B.08 W912EP21R0024 Amendment 0003.pdf
PDF 667 KB Posted
- Attached to
- Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Project
- Solicitation number
- W912EP21R0024
About this file
This solicitation seeks proposals for construction services for the Central Everglades Planning Project (CEPP) Everglades Agricultural Area (EAA) A-2 Reservoir Project located in Palm Beach County, Florida. The scope of work includes constructing approximately 7.2 miles of parallel open channels and a maintenance road with benches separating the canals. Work will also include crushing, processing, and stockpiling excavated material within construction limits, as well as potentially constructing or modifying site access and haul roads. The estimated task order magnitude is $25 million to $100 million, with a performance period of 730 calendar days. Proposals will be evaluated for technical merit, past performance, small business participation, and price using best value procedures. The solicitation is seeking proposals due by an unspecified date. The Department of the Army Corps of Engineers Engineering District Jacksonville is the issuing agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide changes to specifications: Volume II - Technical Specifications
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP21R0024
X 9B. DATED (SEE ITEM 11)
30-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jul-2021
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
W912EP21R0024 Amendment 0003
Central Everglades Planning Project (CEPP) Contract 10A, EAA Seepage and Inflow/Outflow Canal
Palm Beach County Florida
SUMMARY OF CHANGES
1. SPECIFICATIONS:
Text changes are in underline green lettering only and deleted text is simply removed to maintain neatness in the Line Items and Pricing Schedule. For other sections, text changes have been updated with additions noted by underlined text (green in PDF) and deletions noted by line/cross-outs (red in PDF). These text changes pertain only to changes made by this amendment.
Changes to Specifications:
Volume 2 of 2 – Technical Specifications
DELETE Submittal Register and Replace with the attached Submittal Register.
DELETE Section 01 74 19.
(End of Summary of Changes)
EAA A-2 Seepage and Inflow/Outflow Canals Palm Beach County, Florida
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 31 32 GEOTECHNICAL DATA REPORT
00 33 50 WEATHER, WATER, STAGE AND TIDE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 52 10 CONTRACTING OFFICER'S FIELD OFFICE
01 55 26 TRAFFIC CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
01 78 02 CLOSEOUT SUBMITTALS
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING GRUBBING AND DE-MUCKING
31 23 16 BLASTING AND ROCK REMOVAL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 92 23 SODDING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1 W912EP21R0024 Amendment 0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES
Central Everglades Planning Project, (CEPP) Contract 10A, EAA
01 22 00 SD-01 Preconstruction Submittals
1.4 G ROSchedule of Values
SD-07 Certificates
3.1.1 G RORequest for Progress Payment
01 30 00 SD-01 Preconstruction Submittals
1.6.3Draft Joint Risk Register
1.6.4List of Subcontractors
1.6.5Liability Insurance Policy
SD-07 Certificates
1.7.1.2 G ROPartnering Meeting(s) Written
Synopsis
3.3Signature Authority
3.4Drug-Free Work Place Record
01 32 01 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
SD-07 Certificates
3.4.3 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.9 G ROExport File
01 35 26 SD-01 Preconstruction Submittals
1.7 G DOAccident Prevention Plan (APP)
1.6.1.1 G DOSite Safety and Health Officer
SD-06 Test Reports
1.4Monthly Exposure Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES
