting

SD-07 Certificates

1.7.3 GQuality Control Laboratory and

Field Testing Equipment

Calibration

1.7.2 GLaboratory Testing Personnel

Qualifications

31 23 16 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

31 23 16 1.8.3 G DORock Excavation Cross-Section

Survey

1.8.2.3 G DOBlasting Consultant

1.8.2.2 G DOBlasting Specialist

1.8.2.1 G DOBlaster in Charge

1.8.5 G DOBlasting Safety Plan

1.8.2.2 G DOBlasting Security Plan

1.8.2.3 G DOTest Blast Plan

1.8.3 G DOPre-Blast Survey

1.8.4 G DOMaster Blasting Plan

SD-03 Product Data

1.8.4Seismograph Equipment

2.2Lightning Detection Device

1.8.4Blasting Equipment

SD-05 Design Data

1.8.2.1 G DOIndividual Shot Plans

SD-06 Test Reports

1.8.2.3Blasting Consultant's Monthly

Report

1.8.2.2Drilling Logs

1.8.2.3Individual Shot

3.4.6Individual Vibration Monitoring

Report

3.2Test Blast

3.4.3 G DOPost Blast Report

3.4.8 G DODamage Inspection Surveys

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

31 23 16 3.4.5 G DOSeismic Monitoring

3.3.5.5 G DOVibration Exceedence

3.3.5.3 G DOBlast Vibrations

3.3.5.4 G DOVibration Records

3.4.4Post Blast Videos

SD-07 Certificates

1.8.2.2 G DOBlasting Licenses

1.8.2.5 GMagazine Keeper

1.8.2.4 G DOVibration Control Specialist

32 92 23 SD-03 Product Data

1.4.1Delivery

1.4.1Delivery Schedule

3.2.1Finished Grade and Topsoil

3.2.1Finished Grades

2.2Topsoil

3.4 G ROQuantity Check

3.7 G ROSod Establishment Period

3.7.3.4Maintenance Record

SD-06 Test Reports

3.1.4Equipment Calibration

3.1.6Soil Test

SD-07 Certificates

2.1Sod

2.2Topsoil

2.3.1Fertilizer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SF30
21R0024_EAASeppageCnt10A_Am0003_210729
New TOC.pdf
PROJECT TABLE OF CONTENTS

continue page

File details come from the government source that posted it. Updated .