01 35 26 1.4.1Monthly Qualification Summary
Report
1.12.1Mishap Notification
1.12.2 G DOAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.2 G DOCompetent Person
1.6.1.3Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G DOCritical Lift Plan
1.7.2.4 G DONaval Architecture Analysis
1.8 G DOActivity Hazard Analysis (AHA)
1.9.1 G DOConfined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.12.5 G DOCrane Inspection Reports
01 45 04 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-07 Certificates
3.7.2 G ROLaboratory Qualifications
3.2.2Letter of Authority
01 50 02 SD-01 Preconstruction Submittals
1.4.1 G ROMobilization/Demobilization Plan
1.4.2 G ROSecurity Plan
3.6 G ROSecurity Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES
01 50 02 SD-02 Shop Drawings
2.1Contractor's Temporary Facilities
3.5Contractor's Temporary Facilities
3.2.6Temporary Electric Drawings
01 52 10 SD-02 Shop Drawings
2.1Contracting Officer's Field Office
01 55 26 SD-01 Preconstruction Submittals
1.3 G ROTraffic Control Plan
01 57 20 SD-01 Preconstruction Submittals
1.6 G DOEnvironmental Protection Plan
3.1.5.9 G DOIndigo Snake
Protection/Education Plan
SD-07 Certificates
1.7.1 G DOBird Monitoring Qualifications
1.7.2 G DOEastern Indigo Snake Observer
SD-11 Closeout Submittals
3.1.5.3 G DOProtected Species Summary
Report
3.1.5.9 G DOEastern Indigo Snake Monitoring
Report
3.1.5.4 G DOLogs/Summary Of Bird Nesting
Monitoring Report
3.4.2.1Invasive And Nuisance Species
Report
01 57 25 SD-01 Preconstruction Submittals
1.3 G DOTurbidity Monitor Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES
01 57 25 SD-03 Product Data
3.1.1.1Calibration Standard
SD-06 Test Reports
3.4.2Turbidity Monitoring Reports
01 78 02 SD-02 Shop Drawings
1.3 G ROAs-Builts
1.3.1.2 G ROWorking As-Built Drawings
SD-03 Product Data
1.4.2 G ROWarranty Tags
1.6 G ROFinal Cleaning
31 00 00 SD-01 Preconstruction Submittals
1.7.1 GCanal Excavation and
Embankment Contruction Work
Plan
SD-03 Product Data
3.7.1 GEmbankments
SD-06 Test Reports
3.11 GTesting
SD-07 Certificates
1.7.3 GQuality Control Laboratory and
Field Testing Equipment
Calibration
1.7.2 GLaboratory Testing Personnel
Qualifications
31 23 16 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES
31 23 16 1.8.3 G DORock Excavation Cross-Section
Survey
1.8.2.3 G DOBlasting Consultant
1.8.2.2 G DOBlasting Specialist
1.8.2.1 G DOBlaster in Charge
1.8.5 G DOBlasting Safety Plan
1.8.2.2 G DOBlasting Security Plan
1.8.2.3 G DOTest Blast Plan
1.8.3 G DOPre-Blast Survey
1.8.4 G DOMaster Blasting Plan
SD-03 Product Data
1.8.4Seismograph Equipment
2.2Lightning Detection Device
1.8.4Blasting Equipment
SD-05 Design Data
1.8.2.1 G DOIndividual Shot Plans
SD-06 Test Reports
1.8.2.3Blasting Consultant's Monthly
Report
1.8.2.2Drilling Logs
1.8.2.3Individual Shot
3.4.6Individual Vibration Monitoring
Report
3.2Test Blast
3.4.3 G DOPost Blast Report
3.4.8 G DODamage Inspection Surveys
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES
31 23 16 3.4.5 G DOSeismic Monitoring
3.3.5.5 G DOVibration Exceedence
3.3.5.3 G DOBlast Vibrations
3.3.5.4 G DOVibration Records
3.4.4Post Blast Videos
SD-07 Certificates
1.8.2.2 G DOBlasting Licenses
1.8.2.5 GMagazine Keeper
1.8.2.4 G DOVibration Control Specialist
32 92 23 SD-03 Product Data
1.4.1Delivery
1.4.1Delivery Schedule
3.2.1Finished Grade and Topsoil
3.2.1Finished Grades
2.2Topsoil
3.4 G ROQuantity Check
3.7 G ROSod Establishment Period
3.7.3.4Maintenance Record
SD-06 Test Reports
3.1.4Equipment Calibration
3.1.6Soil Test
SD-07 Certificates
2.1Sod
2.2Topsoil
2.3.1Fertilizer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
| SF30 |
| 21R0024_EAASeppageCnt10A_Am0003_210729 |
| New TOC.pdf |
| PROJECT TABLE OF CONTENTS |
continue page